DESIGN CRITERIA:
References:
Manual on Water Supply & Treatment, Third Edition- Revised & Updated, CPHEE
A) 1999
Raw water source: Gang Canal, conveyed through intake structure& via Raw wa
site
No of hours of operation
Max. Water losses considered for design (Part 1, Volume 1, Cl. 6.20.5 pg 61 of 23
Design Inlet raw water from Raw water reservoir including max. water losses
Recycle Flow Details ( Total Recycle flow = Tube Settler Supernatant Flow + Thick
Supernatant Flow)
Design flow including Max. Water losses and Recycle flow for New 20 MLD WTP
Design Overload flow for Interconnecting pipes, valves on pipes and Channels (Pa
Volume 1, Cl. 6.30.5.1 pg 104 of 230)
Raw water quality (Part 1, Volume 1, Cl. 6.20.4, pg. 60-61 of 230 (Table 9))
Turbidity
Coliform count
Treated water quality (Part 1, Volume 1, Cl. 6.20.6, pg. 61-63 of 230 (Table 11)
Turbidity
L&T Construction
Water & Effluent Treatment
Residual Chlorine
1 INLET CHAMBER
No. of Units
Width of Chamber
L&T Construction
Water & Effluent Treatment
Free Board
Flow capacity required as % of design flow (Part 1, Vol.1, Cl. 6.30.5.3, Pg 104 of 2
According to IS 14371 (1996) (Part 1, Volume 1, Cl. 6.20.9, pg. 64 of 230 (Tabl
Throat width b
C value
C
n value
submergence ratio
C
Height of the broad-crested weir hp2
C
So, HL
Provided Hea
l - throat
l1 - entrance
C
C
l2 - exit
Approach channel
b1
length of channel
C
Liquid depth
L&T Construction
Water & Effluent Treatment
Fr =
Downstream channel
L&T Construction
Water & Effluent Treatment
length
velocity in channel
C
Size of downstream channel:
C
C
C
A Perforated baffle wall at flash mixer inlet shall be provided to avoid short circuitin
3 FLASH MIXER
No. of Units
Volume required
Free Board
C
Detention time range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Table 8, Pg 58 of 2
Clariflocculator (CF-05 A)
Outlet Zone1
Outlet Zone2
L&T Construction
Water & Effluent Treatment
No. of Units
C
C
Detention time
Width of chamber
Length of chamber
Free Board
Considered Overloading
Detention time
Free Board
5 CLARIFLOCCULATORS
No.of(𝑸𝒅^𝟑
Units (As per NIT, Part 1, Volume 1, Cl. 6.30.5.10, Pg 106 of 230)
𝒉)/𝒍=𝟐𝟗𝟑𝟐𝟑 �
Design flow capacity per Unit
Retention time considered (As per NIT, Part 1, Volume 1, Cl. 6.30.5.10, Pg 106 of
Free board
Opening Port
Height of port
Surface Loading rate (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230)
Dia of clariflocculator provided including inside launder and its wall thickness
Free Board
Size of Clariflocculator:
Detention time range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230)
Hydraulic overloading (As per NIT, Part 1, Volume 1, Cl. 6.20.10, Pg 65 of 230)
Detention time range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230)
Surface Loading rate range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230
L&T Construction
Water & Effluent Treatment
Velocity considered
Hydraulic overloading (As per NIT, Part 1, Volume 1, Cl. 6.20.10, Pg 65 of 230)
No of notches required
where
Weir loading
L&T Construction
Water & Effluent Treatment
Area
C
Free Board
No. of channels
Design flow
Area
C
Free Board
Recycle flow
Sludge of PACl
Assumed theoretical quantity of sludge produced by PolyAluminium Chloride (PAC
coagulant
Area
Depth of channel
Width of channel
L&T Construction
Water & Effluent Treatment
Free Board
C
Size of Filter Inlet Channel:
Type of filtration
Length of twin bed filter considered (excluding channel between single bed filters)
Free board
As per CPHEEO clause 7.6.3.5 the L/B ratio of filter bed shall be 1.11 to 1.66
Hydraulic overloading (As per NIT, Part 1, Volume 1, Cl. 6.20.10, Pg 65 of 230)
No. of Twin Bed Filters working during backwash of 1 twin bed filter
Design flow per each working twin bed filter under one twin bed back wash
Note: 3 twin bed filters are capable to meet the capacity of net 20 MLD flow during
L&T Construction
Water & Effluent Treatment
Specific Gravity
L&T Construction
Water & Effluent Treatment
Estimation of sand depth ( Ref : Page 634 of CPHEEO Manual May 1999 Edit
Assume the depth of sand as 900 mm and effective size of sand as 0.65 mm
The sand depth can be checked against break through of floc through sand bed b
Depth of sand provided (As per Part 1, Volume 1, Cl 6.30.5.13, Pg 108 of 230)
Rate of Back wash Flow (Part 1, Volume 1, Cl. 6.20.2, Table 8, Pg 59 of 230)
Providing numbers of nozzles per sq. m area of filter bed (based on design standa
(Part 1, Volume 1, Cl. 6.30.5.14 pg 110 of 230)
L&T Construction
Water & Effluent Treatment
No. of channels
Hydraulic Overloading as per NIT (Part 1, Volume 1, Cl. 6.30.5.1, Pg 104 of 230)
Velocity considered
Area of channel
Width of channel
Depth of channel
L&T Construction
Water & Effluent Treatment
Free board
Filter Backwashing
L&T Construction
Water & Effluent Treatment
Water Backwash
Rate of Back wash Flow (Part 1, Volume 1, Cl. 6.20.2 Table 8. Pg 59 of 230)
Area
L&T Construction
Water & Effluent Treatment
Free board
No. of twin bed filters for which the backwash requirement to be stored (Part 1, Vo
1, Cl. 6.30.5.18 pg 115 of 230)
Backwash water storage required for one twin bed filter bac
Backwash Water Overhead Tank storage required (including service water storag
Length of tank
Free board
Air Backwash
Additional flow rate required (Part 1, Vol.1, Cl. 6.30.5.16 Table 18. pg 112 of 230)
6H Filter house - Drain pit (Part 1, Vol.1, Cl. 6.30.5.19, pg 115 of 230)
Liquid depth
Volume of pit
Free board
Filter house - Drain Pumps (Part 1, Vol.1, Cl. 6.30.5.19, pg 115 of 230)
L&T Construction
Water & Effluent Treatment
Min capacity of pump to be provided (Part 1, Vol.1, Cl. 6.30.5.19, pg 115 of 230)
Volume required
Area required
Width of chamber
say
Length of chamber
Freeboard
Length of chamber
Volume Chamber
Freeboard
L&T Construction
Water & Effluent Treatment
Flow from Chlorine mixing chamber to Clear Water Reservoir = Flow to Chlorine m
mixing chamber for Filters Back Wash & Service Water)
Flow withdrawn from Chlorine mixing chamber for 4 Twin Beds Filters Back Wash
