Sie sind auf Seite 1von 10

Md Naushad

Site Engineer (Civil)

Contact Me Summary
+91-8287854926 A Civil Engineer with more than 2 Years
naushadmd208@gmail GULF Experience in Saudia Arabia and 4
.com years India experience. Overall 6 years
Dwarka,Uttam nagar experience In-plant construction work
delhi,India includes construction of oil and gas
processing plants their upgrade and
naushadmohamm revamp, refinery plants.Mataintance
ad8@gmail.com work,Overhead powerline,Cathoid
@naushadmd5 Protection, Underground cable
laying,Workshop,Marl pad making and
Key Responsibilities Compaction,Pole and steel cage
Handled:- installation,concretting and Curring
Building construction work includes
Planning and Execution construction ofOffice and commercial
of works as per design buildings, clinics, school, dining halls,
& drawing. support shop buildings, and security
gates. Excavated work like Trench
Preparation of daily, Excavation,seewages,column foundation
weekly, monthly, and Underground utilities. In India in
reports on work infrastructure like Road,Bridge High rise
buildings, Industrial Building design,
progress (key                  Workshop, Control center, etc
        performance .Knowledge of Bar Bending
indicator) & evaluating Schedules(BBS) construction
as per the planned methods,Layout and construction
schedules. sequences in civil structural
constructions above or below the
Maintaining quality ground.
standards for all
structural works. Education

Institute of civil Engineer (BSAP)


Supervise all excavated
mar-2014 - Dec-2016
area and Barricades for
Bachelor of Engineer (B.E) Civil.
safety Purpose.
Practical and Project in RSPL
(Multystorey Building) in Gujrat and Delhi.
Installation of
pole,steel
cages,Overhead Institute of civil engineer (BSAP)
powerline and may 2011 - Dec-2013
Transformer. Diploma (Civil)
Practical &Project (Commerical
Inside Plant to make building)in Hindustan Prefab Limited
column Foundation (HPL) Delhi.
,Trench Excavation,  Matric (10th ) from C.B.S.E Board in the
Beams and Building year 2008. 
Structure as per
drawings. Work Permit Receiver (ARAMCO)  in
Saudia Arabia.
Maintenance the Inside
and Outside work of
the Plant. Experience

Mastoura &Trading Contracting.Co


(MTCC) Saudia Arabia
Preparation of bar March-2017 - July-2019
bending schedule, Site Engineer
B.O.Q’s, sub contractor Planning and Execution of works as per
bills and    etc., design & drawing.

Supervision of the Preparation of daily, weekly, monthly,


working labour to reports on work progress (key                   
ensure strict       performance indicator) & evaluating
conformance to as per the planned schedules.
methods, quality and
safety. Maintaining quality standards for all
structural works.
Execute steel as per
approved structural Supervise all excavated area and
design. Barricades for safety Purpose.

Study of the related Installation of pole,steel cages,Overhead


documents such as powerline and Transformer.
drawings, Electrical
drawings, plans etc., Inside Plant to make column,C.p
Foundation ,Trench Excavation,  Beams
Checking the quality of and Building Structure as per drawings.
RCC works such as
foundations, columns, Maintenance the Inside and Outside work
beams, walls and slabs of the Plant.
etc.
Supervision of the working labour to
 Coordinating the ensure strict conformance to methods,
strength of grade as quality and safety.
per the requirements. Execute steel as per approved structural
design.
 Attending the client
meeting regarding the Study of the related documents such as
status of work. drawings, Electrical drawings, plans etc.,

 Explains the work and Checking the quality of RCC works such
Study of assembly as foundations, columns, beams, walls
drawings to the new and slabs etc.
comers.
 Coordinating the strength of grade as
 Checking the Quality per the requirements.
of concrete strengths
regarding the grade, 7  Attending the client meeting regarding
days and 28 days test. the status of work.

Checking the Quality of  Explains the work and Study of


steel and grade of assembly drawings to the new comers.
concrete as per
structural requirement,  Checking the Quality of concrete
diameter shape, and strengths regarding the grade, 7 days
cement. and 28 days test.

 Checking the defects Checking the Quality of steel and grade


like porosity, slag, of concrete as per structural
excess penetration, air requirement, diameter shape, and
cracks etc.  cement.

