PEMBERI TUGAS : KONSULTAN MK : KONTRAKTOR :

PELINDO III PT. CIRIAJASA CM PT SINERGI ASIA PERSADA

TIME SCHEDULE
PEKERJAAN PEMBANGUNAN GUDANG DI TERMINAL KALIMAS ZONA 3 (TAHAP 2)

September Oktober November Desember Januari Februari Maret


Bobot
NO URAIAN PEKERJAAN SAT VOL 18-24 25-1 2-8 9-15 16-22 23-29 30-5 6-12 13-19 20-26 27-3 4-10 11-17 18-24 25-31 1-7 8-14 15-21 22-28 29-4 5-11 12-18 19-25 26-3
% M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24

I PERSIAPAN
1 Administrasi dan dokumentasi ls 1.00 0.19% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079%

2 Pembuatan direksi keet ls 1.00 0.28% 0.1375% 0.1375%


3 Pengukuran dan pembersihan lahan ls 1.00 0.60% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260% 0.0260%

4 Penyediaan air dan listrik kerja ls 1.00 0.19% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079% 0.0079%

5 Pembuatan pagar proyek, t= 2 m ls 1.00 0.43% 0.2140% 0.2140%


6 Mobilisasi dan demobilisasi ls 1.00 0.24% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098% 0.0098%

7 Tes Material ls 1.00 0.09% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039% 0.0039%

8 Pembongkaran Dinding Sebelah Gardu Listrik Eksisting ls 1.00 0.14% 0.0708% 0.0708%

II PEKERJAAN SIPIL
II.A PEKERJAAN TANAH
1 Pekerjaan Galian Tanah m3 276.94 0.11% 0.0283% 0.0283% 0.0283% 0.0283%
2 Pekerjaan Urugan Tanah Kembali m3 76.39 0.04% 0.0191% 0.0191%

3 Pekerjaan Lean Concrete K-175 m3 1,163.21 9.77% 3.2561% 3.2561% 3.2561%

II.B PEKERJAAN TIANG PANCANG


1 Pekerjaan pengadaan tiang pancang minipile uk.25x25 cm m1 1,824.00 3.20% 1.0667% 1.0667% 1.0667%

2 Pekerjaan pemancangan tiang pancang minipile uk.25x25 cm m1 1,824.00 1.29% 0.4301% 0.4301% 0.4301%
3 Pekerjaan penyambungan tiang pancang minipile uk.25x25 cm titik 152.00 0.14% 0.0471% 0.0471% 0.0471%
4 Pekerjaan pemotongan tiang pancang minipile uk.25x25 cm titik 76.00 0.05% 0.0254% 0.0254%
5 Test PDA (Pile Driving Analyzer) untuk tiang pancang titik 4.00 0.18% 0.1823%

II.C PEKERJAAN BETON


1 Pekerjaan Lantai Kerja m3 2.67 0.02% 0.0073% 0.0073% 0.0073%

2 Pekerjaan Pile Cap 800/1500, K-350 m3 18.24 0.53% 0.1765% 0.1765% 0.1765%

3 Pekerjaan Sloof 1 250/400, K-350 m3 2.67 0.100% 0.0251% 0.0251% 0.0251% 0.0251%
4 Pekerjaan Sloof 2 350/400, K-350 m3 26.41 0.792% 0.3962% 0.3962%
5 Pekerjaan Kolom Pedestal K1 450/900, K-350 m3 27.54 1.024% 0.3413% 0.3413% 0.3413%
6 Pekerjaan Kolom Pedestal K2 300/600, K-350 m3 1.44 0.063% 0.0630%

7 Pekerjaan Dinding Beton, K-350 m3 540.10 15.958% 2.6597% 2.6597% 2.6597% 2.6597% 2.6597% 2.6597%

8 Pekerjaan Balok 200/400, K-350 m3 1.77 0.085% 0.0425% 0.0425%

9 Pekerjaan Plat Lantai, K-350 m3 811.20 8.122% 1.6244% 1.6244% 1.6244% 1.6244% 1.6244%
10 Pekerjaan Wiremesh M10-150 m2 2,704.13 3.212% 0.6424% 0.6424% 0.6424% 0.6424% 0.6424%
11 Pekerjaan Construction & Expantion Joint kg 1,154.46 0.135% 0.0673% 0.0673%

