Sie sind auf Seite 1von 1

Item Maintenance Penstock

Unit Road
STA 17+0.00
Grubbing m 7.7 8.3
STA ip23 Maintenance Penstock
Soil excavation m² 1.0 19.8 Maintenance Penstock STA 18+20.00 Item Unit Road

1:0
Item Unit Road
Rock excavation m² 0.0 0.0 Grubbing m 14.0 14.5

.5
Grubbing m 13.1 13.2

1:0
Slope protection m 0.0 1.0 Soil excavation m² 23.6 67.1

.5
Soil excavation m² 33.1 54.7
Banking m² 1.9 0.0 Rock excavation m² 0.0 32.2

1:0
Rock excavation 0.0 25.7 Penstock Maintenance Road
Backfilling m² 0.0 10.9 Penstock Slope protection m 10.9 9.9

1:0

.5
CL Maintenance Road Slope protection m 9.9 13.0 CL

1:0
Penstock CL

.5
Maintenance Road Sand bed m² 0.0 1.5 Banking m² 0.0 0.0
CL m²

.5
CL 0.0 0.0

1:0
CL Banking
Backfilling m² 0.0 10.7

.5
Backfilling m² 0.0 10.7
B Sand bed m² 0.0 1.5

1:0

1:0
Sand bed m² 0.0 1.5

1:0

1:0

.5

.5
.5

.5
1:0
Slope 2% EL734.000

.5
0.719

1:0
Slope 2% EL734.000

.5

1:0.3
.5

0.718
1:0

Slope 2% EL735.191

1:0

1:0.3
0.636

1:0.3
.5
EL732.100

1:0.3
.5

1:0.3

1:0
EL732.100 GRP Pipe Φ2.6m
1:0.3

EL733.279 GRP Pipe Φ2.6m PVC perforated pipe Φ 0.1m


GRP Pipe Φ2.6m PVC perforated pipe Φ 0.1m
PVC perforated pipe Φ 0.1m

STA 17+60.00 Item Maintenance Penstock


Unit Road
Grubbing m 14.4 19.0
Soil excavation m² 29.4 82.6
Rock excavation m² 0.0 41.8

1:0
Slope protection m 10.1 12.7
Maintenance Penstock

.5
Banking m² 0.0 0.0 STA 18+0.00 Item Unit Road
Backfilling m² 0.0 10.7 Grubbing m 10.1 16.4
STA 16+80.00 Maintenance Penstock

1:0
Item Unit Road
Sand bed m² 0.0 1.5 Soil excavation m² 18.2 57.6

.5
Grubbing m 8.9 7.7 Rock excavation m² 0.0 21.0
Soil excavation m² 1.1 22.4 Slope protection m 5.8 12.9
Penstock
Rock excavation m² 0.0 0.0 Banking m² 0.0 0.0

1:0
1:0
Penstock CL
Maintenance Road m 0.0 0.7 Maintenance Road

.5
CL Slope protection

.5
Backfilling m² 0.0 10.7

1:0
CL CL
m² 3.6 0.0

.5
Banking Sand bed m² 0.0 1.5

1:0
Backfilling m² 0.0 10.9 Penstock
Maintenance Road

.5
CL

1:0
Sand bed m² 0.0 1.5 CL

1:0
1:0

.5

.5
1:
Slope 2% EL736.343 2.0
.5
1:0

Slope 2% EL734.000
0.750

0.723

.5
B
.5

1:0.3

1:0.3

1:0

1:0
1:0.3

1:0.3

1:0
EL734.414 EL732.100

.5
GRP Pipe Φ2.6m

.5
PVC perforated pipe Φ 0.1m GRP Pipe Φ2.6m
PVC perforated pipe Φ 0.1m Slope 2% EL734.000

