LOWER PENGANGA INTEGRATED MICRO IRRIGATION PROJECT

Sl. Description
No.
A Design discharge
i Area : 1587.78 ha
ii Designed discharge per ha. : 0.52 lps/ha
iii Design discharge : 825.65 lps
B Total head requirement at Pumphouse
1 Salient levels :
G.L. at pumping point : 241.000 mtr
L.W.L at pumping point : 237.180 mtr

2.i At Farmer Outlet(Sub-Block)


Operating Head Requirement for Drip Irrigation system : 10.00 mtr
Head losses in sub mainlines within the outlet (Assumed) : 1.00 mtr
Head losses in lateral lines within the outlet (Assumed) : 1.00 mtr
Head Losses in the secondary filter at outlet (Assumed) : 2.00 mtr
Head loss provision for Sprinkler Irrigation system (operating head is 5 Mtr.) : 5.00 mtr
other losses (unforeseen) : 0.41 mtr
2.ii At Block Outlet (20HA)
Min. head required at sub block level for operation of Micro irrigation system : 19.41 mtr
Head losses in main pipeline, valves & fittings with in outlet (Calculated) : 6.21 mtr
Total Head Requirement at outlet (20HA) : 25.62 mtr
3 Head required at Pump House: :
Suction/delivery : 4.00 mtr
Primary Filtration Losses : 5.00 mtr
Secondary Filtration Losses at 100 ha Zone level : 5.00 mtr
Losses in Distribution network (Main line loss + Operating head + difference in elevation) : 38.00 mtr
i.e. head required for keeping minimum 30 mtr head at each outlet

Pump house manifold fittings losses : 3.00 mtr


Losses in valves (Sluice, NRV, Hydraulic valves) : 3.00 mtr
other losses (unforeseen) : 1.00 mtr
Total Head required at Jackwell for pumping block I : 59.00 mtr
C Selection / Design of pump
Design discharge of pumping Block I (Q) : 825.65 lps
Design pump head of pumping Block I (H) : 54.00 mts
Pump Capacity (H.P) : Q x H x 1.1 / (75 x Ov. eff.)
Pump Efficiency : 85%
Motor Efficiency : 80%
Overall efficiency (Pump efficiency x motor efficiency) : 68%
Overloading considered : 10%
H. P. - Calculated : 1050.68 H. P.
No of Pump Units : 4.00 No
Capacity of each Pump Unit Calculated : 262.67 H. P.
Total Power Calculated for each Pump Unit : 195.95 KW
Rounded to available motor, Say Total Power Required for each : 200.00 KW
Pump Unit
Total Power Required : 800.00 KW
Total H. P. - Provided : 1072.00 H. P.
No of Pump Units Provided : 4.00 No
No of Stand-By Pump Units Provided : 4.00 No
Capacity of each Provided Pump Unit 270.00 H. P.
Pump type : Submersible Pump
Note: Refer Pump manufacturers chart for 1072.00 HP of Pump to suit design discharge of 825.65 lps &
Provide 270.0 HP x 4.0 Nos of Submersible Pumps for the discharge of 206.41 lps & Total 59.0 Mtr. Head
Each.

You created this PDF from an application that is not licensed to print to novaPDF printer (http://www.novapdf.com)
LOWER PENGANGA INTEGRATED MICRO IRRIGATION PROJECT
Salient features of pump at jackwell
Design discharge of Pump block (Q) 0.82565 cumecs
Design Head of Pump block (H) 59.00 mtr
Designed Pumps Capacity (calculated) 1050.68 HP
Capacity of each Pumps unit (calculated) 262.67 HP
No. of Pump units porvided 4 No.s
No. of Stand-By Pump porvided 4 No.s
Proposed total pumps capacity 1072.00 HP
Proposed each pump capacity 270.00 HP
Pump Discharge 0.2064 cumecs
Pump Head 59.00 mtr

Design of Delivery Pipes 
Discharge of Each Pumps (Q)= 0.2064 cumecs
Velocity in the delivery pipe shall be less than 2.50 m / Sec
Hence considering velocity as 2.30 m/sec.
Velocity (V) = 2.30 m/sec

Area (A) = Q/V=0.2064/2.30


= 0.0897 m²
Diameter of pipe required (d) = = Sq.rt ( 4 x A / π )

Diameter of pipe required (d) = 0.30 mtr


Say 0.40 mtr
It is proposed to install 0.40 mtr diameter, 10 mm thick of delivery pipes

Design of Manifold Pipe 
Total Discharge of all the pumps (Q)= 0.82565 cumecs
Velocity in the manifold pipe shall be less than 2.00 m/sec.
Hence considering velocity as 1.50 m/sec.
Velocity (V) = 1.50 m/sec
Area (A) = Q/V=0.82565/1.50
= 0.550 m²
Diameter of pipe required (d) = = Sq.rt ( 4 x A / π )
Diameter of pipe required (d) = 0.741 mtr
Say 1.00 mtr
It is proposed to install 1.00 mtr diameter,10 mm thick of Manifold pipe

Dimensions of Pump House


Total Discharge of all the pumps (Q) =
Min. Retention time in the sump is assumed as 3.00 minutes.
Assumed Dimensions of pump house are 13m x 6.5m x3.80m
Volume of pump hose up to FSL = 13x 6.5 x 3.80 = 321.10 m3
Retention time in the sump = (321.10 / 0.82565)/ 60 = 6.48 minutes.