Flow of backwash water required for future 20 MLD WTP for design = Flow of bac
design
Design Flow of backwash water required for all beds washes for future 20 MLD W
Considered No. of twin beds washed per day for existing 23 MLD WTP
Design Flow of backwash water required for all beds washes for existing 23 MLD
Dirty Backwash water storage required = Waste water generated during one back
Width of tank
Length of tank
Free board
8 TUBE SETTLER
Flow (Filter backwash water) to the tube settler = Dirty Backwash water quantity f
3 WTPs
Width of the tube settler provided (Size provdied tentatively, it may vary as per ven
recommendations)
Length of the tube settler arrived (Size provdied tentatively, it may vary as per ven
recommendations)
Free board
Total depth
Tan 60
Angle Correction
Width provided
Size of tube settler with two hoppers (Tentative size only, may vary as per ve
TSS in supernatant
9 SLUDGE SUMP
Total amount of sludge solids produced (From clariflocculators and Tube settler)
Total volume of sludge generated per day (From clariflocculators and Tube settler)
Volume of sump
Plan area
Free board
Number of thickeners
Say,
Supernatant flow
No. of tanks
Detention time
Volume of Sump
LD considered
Length of sump
No of working centrifuge
No of standby centrifuge
Centrate flow
TSS calculation
No of working pumps
No of standby pumps
Storage depth
No. of rows
Length of shed
Height of Shed
Volume of sump
Plan area
Length of sump
Width of sump
Free board
15 CHEMICAL HOUSE
L&T Construction
Water & Effluent Treatment
No. of tanks
Diameter of tank
L&T Construction
Water & Effluent Treatment
No.of tanks
No. of days storage required (Part 1, Vol 1, Cl. 6.30.5.7, Pg. 105 of 230)
Volume of Storage
Area of tank
Length
Free board
No of pumps (working)
Provided
No.of tanks
DWPE requirement
DWPE requirement
Area of tank
Diameter
Free board
No. of Pumps
Storage period
Stacking height
Area required
Length required
Width required
Width provided
L&T Construction
Water & Effluent Treatment
Chemical house - Drain pit (Part 1, Vol.1, Cl. 6.30.5.9, pg 106 of 230)
Liquid depth
Volume of pit
Free board
Drain Pumps
16 CHLORINATION SYSTEM
Pre-Chlorination
Maximum Chlorine dosage considered (Part 1, Vol 1, Cl. 6.30.5.3, Pg.104 of 230)
So, Total no. of tonners required to be housed in tonner area (for pre-chlorination)
Post-Chlorination
L&T Construction
Water & Effluent Treatment
So, Total no. of tonners required to be housed in tonner area (for post-chlorination
Therefore, total no. of tonners housed in Chlorine Container Room (Part 1, Vol 1, C
6.30.5.29 pg 118 of 230 )
L&T Construction
Water & Effluent Treatment
CRITERIA:
es:
n Water Supply & Treatment, Third Edition- Revised & Updated, CPHEEO, Ministry of Urban Developme
1996): Measurement of Liquid flow in open channels - Parshall and Saniiri flumes
er source: Gang Canal, conveyed through intake structure& via Raw water reservoir & pumping station a
rs of operation 24
20000
833.34
0.24
L&T Construction
Water & Effluent Treatment
et raw water from Raw water reservoir including max. water losses 20.4
20400
850
0.24
low Details ( Total Recycle flow = Tube Settler Supernatant Flow + Thickener
ant Flow)
1.0312
1031.20
42.97
L&T Construction
Water & Effluent Treatment
0.02
w including Max. Water losses and Recycle flow for New 20 MLD WTP 21.43
21431.2
892.97
0.25
verload flow for Interconnecting pipes, valves on pipes and Channels (Part 1,
Cl. 6.30.5.1 pg 104 of 230) 30
er quality (Part 1, Volume 1, Cl. 6.20.4, pg. 60-61 of 230 (Table 9))
10 to 100
water quality (Part 1, Volume 1, Cl. 6.20.6, pg. 61-63 of 230 (Table 11))
<1
L&T Construction
Water & Effluent Treatment
HAMBER
ts 1
21431
0.25
pth considered 3
Chamber 2.2
L&T Construction
Water & Effluent Treatment
d 0.50
r overloading
0.33
21431.2
0.25
L&T Construction
Water & Effluent Treatment
acity required as % of design flow (Part 1, Vol.1, Cl. 6.30.5.3, Pg 104 of 230) 130.00
0.33
g to IS 14371 (1996) (Part 1, Volume 1, Cl. 6.20.9, pg. 64 of 230 (Table 13))
dth b 0.450
1.038
C
1.537
0.480
0.290
C
L&T Construction
Water & Effluent Treatment
0.262
0.600
nce 1.425
C
C
0.920
h channel
1.020
channel 4.500
C
pth 0.552
0.600
L&T Construction
Water & Effluent Treatment
ty in channel 0.500
height hc 0.950
d required 0.350
d provided 0.500
Froude number
0.206
0.210
< 0.5
Hence Ok
eam channel
L&T Construction
Water & Effluent Treatment
2.25
2.25
th considered 0.60
channel 0.50
C
e of Flash mixer
C
ed baffle wall at flash mixer inlet shall be provided to avoid short circuiting.
IXER
ts 1
892.97
0.25
equired 10
d 0.5
C
r overloading
0.33
time range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Table 8, Pg 58 of 230) 20 to 60
Hence Ok
ash Mixer (excluding perforated baffle with inlet zone): 2 m (L) x 2 m (W) x 2.5 m
Clariflocculator (CF-05 A)
Outlet Zone1
Outlet Zone2
L&T Construction
Water & Effluent Treatment
ts 1
892.97
C
0.25
C
time 25
hamber 2.0
chamber 2.80
d 0.50
r overloading
L&T Construction
Water & Effluent Treatment
ed Overloading 30.00
0.33
tlet zones 2
let zones are provided at both sides of distribution chamber and convey the flow equally to two clarifloccu
e weirs
10715.60
446.49
0.12
time 20
d 0.50
ach Distribution Chamber outlet zone: 2.8 m (L) x 0.9 m (W) x 1 m LD + 0.5 m FB
OCCULATORS
892.97
0.25
446.5
time considered (As per NIT, Part 1, Volume 1, Cl. 6.30.5.10, Pg 106 of 230) 25
of Central column 1
189
L&T Construction
Water & Effluent Treatment
d 0.5
Port
of port 0.21
port 0.3
zone of Clariflocculator
oading rate (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230) 35
368.38
riflocculator provided including inside launder and its wall thickness 21.7 + 0.4 + 0.15 + 0.4 +
d 0.5
time range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230) 2 to 8
Hence Ok.
Hence Ok.
r overloading:
time range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230) 2 to 8
Hence Ok.
oading rate range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230) 25 to 75
Hence Ok.
