Beruflich Dokumente
Kultur Dokumente
7) Facilities, tools
5) Design review
Commitment
Mat- No.: Drw. No. Version No. Supplier Supplier-No.
9) Emergency plan
10) Test / control plan for prototype parts
Rev.01
15) Process development / process
freeze
16) P - FMEA
17) Measurement system analysis and
test equipment capability
442221750.xlsx
21) Photo of Seriestool (if applicable)
Rev.01
General Part Status RYG
442221750.xlsx
Supplier Advanced Product Quality Planning Melecs EWS GmbH
Version: Date:
Part No.(Melecs);
Part No. (Supplier) Customer SOP date;
Application;
Part name;
Product Type;
Project
APQP elements - requirements/evidence see project audit lists GYR- Target date Actual Responsible Comme
Status date
1) Set the source / customer order 2/ Feb/ 17 1/ Feb/ 17
2) Customer requirements
3) Contract review/Feasibility Commitment
4) Product / Design FMEA
5) Design review
6) Quality planning @ subsupplier
7) Facilities, tools
8) Test methods, test equipment
9) Emergency plan
10) Test / control plan for prototype parts
11) Production and testing of prototype parts
12) Drawings / specifications (design freeze)
13) Process flow diagram and series layout
14) Logistics- / supply- / packaging concept
15) Process development / process freeze
16) P - FMEA
17) Measurement system analysis and test equipment capability
18) Design Validation@customer Level (Melecs)
19) Prelaunch control plan
created/changed: Domokos A./ EWS SQM 02.03.2017 442221750.xlsx
checked/released:Krammer L./ EWS SQM 02.03.2017
Supplier Advanced Product Quality Planning Melecs EWS GmbH
Version: Date:
Part No.(Melecs);
Part No. (Supplier) Customer SOP date;
Application;
Part name;
Product Type;
Project
Phone Ext.
Comments
Comments
Comments
ity plan
Status
open
closed
in process