I. PRELIMINARIES
Mobilization/ Demobilization lot 1.00
Temporary Facilities(BY THE OWNER) lot 1.00
Building Permits (LEGWORK ONLY)
As-built Drawings(by designer)
V. Plastering
wall sqm. 260.00 180.00
Corner Edge Lm. 40.00 80.00
8,000.00 8,000.00
- -
-
-
-
5,000.00 1,800.00 1,800.00 6,800.00
-
-
-
-
1,500.00 250.00 750.00 2,250.00
-
-
-
46,800.00 250.00 65,000.00 111,800.00
3,200.00 150.00 6,000.00 9,200.00
-
147,680.00
111,921.00
259,601.00
8,000.00
267,601.00
40,140.15
307,741.15