Question: Perform rate analysis for internal plastering 15mm thick in CM 1:4 including
sca olding
rate analysis of construction work (/t/rate analysis of construction work/) • 1.6k views
Consider 100m²
³
30
= ( × 1.5) + 1.5 = 1.95m
100
³
20
= ( × 1.95) + 1.95 = 1.95m
100
Cement Quantity = ³
2.34
= 0.468m
(1+4)
https://www.ques10.com/p/30700/perform-rate-analysis-for-internal-plastering-15mm/ 1/4
10/10/2019 Perform rate analysis for internal plastering 15mm thick in CM 1:4 including scaffolding
Rate per m³ ²
24922.48
= = Rs.249.22/m
100
Recommended
(https://play.google.com/store/apps/details?id=com.ques10)
https://www.ques10.com/p/30700/perform-rate-analysis-for-internal-plastering-15mm/ 2/4
10/10/2019 Perform rate analysis for internal plastering 15mm thick in CM 1:4 including scaffolding
(market://details?
id=com.ques10&utm_source=global_co&utm_medium=prtnr&utm_content=Mar2515&utm_campaign=PartBadge&pcampaignid=MKT-
Other-global-all-co-prtnr-py-PartBadge-Mar2515-1)
https://www.ques10.com/p/30700/perform-rate-analysis-for-internal-plastering-15mm/ 3/4
10/10/2019 Perform rate analysis for internal plastering 15mm thick in CM 1:4 including scaffolding
https://www.ques10.com/p/30700/perform-rate-analysis-for-internal-plastering-15mm/ 4/4