12 Pekerjaan Kolom Praktis, K-350 m3 0.58 0.020% 0.0204%

13 Pekerjaan Beton Kolom Komposit, K-350 m3 33.59 0.911% 0.1519% 0.1519% 0.1519% 0.1519% 0.1519% 0.1519%

II.D PEKERJAAN BAJA STRUKTURAL


1 Pekerjaan Struktur Kolom Baja WF 500.200.10.16 kg 24,133.58 5.168% 1.7225% 1.7225% 1.7225%
2 Pekerjaan Struktur Kolom Baja WF 300.150.6,5.9 kg 4,297.71 0.920% 0.4601% 0.4601%
3 Pekerjaan Plat Kolom Baja (base plate, shearkey, rib, stiffner) kg 3,418.20 0.732% 0.2440% 0.2440% 0.2440%
4 Pekerjaan Baut Angkur M36 Pedestal bh 160.00 0.136% 0.0680% 0.0680%
5 Pekerjaan Baut untuk Sambungan Balok Kolom M20 bh 128.00 0.018% 0.0181%

6 Pekerjaan Rangka Atap Pipa Baja Pipa 4" SCH 40 kg 20,351.86 4.780% 1.5935% 1.5935% 1.59%

7 Pekerjaan Rangka Atap Pipa Baja Pipa 2" SCH 40 kg 20,351.86 4.780% 1.5935% 1.5935% 1.59%

8 Pekerjaan Sambungan Flange Rangka Atap Pipa kg 405.44 0.087% 0.0868%


9 Baut Sambungan Flange 4" M16 bh 272.00 0.026% 0.0128% 0.0128%
10 Baut Sambungan Flange 4" M12 bh 68.00 0.003% 0.0016% 0.0016%
11 Pekerjaan Plat Pipa Baja (end plate, stiffner) kg 1,197.84 0.256% 0.1282% 0.1282%

12 Pekerjaan Baut untuk Sambungan Rangka M20 bh 1,428.00 0.202% 0.2022%

13 Pekerjaan Baut untuk Sambungan Rangka M12 bh 2,108.00 0.099% 0.0995%

14 Pekerjaan Tie Beam Baja kg 7,251.92 1.553% 1.5528%


15 Pekerjaan Plat Tie Beam Baja (gusset, haunch) kg 1,189.95 0.255% 0.2548%
16 Pekerjaan Pengecatan Baja m2 1,520.52 0.493% 0.0821% 0.0821% 0.0821% 0.0821% 0.0821% 0.0821%
17 Pekerjaan Sagrod Ø10 kg 818.14 0.175% 0.0876% 0.0876%

18 Pekerjaan Ikatan Angin D16 kg 2,687.58 0.313% 0.1566% 0.1566%

19 Pekerjaan Ikatan Angin Siku 60.60.4 kg 652.37 0.140% 0.1397%

20 Pekerjaan Baut M12 untuk Ikatan Angin Siku bh 80.00 0.004% 0.0038%

21 Pekerjaan Jarum Keras bh 527.00 0.075% 0.0746%


22 Pekerjaan Gording Baja CNP 150.50.20.2,3 kg 14,540.24 3.113% 1.0378% 1.0378% 1.0378%
23 Pekerjaan Plat Gording Baja (gusset, plat) kg 601.51 0.129% 0.1288%
24 Pekerjaan Baut Gording M12 bh 2,108.00 0.099% 0.0995%

III PEKERJAAN ARSITEKTUR


III.A PEKERJAAN PENUTUP DINDING
1 Pekerjaan Pasangan Dinding Bata m2 268.22 0.30% 0.0740% 0.0740% 0.0740% 0.0740%
2 Pekerjaan Plesteran m2 536.44 0.30% 0.0989% 0.0989% 0.0989%

