SHEET : 1 OF: 12

TEST REPORT FOR OVER CURRENT & EARTH FAULT


PAGE :
RELAY
DATE : 29.01.2018
Client :
Project :

1. Location : MVC-1

Feeder Name : SPARE-2

2. Name plate details:

Make Schneider electrical


Type / Model no P143
Sl. No. 36151878/01/12
CT Ratio 100/1A

TESTED BY WITNESSED BY
SHEET : 2 OF: 12
TEST REPORT FOR OVER CURRENT & EARTH FAULT
PAGE :
RELAY
DATE : 29.01.2018
Client :
Project :

PT Ratio 6600/110v

3. Measurement:

CURRENT
Measured Current(A)
Ref Injected Current(A)
R Y B N
R 1.0 100 0 0 100
Y 1.0 0 99.98 0 99.98
B 1.0 0 0 99.71 99.71
RYB 1.0 99.99 99.95 99.76 0
TESTED BY WITNESSED BY
SHEET : 3 OF: 12
TEST REPORT FOR OVER CURRENT & EARTH FAULT
PAGE :
RELAY
DATE : 29.01.2018
Client :
Project :

VOLTAGE
Measured Voltage(V)
Ref Applied Voltage (V)
RN YN BN
3808 3802 3804
RYB 110.0 RY YB BR
6594 6591 6593

4. Secondary injection test:

4.1 OVER CURRENT


TESTED BY WITNESSED BY
SHEET : 4 OF: 12
TEST REPORT FOR OVER CURRENT & EARTH FAULT
PAGE :
RELAY
DATE : 29.01.2018
Client :
Project :

I>1 NON DIR IEC V INVERSE I>1 SET-0.4A TMS – 0.45


Injected Current (A) Operated Time (s)
REF Pickup (A)
*2 *5 *2 *5
R 0.60 0.8 2.0
Y 0.60 0.8 2.0 6.12 1.53
B 0.60 0.8 2.0
CALCULATED TIME 6.075 1.519

I>3 NON DIRECTIONAL SET -11.0A TIME : 50ms

TESTED BY WITNESSED BY
SHEET : 5 OF: 12
TEST REPORT FOR OVER CURRENT & EARTH FAULT
PAGE :
RELAY
DATE : 29.01.2018
Client :
Project :

REF Operating current (A) Operating Time (ms)


R 11.0
Y 11.0 77.3
B 11.0

4.2 EARTH FAULT


IN1>1 NON DIR IEC S INVERSE I>1 SET-0.1A TMS – 0.1
Injected Current (A) Operated Time (s)
REF
*2 *5 *2 *5
N 0.2 0.5 1.04 0.443
CALCULATED TIME 1.002 0.428
TESTED BY WITNESSED BY
SHEET : 6 OF: 12
TEST REPORT FOR OVER CURRENT & EARTH FAULT
PAGE :
RELAY
DATE : 29.01.2018
Client :
Project :

IN1>2 NON DIRECTIONAL SET -1.0A TIME : 50ms


REF Operating current (A) Operating Time (ms)
N 1.01 92.0

IN1>3 DIRECTIONAL SET -0.5A TIME : 10ms ANGLE : -45DEGREE


REF Applied Voltage (V) Operating current (A) Operating Time (ms)
R – 10.0
N Y – 63.5 0.51 (45 to 224) 34.0
B – 63.5

TESTED BY WITNESSED BY
SHEET : 7 OF: 12
TEST REPORT FOR OVER CURRENT & EARTH FAULT
PAGE :
RELAY
DATE : 29.01.2018
Client :
Project :

4.3 UNDER VOLTAGE

V<1 DT SET -99.0 V TIME : 2.0 s


REF Operating Voltage (V) Operating Time (s)
R 57.1
Y 57.1 2.02
B 57.1

V<2 DT SET -94.0 V TIME : 1.0 s


REF Operating Voltage (V) Operating Time (s)
R 54.2 1.02
TESTED BY WITNESSED BY
SHEET : 8 OF: 12
TEST REPORT FOR OVER CURRENT & EARTH FAULT
PAGE :
RELAY
DATE : 29.01.2018
Client :
Project :

Y 54.2
B 54.2

4.4 OVER VOLTAGE

V>1 DT SET -121.0 V TIME : 2.0 s


REF Operating Voltage (V) Operating Time (s)
R 69.9 2.03
TESTED BY WITNESSED BY
SHEET : 9 OF: 12
TEST REPORT FOR OVER CURRENT & EARTH FAULT
PAGE :
RELAY
DATE : 29.01.2018
Client :
Project :

Y 69.9
B 69.9

V>2 DT SET -143.0 V TIME : 1.0 s


REF Operating Voltage (V) Operating Time (s)
R 82.6
Y 82.6 1.04
B 82.6

4.5 RESIDUAL OVER VOLTAGE

TESTED BY WITNESSED BY
SHEET : 10 OF:
12
TEST REPORT FOR OVER CURRENT & EARTH FAULT
RELAY PAGE :

DATE : 29.01.2018
Client :
Project :

VN>1 DT SET -4.0 V TIME : 2.0 s


REF Operating Voltage (V) Operating Time (s)
R 67.8
Y 63.51 2.04
B 63.51

VN>2 DT SET -5.0 V TIME : 1.0 s


REF Operating Voltage (V) Operating Time (s)
R 68.6
Y 63.51 1.06
B 63.51
TESTED BY WITNESSED BY
SHEET : 11 OF:
12
TEST REPORT FOR OVER CURRENT & EARTH FAULT
RELAY PAGE :

DATE : 29.01.2018
Client :
Project :

4.6 CB FAIL ALARAM CHECKED OK.

4.6 SUPERVISION
REF Pickup Voltage (V) Status
R 33.0
Y 63.5 5.0 s ALARAM CHECKED OK
B 63.51

5. Comments : Nill.

TESTED BY WITNESSED BY
SHEET : 12 OF:
12
TEST REPORT FOR OVER CURRENT & EARTH FAULT
RELAY PAGE :

DATE : 29.01.2018
Client :
Project :

6. Result : Relay found healthy.