0.718

.5
1:0.3

1:0
1:0.3
EL732.100
GRP Pipe Φ2.6m
PVC perforated pipe Φ 0.1m

STA 17+40.00 Item Maintenance Penstock


Unit Road
Grubbing m 23.1 11.7
Soil excavation m² 92.1 53.0
Maintenance Penstock Rock excavation m² 52.5 89.3
STA ip22 Item Unit Road
Grubbing m 7.4 7.7 Road Excavation boundary
Slope protection m 14.7 9.0 STA 17+80.00 Item Maintenance Penstock
Unit Road
Banking m² 0.0 0.0 Grubbing m 10.6 11.4
Soil excavation m² 6.1 25.6
Backfilling m² 0.0 10.7
1:0

Rock excavation m² 0.0 0.0 Soil excavation m² 29.6 45.1


.5

Sand bed m² 0.0 1.5 Rock excavation m² 0.0 17.7


Slope protection m 1.4 1.0
Penstock Penstock Maintenance Road Slope protection m 6.8 10.0
Maintenance Road Banking m² 0.0 0.0 CL CL
1:0

CL CL Banking m² 0.0 0.0


1:0
Backfilling m² 0.0 12.4
.5

Sand bed m² 0.0 1.5 .5 Backfilling m² 0.0 10.7


B Sand bed m² 0.0 1.5
1:0

Penstock
1:0

1:0 Maintenance Road

1:0
.5
1:0

Slope 2% EL736.697 CL
.5

CL
.5
0.654

.5
.5
.5
.5

1:0.3

1:0
1:0
1:0.3

EL734.764
GRP Pipe Φ2.6m

1:0
PVC perforated pipe Φ 0.1m

1:0
1:0

1:0

.5

.5

.5
1:0
.5

.5

Slope 2% EL734.000

.5
0.719
Slope 2% EL734.000

1:0
0.723

1:0.3
1:0.3
1:0.3
1:0.3

EL732.100
EL732.100 GRP Pipe Φ2.6m
GRP Pipe Φ2.6m PVC perforated pipe Φ 0.1m
PVC perforated pipe Φ 0.1m

Maintenance Penstock
0 4 8 12 16 20 m
STA 17+20.00 Item Unit Road
STA 16+60.00 Item Unit
Maintenance Penstock
Road Grubbing m 14.4 9.0 S = 1 : 400
Grubbing m 7.8 7.6 Soil excavation m² 44.4 46.7
Soil excavation m² 8.7 26.4 Rock excavation m² 0.6 31.7 OWNER PT. CITRA MULTI ENERGI, JAKARTA, INDONESIA
Rock excavation m² 0.0 0.0 Penstock Slope protection m 11.6 8.4 TOYO ENERGY FARM CO., LTD, TOKYO, JAPAN
Penstock Maintenance Road
Maintenance Road Slope protection m 2.2 1.0 CL CL m²
CL CL Banking 0.0 0.0 DESIGN
CHODAI CO.,LTD, TOKYO, JAPAN
1:0

Banking m² 0.0 0.0 m² 0.0 10.7 CONSULTANT


Backfilling
.5

1:0

Backfilling m² 0.0 11.1 K m² PROJECT


.5

Sand bed 0.0 1.5 SION HYDRO POWER PROJECT


Sand bed m² 0.0 1.5 HUMBANG HASUNDUTAN - SUMATERA UTARA
1:0

1:0

1:0
.5
1:0

Slope 2% EL737.497 DRAWING TITLE


.5

.5

WATERWAY & MAINTENANCE ROAD


.5
0.782

.5
.5

1:0
1:0.3

1:0

Slope 2% EL734.000 CROSS-SECTIONS (STA 16+60.00 ~ STA 18+20.00)


1:0.3

0.723

EL735.536
1:0.3

Sheet 10/13
1:0.3

GRP Pipe Φ2.6m EL732.100


PVC perforated pipe Φ 0.1m GRP Pipe Φ2.6m SCALE 1:400 DATE : 15/09/2017
PVC perforated pipe Φ 0.1m Designed
Checked Y. Oyama DRAWING NO. DC-UP-032-A
Approved H. Takase

Das könnte Ihnen auch gefallen