Date :07.10.2019 Client: TANVI TECHSOLUTIONS & L& T CONSTRUCTION Doc.No.: 1097/01
1.5 M
Chd : HM Project:PCSCL Subject: CANTILEVER
POLE DBR
Date :07.10.2019 Rev: 0
CONTENTS
Sr Sub Page
Item Description
No section nos
1 Introduction 1
I Structure Description 1
II Material Data 1
2 References 1
3 Loads & Load combinations 2
I Dead Load 2
II Live Load 2
III Wind Load 2
IV Earthquake Load 2
V Primary Load Cases 2
VI Load Combinations 3
4 Design Philosophy 3
5 Analysis & Design 4
6 Check for Overturning 5
7 Design Of Pedestal 5
8 Design of Base plate
9 STAAD File
This document is property of GEC it should not be copied or disclosed without obtaining specific approval from GEC
Project
By : HK GOMA ENGG & CONSULTANCY No:
1097
Date :07.10.2019 Client: TANVI TECHSOLUTIONS & L& T CONSTRUCTION Doc.No.: 1097/01
1.5 M
Chd : HM Project:PCSCL Subject: CANTILEVER
POLE DBR
Date :07.10.2019 Rev: 0
1. Introduction
This document mainly covers Introduction of structure, geometry & loading applied on
structure, analysis methods adopted, design philosophy and reference taken etc.
Project is mainly known as “1.5M CANTILEVER POLE ”. The project site is located near
Ahmedabad, Gujarat
I. Building description
2. References
The design & drawings are developed on the basis of the standard codes and documents and
specified codes used are mention below:
This document is property of GEC it should not be copied or disclosed without obtaining specific approval from GEC
Project
By : HK GOMA ENGG & CONSULTANCY No:
1097
Date :07.10.2019 Client: TANVI TECHSOLUTIONS & L& T CONSTRUCTION Doc.No.: 1097/01
1.5 M
Chd : HM Project:PCSCL Subject: CANTILEVER
POLE DBR
Date :07.10.2019 Rev: 0
This section deals with the loads & load combination adopted for the analysis & design of
structure is mentioned below:
Structure is designed for basic wind speed of 39 m/s in accordance with IS: 875(Part-
3).
Pole structure is critical towards wind as the structure is light weighed so earthquake
analysis not done.
Dead Load:- DL
Wind Load:- WL (X) in X direction
WL (Z) in Z direction
V. Load Combinations
4. Design Philosophy
Generally structure is analysed as frame structure using Staad Pro for the loads and
load combinations mentioned in section 3.0.
This document is property of GEC it should not be copied or disclosed without obtaining specific approval from GEC
Project
By : HK GOMA ENGG & CONSULTANCY No:
1097
Date :07.10.2019 Client: TANVI TECHSOLUTIONS & L& T CONSTRUCTION Doc.No.: 1097/01
1.5 M
Chd : HM Project:PCSCL Subject: CANTILEVER
POLE DBR
Date :07.10.2019 Rev: 0
All design of RCC members is carried out by Limit state method as per IS:
456-2000.
All design of Steel structures is carried out as per IS: 800-2007 by Limit stated
method.
Columns are designed as a Fixed based connection to footings.
For foundation design net allowable bearing pressure at 2.0 mtr depth from
N.G.L is adopted as 150 kN/M2.
WIND DETAILS
a) Basic Wind Speed 42 m/sec as per IS 875 (Part 3) – 2015
This document is property of GEC it should not be copied or disclosed without obtaining specific approval from GEC
Project
By : HK GOMA ENGG & CONSULTANCY No:
1097
Date :07.10.2019 Client: TANVI TECHSOLUTIONS & L& T CONSTRUCTION Doc.No.: 1097/01
1.5 M
Chd : HM Project:PCSCL Subject: CANTILEVER
POLE DBR
Date :07.10.2019 Rev: 0
8. Design of Pedestal
Providing min reinforcement = 0.15 % of gross cross section
Required reinforcement area = 0.15X 650 X 650/100 = 634 mm2
Dia of Bar Used = 12 mm
No. of Bar required = 6 no.
Providing reinforcement = 678 mm2> 634 mm2
Provide 8 mm dia stirrup @ 175 mm c/c
This document is property of GEC it should not be copied or disclosed without obtaining specific approval from GEC