L&T Construction
Water & Effluent Treatment
0.09
onsidered 0.6
e flow 0.14
r Weir loading
0.16
/C of Notch 0.2
ugh V notch =
of notch , in degrees , 90
5
8
C d tan(2 / 2) 2 g H
eration due to gravity,
2
15 m/s 9.8
over notch, m
ad of notch 0.042
C
ng 558.2 / 68.2
L&T Construction
Water & Effluent Treatment
8.19
196.6
IT, Part 1, Volume 1, Cl. 6.30.5.10 pg 106 of 230) < 300 m3/m/d
Hence Ok
water Channel
C
0.17
0.21
C
he channel 0.5
L&T Construction
Water & Effluent Treatment
d 0.5
larified Water Channel (from clariflocculator): 0.5 m (W) x 0.5 m (LD) + 0.5 m FB
annels 1
w 892.97
0.33
0.41
C
he channel 0.8
C
d 0.5
om Clariflocculators
ow 1031.2
55.31
ed solids in the supernatant of the Clariflocculators (Part 1, Volume 1, Cl.
61 of 230) 5
f PACl
theoretical quantity of sludge produced by PolyAluminium Chloride (PACl)
0.40
642.936
257.18
r design considered for quantiy of PACL removed as
ef. STC/RUSDP/SGN/01/232, additional observations, Sl.
257.18 x 130 %
334.33
arified water flow from Clariflocculators = Design Flow to Clariflocculators - Clariflocculators settled sludg
AND FILTERS
t Channel
channel 1
887.37
C
0.33
0.42
channel 0.5
hannel 0.9
L&T Construction
Water & Effluent Treatment
d 0.5
C
nd Gravity Filters
ow to Filters 21296.67
887.37
n Bed Filters 4
twin bed filter considered (excluding channel between single bed filters) 8.00
d 0.5
PHEEO clause 7.6.3.5 the L/B ratio of filter bed shall be 1.11 to 1.66 Hence OK
r overloading:
<9
L&T Construction
Water & Effluent Treatment
887.37
w per each working twin bed filter under one twin bed back wash 887.37 / 3
295.79
tration through each working filter during backwash time 295.79 / 37.6
7.87
<9
win bed filters are capable to meet the capacity of net 20 MLD flow during downtime of one filter during ba
L&T Construction
Water & Effluent Treatment
dia Specifications
dia Specifications
on of sand depth ( Ref : Page 634 of CPHEEO Manual May 1999 Edition)
depth can be checked against break through of floc through sand bed by
sand provided (As per Part 1, Volume 1, Cl 6.30.5.13, Pg 108 of 230) 0.90
Hence OK
ack wash Flow (Part 1, Volume 1, Cl. 6.20.2, Table 8, Pg 59 of 230) 36.00
numbers of nozzles per sq. m area of filter bed (based on design standards)
olume 1, Cl. 6.30.5.14 pg 110 of 230) 45
L&T Construction
Water & Effluent Treatment
Water Channel
annels 1
0.33
onsidered 0.80
hannel 0.41
hannel 0.80
channel 0.60
L&T Construction
Water & Effluent Treatment
d 0.50
ilter house:
37.3
10
ckwashing
L&T Construction
Water & Effluent Treatment
ckwash
ack wash Flow (Part 1, Volume 1, Cl. 6.20.2 Table 8. Pg 59 of 230) 36.00
0.38
0.38
L&T Construction
Water & Effluent Treatment
d 0.50
n bed filters for which the backwash requirement to be stored (Part 1, Volume
0.5.18 pg 115 of 230) 1
Backwash water storage required for one twin bed filter backwash 225.6
Water Requirement
h Water Overhead Tank storage required (including service water storage) 225.6 + 4.7
230.3
e tank 143.94
tank 29.00
d 0.50
h tank Pumps
h tank Pumps 2
rking pumps 1
wash
wers considered 2
rking blowers 1
flow rate required (Part 1, Vol.1, Cl. 6.30.5.16 Table 18. pg 112 of 230) 20.0
he pit 1.00
pth 1.50
pit 3.00
d 0.30
ain pumps 1
of tank fill 1
pacity provided 11
Mixing Chamber
0.46
equired 27.78
ired 13.89
hamber 1.86
1.9
chamber 7
d 0.50
hlorine mixing Chamber (With Baffles): 7.8 m (L) x 1.9 m (W) x 2 m LD+ 0.5 m FB
chamber 1.90
hamber 3.70
d 0.50
L&T Construction
Water & Effluent Treatment
Mixing Chamber Outlet Chamber: 1.9 m (L) x 1.2 m (W) x 1.65 m LD+ 0.5 m F
Chlorine mixing chamber to Clear Water Reservoir = Flow to Chlorine mixing chamber - (Flow withdrawn
amber for Filters Back Wash & Service Water)
drawn from Chlorine mixing chamber for 4 Twin Beds Filters Back Wash 902.40
0 MLD WTP
L&T Construction
Water & Effluent Treatment
ow of backwash water required for all beds washes for future 20 MLD WTP 902.4
23 MLD WTP
ed No. of twin beds washed per day for existing 23 MLD WTP 4.0
ow of backwash water required for all beds washes for existing 23 MLD WTP 1152.0
2956.8
L&T Construction
Water & Effluent Treatment
kwash water storage required = Waste water generated during one backwash (Part 1, Volume 1, Cl 6.30.6
ks provided 1.00
e tank 96.00
ank 7.0
tank 13.8
d As per HFD
TTLER
er backwash water) to the tube settler = Dirty Backwash water quantity from all
2956.80
184.80
be settlers 1.0
required 33.6
he tube settler provided (Size provdied tentatively, it may vary as per vendor
ndations) 3.6
the tube settler arrived (Size provdied tentatively, it may vary as per vendor
ndations) 9.4
d 0.5
er Depth 3.5
h 4.0
1.732
rection 0.6
vided 4.7
ube settler with two hoppers (Tentative size only, may vary as per vendor recommendations)
4.7 m (L) x 4.7 m (W) x 3.5 m LD + 0.5 m FB
ube Settler: X 2 Compartments
L&T Construction
Water & Effluent Treatment
FROM CLARIFLOCCULATORS
MLD WTP
0 MLD WTP
unt of sludge from clariflocculators (Considered similar to New 20 MLD WTP) 1412.54
23 MLD WTP
unt of sludge from clariflocculators (Considered in proportion to New 20 MLD
1624.43
w to filters 5
pernatant 53.66
SUMP
unt of sludge solids produced (From clariflocculators and Tube settler) 4664.20
me of sludge generated per day (From clariflocculators and Tube settler) 444.22
sump 37.02
pth considered 3
12.34
d As per HFD
of pump required 19
of pump provided 19
SLUDGE THICKENER
f thickeners 1.00
d considered 0.50
8.70
444.22
ED SLUDGE SUMP
ks 1.00
time 8.00
Sump 44.44
ered 3.00
sump 3.90
d provided 0.50
king hrs per day (Part 1, Vol 1, Cl 6.30.6.7 pg 126 of 230 ) 16.00
onsistency at the outlet of centrifuge (Part 1, Vol 1, Cl 6.30.6.7 pg 126 of 230) 20.00
1.23
low 113.71
7.20
ulation
e Feed Pump
epth 2
beds considered 15
ws 1.0
ds in shed 15.0
L&T Construction
Water & Effluent Treatment
shed 20.0
Shed 4.0
E WATER SUMP
3247.3
time considered 30
L&T Construction
Water & Effluent Treatment
sump 67.7
19.34
sump 7.0
ump 2.8
d 0.5
ecycle water sump: 7 m (L) x 2.8 m (W) x 3.5 m (LD) + 0.5 m (FB
water Pump
AL HOUSE
L&T Construction
Water & Effluent Treatment
SING SYSTEM
sing Tank
ks 2.00
d considered 0.50
required 1.62
of tank 1.50
L&T Construction
Water & Effluent Treatment
k Storage tank
ks 2