3 Pekerjaan Acian m2 536.44 0.18% 0.0904% 0.0904%

4 Pekerjaan Pengecatan Dinding m2 2,798.55 0.95% 0.1578% 0.1578% 0.1578% 0.1578% 0.1578% 0.1578%
5 Pekerjaan Ventilasi Alumunium (L=2 m) m1 203.40 2.30% 0.7680% 0.7680% 0.7680%

6 Rangka Clading CNP 150 x 60 x 20 x 2,2 kg 1,395.21 0.30% 0.1494% 0.1494%


7 Spandek Lysaght m2 311.06 0.73% 0.3670% 0.3670%
8 Siku 40.40.4 kg 50.82 0.01% 0.0109%

9 Baut M10 bh 120.00 0.01% 0.0057%

10 Sagrod Ø10 Clading kg 118.16 0.01% 0.0138%

III.B PEKERJAAN PENUTUP LANTAI


1 Floor Hardener (termasuk curing compound) warna natural (tipe C, 7 kg/m2) m2 2,704.13 1.96% 0.3920% 0.3920% 0.3920% 0.3920% 0.3920%
2 Pekerjaan Paving K-500 + Sand Bedding m2 1,661.72 2.50% 1.2518% 1.2518%
3 Pekerjaan Kanstin dan Pengecatan m1 216.00 0.34% 0.1710% 0.1710%
III.C PEKERJAAN ATAP, TALANG DAN PINTU GUDANG
1 Atap Expose Zincalume Gelombang tebal = 0,55 mm m2 4,035.20 6.79% 3.3936% 3.3936%

2 Talang horizontal tepi ( zincalume ) t=0,4mm + rangka talang m1 208.00 0.41% 0.4068%

3 Roof strainer PVC unit 22.00 0.02% 0.0226%


4 Pekerjaan Talang Vertikal PVC 4" m1 328.68 0.26% 0.2581%
5 Besi Penggantung talang vertical Ø10 kg 132.75 0.02% 0.0155%

6 Flashing m1 208.00 0.21% 0.2120%


7 Listplank t=0.8m m2 62.40 0.04% 0.0221% 0.0221%

8 Pekerjaan Fascia L 50x50x4 kg 76.07 0.02% 0.0163%

9 Pekerjaan pintu gudang + aksesoris unit 4.00 1.36% 0.6796% 0.68%

III.D PEKERJAAN SALURAN


1 Pekerjaan Urugan Pasir m3 19.42 0.04% 0.0367%
2 Pekerjaan Uditch+Cover uk. 60x60 Beban Gandar 20 T m1 215.80 3.22% 1.0746% 1.0746% 1.0746%

III.E PEKERJAAN LAIN-LAIN


1 Pekerjaan Marka Thermoplastic m2 17.16 0.10% 0.1011%
2 Pengadaan dan Pemasangan Bioseptictank kap. 3 m3 unit 1.00 0.11% 0.1133%

IV PEKERJAAN MEKANIKAL / ELEKTRIKAL


IV.A INSTALASI LUAR GUDANG
1 Pengadaan dan pemasangan Kabel NYFGBY 4 x 50 mm m1 127.00 0.87% 0.8739%
2 Panel SDP Utama uk. 800 x 600 x 300 mm inc Accecories set 1.00 0.08% 0.0755%

- MCCB 3P, 100A, 1 bh


- MCCB 3P, 60A, 2 bh
- Terminal Nol Klem, 1 bh
- Pilot Lamp R-S-T, 3 bh
- Voltmeter, 1 bh
- Amperemeter, 3 bh
- Internal wiring + Acessories
- Pentanahan
3 Panel APP (Alat pengukur panel) + KWh Meter 3P, 10.600 VA set 1.00 0.03%
4 Panel otomatis outdoor uk. 800 x 600 x 300 mm set 1.00 0.06% 0.0340%

