Project:
Sewerage system for housing society (through gravity flow).
Location:
Jhelum road, Bank of upper Chenab canal, Jhelum.
Project description:
POPULATION FORCASTING:
Present population:
(No. of plots * no. of persons per plot) + other population
Design future population:
Pi + [1+ % rate of growth] n
Here n = no. of years for design
Per capita water consumption:
400 lpcd
Avg. daily flow:
(Population*per capita consumption*factor)/1000
Here, Factor = 0.8 to 0.9
Peak factor:
1+ (14/4+P.05)
Here,P = In thousands
Peak flow:
Peak factor* Avg. daily flow
Slope of sewer:
S = ((V*n)/R2/3)2
Here, n=0.013
R=D/4
Min. velocity:
0.7m/s
Cycle time:
20 minutes
Depth of wet well:
2m
Infiltration:
10% of Qavg
Minimum cover:
1m
Sewage flow:
90% of Qavg
Calculations:
Manhole-1 to manhole-2
Total no. of plots = 19
Other population = 0
Initial population = 7*19+0
= 133 persons
Future population = 133*(1+2.3%) ^20
=209.58 persons
Average daily flow = (0.9*209.58*400)/1000
=75.4513 m3d-1
Peak factor = 1+ (14/4+P0.5)
=4.140
Peak sewage flow = 4.140*75.4513
=312.410m3d-1
Storm sewage flow = 312.410m3d-1
Infiltration = 0.1*75.4513
= 8.38348m3d-1
Total sewage flow = 633.20348 m3d-1
=0.0073 m3s-1
Min. velocity = 0.7 ms-1
Area of sewer = Q/V =0.0104m2
Dia. of sewer = ((0.0104*4)/3.14)0.5
=0.11525m
=115.25mm
Adopted dia. = 225mm
Slope of sewer= ((0.7*0.013)/ (0.225/4)2/3)2
=0.00385
QFull = (0.7*3.14*0.2252)/4
=0.0278 m3d-1
Q/QFull = 0.26344
d/D = 0.55 (From graph)
d = 0.55*225
=123.75mm
V/VFull = 0.85 (From graph)
V = 0.595 ms-1
Length of pipe = 98m (Map scale: 1cm=10m)
Ground level upper = 100.8m
Ground level lower = 100.5m
Invert level upper = 100.8-1-42-0.225
=99.53m
Invert level lower = 100.5-1-42-0.225
=99.23m
Height of manhole = 100.8-99.53
=1.267m