ys storage required (Part 1, Vol 1, Cl. 6.30.5.7, Pg. 105 of 230) 60.00
Storage 32.15
nk 6.43
2.6
d 0.5
ACl Bulk Storage tank : 2.6 m (L) x 2.6 m (W) x 2.5 m (LD) + 0.5 m (
mps (working) 1
300
R DOSING SYSTEM
ks 2.00
quirement
4.20
quirement 10.50
nk 3.50
2.20
d 0.50
ing pumps 2 (1 W + 1 S)
mps 1.00
ulk storage
eriod 30.00
height 1.50
ired 0.28
quired 1.00
uired 0.30
vided 1.00
L&T Construction
Water & Effluent Treatment
he pit 1.00
pth 1.50
pit 4.50
d 0.30
mps
ain pumps 1
of tank fill 1
pacity provided 5
L&T Construction
Water & Effluent Treatment
NATION SYSTEM
rination
ow rate 892.97
0.005
orinators (Working) 1
orinators (Standby) 1
4500
orination
L&T Construction
Water & Effluent Treatment
ow rate 887.36
0.003
orinators (Working) 1
orinators (Standby) 1
2670
REFERENCES :
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
Q
Hydraulic flow calculations have been carried out to fix the hydraulic levels of various units t
1. Manual on Water Supply & Treatment, Third Edition- Revised and Updated, CPHEEO, Mi
New Delhi, May 1999
4. Levels shall be transferred to Hydraulic Flow Diagram of WTP (DWG No. LE160960-P-W
LE160960-P-WW-WT-BE-2001
CR = Roughness Coefficient
L = Length of pipe, m
D = Diameter of pipe, m
R = Hydraulic radius in m
LQ
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
𝑸=𝟎.𝟓𝟒𝟒𝟓𝒄_𝒆 √𝒈 𝒃
b = length of weir
𝒄_𝒅
Flow through orifice,
LE160960-P-WW-WT-BE-2001
DESIGNED
〖 (� �
PG
a = area of opening, m2
Q
g = acceleration due to garvity, m/s2
H= head loss, m
(Reference : CPHEEO Manual on Water Supply & Treatment, May 1999,Pg. 115, Cl. 6.2.9)
Where, K
g
V
H = KV2 / 2g
= Resistant co-efficient
90 deg. Bend
45 deg. Bend
Sluice gate
Exit to pipe
Entry to pipe
Butterfly valve
Plug valve
0.75
0.5
1.5
0.62
0.5
0.3
0.3
DESIGNED
K-Value
PG
CQR
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGN CRITERIA:
No of hours of operation
PG
h
QR
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
Max. Water losses considered for design (Part 1, Volume 1, Cl. 6.20.5 pg 61 of 230)
Design Inlet raw water from Raw water reservoir including max. water losses
L&T Construction
Water & Effluent Treatment
LE160960-P-WW-WT-BE-2001
DESIGNED
Design flow including Max. water losses and Recycle flow for New 20 MLD WTP
1 HEAD LOSS BETWEEN CLEAR WATER RESERVOIR (CWR) AND TREATED WATER C
No. of compartment
94.Q62D
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED
Head loss
velocity considered
head loss, h
HL(f) = KV2 / 2g
K = 0.5+1
DESIGNED
h
PG
Q
L
C
R
94.Q62D
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
1 .81
No. of Tees
Total Head loss from Chlorine Mixing Channel outlet chamber to CWR
IL of outlet chamber
LE160960-P-WW-WT-BE-2001
DESIGNED
L&T Construction
Water & Effluent Treatment
Q 0 . 5445 C e
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
gb H
H
Channel width
Q
L&T Construction
Water & Effluent Treatment
Velocity in channel
n ( concrete surface)
S=
Loss of head =
K, coefficient
DOCUMENT NO.
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
velocity of flow
HL per bend
Q
L&T Construction
Water & Effluent Treatment
Depth
n ( concrete surface)
DOCUMENT NO.
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
L&T Construction
Water & Effluent Treatment
S=
Loss of head =
2 HEAD LOSS BETWEEN TREATED WATER CHANNEL & FILTER INLET CHANNEL
DESIGNED
PG
L&T Construction
Water & Effluent Treatment
DESIGNED
PG
Q 0 . 5445 C e
Q
LE160960-P-WW-WT-BE-2001
gb H
L&T Construction
Water & Effluent Treatment
Area of opening
HL(f) = KV2 / 2g
K = 0.5+1
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
L&T Construction
Water & Effluent Treatment
velocity of flow
h=kv2/2g
No. of bends
PG
Sandsize , mm
% Sand smaller
than stated size
0.3
0.0
0.4
2.0
0.5
10
0.6
27
0.7
50
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
0.8
70
h
9
where
h= head loss in m
L&T Construction
Water & Effluent Treatment
Sphericity of sand
V = Velocity of filtration
Y = grain sphericity
Pi = Fraction of sand
l
g
v
f3
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
Head loss for a clean filter is determined using Kozeny's equation for stratified beds
h kV (1 f ) 2 6
2
n
d
i 1
Q
pi
i
2
0.4
0.5
0.6
0.7
0.8
1.45
L
L&T Construction
Water & Effluent Treatment
0.3 0
10
27
50
70
90
100
PG
Sand fraction
within
Size of sand, mm % of sand larger than stated size adjacent sieve
size
pi x100
17
23
20
20
10
0
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED
h
h/l
L&T Construction
Water & Effluent Treatment
100
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
Max. Flow to each filter considered (with 30% overloading and one of 4 filters under
backwash)
Velocity of flow
Gate size:
L&T Construction
Water & Effluent Treatment
Area of opening
Velocity of water
Head loss h=
Width of channel
Velocity of water
DOCUMENT NO.
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
L&T Construction
Water & Effluent Treatment
slope,S
Loss of head
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED
L&T Construction
Water & Effluent Treatment
Depth
n ( concrete surface)
Loss of head
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
L&T Construction
Water & Effluent Treatment
Width of channel
Velocity
slope,S
Loss of head
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
L&T Construction
Water & Effluent Treatment
Length of weir
Width of launder,b
Diameter of clariflocculator
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
say
L&T Construction
Water & Effluent Treatment
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
Launder width
Wetted perimeter
Manning's coefficient,n
>
C
L&T Construction
Water & Effluent Treatment
IL of launder
No of notches required =
PG
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
The above selected launder size is adequate for carrying capacity indicated above
8
15
C d tan( / 2 ) 2 g H
provide head as
5
2
PG
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
R
L&T Construction
Water & Effluent Treatment
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
Head loss in the central column including port opening to be taken as maximum of
h R 4.81
994.62D
R
L&T Construction
Water & Effluent Treatment
head loss, h
Velocity of flow
h=kv2/2g
Total no of bends
h=kv2/2g
L
DOCUMENT NO.
