SI No Footing Type of Work Bar Dia Length of No of bar quantity, Total

Type (mm) bar, m in each (no's) Quantity


work (no's)

1 F1 Main bar 16 2.6 28 4 112


2 F2 Main bar 16 3 34 1 34
3 F3 Main bar 16 3.05 42 2 84
4 F4 Main bar 16 3.20 42 1 42
5 F5 Main bar 16 3.80 50 1 50
6 0 2.24 52 1 52

Total

Total
eel 32 460.10 Kg
25 161.16 Kg
20 404.80 Kg
12 #VALUE! Kg
Total Length Unit Wt, Kg/m Total Weight, Wastage, Kg Actual Weight , in ton
(m) Kg Kg

291.2 1.58 460.10 460.10 0.46


102 1.58 161.16 161.16 0.16
256.2 1.58 404.80 404.80 0.40
134.40 1.58 212.35 212.35 0.21
190.00 1.58 300.20 300.20 0.30
116.59 input bar Dia at D input bar Dia at input bar Dia at
column D column D column
1538.60 1538.60 1.54
SI No Type of Work Bar Dia Length of No of bar quantity, Total
(mm) bar, m in each (no's) Quantity
work (no's)

1 Main bar (upto 6.5 m) 20 6.5 13 1 13


2 Main bar (upto 14.5 m) 16 8.64 2 1 2
3 Main bar (upto 40m) 16 35.42 8 1 8
4 tie (upto 6.5 m) 12 2.24 34 1 34
5 tie (6.5-14.5 m) 12 2.24 28 1 28
6 tie (14.5-40 m) 12 2.24 52 1 52
Total

Total

20 219.15 Kg
16 498.76 Kg
12 238.85 Kg
Total Length Unit Wt, Kg/m Total Weight, Actual Weight in ton
(m) Kg (add wastage
5%), Kg

84.5 2.47 208.72 219.15 0.22


17.28 1.58 27.30 28.67 0.03
283.36 1.58 447.71 470.09 0.47
76.23 0.89 67.84 71.24 0.07
62.78 0.89 55.87 58.67 0.06
116.59 0.89 103.76 108.95 0.11
911.20 956.76 0.96
SI No Type of Type Ratio Work details
Work Cement Send Stone/brick Lentgh Width (ft) Thickness Quantity
chips (ft) (ft) (no's)

1 Pile P1 1.0 1.5 3.0 54.13 0.98 0.98 10.00


2 Pile P2 1.0 1.5 3.0 49.21 0.98 0.98 28.00
3 Pile P3 1.0 1.5 3.0 54.13 1.31 1.31 38.00
4
5
6
7
Total
Total Reinforce Actual Wet Material Requirement Actual Material Requirement (add
Volume ment Vol. Concrete Volume Cement Cement Send (cft) Stone/brick Cement Cement
(CFT) (CFT) Vol. (cft) (CFT) (cft) Bag(s) chips (cft) (cft) Bag(s)

524.42 13.63 510.79 766.18 139.31 111.44 208.96 417.92 146.27 117.02
1334.89 33.37 1301.52 1952.28 354.96 283.97 532.44 1064.88 372.71 298.17
3540.70 70.81 3469.89 5204.83 946.33 757.07 1419.50 2839.00 993.65 794.92

1440.60 1152.48 2160.90 4321.79 1512.63 1210.10


Material Requirement (add 5%)
Send (cft) Stone/bri
ck chips
(cft)

219.41 438.81
559.06 1118.12
1490.47 2980.95

2268.94 4537.88
SI No Type of Type Ratio Work details
Work Cement Send Stone/brick Lentgh Width (ft) Thickness Quantity
chips (ft) (ft) (no's)

1 Pile P1 1.0 1.5 3.0 54.13 0.98 0.98 10.00


2 Pile P2 1.0 1.5 3.0 49.21 0.98 0.98 28.00
3 Pile P3 1.0 1.5 3.0 54.13 1.31 1.31 38.00
4
5
6
7
Total
Total Reinforce Actual Wet Material Requirement Actual Material Requirement (add
Volume ment Vol. Concrete Volume Cement Cement Send (cft) Stone/brick Cement Cement
(CFT) (CFT) Vol. (cft) (CFT) (cft) Bag(s) chips (cft) (cft) Bag(s)

524.42 1048.84 -524.42 -786.63 -143.02 -114.42 -214.54 -429.07 -150.18 -120.14
1334.89 33.37 1301.52 1952.28 354.96 283.97 532.44 1064.88 372.71 298.17
3540.70 70.81 3469.89 5204.83 946.33 757.07 1419.50 2839.00 993.65 794.92

1158.27 926.61 1737.40 3474.80 1216.18 972.94


Material Requirement (add 5%)
Send (cft) Stone/bri
ck chips
(cft)

-225.26 -450.53
559.06 1118.12
1490.47 2980.95

1824.27 3648.54
steel unit weight= 7850 kg/m3 490 lb./ft.3

Reinforcement SIZE THEORETICAL WEIGHT

(Diameter) mm KG/M KG/Ft


6 0.222 0.067
8 0.395 0.12
10 0.62 0.188
12 0.89 0.27
14 1.21 0.367
16 1.58 0.48
18 2 0.6067
20 2.47 0.751
22 2.98 0.904
25 3.85 1.174
28 4.83
32 6.31 1.925
40 9.87
SI No Type of Work Bar Dia Length of No of bar quantity, Total
(mm) bar, m in each (no's) Quantity
work (no's)

1 Main bar (upto 6.5 m) 28 8.5 26 1 26


2 Main bar (upto 14.5 m) 25 9.47 16 1 16
3 Main bar (upto 40m) 20 28.3 10 1 10
4 tie (upto 6.5 m) 16 2.87 45 1 45
5 tie (6.5-14.5 m) 12 2.87 26 1 26
6 tie (14.5-40 m) 12 2.87 52 1 52
Total

28
25 2246.13 Kg
20 741.01 Kg
16 227.52 Kg
12 213.58 Kg
Total Length Unit Wt, Kg/m Total Weight, Wastage Actual Weight in ton
(m) Kg (add wastage
5%), Kg

221 4.83 1067.43 439.50 1506.93 1.51


151.52 3.85 583.35 155.85 739.20 0.74
283 2.47 699.01 42.00 741.01 0.74
129.17 1.58 204.08 23.44 227.52 0.23
74.63 0.89 66.42 8.32 74.74 0.07
149.26 0.89 132.84 6.00 138.84 0.14
2753.13 3428.24 3.43
SI No Type of Work Bar Dia Length of No of bar quantity, Total
(mm) bar, m in each (no's) Quantity
work (no's)

1 Main bar (upto 6.5 m) 20 6.5 10 1 10


2 Main bar (upto 14.5 m) 20 15.3 2 1 2
3 Main bar (upto 40m) 20 42.4 8 1 8
4 tie (upto 6.5 m) 16 2.87 34 1 34
5 tie (6.5-14.5 m) 12 2.87 28 1 28
6 tie (14.5-40 m) 12 2.87 52 1 52
Total

Total

20 1127.65 Kg
16 161.91 Kg
12 214.59 Kg
Total Length Unit Wt, Kg/m Total Weight, Actual Weight in ton
(m) Kg (add wastage
5%), Kg

65 2.47 160.55 168.58 0.17


30.6 2.47 75.58 79.36 0.08
339.2 2.47 837.82 879.72 0.88
97.59 1.58 154.20 161.91 0.16
80.37 0.89 71.53 75.11 0.08
149.26 0.89 132.84 139.48 0.14