Sie sind auf Seite 1von 380

L&T Construction

Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

DESIGN CRITERIA:

References:
Manual on Water Supply & Treatment, Third Edition- Revised & Updated, CPHEE
A) 1999

B) IS 14371(1996): Measurement of Liquid flow in open channels - Parshall and San

C) Tender document for Proposed 20 MLD WTP at Nathavali

Raw water source: Gang Canal, conveyed through intake structure& via Raw wa
site

WTP Treated water output Capacity

No of hours of operation

Design Outlet Capacity of WTP


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Max. Water losses considered for design (Part 1, Volume 1, Cl. 6.20.5 pg 61 of 23

Design Inlet raw water from Raw water reservoir including max. water losses

Recycle Flow Details ( Total Recycle flow = Tube Settler Supernatant Flow + Thick
Supernatant Flow)

Recycle flow for New 20 MLD WTP

Recycle flow for New 20 MLD WTP


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Design flow including Max. Water losses and Recycle flow for New 20 MLD WTP

Design Overload flow for Interconnecting pipes, valves on pipes and Channels (Pa
Volume 1, Cl. 6.30.5.1 pg 104 of 230)

Raw water quality (Part 1, Volume 1, Cl. 6.20.4, pg. 60-61 of 230 (Table 9))

Turbidity

Coliform count

Treated water quality (Part 1, Volume 1, Cl. 6.20.6, pg. 61-63 of 230 (Table 11)

Turbidity
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Residual Chlorine

E. Coliform or thermotolerant coliform bacteria

Total Coliform bacteria

1 INLET CHAMBER

No. of Units

Design Flow to Inlet Chamber

Detention time (Part 1, Volume 1, Cl. 6.30.5.2, pg. 104 of 230)

Volume of the chamber required

Liquid depth considered

Area of Inlet chamber

Length of chamber considered

Width of Chamber
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Volume of the chamber provided

Free Board

Check for overloading

Overloading as per NIT (Part 1, Volume 1, Cl. 6.20.10, pg. 64 of 230)

Design flow with overloading

Detention time provided

Size of Inlet Chamber:

2 INLET CHANNEL WITH PARSHALL FLUME

Design flow from Inlet Chamber to Parshall Flume


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Flow capacity required as % of design flow (Part 1, Vol.1, Cl. 6.30.5.3, Pg 104 of 2

Flow to Parshall flume

According to IS 14371 (1996) (Part 1, Volume 1, Cl. 6.20.9, pg. 64 of 230 (Tabl

Selecting Parshall flume No.:

Throat width b

C value
C

n value

Upstream (entrance section) head - ha

submergence ratio

head at throat section - hb


C
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

C
Height of the broad-crested weir hp2

C
So, HL

Provided Hea

l - throat

l1 - entrance
C
C

l2 - exit

Length of flume (approx.)

Approach channel

b1

length of channel
C

Provide width of channel

Liquid depth
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

So, velocity in channel

Height of the broad-crested weir hp2

Side wall height hc

Free board required

Free board provided

Check for Froude number

Fr =

Size of approach channel:

Downstream channel
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

length

liquid depth considered

velocity in channel
C
Size of downstream channel:
C
C
C

Total channel length

Total channel length provided

Inlet zone of Flash mixer


C

A Perforated baffle wall at flash mixer inlet shall be provided to avoid short circuitin

Width of inlet zone provided before Perforated baffle wall

Length of inlet zone provided

Liquid depth of inlet zone provided


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

3 FLASH MIXER

No. of Units

Design flow from Parshall flume to Flash Mixing Tank

Detention time considered (Part 1, Volume 1, Cl. 6.20.2, Table 8, Pg 58 of 230)

Volume required

Liquid depth considered

Area of flash mixer required

Considering square chamber, side of chamber

Volume of the flash mixer provided


C

Free Board
C

Check for overloading

Overloading as per NIT (Part 1, Volume 1, Cl. 6.20.10, pg 65 of 230)


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Flow to Flash mixer with overloading

Detention time provided

Detention time range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Table 8, Pg 58 of 2

Size of Flash Mixer (excluding perforated baffle with inlet zone):

4 DISTRIBUTION CHAMBER & OUTLET ZONES

Clariflocculator (CF-05 A)

Outlet Zone1

Flash Distribution Chamber Bypass Channel


Mixer (DC-04)

Outlet Zone2
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

4A DISTRIBUTION CHAMBER Clariflocculator (CF-05 B)

No. of Units

Design flow from Flash mixing tank to Distribution chamber

C
C

Detention time

Volume of the chamber required

Width of chamber

Length of chamber

Liquid depth considered

Volume of the chamber provided

Free Board

Size of Distribution Chamber:

Check for overloading


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Considered Overloading

Flow to Distribution chamber with overloading

Detention time provided

4B DISTRIBUTION CHAMBER OUTLET ZONES

No. of Outlet zones


These outlet zones are provided at both sides of distribution chamber and convey
adjustable weirs

Flow to each distribution chamber outlet zone

Detention time

Volume of each zone required

Length of each zone


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Liquid depth of each zone

Width of each zone

Free Board

Size of each Distribution Chamber outlet zone:

5 CLARIFLOCCULATORS

Design flow from Distribution Chamber to Clariflocculators

No.of(𝑸𝒅^𝟑
Units (As per NIT, Part 1, Volume 1, Cl. 6.30.5.10, Pg 106 of 230)
𝒉)/𝒍=𝟐𝟗𝟑𝟐𝟑 �
Design flow capacity per Unit

5A Flocculation zone of clariflocculator


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Retention time considered (As per NIT, Part 1, Volume 1, Cl. 6.30.5.10, Pg 106 of

Volume of flocculator required

Side water depth considered

Plan area required for the flocculator

Consider feed water velocity

Inside dia of central column arrived

Consider wall thickness for central column and flocullator wall as

Outer dia of Central column

Area for the central column :

Total area required for flocculator zone including central pipe

Inside Diameter of the flocculator required

Inside Diameter of the flocculator provided

Plan area for the flocculator

Volume of flocculator required


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Assume thickness of flocculator outer wall

Flocculator outer Dia

Area of flocculator including walls

Volume provided in the flocculator including walls

Free board

Size of Flocculator zone:

Opening Port

Consider velocity in port

Total area of port

Considering 4 nos of ports, area of each port

Assume width of port

Height of port

Provide 4 ports of size 0.20 m (W) X 0.30 m (H)


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

5B Clarifier zone of Clariflocculator

Surface Loading rate (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230)

Clarifier Area required :

Total Area of clariflocculator required

Dia of clariflocculator required

Width of launder provided

Dia of clariflocculator provided including inside launder and its wall thickness

Dia of clariflocculator provided

Free Board

Size of Clariflocculator:

Area provided for clarification

Volume of clarifier zone

Detention time for clarifier zone


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Detention time range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230)

So, actual Surface Loading rate provided

(As per NIT, Part 1, Volume 1, Cl. 6.30.5.10, Pg 106 of 230)

Check for overloading:

Hydraulic overloading (As per NIT, Part 1, Volume 1, Cl. 6.20.10, Pg 65 of 230)

Design flow with overloading per unit

Then, detention time in clarifier zone

Detention time range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230)

Surface Loading rate provided

Surface Loading rate range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

5C Clariflocculator launder sizing


Hydraulic overloading considered (As per NIT, Part 1, Volume 1, Cl. 6.30.5.1, Pg
230)

Flow with Hydraulic overloading per unit

Flow to one half of the launder

Velocity considered

Area of the flow

Width of the launder considered

Liquid depth as per hydraulics

Size of the clariflocculator launder:

Check for Weir loading

Hydraulic overloading (As per NIT, Part 1, Volume 1, Cl. 6.20.10, Pg 65 of 230)

Flow with overloading condition per unit


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Peripheral length of clariflocculator (Inside launder)

Provide C/C of Notch

No of notches required

Flow through each notch

Flow through V notch =

where

Cd = Coeffecient of discharge= 0.6 for 90 0 notch

Θ = angle of notch , in degrees ,


5
8
tan(2  / 2) 2 g H 2
C d m/s
g = acceleration due to gravity,
15
H= head over notch, m

Hence head of notch


C

However head provided

Weir loading
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

(As per NIT, Part 1, Volume 1, Cl. 6.30.5.10 pg 106 of 230)

Provide 341 triangular notches with 0.075 m LD at a c/c spacing of 0.2 m


C

5D Clarified water Channel


C

No. of channels for each clariflocculator

Hydraulic Overloading (Part 1, Volume 1, Cl. 6.30.5.1 pg 104 of 230)


C

Design flow per channel


C

Consider velocity of flow


C

Area
C

Consider Depth of channel as

Width of the channel


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Free Board

Size of Clarified Water Channel (from clariflocculator):

5E Common Clarified Water / Bypass Channel

No. of channels

Design flow

Hydraulic Overloading (Part 1, Volume 1, Cl. 6.30.5.1 pg 104 of 230)


C

Flow per channel with overloading

Consider velocity of flow

Area
C

Consider Depth of channel as

Width of the channel


C

Free Board

Size of Common Clariflocculator Bypass Channel:


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Sludge from Clariflocculators

Design flow to Clariflocculators including recycle

TSS Considered at raw water inlet of (Max.)

Recycle flow

TSS Conc. in recycle flow

TSS Concentration in flow to Clariflocculators

Suspended solids in the supernatant of the Clariflocculators (Part 1, Volume 1, Cl.


6.20.5, pg 61 of 230)

TSS Conc. removed in Clariflocculators

Quantity of Total suspended solids removed in clariflocculators

Sludge of PACl
Assumed theoretical quantity of sludge produced by PolyAluminium Chloride (PAC
coagulant

Max. Dosage of PACl considered


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Quantity of PACl dosed per day

Quantity of PACl removed as sludge

130% over design considered for quantiy of PACL removed as


sludge (Ref. STC/RUSDP/SGN/01/232, additional observations, Sl.
No. 7)

Total amount of sludge from clariflocculators = TSS quantity removed in Clarifloccu


+ Quantity of PACl removed as sludge

Total amount of sludge from clariflocculators

Consistency of clariflocculator sludge considered

Consider specific gravity of clariflocculator sludge

Volume of clariflocculator sludge

Clarified water from Clariflocculators


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Design Clarified water flow from Clariflocculators = Design Flow to Clariflocculator

Clarified water from Clariflocculators

6 RAPID SAND FILTERS

6A Filter Inlet Channel

Fliter inlet channel

Design flow of Clarified water from Clariflocculators


C

Hydraulic Overloading considered (Part 1, Volume 1, Cl. 6.30.5.1 pg 104 of 230)

Flow into channel with overloading

Velocity through channel considered

Area

Depth of channel

Width of channel
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Free Board

C
Size of Filter Inlet Channel:

6B Rapid Sand Gravity Filters

Type of filtration

Design Flow to Filters

No. of Twin Bed Filters

No. of Twin Bed Filters (working)

Design flow per bed

Average Rate of filtration (Part 1, Volume 1, Cl. 6.20.2, Table 8. Pg 59 of 230)

Area of filtration required per bed

Length of twin bed filter considered (excluding channel between single bed filters)

Length of one bed

Width of each bed required


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Width of the bed provided

Free board

Length to Width ratio

As per CPHEEO clause 7.6.3.5 the L/B ratio of filter bed shall be 1.11 to 1.66

Area of each twin bed filter provided

Rate of filtration adopted

(Part 1, Volume 1, Cl. 6.20.2, Table 8. Pg 59 of 230)

Check for overloading:

Hydraulic overloading (As per NIT, Part 1, Volume 1, Cl. 6.20.10, Pg 65 of 230)

Design flow with overloading per twin bed filter

Area of each twin bed filter provided

Rate of filtration at overloading condition


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

(Part 1, Volume 1, Cl. 6.20.2, Table 8. Pg 59 of 230)

Check for filtration during backwash:

Considering No. of Twin Bed Filters to be backwashed at a time

No. of Twin Bed Filters working during backwash of 1 twin bed filter

Total design flow to Filters

Design flow per each working twin bed filter under one twin bed back wash

Area of each twin bed filter provided

Rate of filtration through each working filter during backwash time

(Part 1, Volume 1, Cl. 6.20.2, Table 8. Pg 59 of 230)

Note: 3 twin bed filters are capable to meet the capacity of net 20 MLD flow during
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Filter Media Specifications

Depth of sand bed (Part 1, Volume 1, Cl 6.30.5.13, Pg 108 of 230)

Depth of gravel layer considered

Water column (Part 1, Volume 1, Cl 6.30.5.13 pg 108 of 230)

Size of Rapid sand Filter - Twin bed:

Size of Rapid sand Filter - Single bed:

Sand Media Specifications

Effective size (Part 1, Volume 1, Cl 6.30.5.13, Pg 108 of 230)

Uniformity coefficient (Part 1, Volume 1, Cl 6.30.5.13, Pg 108 of 230)

Silica content (Part 1, Volume 1, Cl 6.30.5.13, Pg 108 of 230)

Specific Gravity
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Estimation of sand depth ( Ref : Page 634 of CPHEEO Manual May 1999 Edit

Assume the depth of sand as 900 mm and effective size of sand as 0.65 mm

The sand depth can be checked against break through of floc through sand bed b

calculating minimum depth required using Hudson formula

Q : Rate of filtration in m3/m2/hr (max)

d : Sand size in mm - 0.65 mm ( Mean diameter)

h : Terminal head loss in M - 2.5M ( Under exigency condition)


B : Break through index, 4x10-4 considered for poor response to filtration and ave
degree of pre treatment

Therefore Sand depth (l) =

Depth of sand provided (As per Part 1, Volume 1, Cl 6.30.5.13, Pg 108 of 230)

Provided depth of sand is sufficient to avoid breakthrough of floc

Under Drainage System (Nozzles)


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

A. No of nozzles required based on inlet flow and backwash flow

Area of each single bed

Design Flow per each twin bed filter

Flow per single bed

Rate of Back wash Flow (Part 1, Volume 1, Cl. 6.20.2, Table 8, Pg 59 of 230)

Backwash water flow per single bed


As the backwash flow is higher than the inlet flow, the nozzles are designed for
backwash flow

Capacity of each filter nozzle

Considering capacity of nozzles

No. of nozzles required per single bed

No. of nozzles required per twin bed

Total number of nozzles required for 4 twin beds

B. No of nozzles required based on surface area

Providing numbers of nozzles per sq. m area of filter bed (based on design standa
(Part 1, Volume 1, Cl. 6.30.5.14 pg 110 of 230)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

No. of nozzles required per single bed

No. of nozzles required per twin bed

Total number of nozzles required for 4 twin beds

Total number of Polypropylene nozzles provided

6C Treated Water Channel

No. of channels

Hydraulic Overloading as per NIT (Part 1, Volume 1, Cl. 6.30.5.1, Pg 104 of 230)

Design flow from Filters = Design Flow to Filters

Flow from filters with overloading

Velocity considered

Area of channel

Width of channel

Depth of channel
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Free board

Size of Treated water channel:

6D Filter House Gallery

6E Overall Filter house:

Width of gutter for twin bed filter

Length of Overall Filter House

Please refer separate corresponding sketch for length of filter house.

Width of Filter House

Overall Filter house size

Filter Backwashing
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Water Backwash

Rate of Back wash Flow (Part 1, Volume 1, Cl. 6.20.2 Table 8. Pg 59 of 230)

Considering no. of twin bed to be backwashed at a time

Area for one filter (one half of a twin bed)

Backwash water flow rate required for single bed

Backwash water flow rate required for twin bed

Duration of Back wash (Part 1, Volume 1, Cl. 6.30.5.18 pg 115 of 230)

Volume of Back wash

6F Dirty Backwash Water Channel


Dirty Back wash flow from twin bed filter = Backwash water flow required for twin b
filter

Dirty Back wash flow from twin bed filter

Velocity through channel considered

Area
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Width of channel considered

Liquid depth provided

Provided area of channel

Free board

Size of Dirty Backwash Channel:

6G Backwash Water Overhead Tank

No. of twin bed filters for which the backwash requirement to be stored (Part 1, Vo
1, Cl. 6.30.5.18 pg 115 of 230)

Backwash water storage required for one twin bed filter bac

Service Water Requirement

Considering Water requirement for domestic purposes

Considering Water requirement for Emergency purposes

Volume of water for chemical preparation for 1 hr

Considering Water requirement for tank cleaning & flushing purposes


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Service Water storage required

Backwash Water Overhead Tank storage required (including service water storag

Consider Liquid depth of backwash water tank as

Area of the tank

Consider Width of tank

Length of tank

Area of the tank provided

Free board

Volume of tank provided

Backwash tank shall be provided on rooftop of filter house

Size of Backwash water tank:


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Backwash tank Pumps

Backwash tank Pumps

No. of working pumps

Hours per shift (Part 1, Vol.1, Cl. 6.30.5.18, Pg 115 of 230)


Assuming all working filters to be backwashed in 1 shift, no. of backwashes (Part
Vol.1, Cl. 6.30.5.18, Pg 115 of 230)

Duration of 1 backwash (Part 1, Vol.1, Cl. 6.30.5.18, Pg 115 of 230)

Max. time between 2 consecutive backwashes in 1 shift

Therefore, Duration of tank fill

Capacity of each Backwash pump provided

However Pump capacity provided

Air Backwash

No. of blowers considered

No. of working blowers

Area of each twin bed filter


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Rate of Air Backwash (Part 1, Vol.1, Cl. 6.20.2 Table 8. pg 59 of 230)

Air Flowrate required per blower

Additional flow rate required (Part 1, Vol.1, Cl. 6.30.5.16 Table 18. pg 112 of 230)

Blower capacity provided

6H Filter house - Drain pit (Part 1, Vol.1, Cl. 6.30.5.19, pg 115 of 230)

Length of the pit

Width of the pit

Liquid depth

Volume of pit

Free board

Size of the Drain pit

Filter house - Drain Pumps (Part 1, Vol.1, Cl. 6.30.5.19, pg 115 of 230)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

No. of Drain pumps

Duration of tank fill

Capacity of each Drain pump required

Min capacity of pump to be provided (Part 1, Vol.1, Cl. 6.30.5.19, pg 115 of 230)

Pump capacity provided

6I Chlorine Mixing Chamber

Design flow to Chlorine Mixing Chamber from Treated Water Channel


Ultimate capacity required for chlorine mixing chamber (Part 1, Volume 1, Cl 6.20
of 230)

Minimum Hydraulic Retention time provided

Volume required

Consider liquid depth

Area required

Considering width to length ratio


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Width of chamber

say

Length of chamber

Length of chamber (Including 4Nos baffles)

Freeboard

Size of Chlorine mixing Chamber (With Baffles):

6J Chlorine Mixing Chamber Outlet Chamber:

Design flow to Outlet chamber

Length of chamber

Liquid depth considered

Detention time considered

Volume Chamber

Width of chamber provided

Freeboard
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Chlorine Mixing Chamber Outlet Chamber:

Flow from Chlorine mixing chamber to Clear Water Reservoir = Flow to Chlorine m
mixing chamber for Filters Back Wash & Service Water)

Flow withdrawn from Chlorine mixing chamber for 4 Twin Beds Filters Back Wash

Flow withdrawn from Chlorine mixing chamber for service water

Remaining Flow to Clear Water Reservoir

7 DIRTY BACKWASH STORAGE TANK

Flow of backwash water for Filters of New 20 MLD WTP


Backwash water storage required is volume of backwash water required per twin b
wash

No. of twin beds washed per day

Volume of water required for all 4 beds washes

Future 20 MLD WTP


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Flow of backwash water required for future 20 MLD WTP for design = Flow of bac
design

Design Flow of backwash water required for all beds washes for future 20 MLD W

Existing 23 MLD WTP

Considered No. of twin beds washed per day for existing 23 MLD WTP

Length of each twin bed

Width of each twin bed

Area of each twin bed

Rate of Back wash Flow considered

Duration of Back wash (Part 1, Volume 1, Cl. 6.30.5.18 pg 115 of 230)

Backwash volume required per wash per twin bed

Design Flow of backwash water required for all beds washes for existing 23 MLD

Dirty Backwash water quantity from all 3 WTPs


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Dirty Backwash water storage required = Waste water generated during one back

Dirty Backwash water storage provided for maximum backwash volume

Consider Liquid depth of the tank as

No. of tanks provided

Area of the tank

Width of tank

Length of tank

Area of the tank provided

Free board

Volume of tank provided

Size of Dirty Backwash storage tank:

Tube Settler feed pumps

Total flow in a day for Tube Settler

No. of pumps working


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

No. of standby pumps

Capacity of pump assuming 16 hrs. working

Capacity of pumps provided

8 TUBE SETTLER
Flow (Filter backwash water) to the tube settler = Dirty Backwash water quantity f
3 WTPs

No. of tube settlers

No of compartments in tube settler considered

SLR provided (As per vendor recommendations, it may vary)

Plan area required

Width of the tube settler provided (Size provdied tentatively, it may vary as per ven
recommendations)
Length of the tube settler arrived (Size provdied tentatively, it may vary as per ven
recommendations)

Length of each compartment of tube settler

Height of tube deck


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Space below tube deck

Space above tube deck

Free board

Side Water Depth

Total depth

Volume of total tube deck required (actual )

Volume of total tube deck with 10% margin

Angle of inclination of tubes with horizontal

Tan 60

Angle Correction

Width of each chamber with angle correction

Consider a inlet chamber at the length of the tube settler - 0.3 m

Width provided

Size of tube settler with two hoppers (Tentative size only, may vary as per ve

Size of Tube Settler:


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Overall size of Tube Settler:

For New, Existing and Future WTPs

SLUDGE FROM CLARIFLOCCULATORS

New 20 MLD WTP

Total amount of sludge from clariflocculators

Volume of clariflocculators sludge

Future 20 MLD WTP

Total amount of sludge from clariflocculators (Considered similar to New 20 MLD W

Volume of clariflocculator sludge (Considered similar to New 20 MLD WTP)

Existing 23 MLD WTP


Total amount of sludge from clariflocculators (Considered in proportion to New 20
WTP)

Volume of clariflocculator sludge (Considered in proportion to New 20 MLD WTP)


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Total amount of sludge from clariflocculators (From all 3 WTPs)

Total Volume of clariflocculators sludge (From all 3 WTPs)

SLUDGE FROM TUBE SETTLER

Total flow to Tube Settler

TSS in flow to filters

Outlet TSS in Filtered water considered


Total solids removed in filter (settled on bed during filtration and washed away as f
backwash)

Solid entering tube settler as filter backwash

Solids removal in tube settler considered (as per vendor)

Therefore, solids removed as underflow

Consistency of tube settler sludge

Consider specific gravity of tube settler sludge

Volume of tube settler sludge

Total flow of reclaimed backwash as supernatant


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

TSS in supernatant

9 SLUDGE SUMP

Number of sludge sump provided

Total amount of sludge solids produced (From clariflocculators and Tube settler)

Total volume of sludge generated per day (From clariflocculators and Tube settler)

Retention time considered

Volume of sump

Liquid depth considered

Plan area

Length of sludge Sump

Width of sludge sump

Total Volume of Sludge sump

Free board

Size of Sludge sump:


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Sludge Thickener feed pumps

No. of pumps working

No. of standby pumps

Capacity of pump required

Capacity of pump provided

10 GRAVITY SLUDGE THICKENER

Number of thickeners

Side Water Depth considered

Free board considered

Based on solid loading rate:

Solid loading rate considered

Total sludge produced per day

Total volume of sludge generated per day


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Plan area required for the thickener

Based on hydraulic loading rate:

Hydraulic loading rate considered

Volume of total sludge generation per day

Plan area required for the thickener

Plan area considered for thickener (max. requirement)

Thickener diameter required

Say,

Size of the thickener

Total inlet flow to the thickeners :

Solids consistency at the outlet of thickeners considered

Solid removal efficiency in thickener


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Amount of thickened solids

Volume of thickened sludge

Supernatant flow

Solids escaping in supernatant

11 THICKENED SLUDGE SUMP

Total inflow of thickened sludge

No. of tanks

Detention time

Volume of Sump

LD considered

Area of sludge sump

Length of sump

Width of sump provided

Volume of sludge sump provided


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Free board provided

Size of thickened sludge sump:

12 CENTRIFUGE - SLUDGE DEWATERING

Sludge flow to the centrifuge

Solids entering the centrifuge

No of working centrifuge

No of standby centrifuge

No of working hrs per day (Part 1, Vol 1, Cl 6.30.6.7 pg 126 of 230 )

Sludge flow to the centrifuge

Capacity of centrifuge provided

Solid removal efficiency in centrifuge (Part 1, Vol 1, Cl 6.30.6.7 pg 126 of 230)

Sludge Consistency at the outlet of centrifuge (Part 1, Vol 1, Cl 6.30.6.7 pg 126 of

Solids in dewatered sludge

Solids escaping in centrate


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Volume of dewatered sludge

Centrate flow

TSS calculation

TSS load entering centrifuge

TSS captured in centrifuge

TSS in centrate flow

TSS content in centrate

Centrifuge Feed Pump

No of working pumps

No of standby pumps

Capacity of pump required


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Capacity of pumps provided

13 DEWATERED SLUDGE STORAGE SHED

Flow rate of dewatered sludge

No. of days for storage (Part 1, Vol 1, Cl 6.30.6.9 pg 127 of 230 )

Total volume of the sludge drying

Storage depth

Area required for the sludge storage beds

No. of the beds considered

Width of each bed considered

Length of each bed considered

Clearance between adjacent beds

Total plan area required for shed

No. of rows

No. of beds in shed


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Length of shed

Height of Shed

Size of the Dewatered Sludge Storage Shed

14 RECYCLE WATER SUMP

Number of recycle water sump provided

Flow of reclaimed backwash from tube settler

Flow of thickener supernatant

Solids in reclaimed backwash flow from tube settler

Solids in Thickener supernatant flow

Total Solids in flow to Recycle water sump

Concentration of solids in recycle flow

Total flow to recycle water sump

Retention time considered


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Volume of sump

Liquid depth considered

Plan area

Length of sump

Width of sump

Total Volume of recycle water sump

Free board

Size of Recycle water sump:

Recycle water Pump

Capacity of the pump provided

Capacity of the Pump (1W+1S) provided

15 CHEMICAL HOUSE
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

PACl DOSING SYSTEM

PACl Dosing Tank

No. of tanks

No. of tanks in preparation simultaneously

Max. PACl dosage rate considered

PACl requirement per day

PACl requirement per hour

Strength of PACl solution

Volume of 10% PACl solution required

Detention time for each tank

Volume required for 12 hours capacity

Liquid depth considered

Free board considered

Plan area required

Diameter of tank
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Size of the PACl Dosing Tank

PACl Bulk Storage tank

No.of tanks

Max. PACl dosage rate considered

PACl reqd. (100 %) for one day

No. of days storage required (Part 1, Vol 1, Cl. 6.30.5.7, Pg. 105 of 230)

PACl reqd. (100 %) for storage

Density of PACl liquid

Volume of Storage

Volume of each tank provided

Liquid depth considered

Area of tank

Length

Width of Tank required


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Width of Tank provided

Free board

Size of PACl Bulk Storage tank :

Dosing System for PACl:

No of pumps (working)

Capacity of PACl dosing pump required

Provided

POLYMER DOSING SYSTEM

DWPE Solution dosing tank

No.of tanks

No. of tanks in preparation of DWPE simultaneously

DWPE requirement

DWPE dosage for centrifuge

Sludge inflow to centrifuge produced per day ( Dry solids )


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

DWPE requirement per day for centrifuge

DWPE requirement

Required consistency of DWPE solution to be dosed

Density of DWPE approx.

Volume of DWPE required

Retention time of each tank

Storage volume required per tank

Liquid depth considered

Area of tank

Diameter

Free board

Size of DWPE solution dosing tank :

DWPE Solution dosing pumps for centrifuge


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

No.of Dosing pumps

Capacity of Dosing pump required

No. of Pumps

Capacity of each dosing pump

DWPE bulk storage

DWPE quantity required per day

Storage period

Bulk Density of DWPE

Volume required for storage

Stacking height

Area required

Length required

Width required

Width provided
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Volume required for storage

Chemical house - Drain pit (Part 1, Vol.1, Cl. 6.30.5.9, pg 106 of 230)

Length of the pit

Width of the pit

Liquid depth

Volume of pit

Free board

Size of the Drain pit:

Drain Pumps

No. of Drain pumps

Duration of tank fill

Capacity of each Drain pump provided

Pump capacity provided


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

16 CHLORINATION SYSTEM

Pre-Chlorination

Design Flow rate

Maximum Chlorine dosage considered (Part 1, Vol 1, Cl. 6.30.5.3, Pg.104 of 230)

No. of Chlorinators (Working)

No. of Chlorinators (Standby)

Chlorinator Capacity required

Each Chlorinator Capacity provided

Booster pumps for Chlorination (As per vendor)

No. of operating booster pumps

Required chlorine conc. In chlorine solution to be dosed for Pre-chlorination

Capacity of chlorinator utilized


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Booster pump capacity

Booster pump capacity provided

Operational hours per day

Total chlorine required per day

Chlorine in each tonner

No. of tonners required per day

No. of days served by 1 tonner

No of days of chlorine Storage provided (Part 1, Vol 1, Cl 6.30.5.29 pg 118 of 230

So, no. of tonners required, for storage period

So, Total no. of tonners required to be housed in tonner area (for pre-chlorination)

Providing no. of tonners (working + standby) (Part 1, Vol. 1, Cl 6.30.5.29 pg 1


230 )

Post-Chlorination
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Design Flow rate

Maximum Chlorine dosage considered (Part 1, Vol 1, Cl 6.20.2,Table 8, pg 59 of 2

No. of Chlorinators (Working)

No. of Chlorinators (Standby)

Chlorinator Capacity required

Each Chlorinator Capacity provided

Booster pumps for Chlorination (As per vendor)

No. of operating booster pumps

Required chlorine conc. In chlorine solution to be dosed to CCT

Capacity of chlorinator utilized

Booster pump capacity

Booster pump capacity provided


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE


WATER - SRI GANGANAGAR PROJECT

TITLE: PROCESS DESIGN CALCULATION FOR NEW 20 MLD


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Operational hours per day

Total chlorine required per day

Chlorine in each tonner

No. of tonners required per day

No. of days served by 1 tonner

No of days of chlorine Storage provided (Part 1, Vol 1, Cl 6.30.5.29 pg 118 of 230)

So, no. of tonners required, for storage period

So, Total no. of tonners required to be housed in tonner area (for post-chlorination

Providing no. of tonners (working + standby) (Part 1, Vol. 1, Cl 6.30.5.29 pg 118 of

Therefore, total no. of tonners housed in Chlorine Container Room (Part 1, Vol 1, C
6.30.5.29 pg 118 of 230 )
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

CRITERIA:

es:
n Water Supply & Treatment, Third Edition- Revised & Updated, CPHEEO, Ministry of Urban Developme

1996): Measurement of Liquid flow in open channels - Parshall and Saniiri flumes

ocument for Proposed 20 MLD WTP at Nathavali

er source: Gang Canal, conveyed through intake structure& via Raw water reservoir & pumping station a

ated water output Capacity 20

rs of operation 24

utlet Capacity of WTP 20

20000

833.34

0.24
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

er losses considered for design (Part 1, Volume 1, Cl. 6.20.5 pg 61 of 230) 2

et raw water from Raw water reservoir including max. water losses 20.4

20400

850

0.24

low Details ( Total Recycle flow = Tube Settler Supernatant Flow + Thickener
ant Flow)

=Total Recycle Flow for 6


MLD * (New 20 MLD WTP
flow / (New 20 MLD WTP
flow + Existing 23 MLD
WTP flow +Future 20 ML
ow for New 20 MLD WTP WTP flow ))
=Total Recycle Flow * (20
MLD / (20 MLD + 23 MLD
+20 MLD))

ow for New 20 MLD WTP =3.248 x 20/(20+23+20

1.0312

1031.20

42.97
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

0.02

w including Max. Water losses and Recycle flow for New 20 MLD WTP 21.43

21431.2

892.97

0.25

verload flow for Interconnecting pipes, valves on pipes and Channels (Part 1,
Cl. 6.30.5.1 pg 104 of 230) 30

er quality (Part 1, Volume 1, Cl. 6.20.4, pg. 60-61 of 230 (Table 9))

10 to 100

count Up to > 24000

water quality (Part 1, Volume 1, Cl. 6.20.6, pg. 61-63 of 230 (Table 11))

<1
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

Chlorine 0.35 to 0.45

m or thermotolerant coliform bacteria Absent

orm bacteria Absent

HAMBER

ts 1

ow to Inlet Chamber 21.43

21431

0.25

time (Part 1, Volume 1, Cl. 6.30.5.2, pg. 104 of 230) 60

the chamber required 15.00

pth considered 3

let chamber 5.00

chamber considered 2.3

Chamber 2.2
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

the chamber provided 15.18

d 0.50

r overloading

ng as per NIT (Part 1, Volume 1, Cl. 6.20.10, pg. 64 of 230) 30.00

w with overloading 27.86

0.33

time provided 46.0

let Chamber: 2.3 m (L) x 2.2 m (W) x 3 m (LD) + 0.5 m (FB

HANNEL WITH PARSHALL FLUME

w from Inlet Chamber to Parshall Flume 21.43

21431.2

0.25
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

acity required as % of design flow (Part 1, Vol.1, Cl. 6.30.5.3, Pg 104 of 230) 130.00

arshall flume 27.86

0.33

g to IS 14371 (1996) (Part 1, Volume 1, Cl. 6.20.9, pg. 64 of 230 (Table 13))

Parshall flume No.: 4.00

dth b 0.450

1.038
C

1.537

(entrance section) head - ha 0.474

0.480

nce ratio 0.600

roat section - hb 0.288

0.290
C
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS
C

the broad-crested weir hp2 0.072


C

0.262

Provided Head loss 0.30


C

0.600

nce 1.425
C
C

0.920

flume (approx.) 2.945

h channel

1.020

channel 4.500
C

idth of channel 1.100

pth 0.552

0.600
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

ty in channel 0.500

the broad-crested weir hp2 0.072

height hc 0.950

d required 0.350

d provided 0.500

Froude number

0.206

0.210

< 0.5

Hence Ok

pproach channel: 4.5 m L x 1.1 m W x 0.6 m LD + 0.5 m FB

eam channel
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

2.25

2.25

th considered 0.60

channel 0.50
C

ownstream channel: 2.25 m L x 1.1 m W x 0.6 m LD + 0.5 m FB


C
CC

nnel length 2.945 + 4.5 + 2.25

nnel length provided 10

e of Flash mixer
C

ed baffle wall at flash mixer inlet shall be provided to avoid short circuiting.

nlet zone provided before Perforated baffle wall 0.5

inlet zone provided 2

pth of inlet zone provided 2.55


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

IXER

ts 1

w from Parshall flume to Flash Mixing Tank 21431.20

892.97

0.25

time considered (Part 1, Volume 1, Cl. 6.20.2, Table 8, Pg 58 of 230) 40

equired 10

pth considered 2.50

ash mixer required 4

ng square chamber, side of chamber 2.0

the flash mixer provided 10


C

d 0.5
C

r overloading

ng as per NIT (Part 1, Volume 1, Cl. 6.20.10, pg 65 of 230) 30.00


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

ash mixer with overloading 1160.87

0.33

time provided 30.4

time range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Table 8, Pg 58 of 230) 20 to 60

Hence Ok

ash Mixer (excluding perforated baffle with inlet zone): 2 m (L) x 2 m (W) x 2.5 m

UTION CHAMBER & OUTLET ZONES

Clariflocculator (CF-05 A)

Outlet Zone1

Flash Distribution Chamber Bypass Channel


Mixer (DC-04)

Outlet Zone2
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

UTION CHAMBER Clariflocculator (CF-05 B)

ts 1

w from Flash mixing tank to Distribution chamber 21431.2

892.97
C

0.25
C

time 25

the chamber required 6.25

hamber 2.0

chamber 2.80

pth considered 1.15

the chamber provided 6.44

d 0.50

istribution Chamber: 2.8 m (L) x 2 m (W) x 1.15 m LD + 0.5 m FB

r overloading
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

ed Overloading 30.00

stribution chamber with overloading 1160.87

0.33

time provided 19.6

UTION CHAMBER OUTLET ZONES

tlet zones 2
let zones are provided at both sides of distribution chamber and convey the flow equally to two clarifloccu
e weirs

ach distribution chamber outlet zone = 21431.2 / 2

10715.60

446.49

0.12

time 20

each zone required 2.48

each zone 2.80


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

pth of each zone 1.00

each zone 0.90

d 0.50

ach Distribution Chamber outlet zone: 2.8 m (L) x 0.9 m (W) x 1 m LD + 0.5 m FB

OCCULATORS

w from Distribution Chamber to Clariflocculators 21431.2

892.97

0.25

s (As per NIT, Part 1, Volume 1, Cl. 6.30.5.10, Pg 106 of 230)


^𝟑 2
=𝟐𝟗𝟑𝟐𝟑 �
w capacity per Unit 10716

446.5

ion zone of clariflocculator


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

time considered (As per NIT, Part 1, Volume 1, Cl. 6.30.5.10, Pg 106 of 230) 25

flocculator required 186.04

r depth considered 3.5

required for the flocculator 53.15

feed water velocity 0.6

of central column arrived 0.6

wall thickness for central column and flocullator wall as 0.2

of Central column 1

he central column : 0.79

required for flocculator zone including central pipe 53.94

meter of the flocculator required 8.3

meter of the flocculator provided 8.3

for the flocculator 54.11

flocculator required 189.39

189
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

hickness of flocculator outer wall 0.3

or outer Dia 8.9

occulator including walls 62.18

rovided in the flocculator including walls 217.63

d 0.5

occulator zone: 8.3 m (Inner Dia) x 3.5 m LD + 0.5 m FB

Port

velocity in port 0.6

of port 0.21

ng 4 nos of ports, area of each port 0.06

width of port 0.2

port 0.3

4 ports of size 0.20 m (W) X 0.30 m (H)


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

zone of Clariflocculator

oading rate (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230) 35

rea required : 306.2

a of clariflocculator required 62.18 + 306.2

368.38

riflocculator required 21.7

aunder provided 0.4

riflocculator provided including inside launder and its wall thickness 21.7 + 0.4 + 0.15 + 0.4 +

riflocculator provided 22.8

d 0.5

lariflocculator: 22.8 m (Dia) x 3.5 m LD + 0.5 m FB

ided for clarification 307.47

clarifier zone 1179.89

time for clarifier zone 2.64


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

time range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230) 2 to 8

Hence Ok.

Surface Loading rate provided 34.9

IT, Part 1, Volume 1, Cl. 6.30.5.10, Pg 106 of 230) 35.0

Hence Ok.

r overloading:

overloading (As per NIT, Part 1, Volume 1, Cl. 6.20.10, Pg 65 of 230) 25

w with overloading per unit 558.2

ention time in clarifier zone 2.20

time range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230) 2 to 8

Hence Ok.

oading rate provided 43.57

oading rate range (As per NIT, Part 1, Volume 1, Cl. 6.20.2, Pg 59 of 230) 25 to 75

Hence Ok.
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

culator launder sizing


overloading considered (As per NIT, Part 1, Volume 1, Cl. 6.30.5.1, Pg 104 of
30

Hydraulic overloading per unit 580.5

ne half of the launder 290.25

0.09

onsidered 0.6

e flow 0.14

he launder considered 0.4

pth as per hydraulics 0.45

e clariflocculator launder: 0.4 m (W) x 0.45 m (LD)

r Weir loading

overloading (As per NIT, Part 1, Volume 1, Cl. 6.20.10, Pg 65 of 230) 25

overloading condition per unit 558.2


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

0.16

l length of clariflocculator (Inside launder) 68.20

/C of Notch 0.2

ches required 341

ugh each notch 0.0005

ugh V notch =

ffecient of discharge= 0.6 for 90 0 notch 0.6

of notch , in degrees , 90
5
8
C d tan(2  / 2) 2 g H
eration due to gravity,
2
15 m/s 9.8

over notch, m

ad of notch 0.042
C

head provided 0.075

ng 558.2 / 68.2
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

8.19

196.6

IT, Part 1, Volume 1, Cl. 6.30.5.10 pg 106 of 230) < 300 m3/m/d

Hence Ok

341 triangular notches with 0.075 m LD at a c/c spacing of 0.2 m


C

water Channel
C

annels for each clariflocculator 1

Overloading (Part 1, Volume 1, Cl. 6.30.5.1 pg 104 of 230) 30


C

w per channel 580.5


C

0.17

velocity of flow 0.8


C

0.21
C

Depth of channel as 0.5

he channel 0.5
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

d 0.5

larified Water Channel (from clariflocculator): 0.5 m (W) x 0.5 m (LD) + 0.5 m FB

Clarified Water / Bypass Channel

annels 1

w 892.97

Overloading (Part 1, Volume 1, Cl. 6.30.5.1 pg 104 of 230) 30


C

channel with overloading 1160.87

0.33

velocity of flow 0.8

0.41
C

Depth of channel as 0.55

he channel 0.8
C

d 0.5

ommon Clariflocculator Bypass Channel: 0.8 m (W) x 0.55 m (LD) + 0.5 m FB


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

om Clariflocculators

w to Clariflocculators including recycle 21431.2

sidered at raw water inlet of (Max.) 50

ow 1031.2

c. in recycle flow 160.2


(20400 x 50 + 1031.2 x
centration in flow to Clariflocculators 160.2) / 21431.2

55.31
ed solids in the supernatant of the Clariflocculators (Part 1, Volume 1, Cl.
61 of 230) 5

c. removed in Clariflocculators 50.31

of Total suspended solids removed in clariflocculators 1078.21

f PACl
theoretical quantity of sludge produced by PolyAluminium Chloride (PACl)
0.40

age of PACl considered 30.0


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

of PACl dosed per day 21.4312 x 30

642.936

of PACl removed as sludge 642.936 x 0.4

257.18
r design considered for quantiy of PACL removed as
ef. STC/RUSDP/SGN/01/232, additional observations, Sl.
257.18 x 130 %