C
h R 4.81
994.62D
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
Q
PG
1.81
h
L&T Construction
Water & Effluent Treatment
Total no of bends
Velocity of flow
Gate size
Area of opening
Velocity of water
k
DOCUMENT NO.
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
L&T Construction
Water & Effluent Treatment
7 HEAD LOSS BETWEEN DISTRIBUTION CHAMBER OUTLET ZONE AND FLASH MIXER
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED
given by
L&T Construction
Water & Effluent Treatment
PG
b= length of weir
H=
Lip of weir
IL of Distribution chamber
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
The Discharge through a rectangular weir at each outlet zone of distribution chamber is
h
L&T Construction
Water & Effluent Treatment
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
b) Head loss through suppressed weir between Distribution chamber and Flash mixer
b= length of weir
H=
Lip of weir
IL of Flash mixer
h
L&T Construction
Water & Effluent Treatment
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED
L&T Construction
Water & Effluent Treatment
So, Headloss
Liquid depth
IL in inlet chamber
DOCUMENT NO.
PG
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
L&T Construction
Water & Effluent Treatment
DESIGNED
PG
Q
LE160960-P-WW-WT-BE-2001
The maximum frictional resistance that can be offered by the filter grains in the fluidized
state is their submerged weight. The head loss across the filter bed in fluidised
conditions is given by,
Where,
hb
m
1 f l
say
Total Head
4.81
L&T Construction
Water & Effluent Treatment
CR
Q
L
C
R
DESIGNED
PG
1 .81
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
Flow in pipe
Dia of pipe
L&T Construction
Water & Effluent Treatment
Head loss, h
DESIGNED
PG
1 .81
Head loss in pipe line from farthest filter to the bottom of wash water tank:
Depth
n ( concrete surface)
S=
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
Loss of head
CR
Flow in pipe
Dia of pipe
Velocity
h
Q
L
C
R
DOCUMENT NO.
DESIGNED
PG
1 .81
994.62 D 4.81
Q
LE160960-P-WW-WT-BE-2001
9 4 .6 2 D
L&T Construction
Water & Effluent Treatment
head loss, h
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED
9 4 .6 2 D
L&T Construction
Water & Effluent Treatment
b) Loss in Pipe
CR
Flow in pipe
Velocity
head loss, h
DESIGNED
PG
1 .81
994.62 D 4.81
Q
LE160960-P-WW-WT-BE-2001
TWL of the dirty backwash storage tank required as per wash water coming from
Existing 23 MLD WTP dirty backwash channel
TWL of the dirty backwash storage tank required as per wash water coming from New
20 MLD WTP dirty backwash channel
L&T Construction
Water & Effluent Treatment
IL of Clariflocculator
Slope 1 in 12 to be provided
Diameter of Clariflocculator
Hopper depth
DOCUMENT NO.
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
L&T Construction
Water & Effluent Treatment
Storage depth
IL of storage zone
CR
Velocity
h
Q
L
C
R
DOCUMENT NO.
DESIGNED
PG
1 .81
Q
LE160960-P-WW-WT-BE-2001
L&T Construction
Water & Effluent Treatment
head loss, h
IL of Clariflocculator
DOCUMENT NO.
DESIGNED
PG
CR
994.62 D 4.81
Q
LE160960-P-WW-WT-BE-2001
L&T Construction
Water & Effluent Treatment
Velocity
head loss, h
Clariflocculators
DOCUMENT NO.
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
TWL of the sludge sump required as per sludge coming from Existing 23 MLD WTP
TWL of the sludge sump required as per sludge coming from New 20 MLD WTP
Clariflocculators
TWL in Thickener
Diameter of thickener
IL of storage zone
DOCUMENT NO.
PG
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
Head loss in Thickener sludge line from Thickener to Thickened Sludge Sump :
L&T Construction
Water & Effluent Treatment
CR
Flow in pipe
Velocity
head loss, h
DESIGNED
PG
1 .81
Q
LE160960-P-WW-WT-BE-2001
L&T Construction
Water & Effluent Treatment
14 TUBE SETTLER
DESIGNED
PG
L&T Construction
Water & Effluent Treatment
DESIGNED
PG
Q
LE160960-P-WW-WT-BE-2001
REFERENCES :
L&T Construction
Water & Effluent Treatment
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
Q
CHECKED
VSD/PGK
A
Hydraulic flow calculations have been carried out to fix the hydraulic levels of various units t
of water from Inlet Chamber to Clear Water Reservoir.
1. Manual on Water Supply & Treatment, Third Edition- Revised and Updated, CPHEEO, Mi
New Delhi, May 1999
4. Levels shall be transferred to Hydraulic Flow Diagram of WTP (DWG No. LE160960-P-W
LE160960-P-WW-WT-BE-2001
D = Diameter of pipe, m
VSD/PGK
CR = Roughness Coefficient
L = Length of pipe, m
R = Hydraulic radius in m
DESIGNED
PG
𝑸=𝟎.𝟓𝟒𝟒𝟓𝒄_𝒆 √𝒈 𝒃
𝑯^(𝟏.𝟓)
LQ
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
LE160960-P-WW-WT-BE-2001
DESIGNED
〖 (� �
PG
a = area of opening, m2
Q
CHECKED
VSD/PGK
H= head loss, m
(Reference : CPHEEO Manual on Water Supply & Treatment, May 1999,Pg. 115, Cl. 6.2.9)
Where, K
g
V
H = KV2 / 2g
= Resistant co-efficient
90 deg. Bend
45 deg. Bend
Sluice gate
Exit to pipe
Entry to pipe
Butterfly valve
Plug valve
DESIGNED
K-Value
0.75
0.5
1.5
0.62
0.5
0.3
0.3
PG
CQR
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
A
DESIGN CRITERIA:
No of hours of operation
h
QR
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
Max. Water losses considered for design (Part 1, Volume 1, Cl. 6.20.5 pg 61 of 230)
Design Inlet raw water from Raw water reservoir including max. water losses
A
L&T Construction
Water & Effluent Treatment
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
Design flow including Max. water losses and Recycle flow for New 20 MLD WTP
1 HEAD LOSS BETWEEN CLEAR WATER RESERVOIR (CWR) AND TREATED WATER C
No. of compartment
94.Q62D
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
Head loss
velocity considered
head loss, h
HL(f) = KV2 / 2g
K = 0.5+1
DESIGNED
h
PG
Q
L
C
R
94.Q62D
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
1 .81
No. of Tees
Total Head loss from Chlorine Mixing Channel outlet chamber to CWR
IL of outlet chamber
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
DESIGNED
PG
Q
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
Q 0 . 5445 C e gb H
H
A
Channel width
Q
L&T Construction
Water & Effluent Treatment
Velocity in channel
n ( concrete surface)
S=
Loss of head =
K, coefficient
DOCUMENT NO.
