Presented By : Raj Shah(140120106104) Submitted to Prof Ankita Shah • INTRODUCTION
• S.O.R is the list of rates of various items of work.
• To facilitate the preparation of estimates , and also to
serve as guide in setting rates in connection with contract agreements.
• It is maintained in the form of printed books known as
schedule of Rates ( S.O.R ). • It consists of group of items such as excavation items , concrete items , demolition items , plumbing items , electrification works etc.
• S.O.R is prepared by Central Public Works Department
(CPWD) which is premier construction organization of Government of India.
• The S.O.R consists rates about 2500-3000 items under
different subheads like Building work , Water supply , Sanitary etc. • S.O.R OF LABOURS
• Various category of labors /artisans are required for
construction. The rates may vary from place to place. Sr no. Type of labors Rates ( per day ) 1 Mistry 400 2 Mason 300 3 Male labor 200 4 Female labor 180 5 Carpenter 300 6 Blacksmith 300 7 Painter 250 8 White Washer 200 9 Plumber 300 10 Watch Man 200 • S.O.R OF WORKERS Description Rates per day Driller 460 Assistant Driller 378 Special Heavy labor for driving 460 sheet pile Water meter Reader 336 Helper for Rig 321 Electrician with 336 “C” Certificate Electrician 588 Electrician with ITI and “C” 563 Certificate Electrician with ITI with “B” 504 certificate Electrician with ITI 460 Pump operator with ITI 460 Pump operator without ITI 460 Laboratory attender SSLC / 10th Std Passed 321 Filter bed operator 563 Filter Bed operator with ITI 460 Filter Bed operator without ITI 391 Carpenter Class 1 475 Carpenter Class 2 444 Cleaner Group1 259 Cleaner Group 2 245 Filter 1 class 438 Filter 2 class 409 Floor Polisher 382 ORIGINAL S.O.R OF MACHINERY ORIGINAL S.O.R OF LABORS