Trench Excavation Safety-Major Building -Ordinary Foundations-Safety Rails-Ladders
Excavation Safety for Major Building Project-Raft Foundation-Safety Rails-Ladders Excavation Safety-Benching-Well Point Dewatering-Major Building-Clay Soil-Safety Rails-Ladders Excavation Safety-Benching-Sump to Manhole Dewatering-Major Sandy Soil-Safety Rails-Ladders Support to Existing Building Surcharge during excavation-Safety Guard Rails Working Platform-Multy Storey Building-Metals Stepped Stairs-Scaffolding On Firm Base Scaffolding Working Platform With Safety Shade Scaffolding-Supports-Column Forms on Slab Scaffolding Supports-Concrete Pouring Platform Embankment Around Radioactive Compound Scaffolding-High Rise Building- From Various Levels to Various levels Tower Crane Location for Major Building High Rise-Tower Cranes Booms Striking Clash to be avoided A General Hospital Buildings Complex Layout Hospital Buildings-Over Head Tower Crane Locations, Without Striking Each Other-Covering Full Covered Area Scope Scaffolding Requirements Indicated By Numbers Notations-Depending on Numbers of Levels/Stories, scaffolds are required Pipe Racks Bases/Foundations- Cast In Situ-All safety precautions required for Excavation, Access, Pumping/pouring, Low level working- When Precast-yard safety, Handling safety during transportation Light Poles Foundation-Both Yard safety & Transportation & offloading safety adherence required Below Ground Sum Chamber RCC-Excavation Safety, Dewatering-Formwork safety-Rebars safety-Scaffolding-Pouring-Test-Backfill RCC Pre Cast Heavy Covers for Manholes- Handling & Transportation Safety Vessels Bases Grouting By Construction Chemicals-Complete safety from Chemicals Heavy Compressors Table Top/RCC-Excavation safety, Dewatering if required, Foundation Massive Block, (Form & rebars+Pouring), Thick Columns & then Table Top-All structural safety activities/measures required Seawater Reservoir/Basin for purpose to circulate cooling water to various hot working machines-RCC structures- Excavations-Mass foundation, Thick walls-Pump rooms- water filling more than 12 M-testing-external Backfill LNG Tanks 10000Cum Capacity PSC Containment Structure-Tank Wall Cryogenic Steel Metal Structure-Activities for safety indicated on sketch-Safety essential for activities as follows: 1. Deep Excavation 2. Dewatering 3. Loose soil removal 4. Imported Fill Laying Granular Materials + Heavy Machine Compaction Over 5. Blinding Concrete 6. Raft Foundation 7. RCC wall circular in plan 50M High Structure+ Cupola Above 8. Movement Temporary Metal Stairs 9. Cupola Fabrication & Lifting by Compressed air to 50 M height 10. Pouring RCC on Cupola + Raised Cantilever platform at that height 11. Pre-stressing 12. Post tension Grouting around tendons 13. Epoxy coating on Containment concrete 14. Above ground protection on internal surface of concrete Traffic diversion of road for infrastructural services activities Road signs-Speed limits-Traffic in sequence/2 halves-one finished first & then other followed Safety 1. Concrete sleepers 2. Warning Cones 3. Diversions 4. Flags men 5. Reflecting lights Suspended Slab Supporting System for pouring above Concrete 1. Chances of Collapse during concrete pouring, if design of system ignored. 2. Propriety system is used 3. Complete supports design analysis is essential 4. Check Loads, Bending Moments, Shear Force & Deflection 5. Obtain Vendor’s system fitness certificate Organisation Chart SHE