Sie sind auf Seite 1von 2

DATE : 01.10.

2019

REPORTING TIME : FROM 06:00 AM (30.09.19) TO 06:00 AM (01.10.19)

SL SHIFT AREA TROUBLE ACTION


UNIT#7
1 'B' Boiler Gun, F.O. A2, BC3 barel jamming cleaning.
Guide bearing oil top up, SP- 150 ( 10+10 = 20 ltr)
2 'B' A.P.H.

3 'B' Mill # 7D Mill trail run done at 7:45 PM


4 'B' Boiler Drum lavel valve open.
5 ' C' Boiler boiler lite up at 3:20 am
6 ' C' P.A. fan -B Lube oil presure-2.1, Modelating presure - 3.5
7 ' C' Boiler Gun F.O. - 02 nos, L.D.O. - 01 nos cleaning.
8 ' C' Boiler Gun running - A4, A3
9 'A & G' Boiler Oil gun cleaning L.D.O & F.O. - A1, A4, BC2, BC4
10 'A & G' Boiler Bottom header valve open - 05 nos.
11 'A & G' Coal feeder Coal feeder A to F top gate open.
12 'A & G' Mill # 7E Hyd oil top up s.s - 46 - 20 ltr.
13 'A & G' Mill # 7B Hyd oil top up s.s - 46 - 20 ltr.
14 'A & G' P.A. fan -B Lube oil presure adjust - 2.4 after - 2.1before
15 'A & G' Boiler Bottom header drum line while fitting.
16 'A & G' P.A. fan -B Hyd oil top up H.L.P. - 46 - 20 ltr.
17 'A & G' Boiler Gun tip blue maching 02 nos.
18 'A & G' F.D. fan - A F.D. fan - A door open & scaop adjust.
Unit # 7 load - 85 MW at 5:30 pm & mill running A,B.
19 'B' Boiler

20 'B' Mill Mill coal rejection manually after 01 hour.


21 'B' Boiler Boiler door checking , pent house to bottom.
Mill 7 B, 7 C, in mill top coal pipe leakage rectified by
22 'B' Mill
jute & sodium silcate.
23 'B' Boiler 12.6 mtr valve open.

UNIT#8
Oil level checking of all rotary equipments and found
1 ' C' All Rotary Equipment
OK.
APH # 8A & 8B checking ok. A side Amps. 6.11 and
2 ' C' APH # 8A & 8B
B side Amps. 6.17
Oil level checking of all rotary equipments and found
3 'A ' All Rotary Equipment
OK.
APH # 8A & 8B checking ok. A side Amps. 6.1 and B
4 'A ' APH # 8A & 8B
side Amps. 6.2
5 'A ' Feeder # 8 D Feeder I/L gate closed.
1) parmit taken, 2) Mill inspection door open, 3) Mill
internal checked & found ok, 4) Mill grinding roll
wear rate is U- 25mm, M - 45mm & L- 15mm 5) Mill
body liner gap adjusted by plate fitting & welding, 6)
6 'A & G' Mill # 8 D
Scraper checked & found ok, 7) Journal oil checked
& found ok, R1- 800mm, R2- 850mm & R3- 800mm,
8) mill box up, 9) mill trail run & found ok then
parmit return.
1) Feeder inspection door open, 2) Feeder internal
7 'A & G' Feeder # 8D checking & found ok, 3) Feeder box up & I/L gate
opend.
8 'B' A.P.H. # 8 B A.P.H. # 8 B ( G/B ) ash cleaning.
Oil level checking of all rotary equipments and found
9 'B' All Rotary Equipment
OK.
APH # 8A & 8B checking ok. A side Amps. 6.1 and B
10 'B' APH # 8A & 8B
side Amps. 6.3

MRS UNIT#8
1 'A' Conveyor Belt Conveyor and mill area coal cleaning
2 'G' Conveyor Belt Conveyor and mill area coal cleaning
3 'B' Conveyor Belt Conveyor and mill area coal cleaning

UNIVERSAL CONSTRUCTION CO.