I.

INTRODUCTION

In this paper you will find that a group of three students will go to a site
with an on-going construction. There they would have performed an ocular
and will conduct risk management activities, where they would look for
problems that might happen during the on-going construction. After the
inspection, they would find ways how to address said problems.

II. OBJECTIVE
A. to inform about the site
B. to describe the risks found in the site and what it entails
C. to identify what area/s of management to address
III. CONTENTS

A. Where is the site located? And what is being built there?

SITE

Location: Lourdes Subdivision Extension Baguio City, Benguet

Project: Four Storey Residential with Basement

Architect: Ar. Francisco Que Jr.

Photo by: Google Maps

Photo Source:
https://www.google.com/maps/place/City+Camp+Rd,+Baguio,+Benguet/@16.411735,
120.5862901,253m/data=!3m1!1e3!4m5!3m4!1s0x3391a16f01190591:0x470683ce10c2fa1
8!8m2!3d16.4109165!4d120.5884121
Photo by: Cherrie C. Pedrito

Photo by: Cherrie C. Pedrito


B. What are the risks found in the site?

Health and Safety Risk

No proper personal protective equipment


(PPE). No hard hats, gloves, safety belts
and proper safety shoes. This neglect for
proper safety might cause injury and
lawsuits. This would cause setback for the
construction to finish.

Photo by: Cherrie C. Pedrito

Fire Hazards

Cleanliness is neglected. No
proper throwing of trash can be a
cause of fire.

Labourers/Workers

No proper barracks for the


workers- might cause sickness to
workers thus the cause of delays.

Photo by: Cherrie C. Pedrito


Materials

Other than the workers, the


materials should be looked over
to track down how much are
used and its left overs

Security

No security might lead to theft.

Photo by: Cherrie C. Pedrito

Weather

The ever changing weather in


Baguio City might cause slower
production and delays

Photo by: Cherrie C. Pedrito


C. What are the risks? And what management do we address them to?

Project Risk Area/s of Management Why


Health and Safety  Project Risk  They ensure the safety and
Management success of the construction
 Project Integration  A person will be appointed
Management to control and monitor safety
equipment
Fire Hazards  Project Integration  A person will be appointed
Management to control and monitor the
 Project Risk construction site
Management  They ensure the safety and
success of the construction
Materials  Project Schedule  They oversee when materials
Management should be delivered during
 Project Integration construction
Management  They monitor and control
 Project Cost  Controls the quality of the
Management materials to be delivered
 Project Quality  They hire people who would
Management oversee the comings and
 Project Resource goings of the materials that
Management will be used.
Security  Project Resource  They are the one who
Management sources out the workers. They
are the ones who monitor
the workers and evaluate
them
Weather  Project Schedule  Because of changing
Management weather the schedule of
 Project Risk construction follows. They
Management adjust how production
should be done proceeding
working days to obtain timely
construction finish
Labourers  Project Resource  They are the one who
Management sources out the workers. They
are the ones who monitor
the workers and evaluate
them