PG
Q
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
A
velocity of flow
HL per bend
Q
L&T Construction
Water & Effluent Treatment
Depth
n ( concrete surface)
DOCUMENT NO.
PG
Q
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
S=
Loss of head =
DESIGNED
PG
2 HEAD LOSS BETWEEN TREATED WATER CHANNEL & FILTER INLET CHANNEL
CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
DESIGNED
PG
Q 0 . 5445 C e
Q
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
gb H
A
L&T Construction
Water & Effluent Treatment
Area of opening
HL(f) = KV2 / 2g
K = 0.5+1
PG
Q
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
velocity of flow
h=kv2/2g
No. of bends
PG
Sandsize , mm
% Sand smaller
than stated size
0.3
0.0
0.4
2.0
0.5
10
0.6
27
0.7
50
Q
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
0.8
70
h
A
9
where
h= head loss in m
L&T Construction
Water & Effluent Treatment
Sphericity of sand
V = Velocity of filtration
Y = grain sphericity
Pi = Fraction of sand
l
g
v
f3
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
CHECKED
VSD/PGK
Head loss for a clean filter is determined using Kozeny's equation for stratified beds
h kV (1 f ) 2 6
2
n
d
i 1
Q
pi
i
2
A
0.4
0.5
0.6
0.7
0.8
1.45
L
L&T Construction
Water & Effluent Treatment
0.3 0
10
27
50
70
90
100
DOCUMENT NO.
PG
Sand fraction
within
size
pi x100
17
23
20
20
10
0
d
Size of sand, mm % of sand larger than stated size adjacent sieve i
Q
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
cm x 100
3.5
4.5
5.5
6.5
7.5
12.25
-
A
h
h/l
L&T Construction
Water & Effluent Treatment
PG
100
Q
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
Max. Flow to each filter considered (with 30% overloading and one of 4 filters under
backwash)
Velocity of flow
Gate size:
A
L&T Construction
Water & Effluent Treatment
Area of opening
Velocity of water
Head loss h=
Width of channel
Velocity of water
DOCUMENT NO.
DESIGNED
PG
Q
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
slope,S
Loss of head
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
Depth
n ( concrete surface)
Loss of head
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
Width of channel
Velocity
slope,S
Loss of head
PG
Q
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
Length of weir
Width of launder,b
Diameter of clariflocculator
DESIGNED
PG
Q
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
say
A
L&T Construction
Water & Effluent Treatment
Wetted perimeter
Manning's coefficient,n
DESIGNED
PG
CHECKED
VSD/PGK
Launder width
>
A
C
L&T Construction
Water & Effluent Treatment
IL of launder
No of notches required =
PG
Q
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
The above selected launder size is adequate for carrying capacity indicated above
A
where
L&T Construction
Water & Effluent Treatment
8
15
C d tan( / 2 ) 2 g H
provide head as
5
2
PG
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
A
R
L&T Construction
Water & Effluent Treatment
Q
L
C
1.81
h R 4.81
994.62D
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
CHECKED
VSD/PGK
Head loss in the central column including port opening to be taken as maximum of
head loss, h
Velocity of flow
h=kv2/2g
Total no of bends
h=kv2/2g
DOCUMENT NO.
PG
L
C
h R 4.81
994.62D
Q
LE160960-P-WW-WT-BE-2001
DESIGNED
Q
1.81
CHECKED
VSD/PGK
A
h
L&T Construction
Water & Effluent Treatment
Total no of bends
Velocity of flow
Gate size
Area of opening
Velocity of water
k
DOCUMENT NO.
PG
Q
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
7 HEAD LOSS BETWEEN DISTRIBUTION CHAMBER OUTLET ZONE AND FLASH MIXER
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
DESIGNED
PG
Q
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
C
The Discharge through a rectangular weir at each outlet zone of distribution chamber is
given by
b= length of weir
H=
Lip of weir
IL of Distribution chamber
A
Q
h
L&T Construction
Water & Effluent Treatment
b= length of weir
H=
Lip of weir
IL of Flash mixer
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED
PG
CHECKED
VSD/PGK
b) Head loss through suppressed weir between Distribution chamber and Flash mixer
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
So, Headloss
Liquid depth
IL in inlet chamber
DOCUMENT NO.
PG
Q
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
DESIGNED
PG
Q
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
The maximum frictional resistance that can be offered by the filter grains in the fluidized
state is their submerged weight. The head loss across the filter bed in fluidised
conditions is given by,
Where,
hb
m
1 f l
head loss, hb =
say
Total Head
CR
Q
L
C
R
PG
1 .81
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
A
Flow in pipe
Dia of pipe
L&T Construction
Water & Effluent Treatment
h
Q
L
C
R
DESIGNED
PG
1 .81
Head loss in pipe line from farthest filter to the bottom of wash water tank:
Head loss, h
CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
Depth
n ( concrete surface)
S=
DESIGNED
PG
Q
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
Loss of head
b) Loss in Pipe
CR
Flow in pipe
Dia of pipe
Velocity
h
Q
L
C
R
DOCUMENT NO.
DESIGNED
PG
1 .81
994.62 D 4.81
Q
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
A
9 4 .6 2 D
L&T Construction
Water & Effluent Treatment
head loss, h
Q
DOCUMENT NO.
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
A
9 4 .6 2 D
L&T Construction
Water & Effluent Treatment
b) Loss in Pipe
CR
Flow in pipe
Velocity
head loss, h
DESIGNED
PG
1 .81
994.62 D 4.81
Q
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
TWL of the dirty backwash storage tank required as per wash water coming from
Existing 23 MLD WTP dirty backwash channel
TWL of the dirty backwash storage tank required as per wash water coming from New
20 MLD WTP dirty backwash channel
A
L&T Construction
Water & Effluent Treatment
IL of Clariflocculator
Slope 1 in 12 to be provided
Diameter of Clariflocculator
Hopper depth
DOCUMENT NO.
PG
Q
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
Storage depth
IL of storage zone
DOCUMENT NO.
DESIGNED
PG
CR
Velocity
h
Q
L
C
R
1 .81
Q
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
head loss, h
IL of Clariflocculator
DOCUMENT NO.
DESIGNED
PG
CR
994.62 D 4.81
Q
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
Velocity
head loss, h
Clariflocculators
DESIGNED
PG
Q
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
TWL of the sludge sump required as per sludge coming from Existing 23 MLD WTP
say
TWL of the sludge sump required as per sludge coming from New 20 MLD WTP
Clariflocculators
say
A
L&T Construction
Water & Effluent Treatment
TWL in Thickener
Diameter of thickener
IL of storage zone
DOCUMENT NO.
