Sie sind auf Seite 1von 4

Multichannel vertical – one sided (20)

Select horiz rail first


then vertical second
Ensure that all options are
completed as required

Multichannel verticals – two sided (22)

Select horiz rail first then lower


vertical second and upper Ensure that all options are
vertical third then middle click completed as required
Diagonal tie wire ropes (15)

Ensure that select switches are set as above > set view to Ctrl 4 and shift 2.

Pick the top bolt first – this procedure will create 2 separate diagonal wires

Where vertical multichannels are being used

add another bolt 100mm from the standard connection.

Select this bolt second

and then middle click Select this bolt second

and then middle click


Panel Joint at Column (11)
Model the PJR vertical members to the required lengths and in the correct plan locations.

Create 2 points at each end of the PJR (in this example 90mm from each end) pick the PJR first then
pick the column and finally pick the point created earlier.

The default application for this component will apply a single Metlcon cleat but this can be altered to
a flat in the dialog box as shown below.
Panel Joint Rail at Mid-Span (21)
Model the PJR vertical members to the required lengths and in the correct plan locations at mid-
span or at a specified plan position.

Select the horizontal rail as the main part first, then select the PJR and finally middle click and the
component will apply the correct cleats and bolts to suit the locations chosen.