cA International
owe 3441 nod 8 Can 2 Ook 1212, ann
Tet ean.) Sot zr, 82, b 108
mah bae ine
Ref NRECA/UREDS; DCSD/W.O1B12017.095 Se 03, 2017
Gopal Gosh
Matager Project Installation
Siemens Lid
Laila Tower ( & 8 Float)
‘Gulshan Avenue
Gulshan
Dhaka 1212
Refs EM MSP/REB Lot3 & S013 GG, Dated 2810872017
Subjects Civil Material est Report from BURT.
Dear Me. Gos,
NRECA Intemational Lid, Supervision & Management Consultant for BREB's UREDS; DCSD Project
(Consultan), reviewed the Material Test Repodts from BUET in response to our request made to BUEY via
NRECAJUREDS; DCSD/W-018/2017-087, Dated: 25/03/2017 for testing the construction material o be used
‘om all subsiation sites o be eonstvucted by Siemens uider UREDS; DCSD project that was submited by you
via the above mentioned reFrenced lle,
Alle Reports submitted as listed on you letter asatached are acceptable in accordance withthe specifications
except the Reinforcing M.S. Bar fom dhe manufacturer HKG Ispat. The BUET Repo indicates that material
presente fils short othe Diameter Tessin many eases. Thercfoe, you cannot use the M.S. Bar from HKG
spat on this project.
Dest Regards
Sincerely,
e)ob/ 2017
Alta Hussain, P. Eng.
Projet Manager
[NECA Intemational (Constant)
UREDS; DCSD Project,
Dik
Astachnents
1. Siemens letter referenced above
ce: |
1. Prost Director UREDS; DCSD, BREB
2. Fileofe
arenes
Energy Management
SIEMENS
‘Ntotion : Project manager -UREDS, DESO Projet
ERS rons Prats
RECA ternational
Howse 8, (Fao), Roa 9,
{alan 2, hy hak
‘sienna cn
‘us t-02 boev826 ‘earn
Smal sheaves nt org ends MME la sae
‘Rural Eecvicly Transmission & Distribution Project
‘Contact no, : BREBIUREDS-W.018-009 and 005, dated 2" February 2047 Up-araation of Rural Elestiity
Distbution Sysiom:; Dhaka, Chilagona & Syne Division (UREDS;0¢8D) Project of BREB under the Rural
Electricity Transmission and Olstibutlon 18D) Project of IDA.
‘Subject: Submission of civil Materials Test Report rom BUET,
(Bosument Transm e. [oF3
Dear Sk,
\We take roerence to your leer NRECAUREDS: DCSMN'01872017-037 We
received fom Bangladesh Univeral Of Enineetng and teetnology —( BUET)
Fepors are as foows
submit the test reports
elas of el materi est
Sen
5° | tems Description Name of Company Test To be Caries out
a Ha, ERM, Arr eat BTS |
Iopat
nixon wstar |i) MSarcOMMoia 2) MS ox | 2) Bin
ee ou (3)NS Be mmo | 3} Tens Song
(as ta tom a4) MS
1 xine
‘Ue Teak Arr Cement Sven Re
Neral araieray
12 | coment ‘Cement Freeh Coan & remse 2) iil & ral tostiog
___| Serene ‘orc 5}_ Compressing Seng Test
13 | Sion Gis onngiaed eon Sy 1) Agrepate Grin Va
0 | ek ci Na (Leet Made) 1) Aggagte Crashing Vave
05 | Set Sand NAC EREZS) 1). ness Mode
(06 | twa Sena 1), neess Moss
07 | eocks (che)
3) Compressing Seog
2} Waar sbeoren
5} Untwote|
“Thanking you and assuring our est atletion at altimes, we remain
Yous tanta,
siebeys ae
se
‘Mathgor Project instalation
Restited
IRECEIV™
16 may 2007
/NRECA Inernatinal i.