334.33

unt of sludge from clariflocculators = TSS quantity removed in Clariflocculators


y of PACl removed as sludge

unt of sludge from clariflocculators 1412.5

cy of clariflocculator sludge considered 1.0

specific gravity of clariflocculator sludge 1.05

clariflocculator sludge 134.53

water from Clariflocculators


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

arified water flow from Clariflocculators = Design Flow to Clariflocculators - Clariflocculators settled sludg

water from Clariflocculators 21296.67

AND FILTERS

t Channel

channel 1

w of Clarified water from Clariflocculators 21296.67

887.37
C

Overloading considered (Part 1, Volume 1, Cl. 6.30.5.1 pg 104 of 230) 30

channel with overloading 1153.59

0.33

hrough channel considered 0.80

0.42

channel 0.5

hannel 0.9
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

d 0.5
C

lter Inlet Channel: 0.9 m (W) x 0.5 m (LD) + 0.5 m FB

nd Gravity Filters

tration Declining rate filtration

ow to Filters 21296.67

887.37

n Bed Filters 4

n Bed Filters (working) 4

w per bed 221.85

Rate of filtration (Part 1, Volume 1, Cl. 6.20.2, Table 8. Pg 59 of 230) 6.0

tration required per bed 37.00

twin bed filter considered (excluding channel between single bed filters) 8.00

one bed 4.00

each bed required 4.63


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

he bed provided 4.70

d 0.5

Width ratio 1.18

PHEEO clause 7.6.3.5 the L/B ratio of filter bed shall be 1.11 to 1.66 Hence OK

ach twin bed filter provided 37.60

tration adopted 5.90

olume 1, Cl. 6.20.2, Table 8. Pg 59 of 230) Hence OK

r overloading:

overloading (As per NIT, Part 1, Volume 1, Cl. 6.20.10, Pg 65 of 230) 25

w with overloading per twin bed filter 277.32

ach twin bed filter provided 37.60

tration at overloading condition 7.40

<9
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

olume 1, Cl. 6.20.2, Table 8. Pg 59 of 230) Hence OK

r filtration during backwash:

ng No. of Twin Bed Filters to be backwashed at a time 1.00

n Bed Filters working during backwash of 1 twin bed filter 3.00

gn flow to Filters 21296.67

887.37

w per each working twin bed filter under one twin bed back wash 887.37 / 3

295.79

ach twin bed filter provided 37.60

tration through each working filter during backwash time 295.79 / 37.6

7.87

<9

olume 1, Cl. 6.20.2, Table 8. Pg 59 of 230) Hence OK

win bed filters are capable to meet the capacity of net 20 MLD flow during downtime of one filter during ba
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

dia Specifications

sand bed (Part 1, Volume 1, Cl 6.30.5.13, Pg 108 of 230) 900

gravel layer considered 100

umn (Part 1, Volume 1, Cl 6.30.5.13 pg 108 of 230) 2.00

apid sand Filter - Twin bed: 8 m (L) x 4.7 m (W)

apid sand Filter - Single bed: 4.7 m (L) x 4 m (W)

dia Specifications

size (Part 1, Volume 1, Cl 6.30.5.13, Pg 108 of 230) 0.55 to 0.75 mm

y coefficient (Part 1, Volume 1, Cl 6.30.5.13, Pg 108 of 230) 1.3 to 1.7

tent (Part 1, Volume 1, Cl 6.30.5.13, Pg 108 of 230) > 90 %

Gravity Not less than 2.5


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

on of sand depth ( Ref : Page 634 of CPHEEO Manual May 1999 Edition)

he depth of sand as 900 mm and effective size of sand as 0.65 mm

depth can be checked against break through of floc through sand bed by

ng minimum depth required using Hudson formula

of filtration in m3/m2/hr (max)

size in mm - 0.65 mm ( Mean diameter)

nal head loss in M - 2.5M ( Under exigency condition)


through index, 4x10-4 considered for poor response to filtration and average
pre treatment

Sand depth (l) = 0.35

sand provided (As per Part 1, Volume 1, Cl 6.30.5.13, Pg 108 of 230) 0.90

depth of sand is sufficient to avoid breakthrough of floc 0.9 > 0.35

Hence OK

ainage System (Nozzles)


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

nozzles required based on inlet flow and backwash flow

ach single bed 18.80

ow per each twin bed filter 221.85

single bed 110.9

ack wash Flow (Part 1, Volume 1, Cl. 6.20.2, Table 8, Pg 59 of 230) 36.00

h water flow per single bed 676.80


ckwash flow is higher than the inlet flow, the nozzles are designed for
flow

of each filter nozzle 1.5 - 2.0

ng capacity of nozzles 2.0

zzles required per single bed 339.0

zzles required per twin bed 678.0

ber of nozzles required for 4 twin beds 2712

nozzles required based on surface area

numbers of nozzles per sq. m area of filter bed (based on design standards)
olume 1, Cl. 6.30.5.14 pg 110 of 230) 45
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

zzles required per single bed 846

zzles required per twin bed 1692

mber of nozzles required for 4 twin beds 6768

ber of Polypropylene nozzles provided 6770

Water Channel

annels 1

Overloading as per NIT (Part 1, Volume 1, Cl. 6.30.5.1, Pg 104 of 230) 30

w from Filters = Design Flow to Filters 21296.67

filters with overloading 27685.68

0.33

onsidered 0.80

hannel 0.41

hannel 0.80

channel 0.60
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

d 0.50

eated water channel: 0.8 m (W) x 0.6 m LD + 0.5 m FB

use Gallery 37.3 m (L) x 5 m (W)

ilter house:

gutter for twin bed filter 0.7


4 x 8 + 4 x 0.7 + 0.4 x 4
Overall Filter House 0.3 x 3

37.3

fer separate corresponding sketch for length of filter house.

Filter House 5 + 4.7 + 0.3

10

ilter house size 37.3 m (L) x 10 m (W)

ckwashing
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

ckwash

ack wash Flow (Part 1, Volume 1, Cl. 6.20.2 Table 8. Pg 59 of 230) 36.00

ng no. of twin bed to be backwashed at a time 1.00

ne filter (one half of a twin bed) 18.80

h water flow rate required for single bed 676.80

h water flow rate required for twin bed 1353.60

of Back wash (Part 1, Volume 1, Cl. 6.30.5.18 pg 115 of 230) 10

Back wash 225.60

kwash Water Channel


k wash flow from twin bed filter = Backwash water flow required for twin bed

k wash flow from twin bed filter 1353.6

0.38

hrough channel considered 1

0.38
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

hannel considered 0.7

pth provided 0.60

area of channel 0.42

d 0.50

irty Backwash Channel: 0.7 m (W) x 0.6 m (LD) + 0.5 m FB

h Water Overhead Tank

n bed filters for which the backwash requirement to be stored (Part 1, Volume
0.5.18 pg 115 of 230) 1

Backwash water storage required for one twin bed filter backwash 225.6

Water Requirement

ng Water requirement for domestic purposes 1.0

ng Water requirement for Emergency purposes 1.5

water for chemical preparation for 1 hr 1.20

ng Water requirement for tank cleaning & flushing purposes 1.0


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

Service Water storage required for 1hr 4.700

h Water Overhead Tank storage required (including service water storage) 225.6 + 4.7

230.3

Liquid depth of backwash water tank as 1.60

e tank 143.94

Width of tank 5.00

tank 29.00

e tank provided 145.00

d 0.50

tank provided 232.0

h tank shall be provided on rooftop of filter house

ackwash water tank: 29 m (L) x 5 m (W) x 1.6 m LD + 0.5 m FB


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

h tank Pumps

h tank Pumps 2

rking pumps 1

shift (Part 1, Vol.1, Cl. 6.30.5.18, Pg 115 of 230) 8


all working filters to be backwashed in 1 shift, no. of backwashes (Part 1,
6.30.5.18, Pg 115 of 230) 4

of 1 backwash (Part 1, Vol.1, Cl. 6.30.5.18, Pg 115 of 230) 10

between 2 consecutive backwashes in 1 shift 1.83

, Duration of tank fill 1.83

of each Backwash pump provided 127

Pump capacity provided 130

wash

wers considered 2

rking blowers 1

ach twin bed filter 37.60


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

r Backwash (Part 1, Vol.1, Cl. 6.20.2 Table 8. pg 59 of 230) 36

ate required per blower 1353.6

flow rate required (Part 1, Vol.1, Cl. 6.30.5.16 Table 18. pg 112 of 230) 20.0

pacity provided 1630

use - Drain pit (Part 1, Vol.1, Cl. 6.30.5.19, pg 115 of 230)

the pit 2.00

he pit 1.00

pth 1.50

pit 3.00

d 0.30

e Drain pit 2 m (L) x 1 m (W) x 1.5 m (LD) + 0.3 m (FB)

use - Drain Pumps (Part 1, Vol.1, Cl. 6.30.5.19, pg 115 of 230)


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

ain pumps 1

of tank fill 1

of each Drain pump required 3

city of pump to be provided (Part 1, Vol.1, Cl. 6.30.5.19, pg 115 of 230) 3

pacity provided 11

Mixing Chamber

w to Chlorine Mixing Chamber from Treated Water Channel 21296.67


apacity required for chlorine mixing chamber (Part 1, Volume 1, Cl 6.20 pg 57
40.00

0.46

Hydraulic Retention time provided 60

equired 27.78

liquid depth 2.00

ired 13.89

ng width to length ratio 1:


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

hamber 1.86

1.9

chamber 7

chamber (Including 4Nos baffles) 7.8

d 0.50

hlorine mixing Chamber (With Baffles): 7.8 m (L) x 1.9 m (W) x 2 m LD+ 0.5 m FB

Mixing Chamber Outlet Chamber:

w to Outlet chamber 21296.67

chamber 1.90

pth considered 1.65

time considered 15.00

hamber 3.70

hamber provided 1.20

d 0.50
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

Mixing Chamber Outlet Chamber: 1.9 m (L) x 1.2 m (W) x 1.65 m LD+ 0.5 m F

Chlorine mixing chamber to Clear Water Reservoir = Flow to Chlorine mixing chamber - (Flow withdrawn
amber for Filters Back Wash & Service Water)

drawn from Chlorine mixing chamber for 4 Twin Beds Filters Back Wash 902.40

drawn from Chlorine mixing chamber for service water 23.98

g Flow to Clear Water Reservoir 20370.29

ACKWASH STORAGE TANK

ackwash water for Filters of New 20 MLD WTP


h water storage required is volume of backwash water required per twin bed
225.60

n beds washed per day 4.00

water required for all 4 beds washes 902.40

0 MLD WTP
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS
ackwash water required for future 20 MLD WTP for design = Flow of backwash water required for new 20

ow of backwash water required for all beds washes for future 20 MLD WTP 902.4

23 MLD WTP

ed No. of twin beds washed per day for existing 23 MLD WTP 4.0

each twin bed 8.0

each twin bed 6.0

ach twin bed 48.0

ack wash Flow considered 36.00

of Back wash (Part 1, Volume 1, Cl. 6.30.5.18 pg 115 of 230) 10

h volume required per wash per twin bed 288.00

ow of backwash water required for all beds washes for existing 23 MLD WTP 1152.0

kwash water quantity from all 3 WTPs 902.4+ 902.4 + 1152

2956.8
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

kwash water storage required = Waste water generated during one backwash (Part 1, Volume 1, Cl 6.30.6

kwash water storage provided for maximum backwash volume 288.0

Liquid depth of the tank as 3.00

ks provided 1.00

e tank 96.00

ank 7.0

tank 13.8

e tank provided 96.6

d As per HFD

tank provided 289.8

irty Backwash storage tank: 13.8 m (L) x 7 m (W) x 3 m LD + FB As per H

tler feed pumps

in a day for Tube Settler 2956.8

mps working 1.00


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

ndby pumps 1.00

of pump assuming 16 hrs. working 184.80

of pumps provided 190.00

TTLER
er backwash water) to the tube settler = Dirty Backwash water quantity from all
2956.80

184.80

be settlers 1.0

mpartments in tube settler considered 2.0

ded (As per vendor recommendations, it may vary) 5.5

required 33.6

he tube settler provided (Size provdied tentatively, it may vary as per vendor
ndations) 3.6
the tube settler arrived (Size provdied tentatively, it may vary as per vendor
ndations) 9.4

each compartment of tube settler 4.70

tube deck 1.0


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

ow tube deck 2.0

ove tube deck 0.5

d 0.5

er Depth 3.5

h 4.0

total tube deck required (actual ) 34.0

total tube deck with 10% margin 38.0

nclination of tubes with horizontal 60.0

1.732

rection 0.6

each chamber with angle correction 4.2

a inlet chamber at the length of the tube settler - 0.3 m 0.3

vided 4.7

ube settler with two hoppers (Tentative size only, may vary as per vendor recommendations)
4.7 m (L) x 4.7 m (W) x 3.5 m LD + 0.5 m FB
ube Settler: X 2 Compartments
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

ize of Tube Settler: 9.4 m (L) x 4.7 m (W) x 3.5 m LD + 0.5 m FB

Existing and Future WTPs

FROM CLARIFLOCCULATORS

MLD WTP

unt of sludge from clariflocculators 1412.54

clariflocculators sludge 134.53

0 MLD WTP

unt of sludge from clariflocculators (Considered similar to New 20 MLD WTP) 1412.54

clariflocculator sludge (Considered similar to New 20 MLD WTP) 134.53

23 MLD WTP
unt of sludge from clariflocculators (Considered in proportion to New 20 MLD
1624.43

clariflocculator sludge (Considered in proportion to New 20 MLD WTP) 154.71


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

unt of sludge from clariflocculators (From all 3 WTPs) 4449.52

me of clariflocculators sludge (From all 3 WTPs) 423.77

FROM TUBE SETTLER

to Tube Settler 2956.80

w to filters 5

S in Filtered water considered 1


s removed in filter (settled on bed during filtration and washed away as filter
) 268.34

ring tube settler as filter backwash 268.34

moval in tube settler considered (as per vendor) 80.00

, solids removed as underflow 214.68

cy of tube settler sludge 1

specific gravity of tube settler sludge 1.05

tube settler sludge 20.45

of reclaimed backwash as supernatant 2936.40


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

pernatant 53.66

SUMP

f sludge sump provided 1

unt of sludge solids produced (From clariflocculators and Tube settler) 4664.20

me of sludge generated per day (From clariflocculators and Tube settler) 444.22

time considered 2.00

sump 37.02

pth considered 3

12.34

sludge Sump 3.6

ludge sump 3.5

me of Sludge sump 37.8

d As per HFD

udge sump: 3.6 m (L) x 3.5 m (W) x 3 m LD + FB As per


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

hickener feed pumps

mps working 1.00

ndby pumps 1.00

of pump required 19

of pump provided 19

SLUDGE THICKENER

f thickeners 1.00

er Depth considered 3.50

d considered 0.50

n solid loading rate:

ing rate considered 80.00

ge produced per day 4664.20

me of sludge generated per day 444.22


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

required for the thickener 58.30

n hydraulic loading rate:

loading rate considered 20.00

total sludge generation per day 444.22

required for the thickener 22.21

considered for thickener (max. requirement) 58.30

diameter required 8.62

8.70

e thickener 8.7 m Dia x 3.5 m (SWD) + 0.5 m (FB)

flow to the thickeners : 4664.20

444.22

nsistency at the outlet of thickeners considered 3.00

oval efficiency in thickener 90.00


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

f thickened solids 4197.80

thickened sludge 133.30

ant flow 310.92

caping in supernatant 466.40

ED SLUDGE SUMP

w of thickened sludge 133.30

ks 1.00

time 8.00

Sump 44.44

ered 3.00

udge sump 15.00

sump 3.90

ump provided 3.90

sludge sump provided 45.63


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

d provided 0.50

ickened sludge sump: 3.9 m (L) x 3.9 m (W) x 3 m (LD) + 0.5 FB

UGE - SLUDGE DEWATERING

w to the centrifuge 133.30

ering the centrifuge 4197.80

king centrifuge 1.00

ndby centrifuge 1.00

king hrs per day (Part 1, Vol 1, Cl 6.30.6.7 pg 126 of 230 ) 16.00

w to the centrifuge 8.40

of centrifuge provided 8.50

oval efficiency in centrifuge (Part 1, Vol 1, Cl 6.30.6.7 pg 126 of 230) 98.00

onsistency at the outlet of centrifuge (Part 1, Vol 1, Cl 6.30.6.7 pg 126 of 230) 20.00

dewatered sludge 4113.85

caping in centrate 83.95


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

dewatered sludge 19.59

1.23

low 113.71

7.20

ulation

entering centrifuge 4197.80

ured in centrifuge 4113.85

ntrate flow 83.95

ent in centrate 738.30

e Feed Pump

king pumps 1.00

ndby pumps 1.00

of pump required 8.40


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

of pumps provided 8.50

RED SLUDGE STORAGE SHED

of dewatered sludge 19.59

ys for storage (Part 1, Vol 1, Cl 6.30.6.9 pg 127 of 230 ) 15

me of the sludge drying 293.85

epth 2

ired for the sludge storage beds 146.93

beds considered 15

each bed considered 1.05

each bed considered 9.4

e between adjacent beds 0.3

n area required for shed

ws 1.0

ds in shed 15.0
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

shed 20.0

Shed 4.0

e Dewatered Sludge Storage Shed 20 m (L) x 9.4 m (W) x 4 m Ht

E WATER SUMP

f recycle water sump provided 1

claimed backwash from tube settler 2936.4

ickener supernatant 310.92

eclaimed backwash flow from tube settler 53.66

Thickener supernatant flow 466.40

ds in flow to Recycle water sump 520.06

ation of solids in recycle flow 160.20

to recycle water sump 3.2480

3247.3

time considered 30
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

sump 67.7

pth considered 3.5

19.34

sump 7.0

ump 2.8

me of recycle water sump 68.6

d 0.5

ecycle water sump: 7 m (L) x 2.8 m (W) x 3.5 m (LD) + 0.5 m (FB

water Pump

of the pump provided 135.3

of the Pump (1W+1S) provided 140

AL HOUSE
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

SING SYSTEM

sing Tank

ks 2.00

ks in preparation simultaneously 1.00

Cl dosage rate considered 30.0

uirement per day 642.94

uirement per hour 26.79

of PACl solution 10.00

10% PACl solution required 0.27

time for each tank 12.00

equired for 12 hours capacity 3.24

pth considered 2.00

d considered 0.50

required 1.62

of tank 1.50
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

e PACl Dosing Tank 1.5 m (Dia) x 2m (LD) + 0.5m (FB)

k Storage tank

ks 2

Cl dosage rate considered 30.00

d. (100 %) for one day 642.94

ys storage required (Part 1, Vol 1, Cl. 6.30.5.7, Pg. 105 of 230) 60.00

d. (100 %) for storage 38576

PACl liquid 1200

Storage 32.15

each tank provided 16.075

pth considered 2.5

nk 6.43

2.6

Tank required 2.5


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

Tank provided 2.6

d 0.5

ACl Bulk Storage tank : 2.6 m (L) x 2.6 m (W) x 2.5 m (LD) + 0.5 m (

ystem for PACl:

mps (working) 1

of PACl dosing pump required 270

300

R DOSING SYSTEM

olution dosing tank

ks 2.00

ks in preparation of DWPE simultaneously 1.00

quirement

sage for centrifuge 2.50

low to centrifuge produced per day ( Dry solids ) 4197.80


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

4.20

quirement per day for centrifuge 10.50

quirement 10.50

consistency of DWPE solution to be dosed 0.10

DWPE approx. 750.00

DWPE required 14.00

time of each tank 8.00

olume required per tank 7.00

pth considered 2.00

nk 3.50

2.20

d 0.50

WPE solution dosing tank : 2.2 m (Dia) x 2 m (LD) + 0.5 m (FB)

olution dosing pumps for centrifuge


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

ing pumps 2 (1 W + 1 S)

of Dosing pump required 875.00

mps 1.00

of each dosing pump 900.00

ulk storage

antity required per day 10.50

eriod 30.00

sity of DWPE 750.00

equired for storage 0.42

height 1.50

ired 0.28

quired 1.00

uired 0.30

vided 1.00
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

equired for storage 1 m (L) x 1 m (W) x 1.5 m (Ht)

house - Drain pit (Part 1, Vol.1, Cl. 6.30.5.9, pg 106 of 230)

the pit 3.00

he pit 1.00

pth 1.50

pit 4.50

d 0.30

e Drain pit: 3 m (L) x 1 m (W) x 1.5 m (LD) + 0.3 m (FB)

mps

ain pumps 1

of tank fill 1

of each Drain pump provided 4.5

pacity provided 5
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

NATION SYSTEM

rination

ow rate 892.97

Chlorine dosage considered (Part 1, Vol 1, Cl. 6.30.5.3, Pg.104 of 230) 5

0.005

orinators (Working) 1

orinators (Standby) 1

or Capacity required 4.5

orinator Capacity provided 5.0

pumps for Chlorination (As per vendor)

erating booster pumps 1

chlorine conc. In chlorine solution to be dosed for Pre-chlorination 1500

of chlorinator utilized 4.5


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

4500

ump capacity 3.0

ump capacity provided 4

al hours per day 24.0

rine required per day 108

n each tonner 900

ners required per day 1

ys served by 1 tonner 8.4

s of chlorine Storage provided (Part 1, Vol 1, Cl 6.30.5.29 pg 118 of 230 ) 15

tonners required, for storage period 2

no. of tonners required to be housed in tonner area (for pre-chlorination) 3

g no. of tonners (working + standby) (Part 1, Vol. 1, Cl 6.30.5.29 pg 118 of


4

orination
L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

ow rate 887.36

Chlorine dosage considered (Part 1, Vol 1, Cl 6.20.2,Table 8, pg 59 of 230 ) 3

0.003

orinators (Working) 1

orinators (Standby) 1

or Capacity required 2.67

orinator Capacity provided 3.0

pumps for Chlorination (As per vendor)

erating booster pumps 1

chlorine conc. In chlorine solution to be dosed to CCT 1500

of chlorinator utilized 2.67

2670

ump capacity 1.78

ump capacity provided 2


L&T Construction
Water & Effluent Treatment

ECT: INTEGRATED WATER SUPPLY AND WASTE Rev. DOCUMENT NO.


