Sie sind auf Seite 1von 1

TIE BEAM

8PCS- 20MM Ø DEF BARS;


500mm STIRRUPS Ø= 10MM;
STIRRUPS SPACING= 1 @
PEDESTAL 50MM, REST @200MM
O.C TO C.L 100MM THK SLAB tw bf tf
WITH 10MM Ø DEF. BARS
SLAB ON GRADE EQUALLY SPACED
BOTHWAYS @ 400MM O.C
NGL
100MM GRAVEL BED

x
PEDESTAL
16PCS- 25MM Ø DEF BARS;
STIRRUPS Ø= 10MM;
(MINIMUM)

STIRRUPS SPACING= 175MM


2000mm

USE: 25 MM Ø DEF BARS


EQUALLY x
SPACED BOTHWAYS
COMBINED FOOTING/ @ +/- 250MM O.C
MAT FOUNDATION

600mm
bf x

tf
4" THK GRAVEL BED

D
x

tf
STRUCTURAL NOTES (FOUNDATION):
tw
1.) FOOTINGS WERE DESIGNED USING AN ALLOWABLE SOIL BEARING CAPACITY OF 100 KPA (2089 PSF) AT DEPTHS INDICATED IN x
THE DRAWINGS. CONFIRMATION OF ACTUAL SOIL BEARING CAPACITY SHALL BE DONE PRIOR TO CONSTRUCTION OF FOUNDATION
INCREASE IN FOUNDATION SIZE SHALL BE DONE WHEN ACTUAL SOIL BEARING CAPACITY, CONFIRMED DURING EXCAVATIONS,
WARRANTS REVISION OF FOUNDATION SIZES.

2.) WHERE, LOOSE/SOFT MATERIAL IS ENCOUNTERED AT DEPTH OF FOOTING/ FOUNDATION INDICATED, EXCAVATE TO FIRM
LAYER AND REPLACE LOOSE/SOFT MATERIALS UNDERNEATH THE FOOTING WITHIN THE FOOTING AREA PLUS 21 DEPTH OF SOIL
MATERIAL ON ALL SIDE WITH SELECTED BACKFILL, COMPACT SELECTED BACKFILL TO 95% MAXIMUM DRY DENSITY (ASTM 01557) x
3.) ALL COLUMN FOOTINGS SHALL REST ON 50MM THK COMPACTED GRAVEL BASE COURSE, UNLESS OTHERWISE STATED.

4.) FILL/BACKFILL SHALL BE PLACED IN 200MM LAYERS AND EACH LAYER SHALL BE COMPACTED TO 95% MAXIMUM DRY DENSITY
BEFORE SUBSEQUENT LAYERS ARE TO BE LAND.

x
500mm STEEL COLUMN
(SEE DETAILS)
6PCS- 181" Ø A307
ANCHOR BOLT;
LENGTH = 16" (400mm)
(DIA. OF HOLE = 11/4" Ø)
500mm

x
(VERIFY ARCH'L DESIGN)

500mm X 500mm
STEEL COLUMN X 25mm MS BASE
(SEE DETAILS) PLATE (20" X 20" X 1")
400 mm

6PCS- 118" Ø A307


D bf
3"

ANCHOR BOLT;
LENGTH = 16" (400mm)
3" 3" FFL (DIA. OF HOLE = 11/4" Ø) tw x

tf
D
bf

PEDESTAL

tf tw
a/ C2a b/ C2b x