 Preparation of Running  Checking the defects like porosity, slag,


Account bills. excess penetration, air cracks

 Proper management of materials and


workmanship
 Proper management
of materials and  Arrangement of materials, labor, etc...
workmanship
 Coordination with sub-contractors for
 Arrangement of the smooth flow of work.
materials, labor, etc...
 Conversant with architectural and
 Coordination with sub- structural drawings.
contractors for the
smooth flow of work.   Making productivity Reports and
analyzing.
 Conversant with
architectural and  Daily updating of coasting sheets for the
structural drawings. project.

  Making productivity  Monthly reconciliation of the materials.


Reports and analyzing.

Kanwar Enterprises Pvt.Ltd (KEPL)


 Daily updating of
April-2014 - Dec-2016
coasting sheets for the
Site Supervisor
project.
Planning and Execution of works as per
design & drawing.
 Monthly reconciliation
of the materials.
Preparation of daily, weekly, monthly,
reports on work progress (key                   
      performance indicator) & evaluating
as per the planned schedules.

Maintaining quality standards for all


structural works.
Other Info Preparation of bar bending schedule,
B.O.Q’s, sub contractor bills and    etc.,
Technical Skills
Experience in Basic use
Supervision of the working labour to
of computers.
ensure strict conformance to methods,
quality and safety.
 AutoCAD 2D And 3D
Max. 
Execute steel as per approved structural
design.
  Excel,M S
Office,PowerPoint &
Study of the related documents such as
Tally.
drawings, Electrical drawings, plans etc.,

 Internet Savvy.
Checking the quality of RCC works such
as foundations, columns, beams, walls
 Data Entry.
and slabs etc.

Languages
 Coordinating the strength of grade as
English,Hindi &Urdu
per the requirements.
Interest
Reading News Paper &  Explains the work and Study of
Travelling. assembly drawings to the new comers.

Personal  Checking the Quality of concrete


Information strengths regarding the grade, 7 days
Father's Name : Sk and 28 days test.
Abbas Ali
Mother's Name : Checking the Quality of steel and grade
Jamirun Nesha of concrete as per structural
requirement, diameter shape, and
cement.
Nationality : Indian
Religion : Islam  Checking the defects like porosity, slag,
Passport No. : excess penetration, air cracks etc. 
N6922293
passport Expiry: Jun  Preparation of Running Account bills.
2026
 Proper management of materials and
Birth Date workmanship
24/Feb/1993
 Arrangement of materials, labor, etc...
Declaration
I hope you will find that  Coordination with sub-contractors for
I am qualified for the the smooth flow of work.
position you are trying
to fill. Please let me   Making productivity Reports and
know, If I can provide analyzing.
you with any further
information on my
background and
qualifications. I Macro Developers Private limited.
appreciate your taking 2013 - 2014
the time to review my Site Supervisor
credentials and Planning and Execution of works as per
experience. Again, design & drawing.
thank you for your
consideration. Preparation of daily, weekly, monthly,
Experience in basic. reports on work progress (key                   
      performance indicator) & evaluating
as per the planned schedules.

Supervision of the working labour to


ensure strict conformance to methods,
quality and safety.

  Making productivity Reports and


analyzing.

 Daily updating of coasting sheets for the


project.

Projects

ARAMCO PROJECT
2011 - 2021
Sub-Station,Buildings &Maintance Work.
Saudi Aramco Project Management is
responsible for delivering Saudi
Aramco's capital projects safely, on
schedule, within budget, and to the
highest standards of integrity.

Buildings

Building construction work includes


construction of:
Office and commercial buildings, clinics,
schools, laboratories, dining halls,
support shop buildings, and security
gates.
Highrise buildings having more than 12
floors, iconic landmarks/buildings, and
hospitals.

2. Residential Housing

Residential housing construction work


includes construction of residential
housing compounds. The definition of a
residential compound is a complex of
community villas (250 villas minimum),
and associated community utilities and
services such as: schools, community
buildings, and parks.

3. In-Plant

In-plant construction work includes


construction of oil and gas processing
plants their upgrade and revamp, refinery
plants, petrochemical plants, plant
utilities (water, nitrogen, air, and steam),
power generation, and bulk plants and
storage tanks.

RSPL (Goverment Project).


2009 - 2016
Excavation & Multystorey Building.

Design of building component


Formwork design
Staircase design
Deep Beams
Slabs
Excavation, Layout and Foundation
Column Casting
Slab, Beam, Shuttering and Casting
Important Components in Building
Construction
Key in Columns
Expansion joint
Water bar
Binding materials.

Email: naushadmd208@gmail.com