R - SRI GANGANAGAR PROJECT LE160960-P-WW-WT-B
C 2001

PROCESS DESIGN CALCULATION FOR NEW 20 MLD DESIGNED CHECKED APRROVE


ND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
AVALI
PG VSD/PGK RVS

al hours per day 24

rine required per day 64.1

n each tonner 900

ners required per day 1

ys served by 1 tonner 14.1

s of chlorine Storage provided (Part 1, Vol 1, Cl 6.30.5.29 pg 118 of 230) 15

tonners required, for storage period 2

no. of tonners required to be housed in tonner area (for post-chlorination) 3

no. of tonners (working + standby) (Part 1, Vol. 1, Cl 6.30.5.29 pg 118 of 230 ) 4

, total no. of tonners housed in Chlorine Container Room (Part 1, Vol 1, Cl


pg 118 of 230 ) 8
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

of water from Inlet Chamber to Clear Water Reservoir.

REFERENCES :
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED

PG

Q
Hydraulic flow calculations have been carried out to fix the hydraulic levels of various units t

1. Manual on Water Supply & Treatment, Third Edition- Revised and Updated, CPHEEO, Mi
New Delhi, May 1999

2. Tender document for Proposed 20 MLD WTP at Nathavali

3. Top Water Level (TWL) of Clear Water Reseroir is taken as 176.6 m

4. Levels shall be transferred to Hydraulic Flow Diagram of WTP (DWG No. LE160960-P-W

Formulae used in hydraulic calculation are given below:

A) Head loss due to pipe :

Head loss as per modified Hazen William's formula:


𝒉=
(� 〖 (�/�_� ) 〗 ^(𝟏.𝟖𝟏
))/(𝟗𝟗𝟒.𝟔𝟐 𝑫^(𝟒.𝟖𝟏) )
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR DESIGNED


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
𝒉=
(� 〖 (�/�_� ) 〗PG
^(𝟏.𝟖𝟏
))/(𝟗𝟗𝟒.𝟔𝟐 𝑫^(𝟒.𝟖𝟏) )
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

Where, Q = Flow, m3/sec

CR = Roughness Coefficient

L = Length of pipe, m

D = Diameter of pipe, m

B) Head loss due to gravity flows in open channels: Manning’s formula :

V = (1/n) x R2/3 x S1/2

Where, V = Velocity of flow in m/sec


QQ
n = Manning’s co-efficient of roughness

R = Hydraulic radius in m

S = Slope of hydraulic gradient

C) Head loss due to weir :


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

D) Head loss through V-notch :

E) Head loss through Submerged orifice :


𝑯^(𝟏.𝟓)
DOCUMENT NO.

LQ
LE160960-P-WW-WT-BE-2001

DESIGNED

PG

𝑸=𝟎.𝟓𝟒𝟒𝟓𝒄_𝒆 √𝒈 𝒃

where, Ce = coefficient of discharge =0.864

b = length of weir

H = Head over weir

𝟖/𝟏𝟓 𝒄_𝒅 𝒕𝒂𝒏(𝜽/𝟐)


Flow through V notch = 𝑯^(𝟓/𝟐)
√𝟐𝒈

Where, Cd = Coeffecient of discharge= 0.6 for 9

U = angle of notch , in degrees ,

g = acceleration due to garvity, m/s2

H= head over notch, m


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

𝒄_𝒅
Flow through orifice,

F) Head loss due to Gates/Vlaves/Bends :


Q =𝒂
�) 〗 ^(𝟎.𝟓)
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED

〖 (� �
PG

Where, Q = Flow through orifice, m3/sec

a = area of opening, m2

Q
g = acceleration due to garvity, m/s2

H= head loss, m

(Reference : CPHEEO Manual on Water Supply & Treatment, May 1999,Pg. 115, Cl. 6.2.9)

Where, K

g
V
H = KV2 / 2g

= Resistant co-efficient

= Velocity of flow in m/sec

= Acceleration due to gravity in m/se


1.8
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Following K Values are used for arriving head loss

HYDRAULICS - WATER STREAM


Type of fitting

90 deg. Bend

45 deg. Bend

Tee 90 deg. Take off

Sluice gate

Exit to pipe

Entry to pipe

Butterfly valve

Plug valve
0.75

0.5

1.5

0.62

0.5

0.3

0.3
DESIGNED

K-Value
PG

CQR
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

Top water level (TWL) of CWR is taken as


1.8
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

DESIGN CRITERIA:

WTP Treated water output Capacity

No of hours of operation

Design Outlet Capacity of WTP


DESIGNED

PG

h
QR
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

Max. Water losses considered for design (Part 1, Volume 1, Cl. 6.20.5 pg 61 of 230)

Design Inlet raw water from Raw water reservoir including max. water losses
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Recycle flow for New 20 MLD WTP


PG h  Q  4
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED

Design flow including Max. water losses and Recycle flow for New 20 MLD WTP

1 HEAD LOSS BETWEEN CLEAR WATER RESERVOIR (CWR) AND TREATED WATER C

a) Head Loss at CWR entry due to Gate valve

Design Flow to Clear Water Reservoir

No. of compartment

Flow through each CWR inlet valve with 30% overload


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

No. of gate valves provided

Flow through each valve

Consider velocity through valve

Area of opening of valve

Provide valve of dia.

Provide valve opening of size =

Therefore, Velocity through gate valve

Head loss through gate valve = kV2/ 2 g

Considering Coeffecient of Resistance as k


PG

94.Q62D
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED

Head loss

However provided head loss


4
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

b) Head loss through main pipe line of 700 mm dia.

Flow through pipe with 30% overloading

velocity considered

Size of pipe provided

Head loss as per modified Hazen William's formula'

Maximum length of pipe considered (L)

Roughness coeffecient for MS pipe, CR

head loss, h

c) Head loss due to entry and exit of main pipe line

HL(f) = KV2 / 2g

K = 0.5+1
DESIGNED

h
PG

 Q 
L 
C
 R

94.Q62D
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

1 .81

994 .62 D 4.81


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Velocity through pipe

Head loss due to entry and exit of pipe

d) Head loss due to Tees

No. of Tees

Head loss due to Tees


PG

Total Head loss from Chlorine Mixing Channel outlet chamber to CWR

TWL of Chlorine Mixing Channel outlet chamber

Liquid depth of chamber

IL of outlet chamber

e) Head loss through weir for water entry to outlet chamber:


Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

The discharge through a rectangular weir is given by

Flow with 30% overloading

Where Ce = coefficient of discharge

b = length of weir, say

H = head over weir

Total head loss due to weir

Free fall considered

Tip of the Weir

f) Head loss in Chlorine Mixing Chamber

Headloss through open channels:

Design flow with 30% overloading


DOCUMENT NO.

Q  0 . 5445 C e

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG

gb H

H
Channel width

Q
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Channel length considered

Velocity in channel

Applying manning's formula for channel,

n ( concrete surface)

Width of channel (b)

Depth of channel (h)

V = 1/n x R2/3 x S1/2

S=

Loss of head =

headloss due to (open channel) bends:

No. of bends, consider

K, coefficient
DOCUMENT NO.

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG
velocity of flow

HL per bend
Q
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Total HL due to bends

Total Headloss for channel & bends

TWL of Channel for chlorine mixing at Entrance

IL of Chlorine mixing chamber

g) Head loss due to Treated water channel

The treated water channel width

Depth

Flow through channel with 30% overload

Velocity in treated water channel

Applying manning's formula for channel,

n ( concrete surface)
DOCUMENT NO.

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Width of channel (b)

Depth of channel (h)

V = 1/n x R2/3 x S1/2

S=

Length (max.) considered for head loss

Loss of head =

Total head loss arrived

Total head loss provided

TWL of treated water channel

IL of Treated water channel at upstream


DOCUMENT NO.

2 HEAD LOSS BETWEEN TREATED WATER CHANNEL & FILTER INLET CHANNEL

a) Head loss through weir:

The discharge through a rectangular weir is given by


Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Flow to each bed under overloading

Where Ce = coefficient of discharge

b = length of weir, say

H = head over weir

Total head loss due to weir

head loss provided

Free fall considered

Lip of the Weir

TWL of control chamber

b) Loss through submerged Orifice

Flow through orifice: Q=Cd

Flow through orifice


a (2gH)0.5
DOCUMENT NO.

DESIGNED

PG

Q  0 . 5445 C e

Q
LE160960-P-WW-WT-BE-2001

gb H
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Velocity through orifice

Area of opening

Head loss required

Head loss provided

Top water level of control chamber 1

c) Head loss due to entry and exit of pipe

HL(f) = KV2 / 2g

K = 0.5+1

consider pipe dia as

Head loss due to entry and exit of pipe

d) Head loss due to 900 bends

consider pipe dia as


DOCUMENT NO.

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

velocity of flow

h=kv2/2g

No. of bends

Total loss of head

e) Total loss through nozzle considered as

f) Initial Head Loss of Filter :(Ref: CPHEEO Manual)


DOCUMENT NO.

PG

For Design purpose sieve analysis of filter sand is considered as follows

Sandsize , mm
% Sand smaller
than stated size
0.3

0.0
0.4

2.0
0.5

10
0.6

27
0.7

50
Q
LE160960-P-WW-WT-BE-2001

DESIGNED

0.8

70
h

9
where

h= head loss in m


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Porosity of sand bed considered

Sphericity of sand

l = depth of sand bed

K = Carmen Kozeny constant

V = Velocity of filtration

v = Kinematic viscosity of water

f = porosity of clean bed

Y = grain sphericity

Pi = Fraction of sand
l

g
v
f3
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED

PG

Head loss for a clean filter is determined using Kozeny's equation for stratified beds

h kV (1  f ) 2 6
 
 
2
n

d
i 1

Q
pi
i
2
0.4

0.5

0.6

0.7

0.8

1.45
L
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

di = geometric mean diameter of sand

0.3 0

10

27

50

70

90

100
PG

Sand fraction
within
Size of sand, mm % of sand larger than stated size adjacent sieve
size
pi x100

17

23

20

20

10

0
Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED
h
h/l
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Total head loss required

For dirty condition maximum head loss provided

However TWL in the filter bed

3 HEAD LOSS IN FILTER INLET GATE AND CHANNEL AROUND FILTERS

a) Head loss at inlet gate to filters


DOCUMENT NO.

100

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG

Max. Flow to each filter considered (with 30% overloading and one of 4 filters under
backwash)

Velocity of flow

Gate size:
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Provide Gate size 400 x 400 mm

Area of opening

Velocity of water

Head loss through gate =kV2/2g

Head loss h=

Head loss considered

b) Head Loss in Filter Inlet channel (FIC)

Design flow in channel with overloading

Channel size selected

Width of channel

Liquid depth of channel

Velocity of water
DOCUMENT NO.

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Length considered for head loss

Using Manning's formula , n for concrete V = 1/n x R2/3 x S1/2

slope,S

Loss of head

Total head loss

TWL of filter inlet channel

IL of filter inlet channel


say

4 HEAD LOSS IN BYPASS CHANNEL/ COMMON CLARIFIED WATER CHANNEL

a) Head loss through Common clarified water channel


PG

Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED

L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

The water channel width

Depth

Flow through channel with 30% overload

Velocity in water channel

Applying manning's formula for channel,

n ( concrete surface)

Width of channel (b)

Depth of channel (h)

Using Manning's formula , n for concrete V = 1/n x R2/3 x S1/2

Length of channel considered

Loss of head

However Head loss provided


S=

TWL in clarified water channel/ bypass channel


Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED

PG
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

IL of clarified water channel

b) Head loss through individual clarifier outlet channel

Flow through the channel with 30% overload

Channel size provided

Width of channel

Liquid depth of channel

Velocity

Length of channel considered

Using manning's equation with n for concrete as

slope,S

Loss of head

TWL of individual Clarified water channel provided is


DOCUMENT NO.

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

IL of clarified water channel

5 HEAD LOSS ACROSS CLARIFLOCCULATOR

a) Head loss in Peripheral Launder

Length of weir

Overflow in launder with 30% overloading

Width of launder,b

Consider the flow divides equally in two sides of launder

Diameter of clariflocculator

Overflow per half launder

Discharge per unit width of launder, "q"

Critical depth at the end of launder y2=[(q/b)^2/g]^(1/3)

No.of sides the weir recieves the flow N


DOCUMENT NO.

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG

say
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Discharge per unit length of launder


DOCUMENT NO.

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

Average length of overflow channel from upper to lower end, L


PG

Liquid depth at the upper end of the launder, y1= [y2^2+{2(q'LN)^2/(gb^2y2)]^(1/2)

Average liquid depth

However provided depth of launder

Launder width

C/s area of flow

Wetted perimeter

Hydraulic mean depth R= A/P

Manning's coefficient,n

Consider the slope in the channel as 1 : 1000

Velocity in launder, using Manning's formula , V = 1/n x R2/3 x S1/2

Carrying capacity of the launder

>
C
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

However provided head loss in launder

TWL of launder at LP provided

TWL of Launder required at HP

IL of launder

b) Head Loss in the Clarifier notch

Total flow with 25% overloading

Peripheral diameter of clariflocculator

Provide C/C of Notch

No of notches required =

Flow through each notch:


DOCUMENT NO.

PG

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

The above selected launder size is adequate for carrying capacity indicated above

Head loss in the launder


where
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Flow through V notch =

8
15
C d tan( / 2 ) 2 g H

Cd = Coeffecient of discharge= 0.6 for 90 0 notch

q = angle of notch , in degrees ,

g = acceleration due to garvity, m/s2

H= head over notch, m

Hence head of notch =

provide head as

Consider a free fall of 100 mm

Head loss at notch=

TWL of clarifier required

However, TWL of Clarifier provided


DESIGNED

5
2
PG

Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001
R
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

6 HEAD LOSS BETWEEN CLARIFLOCCULATOR AND DISTRIBUTION CHAMBER

a) Head Loss in the Flocculation Zone

Head loss in the flocculation zone to be taken as maximum of

b) Head Loss in the central Column


DOCUMENT NO.

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG

Head loss in the central column including port opening to be taken as maximum of

c) Head loss through inlet pipe

Size of inlet pipe (inner dia)

Head loss as per modified Hazen William's formula

Maximum length of pipe, say  Q


L 
C
1.81

h   R  4.81
994.62D

R
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Flow (Q) with over loding condition

Roughness coeffecient for DI pipe, CR

head loss, h

Velocity of flow

d) Losses due to 45 deg bend

h=kv2/2g

Total no of bends

Total loss due to all bends

e) Losses due to 90 deg bend

h=kv2/2g
L
DOCUMENT NO.

 
C 
h   R  4.81
994.62D

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

 Q
PG
1.81
h
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Total no of bends

Total loss due to all bends

f) Head loss through entry gate :

Flow with 30% overloading

Velocity of flow

Gate size

Provide Gate size

Area of opening

Velocity of water

Head loss through gate =kV2/2g

k
DOCUMENT NO.

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Head loss h arrived=

Total head loss =

However head loss provided

TWL of distribution chamber outlet zone required =

Therefore, TWL of distribution chamber outlet zone provided =

IL of distribution chamber outlet zone


PG

7 HEAD LOSS BETWEEN DISTRIBUTION CHAMBER OUTLET ZONE AND FLASH MIXER
Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED
given by
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

a) Head loss through each outlet zone adjustable weir :


DESIGNED

PG

No of outlet zones provided for distribution to individual clariflocculators

where Ce= coefficient of discharge

b= length of weir

H= Head over weir

H=

Total head loss due to weir


Q  0 .5445 C e g b H 1.5

Providing freefall of 0.05 m in weir downstream, total head loss, say

Lip of weir

TWL of Distribution chamber

TWL of Distribution chamber provided

IL of Distribution chamber
Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

The Discharge through a rectangular weir at each outlet zone of distribution chamber is
h
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED

PG

b) Head loss through suppressed weir between Distribution chamber and Flash mixer

The Discharge through a rectangular weir is given by

where Ce= coefficient of discharge

b= length of weir

H= Head over weir

H=

Total head loss due to weir


Q  0.5445 C e g b H 1.5

Providing freefall of 0.05 m in weir downstream, total head loss, say

Lip of weir

TWL of Flash mixer

TWL of Flash mixer provided

IL of Flash mixer
h
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

8 HEAD LOSS BETWEEN FLASH MIXER AND INLET CHAMBER

TWL of Flashmixer inlet zone provided

IL of Flashmixer inlet zone considered

TWL at downstream of parshall flume

a) Head loss through Parshall flume in channel

Design max. flow

Design avg. flow

Selecting Parshall flume No.:

Upstream (entrance section) head - ha

head at throat section - hb


PG

Head loss through perforated baffle at inlet of flash mixer considered

Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Height of the broad-crested weir hp2

So, Headloss

Head loss considered

Liquid depth

TWL in Parshall Flume

Required IL in Parshall Flume

b) Head Loss in the inlet chamber

Head loss including opening to be taken as maximum of

TWL in inlet chamber

Liquid depth in the inlet chamber

IL in inlet chamber
DOCUMENT NO.

PG

Q
LE160960-P-WW-WT-BE-2001

DESIGNED
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

9 STAGING HEIGHT OF BACKWASH TANK

a) Head Loss across filter bed during back washing:

Top level of the filter media (sand)

Maximum head loss throgh filter beds

Water level in filter bed above sand media

Total depth of media including gravel layer of 100 mm

Head Loss across filter bed during backwashing:


DOCUMENT NO.

DESIGNED

PG

Q
LE160960-P-WW-WT-BE-2001

The maximum frictional resistance that can be offered by the filter grains in the fluidized
state is their submerged weight. The head loss across the filter bed in fluidised
conditions is given by,

Where,
hb 
m  

1  f  l

hb = Head loss across filter bed during backwash, m

ρm = mass density of filter grains in kg/m3 (max)


head loss, hb =

say

Total Head
4.81
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

ρ = mass density of water

f = porosity of sand bed,

b) Head loss through backwash inlet at each section :

Backwash water flow

Back wash water main DN500

Using Hazen william's formula, head loss

CR
 Q
L
C
 R
DESIGNED

l = height of expanded bed (considering 150% bed expansion)





PG

1 .81
Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001
Flow in pipe

Dia of pipe
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

considered Length of pipe

Head loss, h

Consider head loss through nozzle as

Total head loss

The head loss during backwash operation


h 
 Q 
L
C 


R 

994 .62 D 4.81


DOCUMENT NO.

DESIGNED

PG
1 .81

Head loss in pipe line from farthest filter to the bottom of wash water tank:

For ensuring proper backwash the head has been considered as

Top Water level of backwash overhead tank

Hence Bottom level of backwash tank


Q
LE160960-P-WW-WT-BE-2001
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

New 20 MLD WTP:

a) Loss in dirty Backwash water channel

The dirty backwash water channel width

Depth

Flow through channel

Velocity in backwash water channel

Applying manning's formula for channel,

n ( concrete surface)

Width of channel (b)

Depth of channel (h)

V = 1/n x R2/3 x S1/2

S=

Length of channel considered


DOCUMENT NO.

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG

10 HEAD LOSS IN BETWEEN DIRTY BACKWASH CHANNEL AND DIRTY BACKWASH ST


b) Loss in Pipe
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Loss of head

TWL of Dirty backwash channel

IL of Dirty backwash channel

Using Hazen william's formula, head loss

CR

Length of pipe, L considered

Flow in pipe

Dia of pipe

Velocity
h 
 Q 
L
C 


R 
DOCUMENT NO.

DESIGNED

PG

1 .81

994.62 D 4.81
Q
LE160960-P-WW-WT-BE-2001
9 4 .6 2 D
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

head loss, h

Provided head loss

Existing 23 MLD WTP:

a) Dirty Backwash water channel

The existing dirty backwash water channel width provided

Depth of channel provided

Dirty Back wash flow from twin bed filter

Flow through channel

TWL of Existing Dirty backwash channel

IL of Existing Dirty backwash channel


PG

Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED
9 4 .6 2 D
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

b) Loss in Pipe

Using Hazen william's formula, head loss

CR

Length of pipe, L considered

Flow in pipe

Dia of pipe, 750 mm

Velocity

head loss, h

Provided head loss


h 
 Q 
L
C 


R 
DOCUMENT NO.

DESIGNED

PG

1 .81

994.62 D 4.81

Q
LE160960-P-WW-WT-BE-2001

TWL of the dirty backwash storage tank required as per wash water coming from
Existing 23 MLD WTP dirty backwash channel
TWL of the dirty backwash storage tank required as per wash water coming from New
20 MLD WTP dirty backwash channel
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Dirty Backwash storage tank

TWL of dirty backwash storage tank provided

Liquid depth of dirty backwash storage tank

Invert Level of dirty backwash storage tank

HYDRAULICS - SLUDGE STREAM

11 HEAD LOSS IN BETWEEN CLARIFLOCCULATOR AND SLUDGE SUMP

New 20 MLD WTP:

IL of Clariflocculator

Slope 1 in 12 to be provided

Diameter of Clariflocculator

Width of storage zone provided at bottom of hopper

Hopper depth
DOCUMENT NO.

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

IL of hopper bottom at the sloped end

Storage depth

IL of storage zone

Using Hazen william's formula, head loss

For 200 mm dia pipe

CR

Equivalent length of pipe, L considered

Flow in pipe considered

Dia of pipe provided

Velocity
h 
 Q 
L
C 


R 
DOCUMENT NO.

DESIGNED

PG

Head loss in Clarifier sludge line from Clariflocculator to Sludge Sump :

1 .81

994 .62 D 4 .81

Q
LE160960-P-WW-WT-BE-2001
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

head loss, h

Existing 23 MLD WTP:

However, TWL of Existing Clariflocculator provided

IL of Clariflocculator
DOCUMENT NO.

DESIGNED

PG

Head loss in Clarifier sludge line from Clariflocculator to Sludge Sump :

Using Hazen william's formula, head loss

For 250 mm dia pipe

CR

Equivalent length of pipe, L considered

Flow in pipe considered


h 
 Q 
L
C 


R 
1 .81

994.62 D 4.81
Q
LE160960-P-WW-WT-BE-2001
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Dia of pipe provided

Velocity

head loss, h

Sludge Sump at New 20 MLD WTP

Clariflocculators
DOCUMENT NO.

