Sie sind auf Seite 1von 2
cA International owe 3441 nod 8 Can 2 Ook 1212, ann Tet ean.) Sot zr, 82, b 108 mah bae ine Ref NRECA/UREDS; DCSD/W.O1B12017.095 Se 03, 2017 Gopal Gosh Matager Project Installation Siemens Lid Laila Tower ( & 8 Float) ‘Gulshan Avenue Gulshan Dhaka 1212 Refs EM MSP/REB Lot3 & S013 GG, Dated 2810872017 Subjects Civil Material est Report from BURT. Dear Me. Gos, NRECA Intemational Lid, Supervision & Management Consultant for BREB's UREDS; DCSD Project (Consultan), reviewed the Material Test Repodts from BUET in response to our request made to BUEY via NRECAJUREDS; DCSD/W-018/2017-087, Dated: 25/03/2017 for testing the construction material o be used ‘om all subsiation sites o be eonstvucted by Siemens uider UREDS; DCSD project that was submited by you via the above mentioned reFrenced lle, Alle Reports submitted as listed on you letter asatached are acceptable in accordance withthe specifications except the Reinforcing M.S. Bar fom dhe manufacturer HKG Ispat. The BUET Repo indicates that material presente fils short othe Diameter Tessin many eases. Thercfoe, you cannot use the M.S. Bar from HKG spat on this project. Dest Regards Sincerely, e)ob/ 2017 Alta Hussain, P. Eng. Projet Manager [NECA Intemational (Constant) UREDS; DCSD Project, Dik Astachnents 1. Siemens letter referenced above ce: | 1. Prost Director UREDS; DCSD, BREB 2. File ofe arenes Energy Management SIEMENS ‘Ntotion : Project manager -UREDS, DESO Projet ERS rons Prats RECA ternational Howse 8, (Fao), Roa 9, {alan 2, hy hak ‘sienna cn ‘us t-02 boev826 ‘earn Smal sheaves nt org ends MME la sae ‘Rural Eecvicly Transmission & Distribution Project ‘Contact no, : BREBIUREDS-W.018-009 and 005, dated 2" February 2047 Up-araation of Rural Elestiity Distbution Sysiom:; Dhaka, Chilagona & Syne Division (UREDS;0¢8D) Project of BREB under the Rural Electricity Transmission and Olstibutlon 18D) Project of IDA. ‘Subject: Submission of civil Materials Test Report rom BUET, (Bosument Transm e. [oF3 Dear Sk, \We take roerence to your leer NRECAUREDS: DCSMN'01872017-037 We received fom Bangladesh Univeral Of Enineetng and teetnology —( BUET) Fepors are as foows submit the test reports elas of el materi est Sen 5° | tems Description Name of Company Test To be Caries out a Ha, ERM, Arr eat BTS | Iopat nixon wstar |i) MSarcOMMoia 2) MS ox | 2) Bin ee ou (3)NS Be mmo | 3} Tens Song (as ta tom a4) MS 1 xine ‘Ue Teak Arr Cement Sven Re Neral araieray 12 | coment ‘Cement Freeh Coan & remse 2) iil & ral tostiog ___| Serene ‘orc 5}_ Compressing Seng Test 13 | Sion Gis onngiaed eon Sy 1) Agrepate Grin Va 0 | ek ci Na (Leet Made) 1) Aggagte Crashing Vave 05 | Set Sand NAC EREZS) 1). ness Mode (06 | twa Sena 1), neess Moss 07 | eocks (che) 3) Compressing Seog 2} Waar sbeoren 5} Untwote| “Thanking you and assuring our est atletion at altimes, we remain Yous tanta, siebeys ae se ‘Mathgor Project instalation Restited IRECEIV™ 16 may 2007 /NRECA Inernatinal i.

Das könnte Ihnen auch gefallen