Beruflich Dokumente
Kultur Dokumente
Industrial Waste
Water
80m3/hr,80m
Design Actual
Blowdown Cooling 35 45
FGD Washing 5 5
Design Temperature T= 27 OC
69.97 mm
2.75 Inches
69.97
80 mm
𝐺/�
Water Velocity v=
1.56E+05 >4000
Flow Turbulent
Absolute Roughness e= 0.05 mm
ⅇ/�
Relative Roughness =
= 0.000625
Δ_𝑓^𝑃=8𝑓(𝐿/ⅆ_𝑖 ) (𝑝𝑢^2)/2
Pressure Drop
= 1855116.9 N/m2
(⋃12
Velocity Head = 8▒2)
/2�
= 0.1705384 m of liquid
= 3.3425531 m
As pressure = 32757.02 N/m2
Suction Side
0.1961192 m of liquid
1921.968
3.5386722
Maximum Elevation Difference = �_1−�_2
= -9 m
Pressure Diffrence = -248675 N/m2
= 2226.671 J/kg
= 12988.91
= 13 kW
head required from the pumpΔ_(𝑃_𝑓
= )/𝑝𝑔−Δ𝑃/𝑝_𝑔 −Δ�
0.148 34.37536
7500 = 34 m
3.342553
3342.553
1671.277
1855117
Coulson & Richardson’s,CHEMICAL ENGINEERING,VOLUM
EERING,VOLUME 6,FOURTH EDITION,Chemical Engineering Design,R.
ering Design,R. K. SINNOTT, 221