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG

head loss provided

TWL of the sludge sump required as per sludge coming from Existing 23 MLD WTP

TWL of the sludge sump required as per sludge coming from New 20 MLD WTP
Clariflocculators

TWL of the sludge sump provided

Liquid depth of sludge sump

Invert Level of sludge sump


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

12 GRAVITY SLUDGE THICKENER

TWL in Thickener

Side water depth of thickener

Invert level of thickener

Diameter of thickener

Sludge storage zone width

Slope of the scraper

IL of hopper bottom at the sloped end

Sludge storage depth

IL of storage zone
DOCUMENT NO.

PG

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

Head loss in Thickener sludge line from Thickener to Thickened Sludge Sump :
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Using Hazen william's formula, head loss

For 200 mm dia pipe

CR

Equivalent length of pipe, L considered

Flow in pipe

Dia of pipe provided

Velocity

head loss, h

13 THICKENED SLUDGE SUMP

TWL of the thickened sludge sump

Liquid depth of thickened sludge sump


h 
 Q 
L
C 


R 
DOCUMENT NO.

DESIGNED

PG

1 .81

994 .62 D 4.81

Q
LE160960-P-WW-WT-BE-2001
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Invert level of thickened sludge sump

14 TUBE SETTLER

TWL in Tube Settler

Side water depth of tube settler

Invert level of tube settler

Length of tube settler


DOCUMENT NO.

Hopper arrangement shall be provided at bottom of tube settler compartments

Hopper wall provided at an angle to the horizontal axis

Width of space provided at bottom of hopper for sludge withdrawl

Height of hopper provided at bottom of tube settler

IL of Tube settler hopper

15 RECYCLE WATER SUMP


Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

TWL of the recycle sump

Liquid depth of the recycle sump

Invert level of the recycle sump


DOCUMENT NO.

DESIGNED

PG

Q
LE160960-P-WW-WT-BE-2001
REFERENCES :
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED

PG

3. Top Water Level (TWL) of Clear Water Reseroir is taken as 176.6 m

Q
CHECKED

VSD/PGK
A

Hydraulic flow calculations have been carried out to fix the hydraulic levels of various units t
of water from Inlet Chamber to Clear Water Reservoir.

1. Manual on Water Supply & Treatment, Third Edition- Revised and Updated, CPHEEO, Mi
New Delhi, May 1999

2. Tender document for Proposed 20 MLD WTP at Nathavali

4. Levels shall be transferred to Hydraulic Flow Diagram of WTP (DWG No. LE160960-P-W

Formulae used in hydraulic calculation are given below:

A) Head loss due to pipe :

Head loss as per modified Hazen William's formula:


𝒉=
(� 〖 (�/�_� ) 〗 ^(𝟏.𝟖𝟏
))/(𝟗𝟗𝟒.𝟔𝟐 𝑫^(𝟒.𝟖𝟏) )
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR DESIGNED


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI
𝒉=
(� 〖 (�/�_� ) 〗PG
^(𝟏.𝟖𝟏
))/(𝟗𝟗𝟒.𝟔𝟐 𝑫^(𝟒.𝟖𝟏) )
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

Where, Q = Flow, m3/sec

D = Diameter of pipe, m

B) Head loss due to gravity flows in open channels: Manning’s formula :


QQ
CHECKED

VSD/PGK

CR = Roughness Coefficient

L = Length of pipe, m

V = (1/n) x R2/3 x S1/2

Where, V = Velocity of flow in m/sec

n = Manning’s co-efficient of roughness

R = Hydraulic radius in m

S = Slope of hydraulic gradient


A

C) Head loss due to weir :


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

D) Head loss through V-notch :


DOCUMENT NO.

DESIGNED

PG

𝑸=𝟎.𝟓𝟒𝟒𝟓𝒄_𝒆 √𝒈 𝒃
𝑯^(𝟏.𝟓)

LQ
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK

where, Ce = coefficient of discharge =0.864

Flow through V notch

E) Head loss through Submerged orifice :


b = length of weir

H = Head over weir

𝟖/𝟏𝟓 𝒄_𝒅 𝒕𝒂𝒏(𝜽/𝟐)


= 𝑯^(𝟓/𝟐)
√𝟐𝒈

Where, Cd = Coeffecient of discharge= 0.6 for 9

U = angle of notch , in degrees ,

g = acceleration due to garvity, m/s2

H= head over notch, m


A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

F) Head loss due to Gates/Vlaves/Bends :


𝒄_𝒅
Flow through orifice, Q =𝒂
�) 〗 ^(𝟎.𝟓)
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED

〖 (� �
PG

Where, Q = Flow through orifice, m3/sec

a = area of opening, m2

Q
CHECKED

VSD/PGK

g = acceleration due to garvity, m/s2

H= head loss, m

(Reference : CPHEEO Manual on Water Supply & Treatment, May 1999,Pg. 115, Cl. 6.2.9)

Where, K

g
V
H = KV2 / 2g

= Resistant co-efficient

= Velocity of flow in m/sec

= Acceleration due to gravity in m/se


A
1.8
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Following K Values are used for arriving head loss

HYDRAULICS - WATER STREAM


Type of fitting

90 deg. Bend

45 deg. Bend

Tee 90 deg. Take off

Sluice gate

Exit to pipe

Entry to pipe

Butterfly valve

Plug valve
DESIGNED

K-Value

0.75

0.5

1.5

0.62

0.5

0.3

0.3
PG

CQR
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK
A

Top water level (TWL) of CWR is taken as 17


1.8
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

DESIGN CRITERIA:

WTP Treated water output Capacity

No of hours of operation

Design Outlet Capacity of WTP


PG

h
QR
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK

Max. Water losses considered for design (Part 1, Volume 1, Cl. 6.20.5 pg 61 of 230)

Design Inlet raw water from Raw water reservoir including max. water losses
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Recycle flow for New 20 MLD WTP


PG h  Q  4
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK

Design flow including Max. water losses and Recycle flow for New 20 MLD WTP

1 HEAD LOSS BETWEEN CLEAR WATER RESERVOIR (CWR) AND TREATED WATER C

a) Head Loss at CWR entry due to Gate valve

Design Flow to Clear Water Reservoir

No. of compartment

Flow through each CWR inlet valve with 30% overload


A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

No. of gate valves provided

Flow through each valve

Consider velocity through valve

Area of opening of valve

Provide valve of dia.

Provide valve opening of size =

Therefore, Velocity through gate valve

Head loss through gate valve = kV2/ 2 g

Considering Coeffecient of Resistance as k


PG

94.Q62D
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK

Head loss

However provided head loss


4
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

b) Head loss through main pipe line of 700 mm dia.

Flow through pipe with 30% overloading

velocity considered

Size of pipe provided

Head loss as per modified Hazen William's formula'

Maximum length of pipe considered (L)

Roughness coeffecient for MS pipe, CR

head loss, h

c) Head loss due to entry and exit of main pipe line

HL(f) = KV2 / 2g

K = 0.5+1
DESIGNED

h
PG

 Q 
L 
C
 R

94.Q62D
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK

1 .81

994 .62 D 4.81


A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Velocity through pipe

Head loss due to entry and exit of pipe

d) Head loss due to Tees

No. of Tees

Head loss due to Tees


PG

Total Head loss from Chlorine Mixing Channel outlet chamber to CWR

TWL of Chlorine Mixing Channel outlet chamber

Liquid depth of chamber

IL of outlet chamber

e) Head loss through weir for water entry to outlet chamber:


Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

The discharge through a rectangular weir is given by

Flow with 30% overloading

Where Ce = coefficient of discharge

b = length of weir, say

H = head over weir

Total head loss due to weir

Free fall considered

Tip of the Weir

f) Head loss in Chlorine Mixing Chamber

Headloss through open channels:

Design flow with 30% overloading


DOCUMENT NO.

DESIGNED

PG

Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK

Q  0 . 5445 C e gb H

H
A
Channel width

Q
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Channel length considered

Velocity in channel

Applying manning's formula for channel,

n ( concrete surface)

Width of channel (b)

Depth of channel (h)

V = 1/n x R2/3 x S1/2

S=

Loss of head =

headloss due to (open channel) bends:

No. of bends, consider

K, coefficient
DOCUMENT NO.

PG

Q
LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK
A
velocity of flow

HL per bend
Q
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Total HL due to bends

Total Headloss for channel & bends

TWL of Channel for chlorine mixing at Entrance

IL of Chlorine mixing chamber

g) Head loss due to Treated water channel

The treated water channel width

Depth

Flow through channel with 30% overload

Velocity in treated water channel

Applying manning's formula for channel,

n ( concrete surface)
DOCUMENT NO.

PG

Q
LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Width of channel (b)

Depth of channel (h)

V = 1/n x R2/3 x S1/2

S=

Length (max.) considered for head loss

Loss of head =

Total head loss arrived

Total head loss provided

TWL of treated water channel

IL of Treated water channel at upstream


DOCUMENT NO.

DESIGNED

PG

2 HEAD LOSS BETWEEN TREATED WATER CHANNEL & FILTER INLET CHANNEL

a) Head loss through weir:

The discharge through a rectangular weir is given by


Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Flow to each bed under overloading

Where Ce = coefficient of discharge

b = length of weir, say

H = head over weir

Total head loss due to weir

head loss provided

Free fall considered

Lip of the Weir

TWL of control chamber

b) Loss through submerged Orifice

Flow through orifice: Q=Cd

Flow through orifice


a (2gH)0.5
DOCUMENT NO.

DESIGNED

PG

Q  0 . 5445 C e

Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK

gb H
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Velocity through orifice

Area of opening

Head loss required

Head loss provided

Top water level of control chamber 1

c) Head loss due to entry and exit of pipe

HL(f) = KV2 / 2g

K = 0.5+1

consider pipe dia as

Head loss due to entry and exit of pipe

d) Head loss due to 900 bends

consider pipe dia as


DOCUMENT NO.

PG

Q
LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

velocity of flow

h=kv2/2g

No. of bends

Total loss of head

e) Total loss through nozzle considered as

f) Initial Head Loss of Filter :(Ref: CPHEEO Manual)


DOCUMENT NO.

PG

For Design purpose sieve analysis of filter sand is considered as follows

Sandsize , mm
% Sand smaller
than stated size
0.3

0.0
0.4

2.0
0.5

10
0.6

27
0.7

50
Q
LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK

0.8

70
h
A

9
where

h= head loss in m


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Porosity of sand bed considered

Sphericity of sand

l = depth of sand bed

K = Carmen Kozeny constant

V = Velocity of filtration

v = Kinematic viscosity of water

f = porosity of clean bed

Y = grain sphericity

Pi = Fraction of sand
l

g
v
f3
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED

PG

 
 
CHECKED

VSD/PGK

Head loss for a clean filter is determined using Kozeny's equation for stratified beds

h kV (1  f ) 2 6
2
n

d
i 1

Q
pi
i
2
A
0.4

0.5

0.6

0.7

0.8

1.45
L
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

di = geometric mean diameter of sand

0.3 0

10

27

50

70

90

100
DOCUMENT NO.

PG

Sand fraction
within

size
pi x100

17

23

20

20

10

0
d
Size of sand, mm % of sand larger than stated size adjacent sieve i

Q
LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK

cm x 100

3.5

4.5

5.5

6.5

7.5

12.25

-
A
h
h/l
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Total head loss required

For dirty condition maximum head loss provided

However TWL in the filter bed

3 HEAD LOSS IN FILTER INLET GATE AND CHANNEL AROUND FILTERS

a) Head loss at inlet gate to filters


DOCUMENT NO.

PG

100

Q
LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK

Max. Flow to each filter considered (with 30% overloading and one of 4 filters under
backwash)

Velocity of flow

Gate size:
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Provide Gate size 400 x 400 mm

Area of opening

Velocity of water

Head loss through gate =kV2/2g

Head loss h=

Head loss considered

b) Head Loss in Filter Inlet channel (FIC)

Design flow in channel with overloading

Channel size selected

Width of channel

Liquid depth of channel

Velocity of water
DOCUMENT NO.

DESIGNED

PG

Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Length considered for head loss

Using Manning's formula , n for concrete V = 1/n x R2/3 x S1/2

slope,S

Loss of head

Total head loss

TWL of filter inlet channel

IL of filter inlet channel


say

4 HEAD LOSS IN BYPASS CHANNEL/ COMMON CLARIFIED WATER CHANNEL

a) Head loss through Common clarified water channel


PG

Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK
A

L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

The water channel width

Depth

Flow through channel with 30% overload

Velocity in water channel

Applying manning's formula for channel,

n ( concrete surface)

Width of channel (b)

Depth of channel (h)

Using Manning's formula , n for concrete V = 1/n x R2/3 x S1/2

Length of channel considered

Loss of head

However Head loss provided


S=

TWL in clarified water channel/ bypass channel


Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED

PG
CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

IL of clarified water channel

b) Head loss through individual clarifier outlet channel

Flow through the channel with 30% overload

Channel size provided

Width of channel

Liquid depth of channel

Velocity

Length of channel considered

Using manning's equation with n for concrete as

slope,S

Loss of head

TWL of individual Clarified water channel provided is


DOCUMENT NO.

PG

Q
LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

IL of clarified water channel

5 HEAD LOSS ACROSS CLARIFLOCCULATOR

a) Head loss in Peripheral Launder

Length of weir

Overflow in launder with 30% overloading

Width of launder,b

Consider the flow divides equally in two sides of launder

Diameter of clariflocculator

Overflow per half launder

Discharge per unit width of launder, "q"

Critical depth at the end of launder y2=[(q/b)^2/g]^(1/3)

No.of sides the weir recieves the flow N


DOCUMENT NO.

DESIGNED

PG

Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK

say
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Average length of overflow channel from upper to lower end, L

Discharge per unit length of launder

C/s area of flow

Wetted perimeter

Hydraulic mean depth R= A/P

Manning's coefficient,n

Consider the slope in the channel as 1 : 1000


DOCUMENT NO.

DESIGNED

PG

Velocity in launder, using Manning's formula , V = 1/n x R2/3 x S1/2

Carrying capacity of the launder


Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK

Liquid depth at the upper end of the launder, y1= [y2^2+{2(q'LN)^2/(gb^2y2)]^(1/2)

Average liquid depth

However provided depth of launder

Launder width

>
A
C
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Head loss in the launder

However provided head loss in launder

TWL of launder at LP provided

TWL of Launder required at HP

IL of launder

b) Head Loss in the Clarifier notch

Total flow with 25% overloading

Peripheral diameter of clariflocculator

Provide C/C of Notch

No of notches required =

Flow through each notch:


DOCUMENT NO.

PG

Q
LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK

The above selected launder size is adequate for carrying capacity indicated above
A
where
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Flow through V notch =

8
15
C d tan( / 2 ) 2 g H

Cd = Coeffecient of discharge= 0.6 for 90 0 notch

q = angle of notch , in degrees ,

g = acceleration due to garvity, m/s2

H= head over notch, m

Hence head of notch =

provide head as

Consider a free fall of 100 mm

Head loss at notch=

TWL of clarifier required

However, TWL of Clarifier provided


DESIGNED

5
2
PG

Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK
A
R
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

6 HEAD LOSS BETWEEN CLARIFLOCCULATOR AND DISTRIBUTION CHAMBER

a) Head Loss in the Flocculation Zone

Head loss in the flocculation zone to be taken as maximum of

b) Head Loss in the central Column

Head loss as per modified Hazen William's formula

Maximum length of pipe, say


DOCUMENT NO.

 Q
L 
C
1.81

h   R  4.81
994.62D
Q
LE160960-P-WW-WT-BE-2001

DESIGNED

PG
CHECKED

VSD/PGK

Head loss in the central column including port opening to be taken as maximum of

c) Head loss through inlet pipe

Size of inlet pipe (inner dia)


A

R
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Flow (Q) with over loding condition

Roughness coeffecient for DI pipe, CR

head loss, h

Velocity of flow

d) Losses due to 45 deg bend

h=kv2/2g

Total no of bends

Total loss due to all bends

e) Losses due to 90 deg bend

h=kv2/2g
DOCUMENT NO.

PG
L 
C 
h   R  4.81
994.62D

Q
LE160960-P-WW-WT-BE-2001

DESIGNED

 Q
1.81
CHECKED

VSD/PGK
A
h
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Total no of bends

Total loss due to all bends

f) Head loss through entry gate :

Flow with 30% overloading

Velocity of flow

Gate size

Provide Gate size

Area of opening

Velocity of water

Head loss through gate =kV2/2g

k
DOCUMENT NO.

PG

Q
LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Head loss h arrived=

Total head loss =

However head loss provided

TWL of distribution chamber outlet zone required =

Therefore, TWL of distribution chamber outlet zone provided =

IL of distribution chamber outlet zone


PG

7 HEAD LOSS BETWEEN DISTRIBUTION CHAMBER OUTLET ZONE AND FLASH MIXER
Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

a) Head loss through each outlet zone adjustable weir :


DOCUMENT NO.

DESIGNED

PG

Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK

C
The Discharge through a rectangular weir at each outlet zone of distribution chamber is
given by

No of outlet zones provided for distribution to individual clariflocculators

where Ce= coefficient of discharge

b= length of weir

H= Head over weir

H=

Total head loss due to weir


Q  0 .5445 C e g b H 1.5

Providing freefall of 0.05 m in weir downstream, total head loss, say

Lip of weir

TWL of Distribution chamber

TWL of Distribution chamber provided

IL of Distribution chamber
A
Q

h
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

where Ce= coefficient of discharge

b= length of weir

H= Head over weir

H=

Total head loss due to weir


Q  0.5445 C e g b H 1.5

Providing freefall of 0.05 m in weir downstream, total head loss, say

Lip of weir

TWL of Flash mixer

TWL of Flash mixer provided

IL of Flash mixer
Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED

PG
CHECKED

VSD/PGK

b) Head loss through suppressed weir between Distribution chamber and Flash mixer

The Discharge through a rectangular weir is given by


A
h
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

8 HEAD LOSS BETWEEN FLASH MIXER AND INLET CHAMBER

TWL at downstream of parshall flume

a) Head loss through Parshall flume in channel

Design max. flow

Design avg. flow

Selecting Parshall flume No.:

Upstream (entrance section) head - ha

head at throat section - hb


PG

Head loss through perforated baffle at inlet of flash mixer considered

TWL of Flashmixer inlet zone provided

IL of Flashmixer inlet zone considered

Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Height of the broad-crested weir hp2

So, Headloss

Head loss considered

Liquid depth

TWL in Parshall Flume

Required IL in Parshall Flume

b) Head Loss in the inlet chamber

Head loss including opening to be taken as maximum of

TWL in inlet chamber

Liquid depth in the inlet chamber

IL in inlet chamber
DOCUMENT NO.

PG

Q
LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

9 STAGING HEIGHT OF BACKWASH TANK

a) Head Loss across filter bed during back washing:

Top level of the filter media (sand)

Maximum head loss throgh filter beds

Water level in filter bed above sand media

Total depth of media including gravel layer of 100 mm

Head Loss across filter bed during backwashing:


DOCUMENT NO.

DESIGNED

PG

Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK

The maximum frictional resistance that can be offered by the filter grains in the fluidized
state is their submerged weight. The head loss across the filter bed in fluidised
conditions is given by,

Where,
hb 
m  

1  f  l

hb = Head loss across filter bed during backwash, m

ρm = mass density of filter grains in kg/m3 (max)


A
4.81
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

ρ = mass density of water

f = porosity of sand bed,


DESIGNED

l = height of expanded bed (considering 150% bed expansion)

head loss, hb =

say

Total Head

b) Head loss through backwash inlet at each section :

Backwash water flow

Back wash water main DN500

Using Hazen william's formula, head loss

CR
 Q
L
C
 R




PG

1 .81
Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK
A
Flow in pipe

Dia of pipe
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

h 
 Q 
L
C 


R 

994 .62 D 4.81


DOCUMENT NO.

DESIGNED

PG
1 .81

Head loss in pipe line from farthest filter to the bottom of wash water tank:

considered Length of pipe

Head loss, h

Consider head loss through nozzle as

Total head loss

The head loss during backwash operation

For ensuring proper backwash the head has been considered as

Top Water level of backwash overhead tank

Hence Bottom level of backwash tank


Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

a) Loss in dirty Backwash water channel

The dirty backwash water channel width

Depth

Flow through channel

Velocity in backwash water channel

Applying manning's formula for channel,

n ( concrete surface)

Width of channel (b)

Depth of channel (h)

V = 1/n x R2/3 x S1/2

S=

Length of channel considered


DOCUMENT NO.

DESIGNED

PG

Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK

10 HEAD LOSS IN BETWEEN DIRTY BACKWASH CHANNEL AND DIRTY BACKWASH ST

New 20 MLD WTP:


A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Loss of head

TWL of Dirty backwash channel

IL of Dirty backwash channel

b) Loss in Pipe

Using Hazen william's formula, head loss

CR

Length of pipe, L considered

Flow in pipe

Dia of pipe

Velocity
h 
 Q 
L
C 


R 
DOCUMENT NO.

DESIGNED

PG

1 .81

994.62 D 4.81
Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK
A
9 4 .6 2 D
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

head loss, h

Provided head loss

Existing 23 MLD WTP:

a) Dirty Backwash water channel

The existing dirty backwash water channel width provided

Depth of channel provided

Dirty Back wash flow from twin bed filter

Flow through channel

TWL of Existing Dirty backwash channel

IL of Existing Dirty backwash channel


PG

Q
DOCUMENT NO.

LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK
A
9 4 .6 2 D
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

b) Loss in Pipe

Using Hazen william's formula, head loss

CR

Length of pipe, L considered

Flow in pipe

Dia of pipe, 750 mm

Velocity

head loss, h

Provided head loss


h 
 Q 
L
C 


R 
DOCUMENT NO.

DESIGNED

PG

1 .81

994.62 D 4.81

Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK

TWL of the dirty backwash storage tank required as per wash water coming from
Existing 23 MLD WTP dirty backwash channel
TWL of the dirty backwash storage tank required as per wash water coming from New
20 MLD WTP dirty backwash channel
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Dirty Backwash storage tank

TWL of dirty backwash storage tank provided

Liquid depth of dirty backwash storage tank

Invert Level of dirty backwash storage tank

HYDRAULICS - SLUDGE STREAM

11 HEAD LOSS IN BETWEEN CLARIFLOCCULATOR AND SLUDGE SUMP

New 20 MLD WTP:

IL of Clariflocculator

Slope 1 in 12 to be provided

Diameter of Clariflocculator

Width of storage zone provided at bottom of hopper

Hopper depth
DOCUMENT NO.

PG

Q
LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

IL of hopper bottom at the sloped end

Storage depth

IL of storage zone
DOCUMENT NO.

DESIGNED

PG

Head loss in Clarifier sludge line from Clariflocculator to Sludge Sump :

Using Hazen william's formula, head loss

For 200 mm dia pipe

CR

Equivalent length of pipe, L considered

Flow in pipe considered

Dia of pipe provided

Velocity
h 
 Q 
L
C 


R 
1 .81

994 .62 D 4 .81

Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

head loss, h

Existing 23 MLD WTP:

However, TWL of Existing Clariflocculator provided

IL of Clariflocculator
DOCUMENT NO.

DESIGNED

PG

Head loss in Clarifier sludge line from Clariflocculator to Sludge Sump :

Using Hazen william's formula, head loss

For 250 mm dia pipe

CR

Equivalent length of pipe, L considered

Flow in pipe considered


h 
 Q 
L
C 


R 
1 .81

994.62 D 4.81
Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Dia of pipe provided

Velocity

head loss, h

Sludge Sump at New 20 MLD WTP

Clariflocculators

TWL of the sludge sump provided

Liquid depth of sludge sump

Invert Level of sludge sump


DOCUMENT NO.

DESIGNED

PG

Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK

head loss provided

TWL of the sludge sump required as per sludge coming from Existing 23 MLD WTP

say
TWL of the sludge sump required as per sludge coming from New 20 MLD WTP
Clariflocculators

say
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

12 GRAVITY SLUDGE THICKENER

TWL in Thickener

Side water depth of thickener

Invert level of thickener

Diameter of thickener

Sludge storage zone width

Slope of the scraper

IL of hopper bottom at the sloped end

Sludge storage depth

IL of storage zone
DOCUMENT NO.

PG

Q
LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK

Head loss in Thickener sludge line from Thickener to Thickened Sludge Sump :
A
CR
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Using Hazen william's formula, head loss

For 200 mm dia pipe

Equivalent length of pipe, L considered

Flow in pipe

Dia of pipe provided

Velocity

head loss, h

13 THICKENED SLUDGE SUMP

TWL of the thickened sludge sump

Liquid depth of thickened sludge sump


h 
 Q 
L
C 


R 
DOCUMENT NO.

DESIGNED

PG

1 .81

994 .62 D 4.81

Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

Invert level of thickened sludge sump

14 TUBE SETTLER

TWL in Tube Settler

Side water depth of tube settler

Invert level of tube settler

Length of tube settler


DOCUMENT NO.

DESIGNED

PG

Q
LE160960-P-WW-WT-BE-2001

CHECKED

VSD/PGK

Hopper arrangement shall be provided at bottom of tube settler compartments

Hopper wall provided at an angle to the horizontal axis

Width of space provided at bottom of hopper for sludge withdrawl

Height of hopper provided at bottom of tube settler

IL of Tube settler hopper

15 RECYCLE WATER SUMP


C
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND


WASTE WATER - SRI GANGANAGAR PROJECT

TITLE: HYDRAULIC DESIGN CALCULATION FOR


NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

TWL of the recycle sump

Liquid depth of the recycle sump

Invert level of the recycle sump


DOCUMENT NO.

PG

Q
LE160960-P-WW-WT-BE-2001

DESIGNED CHECKED

VSD/PGK
A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO.

1 Inlet Chamber IC-01

2 Inlet channel with Parshall Flume PF-02

3 *Inlet zone of Flash Mixer -

Flash Mixer FM-03

4 *Distribution chamber DC-04

*Outlet zone of Distribution chamber -

5 Clariflocculator detail CF-05 A/B

A. Flocculator zone

B. Clariflocculator

C. Clarifier launder

D.Clarified water channel CWC-06 A/B


E.Common Clarified Water / Bypass
Channel BC-07

*
F. Clarifier Control Room -
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO.

6 Filter house -

A. Filter inlet channel FIC-08


B. Rapid gravity sand filters - Twin bed RGSF-09
size A/B/C/D
i. Rapid gravity sand filters - Single bed
size -

C. Treated Water Channel TWC-10

*
E. Filter House Gallery

F. Dirty Backwash Channel DBC-11

G. Backwash Water - Overhead Tank BOHT-12

H. Drain Pit for Filter House


*
I. Chlorine Mixing Chamber (With
Baffles) CMC-13

J. Outlet Chamber -

*
K. Filter Annexe Building -

7 Dirty Backwash Storage Tank DBST-15


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO.

8 *Tube Settler TS-16

9 Sludge Sump SS-17


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO.

10 Gravity Sludge Thickener ST-18

11 Thickened Sludge Sump TSS-19


*Thickened Sudge Pump House and
12 Control Room -

13 *Centrifuge Building -

i. Ground floor

ii. First floor

14 *Dewatered Sludge Storage Shed -

15 Recycle Water Sump RWS-20

16 *Chemical House -

Ground floor plan

A. PACl Storage Tanks PAST-21 A/B

B. DWPE Storage area

*
C. Washroom
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO.

D. Drain pit for Chemical House

*
E. Control Room

First floor plan

A. DWPE dosing tank PDT-22 A/B

B. PACl dosing tank PADT-21 C/D

C. *Washroom

17 *
A. Chlorinator room -

*
B. Chlorine Tonner shed -

18 *Admin - Control - Lab Building -

Ground floor plan

A. *Administration Hall

B. *Officer Rooms
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO.

C. *Staff room cum Toilets / Washroom


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO.

D. *Canteen room

E. *Conference room

First floor plan

A. *Laboratory

B. *Toilets

C. *Store room

D. *Main Control room

19 *Equipment Storeroom -

20 *Workshop -

21 *Security Cabin -

22 *Covered garages -

23 *Electrical Buildings & Structures -

NOTE: 1. Dimensions marked as * are subjected to change during detailed engineering.


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO.

2. Raw Water Reservoir, Raw Water Pumping Station, Clear Water Reservoir and Clear Water Pu
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT
LE

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO. INTERNAL UNIT SIZE IN

1 Inlet Chamber IC-01 2.3 m (L) x 2.2 m (W) x 3 m (LD) + 0.

2 Inlet channel with Parshall Flume PF-02 10 m (L) x 1.1 m (W) x 0.6 m (LD) + 0

3 *Inlet zone of Flash Mixer - 2 m (L) x 0.5 m (W) x 2.55 m (LD) + 0

Flash Mixer FM-03 2 m (L) x 2 m (W) x 2.5 m LD + 0.5 m

4 *Distribution chamber DC-04 2.8 m (L) x 2 m (W) x 1.15 m LD + 0.5

*Outlet zone of Distribution chamber - 2.8 m (L) x 0.9 m (W) x 1 m LD + 0.5

5 Clariflocculator detail CF-05 A/B

A. Flocculator zone 8.3 m (Inner Dia) x 3.5 m LD + 0.5 m

B. Clariflocculator 22.8 m (Dia) x 3.5 m LD + 0.5 m FB

C. Clarifier launder 0.4 m (W) x 0.45 m (LD)

D.Clarified water channel CWC-06 A/B 0.5 m (W) x 0.5 m (LD) + 0.5 m FB
E.Common Clarified Water / Bypass
Channel BC-07 0.8 m (W) x 0.55 m (LD) + 0.5 m FB

*
F. Clarifier Control Room - 5 m (L) x 5 m (W) x 3.5 m Ht
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT
LE

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO. INTERNAL UNIT SIZE IN

6 Filter house - 37.3 m (L) x 10 m (W)

A. Filter inlet channel FIC-08 0.9 m (W) x 0.5 m (LD) + 0.5 m FB


B. Rapid gravity sand filters - Twin bed RGSF-09
size A/B/C/D 8 m (L) x 4.7 m (W)
i. Rapid gravity sand filters - Single bed
size - 4.7 m (L) x 4 m (W)

C. Treated Water Channel TWC-10 0.8 m (W) x 0.6 m LD + 0.5 m FB

*
E. Filter House Gallery 37.3 m (L) x 5 m (W)

F. Dirty Backwash Channel DBC-11 0.7 m (W) x 0.6 m (LD) + 0.5 m FB

G. Backwash Water - Overhead Tank BOHT-12 29 m (L) x 5 m (W) x 1.6 m LD + 0.5 m

H. Drain Pit for Filter House 2 m (L) x 1 m (W) x 1.5 m (LD) + 0.3
*
I. Chlorine Mixing Chamber (With
Baffles) CMC-13 7.8 m (L) x 1.9 m (W) x 2 m LD+ 0.5

J. Outlet Chamber - 1.9 m (L) x 1.2 m (W) x 1.65 m LD+

*
K. Filter Annexe Building - 12.2 m (L) x 7.3 m (W) x 4.5 m Ht

7 Dirty Backwash Storage Tank DBST-15 13.8 m (L) x 7 m (W) x 3 m LD + FB A


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT
LE

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO. INTERNAL UNIT SIZE IN

8 *Tube Settler TS-16 9.4 m (L) x 4.7 m (W) x 3.5 m LD + 0.

9 Sludge Sump SS-17 3.6 m (L) x 3.5 m (W) x 3 m LD + FB


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT
LE

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO. INTERNAL UNIT SIZE IN

10 Gravity Sludge Thickener ST-18 8.7 m Dia x 3.5 m (SWD) + 0.5 m (FB

11 Thickened Sludge Sump TSS-19 3.9 m (L) x 3.9 m (W) x 3 m (LD) + 0.


*Thickened Sudge Pump House and
12 Control Room - 8 m (L) x 4 m (W) x 5.5 m Ht

13 *Centrifuge Building -

i. Ground floor 6.6 m (L) x 5.2 m (W) x 5.5 m Ht

ii. First floor 6.6 m (L) x 5.2 m (W) x 4.5 m Ht

14 *Dewatered Sludge Storage Shed - 20 m (L) x 9.4 m (W) x 4 m Ht

15 Recycle Water Sump RWS-20 7 m (L) x 2.8 m (W) x 3.5 m (LD) + 0

16 *Chemical House -

Ground floor plan 20 m (L) x 10 m (W) x 5 m Ht

A. PACl Storage Tanks PAST-21 A/B 2.6 m (L) x 2.6 m (W) x 2.5 m (LD) +

B. DWPE Storage area 1 m (L) x 1 m (W) x 1.5 m (Ht)

*
C. Washroom 3.5 m (L) x 4 m (W)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT
LE

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO. INTERNAL UNIT SIZE IN

D. Drain pit for Chemical House 3 m (L) x 1 m (W) x 1.5 m (LD) + 0.3

*
E. Control Room 4 m (L) x 4 m (W)

First floor plan 20 m (L) x 10 m (W) x 5.5 m Ht

A. DWPE dosing tank PDT-22 A/B 2.2 m (Dia) x 2 m (LD) + 0.5 m (FB)

B. PACl dosing tank PADT-21 C/D 1.5 m (Dia) x 2m (LD) + 0.5m (FB)

C. *Washroom 3.5 m (L) x 4 m (W)

17 *
A. Chlorinator room - 7 m (L) x 4 m (W) x 4.5 m Ht

*
B. Chlorine Tonner shed - 9 m (L) x 7 m (W) x 4.5 m Ht

18 *Admin - Control - Lab Building -

Ground floor plan 16.31 m (L) x 12.79 m (W) x 3.5 m H

A. *Administration Hall 8.42 m (L) x 6.25 m (W) x 3.5 m Ht

B. *Officer Rooms 2.9 m (L) x 1.475 m (W) x 3.5 m Ht

2.9 m (L) x 1.525 m (W) x 3.5 m Ht


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT
LE

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO. INTERNAL UNIT SIZE IN

2.25 m (L) x 2.45 m (W) x 3.5 m Ht

C. *Staff room cum Toilets / Washroom 6.08 m (L) x 5.15 m (W) x 3.5 m Ht
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT
LE

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO. INTERNAL UNIT SIZE IN

D. *Canteen room 6.25 m (L) x 4.0 m (W) x 3.5 m Ht

E. *Conference room 10.7 m (L) x 6.08 m (W) x 3.5 m Ht

First floor plan

A. *Laboratory 12.65 m (L) x 4.82 m (W) x 3.5 m Ht

B. *Toilets 7.51 m (L) x 5.15 m (W) x 3.5 m Ht

C. *Store room 6.08 m (L) x 3.57 m (W) x 3.5 m Ht

D. *Main Control room 6.9 m (L) x 6.08 m (W) x 5 m Ht

19 *Equipment Storeroom - 8 m (L) x 6.3 m (W) x 4 m Ht

20 *Workshop - 9.4 m (L) x 8 m (W) x 4 m Ht

21 *Security Cabin - 4 m (L) x 3.5 m (W)

22 *Covered garages - 15 m (L) x 5 m (W) x 4 m Ht

23 *Electrical Buildings & Structures - 14 m (L) x 5.6 m (W) x 4 m Ht

NOTE: 1. Dimensions marked as * are subjected to change during detailed engineering.


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR


PROJECT
LE

TITLE: LIST OF CIVIL UNITS FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

S.No. DESCRIPTION OF UNIT TAG NO. INTERNAL UNIT SIZE IN

2. Raw Water Reservoir, Raw Water Pumping Station, Clear Water Reservoir and Clear Water Pu
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

Water Treatment

Type: Slow speed, propeller or turbine


1 Agitator for Flash Mixer AG-A 1 mixer
MOC: Shaft, Paddles: SS-316

Type: Paddle type flocculator


Agitator in flocculator zone AG- 4 (2 nos. per each
2 MOC: Paddles: MS Galvanized
of Clariflocculator B/C/D/E Clariflocculator)
assembly; All fasteners, nuts-bolts: GI
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

Type: Peripheral driven extended half


way rotating Bridge
MOC: Scraper arms, central rotating
Scrapper mechanism for
3 CFM-A/B 2 cage/ shaft, walkway and mechanism
Clariflocculator
support: MS fabricated; All fasteners &
nuts-bolts: GI; Squeezes: Brass or
neoprene rubber

Adjustable V-notch weirs 2 lots (341 nos. per


4 - MOC: SS / FRP;
for Clariflocculators lot)

Filter media shall conform to IS 8419


Sand Media for Rapid latest version. Effective size of sand:
5 - 4
Sand Gravity Filter 0.55 to 0.75 mm; Uniformity coefficient:
1.7 to 1.3; Silica Content > 90%
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

6 Filter Nozzles - MOC: Nozzles: PP with fine slots;


6770
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

Type: Twin Lobe Type Rotary Air Blower


MOC: Casing: High grade CI hardened
and machined on internal Surfaces;
7 Air Scour Blower BL - A/B 2 (1W+1S)
Lobes: High Grade CI; Internal Gears:
High Grade CI; Base Frame: Structural
Steel Confirming to IS 226;

Type: Horizontal centrifugal


Backwash Water Tank
8 BWP - A/B 2 (1W+1S) MOC: Shaft: EN-8; Casing: CI;
Pump
Impeller: Ni-Hardened CI / SS 304;

Wastewater Recovery System


L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

Type: Submersible Mixer


Mixer for Dirty Backwash
9 SM - A/B 2 MOC: Shaft, Paddles: SS 304;
Storage Tank

Type: Non-clog Submersible


TSFP -
10 Tube Settler Feed Pump 2 (1W+1S) MOC: Casing: Cast Iron; Impeller:
A/B
SS304; Seal: Tungsten Carbide;

11 Tube Setller Media - 2 lot MOC: Plates: uPVC;


L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC
11 Tube Setller Media - 2 lot MOC: Plates: uPVC;

Type: Submersible Mixer


12 Mixer for Sludge sump SM - C 1 MOC: Shaft, Paddles: SS 304;

Type: Non-clog Submersible


13 Thickener feed pump TFP - A/B 2 (1W+1S) MOC: Casing: Cast Iron; Impeller:
SS304; Seal: Tungsten Carbide;
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

Type: Central driven mechanism,


Circular (Radial)
MOC: Scraper arms, central rotating
Gravity Sludge Thickener cage/ shaft, feed well, walkway and
14 STM - A 1
Mechanism mechanism support: MSEP;
All submerged fasteners, nuts-bolts: SS
316; Squeezes: Brass or neoprene
rubber;

Adjustable V-notch weirs


15 - 1 lot MOC: SS / FRP;
for Thickener
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

Type: Submersible Mixer


Mixer for Thickened Sludge
16 SM - D 1 MOC: Shaft, Paddles: SS 304;
sump
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

Type: Screw
17 Centrifuge Feed Pump CFP - A/B 2 (1W+1S) MOC: Casing: CI; Rotor: Alloy steel;
Shaft: CS;

Type:Solid bowl Centrifuge


Sludge Dewatering
18 CEN - A/B 2 (1W+1S) MOC: Wetted parts: SS 304; Base
Centrifuge
Frame: Epoxy painted steel;
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM Dewatering


DESCRIPTION TAG NO. QTY (Nos.) Type:Solid bowl
TYPECentrifuge
/ MOC
Sludge
18 CEN - A/B 2 (1W+1S) MOC: Wetted parts: SS 304; Base
Centrifuge
Frame: Epoxy painted steel;

Type: Non-clog Submersible


REWP -
19 Recycle water pump 2 (1W+1S) MOC: Casing: Cast Iron; Impeller:
A/B
SS304; Seal: Tungsten Carbide;

Chemical Handling
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

Agitator for PACl solution Type: Turbine Type


20 AG - F/G 2
Storage tank MOC: Shaft: SS-304

Agitator for PACl solution Type: Turbine Type


21 AG - H/I 2
dosing tank MOC: Shaft: SS-304

Agitator for DWPE solution Type: Turbine Type


22 AG - J/K 2
dosing tank MOC: Shaft: SS-304
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

PADT - 21
23 PACl dosing Tank 2 MOC: FRP / HDPE
C/D

Poly Electrolyte Dosing PDT - 22


24 2 MOC: FRP / HDPE
Tank A/B

Type: Horizontal centrifugal


PATP -
25 PACl Tansfer Pumps 2 (1W+1S) MOC: Shaft: EN-8; Casing: CI; Impeller:
A/B
Ni-Hardened CI / SS 304;
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG
Type: Horizontal centrifugal
PATP -
SL.25
NO. ITEM
PACl DESCRIPTION
Tansfer Pumps TAG NO. QTY (Nos.)
2 (1W+1S) MOC: Shaft: TYPE
EN-8; /Casing:
MOC CI; Impeller:
A/B
Ni-Hardened CI / SS 304;

Type: Diaphragm - Hydraulically


PADP - operated
26 PACl dosing pumps 2 (1W+1S)
A/B MOC: Wetted parts: SS 304 / PP;
Enclosed, corrosion proof;

Type: Diaphragm - Hydraulically


Poly electrolyte dosing operated
27 PDP - A/B 2 (1W+1S)
pumps MOC: Wetted parts: SS 304 / PP;
Enclosed, corrosion proof;
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

Type: Gas chlorination, Gas feed


Vaccum type Chlorinators. System
complete with motive water pumps,
CHL - A/B Ejector, Connector for duty and auxiliary
28 Pre - Chlorination System (Chlorinat 2 (1W+1S) Chlorine Toner and gas piping, Solution
or) Piping and diffusers, Chlorine leak
detectors, Safety equipment,
accessories required for safe operation
of the chlorine system

Chlorine Tonner with TON - As per IS 10553 and other relevant


29 4
tonner roller A/B/C/D standards
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

Type: Gas chlorination, Gas feed


Vaccum type Chlorinators. System
complete with motive water pumps,
CHL - C/D Ejector, Connector for duty and auxiliary
30 Post - Chlorination System (Chlorinat 2 (1W+1S) Chlorine Toner and gas piping, Solution
or) Piping and diffusers, Chlorine leak
detectors, Safety equipment,
accessories required for safe operation
of the chlorine system

Chlorine Tonner with TON - As per IS 10553 and other relevant


31 4
tonner roller E/F/G/H standards
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

Type: Non-clog Submersible


Dewatering Pumps for
32 2 (1W+1S) MOC: Casing: Cast Iron; Impeller:
Neutralisation pit
SS304; Seal: Tungsten Carbide;

Laboratory Equipment

SP - Type: Centrifugal Pumps


33 Sampling pumps 4
A/B/C/D
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

As per NIT - Part 1, Vol 1, Cl. 6.30.6.15,


34 Labaratory Equipment 1 lot
pg 129 to 131 of 230

Miscelleneous Utilities

Type: Non - clog Submersible pumps


Drain Pump for Chemical
35 1 MOC: Casing: CI; Impeller: SS 304;
house
Shaft: SS 304

Type: Non - clog Submersible pumps;


Drain Pump for Filter
36 1 MOC: Casing: CI; Impeller: SS 304;
house
Shaft: SS 305
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) Type: Non - TYPE / MOC
clog Submersible pumps;
Drain Pump for Filter
36 1 MOC: Casing: CI; Impeller: SS 304;
house
Shaft: SS 305

Exhaust fans in Chemical Type: Axial flow fans/ Propeller fans;


37 Suitable
house Wall mounted

Exhaust fans in Chlorinator Type: Axial flow fans/ Propeller fans;


38 Suitable
room Wall mounted
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

Exhaust fans in Filter


Type: Axial flow fans/ Propeller fans;
39 house gallery and Filter Suitable
Wall mounted
annexe building

Lifting Equipment

Electrical Hoist for


40 1 IS standards & relevant codes
for Filter annexe building
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

EOT Crane for Chlorine


41 1 IS standards & relevant codes
Tonner Shed

Electrical Hoist for


42 1 IS standards & relevant codes
for Centrifuge building

Chain pulley block for Tube


43 1 IS standards & relevant codes
Settler Feed Pumps

Chain pulley block for


44 1 IS standards & relevant codes
Thickener Feed Pumps
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC

Chain pulley block for


45 1 IS standards & relevant codes
Recylce Water Pumps

W - Working, S - Standby, SS - Store standby, MOC - Material of Construction

Motor details, Power, Manufacturer, Country origin, model numbers, MOC, efficiency and all other vendor item details will be provided by
Notes:
The above equipment list is for Water treatment plant only. Raw Water Pumping Station, Clear Water Water Pumping Station Equipment

' * ' Head of pumps is subjected to change during detailed engineering.