- MCB 3P, 16A, 1 bh 0.0604%


- MCB 3P, 10A, 3 bh
- MCB 1P, 10A, 3 bh
- Kontaktor 3P, 80A, 1 bh
- Timer Digital, 1 bh
- Terminal Nol Klem, 1 bh
- Internal wiring + Acessories
- Pentanahan
5 Pengadaan dan pemasangan Kabel Lampu Teras NYY 4 x 16 mm2 + Pipa m1 475.00 0.89% 0.4427% 0.4427%

6 Pengadaan dan pemasangan Lampu Outdoor LED HIGHTBAY 100W unit 20.00 0.32% 0.1586% 0.1586%
IV.B INSTALASI DALAM GUDANG
1 Panel APP (Alat pengukur panel) + KWh Meter 1P, 5.500 VA set 3.00 0.10% 0.1042%
2 Panel SDP In Door uk. 600 x 400 x 200 mm set 3.00 0.18% 0.1835%

- MCB 1P, 25A, 1 bh


- MCB 1P, 10A, 5 bh
- Selektor/rotary Switch 10A (on - off) (diletakkan pada pintu panel)
- Pilot Lamp (lampu indikator) + Fuse, 1 bh
- Terminal Nol Klem (Busbar 40 A full neutral,5 bus), 1bh
- Internal wiring + Acessories
3 Pengadaan dan pemasangan Kabel Power Supply NYY 3 x 10 mm2 (untuk 5 KW H Meter) m1 210.00 0.09% 0.0920%
4 Pengadaan dan pemasangan Lampu Indoor MVHL LED HIGTBAY 200W 120 DEGREEE BK
unit 27.00 0.61% 0.2039% 0.2039% 0.2039%
5 Pengadaan dan pemasangan Kabel Power Supply NYY 3 x 2.5 mm2 + Pipa clipsal m1 1,098.00 0.17% 0.0415% 0.0415% 0.0415% 0.0415%
6 Pengadaan dan pemasangan Stop Kontak 1 Phase 220V; 16A unit 8.00 0.00% 0.0044%

7 Pengadaan dan pemasangan Saklar Ganda unit 2.00 0.00% 0.0014%


8 Pengadaan dan pemasangan Kabel Power Supply NYY 3 x 2.5 mm2 + Pipa (untuk Stop Kontak)
m1 695.00 0.10% 0.0328% 0.0328% 0.0328%

IV.C INSTALASI PENANGKAL PETIR


1 Pengadaan dan pemasangan BC 50 mm² m1 173.09 1.44% 1.4377%

2 Pengadaan dan pemasangan Grounding Box control 400 x400x400 dan asesoris unit 3.00 0.02% 0.0181%
3 Pengadaan dan pemasangan Stick Rod 5/8 x 4 meter unit 5.00 0.04% 0.0378%
4 Testing & Commissioning lot 1.00 0.03% 0.0302%

5 Pengadaan dan Pemasangan Instalasi Penangkal Petir unit 3.00 0.23% 0.2311%
6 Pengadaan dan pemasangan Kabel NYY 1 x 70 mm2 dan Clamp m1 695.00 0.78% 0.3910% 0.3910%

TOTAL 100.00%
TOTAL RENCANA KERJA MINGGUAN 0.381% 0.407% 1.599% 1.670% 1.724% 0.299% 0.287% 0.653% 0.740% 6.216% 7.979% 9.330% 7.196% 7.525% 4.993% 8.647% 9.060% 6.817% 5.526% 3.209% 4.467% 5.040% 4.913% 1.320%

KUMULATIF RENCANA KERJA MINGGUAN - 0.381% 0.788% 2.387% 4.058% 5.782% 6.080% 6.367% 7.020% 7.760% 13.976% 21.955% 31.286% 38.482% 46.007% 51.000% 59.647% 68.707% 75.524% 81.050% 84.259% 88.726% 93.767% 98.680% 100.000%

MENGETAHUI : KONSULTAN MK : DIUSULKAN KONTRAKTOR :


PT Pelabuhan Indonesia III (Persero) PT. CIRIAJASA CM PT. SINERGI ASIA PERSADA
Regional Jawa Timur

Azam Rughaidan F.E RULY KARNAJAYA FENDY BAGUS


Project Coordinator Manajer MK Project Manager