Urban Fit-out Construction and Development Corp. Coordination Meeting Minutes No.

001
General Contractor 4 Storey Office/ Commercial Building with LG and PH
Date : 26 February 2019, Tuesday
Time : 9:00AM
Venue : Almar Holding Corp. Office

Attendees:
1. JONATHAN ONG ALMAR HOLDING 6. ENGR. JOONEE PATRICK DIZON URBAN Fitout
CORP.
2. MICHAEL ONG ALMAR HOLDING
CORP.
3. JOY DY SUN ALMAR HOLDING
CORP.
4. ARCH. CHARLES HOWARD NG AR. C.H NG &
ASSO. Co
5. MICHAEL LIM URBAN Fitout

RESPONSIBLE DATE NEEDED /


DISCUSSION
PARTY REMARKS
I. PRIORITY WORKS:

1. Termite Control c/o owner Owner ASAP


2. Elevator Owner ASAP
3. Gen. Set (for verification) Owner ASAP
4. Underground Utilities “Pumps” Owner ASAP
5. Re-Submission of OSM Procurement Schedule URBAN Fitout ASAP

2. SCOPE OF WORKS:
1. Re-computation of Gen. Set loading Mar. 05, 2019
AR. C.H NG &
2. Re schedule of Elevator Contractor prior for product demo Mar. 05, 2019
ASSO. Co
and presentation.
3. Arch. Cited to check and verify the specification vs. FCD plan. URBAN Fitout Noted

3. OTHER MATTERS:

III. ADJOURNMENT:
The meeting was adjourned at 11:00AM ALL Noted
Note: The Minutes of the Meeting shall be considered final unless comments and corrections are
received in writing within (2) days upon issuance.
Urban Fit-out Construction and Development Corp.
General Contractor

Prepared by: Noted by:

Joonee Patrick Dizon MR. MICHAEL LIM


Site Engineer Managing Director