L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

Water Treatment

Type: Slow speed, propeller or turbine


1 Agitator for Flash Mixer AG-A 1 mixer Tank dimensions:
MOC: Shaft, Paddles: SS-316

Type: Paddle type flocculator Speed:


Agitator in flocculator zone AG- 4 (2 nos. per each
2 MOC: Paddles: MS Galvanized
of Clariflocculator B/C/D/E Clariflocculator)
assembly; All fasteners, nuts-bolts: GI Flocculator unit of size:
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

Type: Peripheral driven extended half


way rotating Bridge
MOC: Scraper arms, central rotating
Scrapper mechanism for Clariflocculator
3 CFM-A/B 2 cage/ shaft, walkway and mechanism
Clariflocculator dimensions:
support: MS fabricated; All fasteners &
nuts-bolts: GI; Squeezes: Brass or
neoprene rubber

Adjustable V-notch weirs 2 lots (341 nos. per Clariflocculator (inside


4 - MOC: SS / FRP;
for Clariflocculators lot) launder) dimensions:

Filter media shall conform to IS 8419


Sand Media for Rapid latest version. Effective size of sand: Depth of sand media: 900
5 - 4
Sand Gravity Filter 0.55 to 0.75 mm; Uniformity coefficient: To suit filter bed of size:
1.7 to 1.3; Silica Content > 90%
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

To suit 4 nos. filter beds,


6 Filter Nozzles - MOC: Nozzles: PP with fine slots;
6770 each of size:
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

Speed: < 1000 rpm. Noise


Type: Twin Lobe Type Rotary Air Blower blower.
MOC: Casing: High grade CI hardened
and machined on internal Surfaces;
7 Air Scour Blower BL - A/B 2 (1W+1S) Capacity (m3/hr):
Lobes: High Grade CI; Internal Gears:
High Grade CI; Base Frame: Structural
Steel Confirming to IS 226;
Pressure (mm WC):

Type: Horizontal centrifugal Capacity (m3/hr):


Backwash Water Tank
8 BWP - A/B 2 (1W+1S) MOC: Shaft: EN-8; Casing: CI;
Pump
Impeller: Ni-Hardened CI / SS 304; Head (m):

Wastewater Recovery System


L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

Type: Submersible Mixer


Mixer for Dirty Backwash
9 SM - A/B 2 MOC: Shaft, Paddles: SS 304;
Storage Tank To suit chamber of size:

Fluid handled: 1.05 S.G.;


Type: Non-clog Submersible
TSFP -
10 Tube Settler Feed Pump 2 (1W+1S) MOC: Casing: Cast Iron; Impeller: Capacity (m3/h):
A/B
SS304; Seal: Tungsten Carbide;
Head (m WC):

To suit tank size


(including 1 baffle):
11 Tube Setller Media - 2 lot MOC: Plates: uPVC;
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC
11 Tube Setller Media - 2 lot MOC: Plates: uPVC;
Angle of inclination: 60deg
Minimum thickness of plate

Type: Submersible Mixer


12 Mixer for Sludge sump SM - C 1 MOC: Shaft, Paddles: SS 304;
To suit chamber of size:

Fluid handled: 1.05 S.G.;


Type: Non-clog Submersible
13 Thickener feed pump TFP - A/B 2 (1W+1S) MOC: Casing: Cast Iron; Impeller: Capacity (m3/h):
SS304; Seal: Tungsten Carbide;
Head (m WC):
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

Type: Central driven mechanism,


Circular (Radial)
MOC: Scraper arms, central rotating
Gravity Sludge Thickener cage/ shaft, feed well, walkway and
14 STM - A 1 To suit tank of size:
Mechanism mechanism support: MSEP;
All submerged fasteners, nuts-bolts: SS
316; Squeezes: Brass or neoprene
rubber;

Adjustable V-notch weirs


15 - 1 lot MOC: SS / FRP; To suit tank of size:
for Thickener
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

Type: Submersible Mixer


Mixer for Thickened Sludge
16 SM - D 1 MOC: Shaft, Paddles: SS 304;
sump To suit chamber of size:
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

Fluid type: Sludge; Sludge


Solids handling size: 40 m
Type: Screw
17 Centrifuge Feed Pump CFP - A/B 2 (1W+1S) MOC: Casing: CI; Rotor: Alloy steel;
Shaft: CS; Capacity (m3/h):

Head (m WC):

Solids consistency at the in


polyelectrolyte and sludge;
minimum 20%

Type:Solid bowl Centrifuge Capacity (m3/h):


Sludge Dewatering
18 CEN - A/B 2 (1W+1S) MOC: Wetted parts: SS 304; Base
Centrifuge
Frame: Epoxy painted steel;
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM Dewatering


DESCRIPTION TAG NO. QTY (Nos.) Type:Solid bowl
TYPECentrifuge
/ MOC SPECIFIC
Sludge
18 CEN - A/B 2 (1W+1S) MOC: Wetted parts: SS 304; Base
Centrifuge
Frame: Epoxy painted steel;
Solids loading (kg/d):

Hours of operation:

Fluid handled: 1.05 S.G.;


Type: Non-clog Submersible
REWP -
19 Recycle water pump 2 (1W+1S) MOC: Casing: Cast Iron; Impeller: Capacity (m3/h):
A/B
SS304; Seal: Tungsten Carbide;
Head (m WC):

Chemical Handling
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

Agitator for PACl solution Type: Turbine Type


20 AG - F/G 2 Tank dimensions:
Storage tank MOC: Shaft: SS-304

Agitator for PACl solution Type: Turbine Type


21 AG - H/I 2 Tank dimensions:
dosing tank MOC: Shaft: SS-304

Agitator for DWPE solution Type: Turbine Type


22 AG - J/K 2 Tank dimensions:
dosing tank MOC: Shaft: SS-304
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

PADT - 21
23 PACl dosing Tank 2 MOC: FRP / HDPE Tank dimensions:
C/D

Poly Electrolyte Dosing PDT - 22


24 2 MOC: FRP / HDPE Tank dimensions:
Tank A/B

Type: Horizontal centrifugal Capacity (lph):


PATP -
25 PACl Tansfer Pumps 2 (1W+1S) MOC: Shaft: EN-8; Casing: CI; Impeller:
A/B
Ni-Hardened CI / SS 304;
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK
Type: Horizontal centrifugal
PATP -
SL.25
NO. ITEM
PACl DESCRIPTION
Tansfer Pumps TAG NO. QTY (Nos.)
2 (1W+1S) MOC: Shaft: TYPE
EN-8; /Casing:
MOC CI; Impeller: SPECIFIC
A/B
Ni-Hardened CI / SS 304;
Head (m WC):

Type: Diaphragm - Hydraulically Capacity (lph):


PADP - operated
26 PACl dosing pumps 2 (1W+1S)
A/B MOC: Wetted parts: SS 304 / PP;
Enclosed, corrosion proof; Head (m WC):

Type: Diaphragm - Hydraulically Capacity (lph):


Poly electrolyte dosing operated
27 PDP - A/B 2 (1W+1S)
pumps MOC: Wetted parts: SS 304 / PP;
Enclosed, corrosion proof; Head (m WC):
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

Type: Gas chlorination, Gas feed


Vaccum type Chlorinators. System
complete with motive water pumps,
CHL - A/B Ejector, Connector for duty and auxiliary
Capacity of chlorinator
28 Pre - Chlorination System (Chlorinat 2 (1W+1S) Chlorine Toner and gas piping, Solution
(kg/h):
or) Piping and diffusers, Chlorine leak
detectors, Safety equipment,
accessories required for safe operation
of the chlorine system

Chlorine Tonner with TON - As per IS 10553 and other relevant


29 4 Capacity (kg):
tonner roller A/B/C/D standards
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

Type: Gas chlorination, Gas feed


Vaccum type Chlorinators. System
complete with motive water pumps,
CHL - C/D Ejector, Connector for duty and auxiliary
Capacity of chlorinator
30 Post - Chlorination System (Chlorinat 2 (1W+1S) Chlorine Toner and gas piping, Solution
(kg/h):
or) Piping and diffusers, Chlorine leak
detectors, Safety equipment,
accessories required for safe operation
of the chlorine system

Chlorine Tonner with TON - As per IS 10553 and other relevant


31 4 Capacity (kg):
tonner roller E/F/G/H standards
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

Type: Non-clog Submersible Capacity (m3/h):


Dewatering Pumps for
32 2 (1W+1S) MOC: Casing: Cast Iron; Impeller:
Neutralisation pit
SS304; Seal: Tungsten Carbide; Head (m WC):

Laboratory Equipment

SP - Type: Centrifugal Pumps


33 Sampling pumps 4 Pump capacity: Suitable
A/B/C/D
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

As per NIT - Part 1, Vol 1, Cl. 6.30.6.15,


34 Labaratory Equipment 1 lot IS standards & relevant co
pg 129 to 131 of 230

Miscelleneous Utilities

Type: Non - clog Submersible pumps Capacity (m3/h):


Drain Pump for Chemical
35 1 MOC: Casing: CI; Impeller: SS 304;
house
Shaft: SS 304 Head (m WC):

Type: Non - clog Submersible pumps; Capacity (m3/h):


Drain Pump for Filter
36 1 MOC: Casing: CI; Impeller: SS 304;
house
Shaft: SS 305
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) Type: Non - TYPE / MOC
clog Submersible pumps; SPECIFIC
Drain Pump for Filter
36 1 MOC: Casing: CI; Impeller: SS 304;
house
Shaft: SS 305 Head (m WC):

Exhaust fans in Chemical Type: Axial flow fans/ Propeller fans;


37 Suitable Fan capacity: Suitable
house Wall mounted

Exhaust fans in Chlorinator Type: Axial flow fans/ Propeller fans;


38 Suitable Fan capacity: Suitable
room Wall mounted
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

Exhaust fans in Filter


Type: Axial flow fans/ Propeller fans;
39 house gallery and Filter Suitable Fan capacity: Suitable
Wall mounted
annexe building

Lifting Equipment

Electrical Hoist for


40 1 IS standards & relevant codes Capacity: 3 T
for Filter annexe building
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

EOT Crane for Chlorine


41 1 IS standards & relevant codes Capacity: 3 T
Tonner Shed

Electrical Hoist for


42 1 IS standards & relevant codes Capacity: 3 T
for Centrifuge building

Chain pulley block for Tube


43 1 IS standards & relevant codes Capacity: 1 T
Settler Feed Pumps

Chain pulley block for


44 1 IS standards & relevant codes Capacity: 1 T
Thickener Feed Pumps
L&T Construction
Water & Effluent Treatment

DOCUMENT NO.
PROJECT: INTEGRATED WATER SUPPLY AND WASTE
WATER - SRI GANGANAGAR PROJECT
LE160960-P-WW-WT-BE-2001

TITLE: LIST OF MECHANICAL UNITS FOR NEW 20 MLD DESIGNED CHECKED


WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI PG VSD/PGK

SL. NO. ITEM DESCRIPTION TAG NO. QTY (Nos.) TYPE / MOC SPECIFIC

Chain pulley block for


45 1 IS standards & relevant codes Capacity: 1 T
Recylce Water Pumps

W - Working, S - Standby, SS - Store standby, MOC - Material of Construction

Motor details, Power, Manufacturer, Country origin, model numbers, MOC, efficiency and all other vendor item details will be provided by
Notes:
The above equipment list is for Water treatment plant only. Raw Water Pumping Station, Clear Water Water Pumping Station Equipment

' * ' Head of pumps is subjected to change during detailed engineering.


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

PROCESS (RAW / FILTERED/ CLEAR WATER) L

1 Distribution Chamber (DC-04) Clariflocculator (CF-05 A) 580.44 1.0 453.2

2 Distribution Chamber (DC-04) Clariflocculator (CF-05 B) 580.44 1.0 453.2

Rapid Gravity Sand Filter Filter Control Box for Rapid Gravity
3 288.41 2.0 225.9
(RGSF-09 A) Sand Filter (RGSF-09 A)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Rapid Gravity Sand Filter Filter Control Box for Rapid Gravity
4 288.41 2.0 225.9
(RGSF-09 B) Sand Filter (RGSF-09 B)

Rapid Gravity Sand Filter Filter Control Box for Rapid Gravity
5 288.41 2.0 225.9
(RGSF-09 C) Sand Filter (RGSF-09 C)

Rapid Gravity Sand Filter Filter Control Box for Rapid Gravity
6 288.41 2.0 225.9
(RGSF-09 D) Sand Filter (RGSF-09 D)

7 Chlorine Mixing Chamber Treated water line main header 1103.40 1.0 624.9
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

8 Bypass line for Flow meter 1103.40 1.0 624.9

Clear Water Reservoir (CWR - 14)


9 Treated water line main header 1103.40 1.0 624.9
Compartment 1

Clear Water Reservoir (CWR - 14)


10 Treated water line main header 1103.40 1.0 624.9
Compartment 2

Backwash Tank Pumps - Suction


11 Post Chlorine Chamber 164.51 1.2 220.3
header
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Back Wash Tank Pump (BWP-A)


12 Suction Common Header 164.51 1.2 220.3
Suction line

Back Wash Tank Pump (BWP-B)


13 Suction Common Header 164.51 1.2 220.3
Suction line

Back Wash Tank Pump (BWP-A)


14 Back Wash Tank Pump (BWP-A) 164.51 1.5 197.0
Individual Delivery Line

Back Wash Tank Pump (BWP-B)


15 Back Wash Tank Pump (BWP-B) 164.51 1.5 197.0
Individual Delivery Line
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Back Wash Tank Pumps Common Delivery line To Back Wash Overhead
16 329.02 1.5 278.6
Tank (BOHT-10)

Back Wash Overhead Tank Common header for Filters Back Wash
17 1759.68 3.0 455.6
(BOHT-10) lines

18 Bypass line for Flow meter 1759.68 3.0 455.6

Common header for Filters Back Rapid Gravity Sand Filter (RGSF-09
19 1759.68 2.5 499.1
Wash lines A)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Common header for Filters Back Rapid Gravity Sand Filter (RGSF-09
20 1759.68 2.5 499.1
Wash lines B)

Common header for Filters Back Rapid Gravity Sand Filter (RGSF-09
21 1759.68 2.5 499.1
Wash lines C)

Common header for Filters Back Rapid Gravity Sand Filter (RGSF-09
22 1759.68 2.5 499.1
Wash lines D)

AIR LINES
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

23
Individual Air Blower discharge
Blower Common delivery header 1759.7 15.0 203.8
(BL-A/B)
24
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

25 …… …… ……
Blower (BL-A/B) Air Vent Line Atmosphere
26 …… …… ……

27 Blower Common delivery header 1759.7 15.0 203.7

Rapid Gravity Sand Filter (RGSF-09


28 Blower common header 1759.7 15.0 203.7
A)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Rapid Gravity Sand Filter (RGSF-09


29 Blower common header 1759.7 15.0 203.7
B)

Rapid Gravity Sand Filter (RGSF-09


30 Blower common header 1759.7 15.0 203.7
C)

Rapid Gravity Sand Filter (RGSF-09


31 Blower common header 1759.7 15.0 203.7
D)

SLUDGE LINES
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

32 Clariflocculator (CF-05A) Common Sludge header 43.7 0.9 131.1

33 Clariflocculator (CF-05B) Common Sludge header 43.7 0.9 131.1

34 Common Sludge header to Sludge Sump (SS-17) 87.5 0.9 185.4

Dirty Backwash Storage Tanks (DBST-


35 Dirty Back Wash Channel 1759.7 1.5 644.3
15)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Tube Settler Feed Pump (TSFP-


36 Common Discharge Header 240.2 1.5 238.1
A)
Tube Settler Feed Pump (TSFP-
37 Common Discharge Header 240.2 1.5 238.1
B)

Tube Settler Feed Pumps Common Discharge Header - Bypass line for
38 240.2 1.5 238.1
Flow meter

39 Tube Settler (TS-16) Sludge Sump (SS-17) 13.3 0.9 72.3


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

40 Thickener Feed Pump (TFP-A) TFP discharge - Common header 24.1 1.5 75.4

41 Thickener Feed Pump (TFP-B) TFP discharge - Common header 24.1 1.5 75.4

42 TFP discharge - Common header - Bypass line for flow meter 24.1 1.5 75.4

43 Sludge Thickener (ST-18) Thickened Sludge sump (TSS-19) 86.7 0.9 184.6
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Thickened Sludge sump (TSS- Centrifuge feed Pump Suction


44 10.9 1.2 56.7
19) Common header

Centrifuge feed Pump Suction (CFP-


45 Suction Common Header 10.9 1.2 56.7
A)

Centrifuge feed Pump Suction (CFP-


46 Suction Common Header 10.9 1.2 56.7
B)

Centrifuge feed Pump


47 CFP discharge - common header 10.9 1.5 50.8
Discharge (CFP- A)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Centrifuge feed Pump


48 CFP discharge - common header 10.9 1.5 50.8
Discharge (CFP-B)

49 CFP discharge - common header 10.9 1.5 50.8

CFP discharge - common


50 Individual sludge feed line for CEN - A 10.9 1.5 50.8
header

CFP discharge - common


51 Individual sludge feed line for CEN - B 10.9 1.5 50.8
header
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Pressure Relief line of


52 Thickened sludge sump (TSS-19) ---- ---- ----
CFP-A
Pressure Relief line of
53 Thickened sludge sump (TSS-19) ---- ---- ----
CFP-B
Clariflocculator (CF-05A) Telescopic Valve for Clariflocculator
54 ---- ---- ----
Common Sludge header (CF-05A) Sludge line
Clariflocculator (CF-05A) Clariflocculator (CF-05A) Common
55 ---- ---- ----
Telescopic Valve Chamber Sludge header
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Clariflocculator (CF-05B) Telescopic Valve for Clariflocculator


56 ---- ---- ----
Common Sludge header (CF-05B) Sludge line
Clariflocculator (CF-05B) Clariflocculator (CF-05B) Common
57 ---- ---- ----
Telescopic Valve Chamber Sludge header

58 Tube Settler Feed Pumps (TSFP-A/B) Common Discharge Header 240.2 1.5 238.1

59 Thickener Feed Pumps (TFP-A/B) Common Discharge Header 24.1 1.5 75.4
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

CHEMICAL LINES

PACL Storage Tank PACL transfer pumps - Suction


60 0.70 1.2 14.4
(PAST-21 A) header
PACL Storage Tank PACL transfer pumps - Suction
61 0.70 1.2 14.4
(PAST-21 B) header

62 PACL transfer pumps - Suction header 0.70 1.2 14.4


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

PACL transfer pumps


63 PACL transfer pumps (PATP-A) 0.7 1.2 14.4
Individual Suction Line

PACL transfer pumps


64 PACL transfer pumps (PATP-B) 0.7 1.2 14.4
Individual Suction Line

PACL transfer pumps (PATP-A)


65 PACL transfer pumps (PATP-A) 0.7 1.5 12.9
Individual Delivery Line

PACL transfer pumps (PATP-B)


66 PACL transfer pumps (PATP-B) 0.7 1.5 12.9
Individual Delivery Line
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

67 PACL transfer pumps Common Delivery line 0.7 1.5 12.9

PACL Dosing Tank


68 Common Delivery line 0.7 1.5 12.9
(PADT-21C)
PACL Dosing Tank
69 Common Delivery line 0.7 1.5 12.9
(PADT-21D)

PACL Dosing Tank


70 Dosing Pump - Suction header 0.4 1.2 10.3
(PADT-21C)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE
PACL Dosing Tank
71 Dosing Pump - Suction header 0.4 1.2 10.3
(PADT-21D)

72 Dosing Pump - Suction header 0.4 1.2 10.3

PACL Dosing Pump (PADP-A)


73 Dosing Pump (PADP-A) 0.4 1.2 10.3
Individual Suction Line
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

PACL Dosing Pump (PADP-B)


74 Dosing Pump (PADP-B) 0.4 1.2 10.3
Individual Suction Line

Dosing Pump (PADP-A) Individual


75 PACL Dosing Pump (PADP-A) 0.4 1.5 9.2
Delivery Line

Dosing Pump (PADP-B) Individual


76 PACL Dosing Pump (PADP-B) 0.4 1.5 9.2
Delivery Line
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

77 Common Delivery line to Flash Mixing Tank (FM-03) 0.4 1.5 9.2

Pressure Relief line of PACL Dosing Tank


78 ---- ---- ----
PADP- A (PADT - 21 C)

Pressure Relief line of PACL Dosing Tank


79 ---- ---- ----
PADP- B (PADT - 21 D)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

DWPE Dosing Tank DWPE Dosing Pump (PDP- A)


80 1.1 1.2 18.3
(PDT- 22 A) Individual Suction Line

DWPE Dosing Tank DWPE Dosing Pump (PDP- B)


81 1.1 1.2 18.3
(PDT- 22 B) Individual Suction Line

82 Dosing Pump - Suction common header 1.1 1.2 18.3


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Dosing Pump suction


83 Dosing Pump (PDP-A) 1.1 1.2 18.3
common header

Dosing Pump suction


84 Dosing Pump (PDP-B) 1.1 1.2 18.3
common header

Dosing Pump (PDP-A) Individual


85 Dosing Pump (PDP-A) 1.1 1.5 16.4
Delivery Line
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Dosing Pump (PDP-B) Individual


86 Dosing Pump (PDP-B) 1.1 1.5 16.4
Delivery Line

87 Common Delivery line 1.1 1.5 16.4

88 Common Delivery line Centrifuge Inlet (CEN-A) 1.1 1.5 16.4

89 Common Delivery line Centrifuge Inlet (CEN-B) 1.1 1.5 16.4


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Pressure Relief line of DWPE Dosing Tank


90 ---- ---- ----
PDP -A (PDT- 22 A)

Pressure Relief line of DWPE Dosing Tank


91 ---- ---- ----
PDP -B (PDT- 22 B)

SUPERNATANT / CENTRATE LINES


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

92 Tube Settler (TS-16) Recycle Water Sump (RWS-20) 238.6 0.9 306.3

93 Sludge Thickener (ST-18) Recycle Water Sump (RWS-20) 24.1 0.9 97.3

94 Recycle Water Pump (REWP-A) Common Discharge Header 182.0 1.5 207.2

95 Recycle Water Pump (REWP-B) Common Discharge Header 182.0 1.5 207.2
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

96 Common Discharge Header 182.0 1.5 207.2

Recycle Water Pumps Common


97 New 20 MLD WTP Inlet Chamber 55.9 1.5 114.8
Discharge Header
Recycle Water Pumps Common
98 Existing 23 MLD WTP RWR 64.2 1.5 123.1
Discharge Header

Individual centrate discharge of


99 Common Centrate Discharge line 9.4 0.9 60.7
Centrifuge CEN - A
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Individual centrate discharge of


100 Common Centrate Discharge line 9.4 0.9 60.7
Centrifuge CEN-B

101 Common Discharge line Plant Drain 9.4 0.9 60.7

DRAIN LINES

Drain line from Inlet chamber


102 Nearest Drain ---- ---- ----
(IC-01)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Drain line from Flash Mixing


103 Nearest Drain ---- ---- ----
Chamber (FM-03)

Rapid Gravity Sand Filter


104 Nearest Drain ---- ---- ----
(RGSF-09 A)

Rapid Gravity Sand Filter


105 Nearest Drain ---- ---- ----
(RGSF-09 B)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Rapid Gravity Sand Filter


106 Nearest Drain ---- ---- ----
(RGSF-09 C)

Rapid Gravity Sand Filter


107 Nearest Drain ---- ---- ----
(RGSF-09 D)

108 Filter House Drain Pump Nearest Drain 14.3 1.5 58.1
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Backwash Overhead Tank


109 Treated Water Channel ---- ---- ----
Overflow (BOHT-12)

Backwash Overhead Tank


110 Nearest Drain ---- ---- ----
(BOHT-12)

Clariflocculators Common
111 Nearest Drain ---- ---- ----
Sludge header
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE
Overflow line - PACL Storage
112 Tank Nearest Drain ---- ---- ----
(PAST-21A)
Overflow line - PACL Storage
113 Tank Nearest Drain ---- ---- ----
(PAST-21B)
Drain line - PACL Storage
114 Tank Nearest Drain ---- ---- ----
(PAST-21A)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE
Drain line - PACL Storage
115 Tank Nearest Drain ---- ---- ----
(PAST-21B)
Overflow line - PACL Dosing
116 Tank Nearest Drain ---- ---- ----
(PADT-21C)
Overflow line - PACL Dosing
117 Tank Nearest Drain ---- ---- ----
(PADT-21D)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Drain line - PACL Dosing Tank


118 Nearest Drain ---- ---- ----
(PADT-21C)

Drain line - PACL Dosing Tank


119 Nearest Drain ---- ---- ----
(PADT-21D)

Overflow line - DWPE Dosing


120 Nearest Drain ---- ---- ----
Tank (PDT-22A)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Overflow line - DWPE Dosing


121 Nearest Drain ---- ---- ----
Tank (PDT-22B)

Drain line - DWPE Dosing


122 Nearest Drain ---- ---- ----
Tank (PDT-22A)

Drain line - DWPE Dosing


123 Nearest Drain ---- ---- ----
Tank (PDT-22B)
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

124 Chemical House Drain Pump Nearest Drain 5.9 1.5 37.1

SERVICE WATER LINES

Back Wash Overhead Tank


125 Common header for Service Water ---- ---- ----
(BOHT-10)
126 Common header Common line for Flushing ---- ---- ----
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

127 Common header Common line for Chemical House ---- ---- ----

Common line for Domestic &


128 Common header ---- ---- ----
Emergency Purpose

129 Common line for Flushing Clariflocculator (CF-05A) Sludge Line ---- ---- ----

130 Common line for Flushing Clariflocculator (CF-05B) Sludge Line ---- ---- ----
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

131 Common line for Flushing Tube Settler (TS-16) Sludge Line ---- ---- ----

132 Common line for Flushing Thickened Sludge Line ---- ---- ----

133 Common line for Flushing Centrifuge feed Pump CFP-A Suction ---- ---- ----

134 Common line for Flushing Centrifuge feed Pump CFP-B Suction ---- ---- ----
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

135 Common line for Flushing Centrifuge feed Pump CFP-A delivery ---- ---- ----

136 Common line for Flushing Centrifuge feed Pump CFP-B delivery ---- ---- ----

137 Common line for Flushing Centrifuge CEN-A ---- ---- ----

138 Common line for Flushing Centrifuge CEN-B ---- ---- ----
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

Common line for Chemical


139 PACL Dosing Tank PADT-21C ---- ---- ----
House

Common line for Chemical


140 PACL Dosing Tank PADT-21D ---- ---- ----
House
Common line for Chemical
141 DWPE Dosing Tank PDT-22A ---- ---- ----
House
Common line for Chemical
142 DWPE Dosing Tank PDT-22B ---- ---- ----
House
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI GANGANAGAR PROJECT

TITLE : PIPE LINE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT SYSTEM FOR 63 MLD AT
NATHAVALI

Velocity
Max. Flow Size
Sl. No. From To Considered
(m3/hr) (mm)
(m/s)

PIPE SCHEDULE

REFERANCE DRAWING:

1. Piping and Instrumentation diagram - LE160960-P-WW-WT-PI-2005, Rev C

NOTES

1) Piping for chlorination system is not included in the above list. Separate list will be submitted for the same as per vendor details

2) The above pipe line list is only for New 20 MLD WTP. Raw Water Reservoir, Raw Water Pumping Station, Clear Water Reservo
DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

D/ CLEAR WATER) LINES

500.0 0.8 DI 500-PW-001-DI K7 Raw Water

500.0 0.8 DI 500-PW-002-DI K7 Raw Water

250.0 1.6 CI 250-PW-003-CI LA Filtered Water


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

250.0 1.6 CI 250-PW-004-CI LA Filtered Water

250.0 1.6 CI 250-PW-005-CI LA Filtered Water

250.0 1.6 CI 250-PW-006-CI LA Filtered Water

700.0 0.8 DI 700-PW-007-DI K7 Clear Water


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

700.0 0.8 DI 700-PW-008-DI K7 Clear Water

700.0 0.80 DI 700-PW-009-DI K7 Clear Water

700.0 0.80 DI 700-PW-010-DI K7 Clear Water

250.0 0.9 CI 250-PW-011-CI LA Clear Water


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

250.0 0.9 CI 250-PW-012-CI LA Clear Water

250.0 0.9 CI 250-PW-013-CI LA Clear Water

200.0 1.5 CI 200-PW-014-CI LA Clear Water

200.0 1.5 CI 200-PW-015-CI LA Clear Water


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

200.0 2.91 CI 200-PW-016-CI LA Clear Water

500.0 2.5 CI 500-PW-017-CI LA Clear Water

500.0 2.5 CI 500-PW-018-CI LA Clear Water

500.0 2.5 CI 500-PW-019-CI LA Clear Water


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

500.0 2.5 CI 500-PW-020-CI LA Clear Water

500.0 2.5 CI 500-PW-021-CI LA Clear Water

500.0 2.5 CI 500-PW-022-CI LA Clear Water

NES
DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

MS 250-AR-101-MS Medium duty Air


250.0 10.0
MS 250-AR-102-MS Medium duty Air
DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

80.0 …… MS 80-AR-103-MS Medium duty Air

80.0 …… MS 80-AR-104-MS Medium duty Air

250.0 10.0 MS 250-AR-105-MS Medium duty Air

250.0 10.0 MS 250-AR-106-MS Medium duty Air


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

250.0 10.0 MS 250-AR-107-MS Medium duty Air

250.0 10.0 MS 250-AR-108-MS Medium duty Air

250.0 10.0 MS 250-AR-109-MS Medium duty Air

LINES
DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

150.0 0.7 DI 150-SL-201-DI K7 Sludge

150.0 0.7 DI 150-SL-202-DI K7 Sludge

200.0 0.8 DI 200-SL-203-DI K7 Sludge

700.0 1.3 DI 700-SL-204-DI K7 Sludge


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

250.0 1.4 DI 250-SL-205-DI K7 Sludge

250.0 1.4 DI 250-SL-206-DI K7 Sludge

250.0 1.4 DI 250-SL-207-DI K7 Sludge

100.0 0.5 DI 100-SL-208-DI K7 Sludge


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

100.0 0.9 DI 100-SL-209-DI K7 Sludge

100.0 0.9 DI 100-SL-210-DI K7 Sludge

100.0 0.9 DI 100-SL-211-DI K7 Sludge

200.0 0.8 DI 200-SL-212-DI K7 Sludge


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

80.0 0.6 DI 80-SL-213-DI K7 Sludge

80.0 0.6 DI 80-SL-214-DI K7 Sludge

80.0 0.6 DI 80-SL-215-DI K7 Sludge

80.0 0.6 DI 80-SL-216-DI K7 Sludge


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

80.0 0.6 DI 80-SL-217-DI K7 Sludge

80.0 0.6 DI 80-SL-218-DI K7 Sludge

80.0 0.6 DI 80-SL-219-DI K7 Sludge

80.0 0.6 DI 80-SL-220-DI K7 Sludge


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

80.0 ---- DI 80-SL-221-DI K7 Sludge

80.0 ---- DI 80-SL-222-DI K7 Sludge

80.0 ---- CI 80-SL-223-CI LA Sludge


C

80.0 ---- CI 80-SL-224-CI LA Sludge


C
DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

80.0 ---- CI 80-SL-225-CI LA Sludge

C
80.0 ---- CI 80-SL-226-CI LA Sludge
C

250.0 1.4 DI 250-SL-227-DI K7 Sludge


C

100.0 0.9 DI 100-SL-228-DI K7 Sludge


C
DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

L LINES

20.0 0.62 HDPE 20-CH-301-HDPE PN6 Chemical

20.0 0.62 HDPE 20-CH-302-HDPE PN6 Chemical

20.0 0.62 HDPE 20-CH-303-HDPE PN6 Chemical


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

20.0 0.62 HDPE 20-CH-304-HDPE PN6 Chemical

20.0 0.62 HDPE 20-CH-305-HDPE PN6 Chemical

20.0 0.62 HDPE 20-CH-306-HDPE PN6 Chemical

20.0 0.62 HDPE 20-CH-307-HDPE PN6 Chemical


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

20.0 0.62 HDPE 20-CH-308-HDPE PN6 Chemical

20.0 0.62 HDPE 20-CH-309-HDPE PN6 Chemical

20.0 0.62 HDPE 20-CH-310-HDPE PN6 Chemical

20.0 0.3 HDPE 20-CH-311-HDPE PN6 Chemical


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

20.0 0.3 HDPE 20-CH-312-HDPE PN6 Chemical

20.0 0.3 HDPE 20-CH-313-HDPE PN6 Chemical

20.0 0.3 HDPE 20-CH-314-HDPE PN6 Chemical


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

20.0 0.3 HDPE 20-CH-315-HDPE PN6 Chemical

20.0 0.3 HDPE 20-CH-316-HDPE PN6 Chemical

20.0 0.3 HDPE 20-CH-317-HDPE PN6 Chemical


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

20.0 0.3 HDPE 20-CH-318-HDPE PN6 Chemical

20.0 ---- HDPE 20-CH-319-HDPE PN6 Chemical

20.0 ---- HDPE 20-CH-320-HDPE PN6 Chemical


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

20.0 1.0 HDPE 20-CH-321-HDPE PN6 Chemical

20.0 1.0 HDPE 20-CH-322-HDPE PN6 Chemical

20.0 1.0 HDPE 20-CH-323-HDPE PN6 Chemical


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

20.0 1.0 HDPE 20-CH-324-HDPE PN6 Chemical

20.0 1.0 HDPE 20-CH-325-HDPE PN6 Chemical

20.0 1.0 HDPE 20-CH-326-HDPE PN6 Chemical


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

20.0 1.0 HDPE 20-CH-327-HDPE PN6 Chemical

20.0 1.0 HDPE 20-CH-328-HDPE PN6 Chemical

20.0 1.0 HDPE 20-CH-329-HDPE PN6 Chemical

20.0 1.0 HDPE 20-CH-330-HDPE PN6 Chemical


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

20.0 ---- HDPE 20-CH-331-HDPE PN6 Chemical

20.0 ---- HDPE 20-CH-332-HDPE PN6 Chemical

ENTRATE LINES
DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

350.0 0.7 DI 350-LC-401-DI K7 Supernatant

100.0 0.9 DI 100-LC-402-DI K7 Supernatant

250.0 1.0 DI 250-LC-403-DI K7 Supernatant

250.0 1.0 DI 250-LC-404-DI K7 Supernatant


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

250.0 1.0 DI 250-LC-405-DI K7 Supernatant

150.0 0.9 DI 150-LC-406-DI K7 Supernatant

150.0 1.0 DI 150-LC-407-DI K7 Supernatant

100.0 0.3 DI 100-LC-408-DI K7 Centrate


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

100.0 0.3 DI 100-LC-409-DI K7 Centrate

100.0 0.3 DI 100-LC-410-DI K7 Centrate

INES

150.0 ---- DI 150-DL-501-DI K7 Drain


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

150.0 ---- DI 150-DL-502-DI K7 Drain

150.0 ---- DI 150-DL-504-DI K7 Drain

150.0 ---- DI 150-DL-505-DI K7 Drain


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

150.0 ---- DI 150-DL-506-DI K7 Drain

150.0 ---- DI 150-DL-507-DI K7 Drain

80.0 0.8 DI 80-DL-508-DI K7 Drain


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

150.0 ---- DI 150-DL-509-DI K7 Drain

150.0 ---- DI 150-DL-510-DI K7 Drain

150.0 ---- DI 150-DL-511-DI K7 Drain


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

50.0 ---- HDPE 50-DL-512-HDPE PN6 Drain

50.0 ---- HDPE 50-DL-513-HDPE PN6 Drain

40.0 ---- HDPE 40-DL-514-HDPE PN6 Drain


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

40.0 ---- HDPE 40-DL-515-HDPE PN6 Drain

50.0 ---- HDPE 50-DL-516-HDPE PN6 Drain

50.0 ---- HDPE 50-DL-517-HDPE PN6 Drain


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

40.0 ---- HDPE 40-DL-518-HDPE PN6 Drain

40.0 ---- HDPE 40-DL-519-HDPE PN6 Drain

50.0 ---- HDPE 50-DL-520-HDPE PN6 Drain


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

50.0 ---- HDPE 50-DL-521-HDPE PN6 Drain

40.0 ---- HDPE 40-DL-522-HDPE PN6 Drain

40.0 ---- HDPE 40-DL-523-HDPE PN6 Drain


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

80.0 0.3 DI 80-DL-524-DI K7 Drain

TER LINES

80.0 ---- GI 80-SW-601-GI Medium duty Service Water

80.0 ---- GI 80-SW-602-GI Medium duty Service Water


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

80.0 ---- GI 80-SW-603-GI Medium duty Service Water

80.0 ---- GI 80-SW-604-GI Medium duty Service Water

50.0 ---- GI 50-SW-605-GI Medium duty Service Water

50.0 ---- GI 50-SW-606-GI Medium duty Service Water


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

50.0 ---- GI 50-SW-607-GI Medium duty Service Water

50.0 ---- GI 50-SW-608-GI Medium duty Service Water

50.0 ---- GI 50-SW-609-GI Medium duty Service Water

50.0 ---- GI 50-SW-610-GI Medium duty Service Water


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

50.0 ---- GI 50-SW-611-GI Medium duty Service Water

50.0 ---- GI 50-SW-612-GI Medium duty Service Water

80.0 ---- GI 80-SW-613-GI Medium duty Service Water

80.0 ---- GI 80-SW-614-GI Medium duty Service Water


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

80.0 ---- GI 80-SW-615-GI Medium duty Service Water

80.0 ---- GI 80-SW-616-GI Medium duty Service Water

80.0 ---- GI 80-SW-617-GI Medium duty Service Water

80.0 ---- GI 80-SW-618-GI Medium duty Service Water


DOCUMENT NO. DATE REV SHEET

LE160960-P-WW-WT-BE-2001 11.07.2017 C 22

DESIGNED CHECKED APPROVED

PG VSD/PGK RVS

Size Actual
Type of Fluid
Provided Velocity MOC Line No. Schedule
Handled
(NB) (m/s)

EDULE

as per vendor details.

Clear Water Reservoir, Clear Water Water Pumping Station Pipe lines are not included in the above list.
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI


GANGANAGAR PROJECT

TITLE : GATE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

SLUICE GATE SCHEDULE

Width available,

Height of gate

C/S area (m2)


Width of gate
available,mm

through gate
Liquid depth

Max. Flow
Location

Tag No.
Sl. No.

(m3/s)
(mm)

(mm)
mm

MSG
Distribution
1 -001 & 2800 1000 500 500 0.156 0.25
Chamber
002

Clariflocculators
Bypass Channel MSG-
2 800 1150 600 1500 0.330 0.90
from Distribution 003
Chamber
C

MSG-
004,
3 Filter Bed Inlet 005, 700 500 400 400 0.107 0.16
006 &
007
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI


GANGANAGAR PROJECT

TITLE : GATE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI

SLUICE GATE SCHEDULE

Width available,

Height of gate

C/S area (m2)


Width of gate
available,mm

through gate
Liquid depth

Max. Flow
Location

Tag No.
Sl. No.

(m3/s)
(mm)

(mm)
mm

MSG-
008,
Washwater Outlet
4 009, 700 500 500 800 0.376 0.40
of Filter Bed
010 &
011

NOTES:

1 Gate dimensions are subject to change during detail engineering based on availability of size as p

2 CI Sluice Gates shall be as per IS 13349 -Latest Edition

3 The above Sluice Gates list only for New WTP.

REFERENCE DRAWINGS:

1 Piping and Instrumentation Diagram for WTP, LE160960-P-WW-WT-PI-2005, Rev C


L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI


GANGANAGAR PROJECT LE16

DESIGN
TITLE : GATE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI PG/SD

SLUICE GATE SCHEDULE

Width available,

Height of gate

C/S area (m2)


Width of gate
available,mm

Max. Velocity
through gate
Liquid depth

Max. Flow
Location

Tag No.
Sl. No.

(m3/s)
(mm)

(mm)

(m/s)
mm

MSG
Distribution
1 -001 & 2800 1000 500 500 0.156 0.25 0.63
Chamber
002

Clariflocculators
Bypass Channel MSG-
2 800 1150 600 1500 0.330 0.90 0.48
from Distribution 003
Chamber
C

MSG-
004,
3 Filter Bed Inlet 005, 700 500 400 400 0.107 0.16 0.67
006 &
007
L&T Construction
Water & Effluent Treatment

PROJECT: INTEGRATED WATER SUPPLY AND WASTE WATER - SRI


GANGANAGAR PROJECT LE16

DESIGN
TITLE : GATE SCHEDULE FOR NEW 20 MLD WTP AND SLUDGE TREATMENT
SYSTEM FOR 63 MLD AT NATHAVALI PG/SD

SLUICE GATE SCHEDULE

Width available,

Height of gate

C/S area (m2)


Width of gate
available,mm

Max. Velocity
through gate
Liquid depth

Max. Flow
Location

Tag No.
Sl. No.

(m3/s)
(mm)

(mm)

(m/s)
mm

MSG-
008,
Washwater Outlet
4 009, 700 500 500 800 0.376 0.40 0.94
of Filter Bed
010 &
011

NOTES:

1 Gate dimensions are subject to change during detail engineering based on availability of size as p

2 CI Sluice Gates shall be as per IS 13349 -Latest Edition

3 The above Sluice Gates list only for New WTP.

REFERENCE DRAWINGS:

1 Piping and Instrumentation Diagram for WTP, LE160960-P-WW-WT-PI-2005, Rev C

Das könnte Ihnen auch gefallen