PG
Q
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
Head loss in Thickener sludge line from Thickener to Thickened Sludge Sump :
A
CR
L&T Construction
Water & Effluent Treatment
Flow in pipe
Velocity
head loss, h
DESIGNED
PG
1 .81
Q
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
14 TUBE SETTLER
DESIGNED
PG
Q
LE160960-P-WW-WT-BE-2001
CHECKED
VSD/PGK
PG
Q
LE160960-P-WW-WT-BE-2001
DESIGNED CHECKED
VSD/PGK
A
L&T Construction
Water & Effluent Treatment
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
A. Flocculator zone
B. Clariflocculator
C. Clarifier launder
*
F. Clarifier Control Room -
L&T Construction
Water & Effluent Treatment
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
6 Filter house -
*
E. Filter House Gallery
J. Outlet Chamber -
*
K. Filter Annexe Building -
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
13 *Centrifuge Building -
i. Ground floor
16 *Chemical House -
*
C. Washroom
L&T Construction
Water & Effluent Treatment
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
*
E. Control Room
C. *Washroom
17 *
A. Chlorinator room -
*
B. Chlorine Tonner shed -
A. *Administration Hall
B. *Officer Rooms
L&T Construction
Water & Effluent Treatment
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
D. *Canteen room
E. *Conference room
A. *Laboratory
B. *Toilets
C. *Store room
19 *Equipment Storeroom -
20 *Workshop -
21 *Security Cabin -
22 *Covered garages -
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
2. Raw Water Reservoir, Raw Water Pumping Station, Clear Water Reservoir and Clear Water Pu
L&T Construction
Water & Effluent Treatment
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
2 Inlet channel with Parshall Flume PF-02 10 m (L) x 1.1 m (W) x 0.6 m (LD) + 0
D.Clarified water channel CWC-06 A/B 0.5 m (W) x 0.5 m (LD) + 0.5 m FB
E.Common Clarified Water / Bypass
Channel BC-07 0.8 m (W) x 0.55 m (LD) + 0.5 m FB
*
F. Clarifier Control Room - 5 m (L) x 5 m (W) x 3.5 m Ht
L&T Construction
Water & Effluent Treatment
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
*
E. Filter House Gallery 37.3 m (L) x 5 m (W)
H. Drain Pit for Filter House 2 m (L) x 1 m (W) x 1.5 m (LD) + 0.3
*
I. Chlorine Mixing Chamber (With
Baffles) CMC-13 7.8 m (L) x 1.9 m (W) x 2 m LD+ 0.5
*
K. Filter Annexe Building - 12.2 m (L) x 7.3 m (W) x 4.5 m Ht
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
10 Gravity Sludge Thickener ST-18 8.7 m Dia x 3.5 m (SWD) + 0.5 m (FB
13 *Centrifuge Building -
16 *Chemical House -
A. PACl Storage Tanks PAST-21 A/B 2.6 m (L) x 2.6 m (W) x 2.5 m (LD) +
*
C. Washroom 3.5 m (L) x 4 m (W)
L&T Construction
Water & Effluent Treatment
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
D. Drain pit for Chemical House 3 m (L) x 1 m (W) x 1.5 m (LD) + 0.3
*
E. Control Room 4 m (L) x 4 m (W)
A. DWPE dosing tank PDT-22 A/B 2.2 m (Dia) x 2 m (LD) + 0.5 m (FB)
B. PACl dosing tank PADT-21 C/D 1.5 m (Dia) x 2m (LD) + 0.5m (FB)
17 *
A. Chlorinator room - 7 m (L) x 4 m (W) x 4.5 m Ht
*
B. Chlorine Tonner shed - 9 m (L) x 7 m (W) x 4.5 m Ht
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
C. *Staff room cum Toilets / Washroom 6.08 m (L) x 5.15 m (W) x 3.5 m Ht
L&T Construction
Water & Effluent Treatment
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
2. Raw Water Reservoir, Raw Water Pumping Station, Clear Water Reservoir and Clear Water Pu
L&T Construction
Water & Effluent Treatment
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
Water Treatment
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
11 Tube Setller Media - 2 lot MOC: Plates: uPVC;
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
Type: Screw
17 Centrifuge Feed Pump CFP - A/B 2 (1W+1S) MOC: Casing: CI; Rotor: Alloy steel;
Shaft: CS;
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
Chemical Handling
L&T Construction
Water & Effluent Treatment
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
PADT - 21
23 PACl dosing Tank 2 MOC: FRP / HDPE
C/D
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
Laboratory Equipment
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
Miscelleneous Utilities
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) Type: Non - TYPE / MOC
clog Submersible pumps;
Drain Pump for Filter
36 1 MOC: Casing: CI; Impeller: SS 304;
house
Shaft: SS 305
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
Lifting Equipment
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
Motor details, Power, Manufacturer, Country origin, model numbers, MOC, efficiency and all other vendor item details will be provided by
Notes:
The above equipment list is for Water treatment plant only. Raw Water Pumping Station, Clear Water Water Pumping Station Equipment
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
Water Treatment
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
11 Tube Setller Media - 2 lot MOC: Plates: uPVC;
Angle of inclination: 60deg
Minimum thickness of plate
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
Head (m WC):
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
Hours of operation:
Chemical Handling
L&T Construction
Water & Effluent Treatment
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
PADT - 21
23 PACl dosing Tank 2 MOC: FRP / HDPE Tank dimensions:
C/D
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
Laboratory Equipment
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
Miscelleneous Utilities
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) Type: Non - TYPE / MOC
clog Submersible pumps; SPECIFIC
Drain Pump for Filter
36 1 MOC: Casing: CI; Impeller: SS 304;
house
Shaft: SS 305 Head (m WC):
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
Lifting Equipment
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001
SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
Motor details, Power, Manufacturer, Country origin, model numbers, MOC, efficiency and all other vendor item details will be provided by
Notes:
The above equipment list is for Water treatment plant only. Raw Water Pumping Station, Clear Water Water Pumping Station Equipment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
Rapid Gravity Sand Filter Filter Control Box for Rapid Gravity
3 288.41 2.0 225.9
(RGSF-09 A) Sand Filter (RGSF-09 A)
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
Rapid Gravity Sand Filter Filter Control Box for Rapid Gravity
4 288.41 2.0 225.9
(RGSF-09 B) Sand Filter (RGSF-09 B)
Rapid Gravity Sand Filter Filter Control Box for Rapid Gravity
5 288.41 2.0 225.9
(RGSF-09 C) Sand Filter (RGSF-09 C)
Rapid Gravity Sand Filter Filter Control Box for Rapid Gravity
6 288.41 2.0 225.9
(RGSF-09 D) Sand Filter (RGSF-09 D)
7 Chlorine Mixing Chamber Treated water line main header 1103.40 1.0 624.9
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
Back Wash Tank Pumps Common Delivery line To Back Wash Overhead
16 329.02 1.5 278.6
Tank (BOHT-10)
Back Wash Overhead Tank Common header for Filters Back Wash
17 1759.68 3.0 455.6
(BOHT-10) lines
Common header for Filters Back Rapid Gravity Sand Filter (RGSF-09
19 1759.68 2.5 499.1
Wash lines A)
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
Common header for Filters Back Rapid Gravity Sand Filter (RGSF-09
20 1759.68 2.5 499.1
Wash lines B)
Common header for Filters Back Rapid Gravity Sand Filter (RGSF-09
21 1759.68 2.5 499.1
Wash lines C)
Common header for Filters Back Rapid Gravity Sand Filter (RGSF-09
22 1759.68 2.5 499.1
Wash lines D)
AIR LINES
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
23
Individual Air Blower discharge
Blower Common delivery header 1759.7 15.0 203.8
(BL-A/B)
24
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
25 …… …… ……
Blower (BL-A/B) Air Vent Line Atmosphere
26 …… …… ……
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
SLUDGE LINES
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
Tube Settler Feed Pumps Common Discharge Header - Bypass line for
38 240.2 1.5 238.1
Flow meter
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
40 Thickener Feed Pump (TFP-A) TFP discharge - Common header 24.1 1.5 75.4
41 Thickener Feed Pump (TFP-B) TFP discharge - Common header 24.1 1.5 75.4
42 TFP discharge - Common header - Bypass line for flow meter 24.1 1.5 75.4
43 Sludge Thickener (ST-18) Thickened Sludge sump (TSS-19) 86.7 0.9 184.6
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
58 Tube Settler Feed Pumps (TSFP-A/B) Common Discharge Header 240.2 1.5 238.1
59 Thickener Feed Pumps (TFP-A/B) Common Discharge Header 24.1 1.5 75.4
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
CHEMICAL LINES
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PACL Dosing Tank
71 Dosing Pump - Suction header 0.4 1.2 10.3
(PADT-21D)
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
77 Common Delivery line to Flash Mixing Tank (FM-03) 0.4 1.5 9.2
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
92 Tube Settler (TS-16) Recycle Water Sump (RWS-20) 238.6 0.9 306.3
93 Sludge Thickener (ST-18) Recycle Water Sump (RWS-20) 24.1 0.9 97.3
94 Recycle Water Pump (REWP-A) Common Discharge Header 182.0 1.5 207.2
95 Recycle Water Pump (REWP-B) Common Discharge Header 182.0 1.5 207.2
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
DRAIN LINES
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
108 Filter House Drain Pump Nearest Drain 14.3 1.5 58.1
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
Clariflocculators Common
111 Nearest Drain ---- ---- ----
Sludge header
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
Overflow line - PACL Storage
112 Tank Nearest Drain ---- ---- ----
(PAST-21A)
Overflow line - PACL Storage
113 Tank Nearest Drain ---- ---- ----
(PAST-21B)
Drain line - PACL Storage
114 Tank Nearest Drain ---- ---- ----
(PAST-21A)
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
Drain line - PACL Storage
115 Tank Nearest Drain ---- ---- ----
(PAST-21B)
Overflow line - PACL Dosing
116 Tank Nearest Drain ---- ---- ----
(PADT-21C)
Overflow line - PACL Dosing
117 Tank Nearest Drain ---- ---- ----
(PADT-21D)
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
124 Chemical House Drain Pump Nearest Drain 5.9 1.5 37.1
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
127 Common header Common line for Chemical House ---- ---- ----
129 Common line for Flushing Clariflocculator (CF-05A) Sludge Line ---- ---- ----
130 Common line for Flushing Clariflocculator (CF-05B) Sludge Line ---- ---- ----
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
131 Common line for Flushing Tube Settler (TS-16) Sludge Line ---- ---- ----
132 Common line for Flushing Thickened Sludge Line ---- ---- ----
133 Common line for Flushing Centrifuge feed Pump CFP-A Suction ---- ---- ----
134 Common line for Flushing Centrifuge feed Pump CFP-B Suction ---- ---- ----
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
135 Common line for Flushing Centrifuge feed Pump CFP-A delivery ---- ---- ----
136 Common line for Flushing Centrifuge feed Pump CFP-B delivery ---- ---- ----
137 Common line for Flushing Centrifuge CEN-A ---- ---- ----
138 Common line for Flushing Centrifuge CEN-B ---- ---- ----
L&T Construction
Water & Effluent Treatment
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT
TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI
Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)
PIPE SCHEDULE
REFERANCE DRAWING:
NOTES
1) Piping for chlorination system is not included in the above list. Separate list will be submitted for the same as per vendor details
2) The above pipe line list is only for New 20 MLD WTP. Raw Water Reservoir, Raw Water Pumping Station, Clear Water Reservo
DOCUMENT NO. DATE REV SHEET
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
NES
DOCUMENT NO. DATE REV SHEET
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LINES
DOCUMENT NO. DATE REV SHEET
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
C
80.0 ---- CI 80-SL-226-CI LA Sludge
C
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
L LINES
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
ENTRATE LINES
DOCUMENT NO. DATE REV SHEET
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
INES
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
TER LINES
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
LE160960-P-WW-WT-BE-2001 11.07.2017 C 22
PG VSD/PGK RVS
Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)
EDULE
Clear Water Reservoir, Clear Water Water Pumping Station Pipe lines are not included in the above list.
L&T Construction
Water & Effluent Treatment
TITLE : GATE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
Width available,
Height of gate
through gate
Liquid depth
Max. Flow
Location
Tag No.
Sl. No.
(m3/s)
(mm)
(mm)
mm
MSG
Distribution
1 -001 & 2800 1000 500 500 0.156 0.25
Chamber
002
Clariflocculators
Bypass Channel MSG-
2 800 1150 600 1500 0.330 0.90
from Distribution 003
Chamber
C
MSG-
004,
3 Filter Bed Inlet 005, 700 500 400 400 0.107 0.16
006 &
007
L&T Construction
Water & Effluent Treatment
TITLE : GATE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
Width available,
Height of gate
through gate
Liquid depth
Max. Flow
Location
Tag No.
Sl. No.
(m3/s)
(mm)
(mm)
mm
MSG-
008,
Washwater Outlet
4 009, 700 500 500 800 0.376 0.40
of Filter Bed
010 &
011
NOTES:
1 Gate dimensions are subject to change during detail engineering based on availability of size as p
REFERENCE DRAWINGS:
DESIGN
TITLE : GATE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI PG/SD
Width available,
Height of gate
Max. Velocity
through gate
Liquid depth
Max. Flow
Location
Tag No.
Sl. No.
(m3/s)
(mm)
(mm)
(m/s)
mm
MSG
Distribution
1 -001 & 2800 1000 500 500 0.156 0.25 0.63
Chamber
002
Clariflocculators
Bypass Channel MSG-
2 800 1150 600 1500 0.330 0.90 0.48
from Distribution 003
Chamber
C
MSG-
004,
3 Filter Bed Inlet 005, 700 500 400 400 0.107 0.16 0.67
006 &
007
L&T Construction
Water & Effluent Treatment
DESIGN
TITLE : GATE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI PG/SD
Width available,
Height of gate
Max. Velocity
through gate
Liquid depth
Max. Flow
Location
Tag No.
Sl. No.
(m3/s)
(mm)
(mm)
(m/s)
mm
MSG-
008,
Washwater Outlet
4 009, 700 500 500 800 0.376 0.40 0.94
of Filter Bed
010 &
011
NOTES:
1 Gate dimensions are subject to change during detail engineering based on availability of size as p
REFERENCE DRAWINGS: