PARTS OF A COMPETENCY-BASED LEARNING MATERIAL

References/Further Reading

Performance Criteria Checklist


Operation/Task/Job Sheet

Self Check Answer Key

Self Check

Information Sheet

Learning Experiences

Learning Outcome Summary

Module
Module Content
Content

Module
List of Competencies
Content

Module Content

Module Content

Front Page
In our efforts to standardize CBLM,
the above parts are recommended for
use in Competency Based Training
(CBT) in Technical Education and
Skills Development Authority (TESDA)
Technology Institutions. The next
sections will show you the
components and features of each part.

Date Developed: Document No. AIT-EIM-NCII-001


Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00
ELECTRICAL INSTALLATION AND MAINTENANCE NC II
COMPETENCY-BASED LEARNING MATERIALS

List of Competencies

No. Unit of Competency Module Title Code

Perform roughing-in Performing roughing-in


activities, wiring and activities, wiring and
cabling works for single- cabling works for ELC741301
single-
1.
phase distribution, phase distribution,
power, lighting and power, lighting and
auxiliary systems auxiliary systems

Install electrical Installing electrical


protective devices for protective devices for
distribution, power, distribution, power,
ELC741302
2.
lighting, auxiliary, lighting, auxiliary,
lightning protection and lightning protection and
grounding systems grounding systems

Install wiring devices Installing wiring


of floor and wall devices of floor and
mounted outlets, wall mounted outlets,
ELC741303
3.
lighting lighting
fixtures/switches, and fixtures/switches, and
auxiliary outlets auxiliary outlets

Date Developed: Document No. AIT-EIM-NCII-001


Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00
MODULE CONTENT

UNIT OF COMPETENCY: Install wiring devices of floor and wall mounted


outlets, lighting fixtures/switches, and auxiliary
outlets

MODULE TITLE: Installing wiring devices of floor and wall


mounted outlets, lighting fixtures/switches,
and auxiliary outlets

MODULE DESCRIPTOR:
This unit covers the knowledge, skills and attitudes on selecting and
installing wiring devices, installing lighting fixtures/switches and
notifying completion of work of floor and wall mounted outlets and
auxiliary outlets.

NOMINAL DURATION: 16 HOURS

LEARNING OUTCOMES:
At the end of this module you MUST be able to:
1. Select wiring devices
2. Install wiring devices
3. Install lighting fixture/switches.
4. Notify completion of work

ASSESSMENT CRITERIA:
1. Drawings are read and interpreted to determine job requirements
2. Correct type and quantity of wiring devices and consumable items are
identified in line with job requirements
3. Tools and equipment are selected in line with job requirements
4. Correct PPE are identified and selected in line with safety
requirements
5. Safety procedures are followed based on safety regulations
6. Correct procedures for installation of wiring devices are performed in
line with job requirements
7. Schedule of work is followed based on agreed time, quality standard
and minimum wastage
8. Further instructions are sought if unplanned events or conditions
occur
9. On-going checking of quality of work is done in accordance with
instructions and requirements.
10. Safety procedures are followed
Date Developed: Document No. AIT-EIM-NCII-001
Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00
11. Correct procedures for installation of lighting fixtures/switches are
performed in line with job requirements
12. Schedule of work is followed to ensure work is completed in an
agreed time, to a quality standard and with a minimum waste
13. Further instructions are sought from a supervisor if unplanned
events or conditions occur
14. On-going checks of quality of work are undertaken in accordance
with instructions and requirements
15. Final checks are made to ensure that work conforms with
instructions and to requirements
16. Supervisor is notified upon completion of work
17. Tools, equipment and any surplus resources and materials are,
where appropriate, cleaned, checked and returned to storage in
accordance with established procedures
18. Work area is cleaned and made safe

Date Developed: Document No. AIT-EIM-NCII-001


Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00
LEARNING OUTCOME NO. 3
Install lighting fixture/switches.

LEARNING CONTENTS:
1. Tools for installing lighting fixture/switches.
2. Procedures for installation of lighting fixture/switches

ASSESSMENT CRITERIA:
1. Safety procedures are followed
2. Correct procedures for installation of lighting fixture and auxiliaries
are performed in line with job requirements
3. Schedule of work is followed to ensure work is completed in an agreed
time, to a quality standard and with a minimum waste
4. Further instructions are sought from a supervisor if unplanned events
or conditions occur.
5. On-going checks of quality of work are undertaken in accordance with
instructions and requirements

CONDITION:
Students/trainees must be provided with the following;
 WORKPLACE LOCATION
 TOOLS, SUPPLIES AND MATERIALS
o Pliers
o Screwdrivers
o Wrenches
o Wire splicers
o Electrician knives
o electric drill
o Ball hammer
 Learning Materials
o Learning elements
o Drawing plan
o Books, manuals, and catalogs
o Philippine Electrical Code

Date Developed: Document No. AIT-EIM-NCII-001


Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00
METHODOLOGY:
 Modular Self-paced
 Lecture
 Demonstration
 Active Discussion

ASSESSMENT METHODS:
 Demonstration
 Direct observation and Oral questioning

Date Developed: Document No. AIT-EIM-NCII-001


Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00
LEARNING EXPERIENCES

Learning Outcome No. 3


Install lighting fixture/switches

Learning Activities Special Instructions


Read and understand the information
Read Information Sheet 3.3-1 on sheet and Check yourself by answering
- Tools for installing lighting Self check.
fixture/switches. The Performance Criteria Checklist will
Procedures for installation of help you to evaluate your work as you
lighting fixture/switches. are practicing your skill.
Evaluate your own work using the
Performance Criteria. When you are
ready, present your work to your trainer
Answer Self-Check 3.3-1 then for final evaluation and recording.
Compare to Answer Key 3.3-1
Upon completion of this unit of
competency, you may now proceed to
the next competency
After doing all activities of this LO,
you are ready to proceed to the next
LO on Facilitate Learning Session.

Date Developed: Document No. AIT-EIM-NCII-001


Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00
Information Sheet 3.3-1
INSTALL LIGHTING FIXTURES/SWITCHES

Learning Objectives:
After reading this INFORMATION SHEET, YOU MUST be able to:
1. Prepare the selected appropriate tools, equipment and materials to
be use..
2. Perform the correct procedures for installation of lighting fixtures
and switches.
Introduction:
Installing and wiring a light fixture is not a very difficult task, but does need
to be approached with a degree of caution. Electricity is involved and if you
allow it to it can give a nasty shock to the careless worker. Never take
chances around electricity.
The first step is always to turn off the current. Turn the light on and find
the correct circuit breaker in your breaker panel. If necessary turn them off
one at a time until the light goes out. Do not depend on the light switch to
turn off the power to the light; someone else could turn it back on, especially
if it is only one of two or more switches controlling the same light fixture.

A. Tools for Installing lighting fixtures and switches.

There are only a few tools and supplies necessary for the task as follows:
1. Screwdrivers. Either or both a flat tip and a Phillips tip screwdriver
may be needed: older screws in an existing fixture often need a flat tip,
while newer screws are usually a Phillips tip.

2. Wire strippers. If a new installation wire strippers will be needed. If


you are replacing an existing fixture, the wires should be already
stripped.

Date Developed: Document No. AIT-EIM-NCII-001


Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00
3. Pliers. Pliers may be needed to tighten supporting nuts on the light
fixture

4. Wire nuts. Probably supplied with the new fixture, but if not a few
wire nuts will be needed.

5. Multi Tester - multi meter or a multi tester, also known as a VOM


(volt-ohm-milliammeter), is an electronic measuring instrument that
combines several measurement functions in one unit. A typical multi
meter can measure voltage, current, and resistance.

Date Developed: Document No. AIT-EIM-NCII-001


Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00
B. Procedure in Installing light fixture/switches.

1. Test the wires inside the electrical cable that extends from the wall with
a voltage tester to ensure that the power is off. If the fixture is being
attached to a new circuit, wiring the circuit into the electrical box should
be done after the fixture has been installed. If you're replacing the old
fixture on an existing circuit, the power should have been turned off
before the old fixture was removed, but double-checking the wires is
always a good idea. A shock from a 110-volt line can kill you.
2. Strip one inch of insulation from the wires on the light fixture with wire
strippers. If the cable inside the wall is new, strip two inches of
sheathing from the end of the cable and one inch of insulation from the
wires inside the cable.
3. Place the bare end of the black wire from the cable in the wall with the
bare end of the black wire from the light fixture. Twist the two ends
together three or four times with a pair of pliers. Connect the white wire
from the cable to the white wire from the light fixture by twisting them
together with the pliers.

4. Place plastic twist caps on the ends of the wires and twist them two or
three times. These caps secure the connected wires and provide an
insulated barrier around them.

5. Wrap the bare ground wire from the cable in the wall around the ground
screw on the fixture, if the fixture has one. Twist the ground wire from
the cable with the ground wire from the fixture. The ground wire on the
fixture can be bare or covered in green insulation.

6. Tuck the wiring into the electrical box inside the wall and attach the
light fixture to the wall.

Date Developed: Document No. AIT-EIM-NCII-001


Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00
Self- Check 3.3-1

TEST I : (Type of Test): True or False.


Instruction: Read the sentence and identify if it is True or False. Write T if
the answer is True and F if the answer is False. Write your
answer on the blank before the number.

_________1. Tuck the wiring into the electrical box inside the wall and
attach the light fixture to the wall.
_________2. Twist the ground wire from the cable with the ground wire
from the fixture.
_________3. if the fixture has one. Do not Twist the ground wire from
the cable with the ground wire from the fixture.
_________4. If you're replacing the old fixture on an existing circuit, the
power should have been turned off
________5. A shock from a 110-volt line can kill you.

Test II. Enumerate the following tools for installing lighting fixtures and
switches.

Date Developed: Document No. AIT-EIM-NCII-001


Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00
ANSWER KEY 3.3-1

Test I
1. True
2. True
3. False
4. False
5. True

Test II
1. Screw drivers
2. Fliers
3. Wire nuts
4. Wire strippers
5. Multi-Tester

Date Developed: Document No. AIT-EIM-NCII-001


Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00
Date Developed: Document No. AIT-EIM-NCII-001
Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00
TASK SHEET 3.3-1
Title: Installation of lighting fixture/switches

Performance Objective: Given all the needed personal protective equipment (PPE) and
Tools; you should be able to install the lighting fixture/switches

Supplies/Materials: Pliers, Screw driver Set, Wire striper, wires, fixtures and switches

Equipment: Working gloves, Safety Shoes, Hard hat

Steps/Procedure:
1. Test the wires inside the electrical cable that extends from the wall with a
voltage tester to ensure that the power is off. If the fixture is being attached to
a new circuit, wiring the circuit into the electrical box should be done after
the fixture has been installed. If you're replacing the old fixture on an existing
circuit, the power should have been turned off before the old fixture was
removed, but double-checking the wires is always a good idea. A shock from a
110-volt line can kill you.
2. Strip one inch of insulation from the wires on the light fixture with wire
strippers. If the cable inside the wall is new, strip two inches of sheathing
from the end of the cable and one inch of insulation from the wires inside the
cable.
3. Place the bare end of the black wire from the cable in the wall with the bare
end of the black wire from the light fixture. Twist the two ends together three
or four times with a pair of pliers. Connect the white wire from the cable to
the white wire from the light fixture by twisting them together with the pliers.

4. Place plastic twist caps on the ends of the wires and twist them two or three
times. These caps secure the connected wires and provide an insulated
barrier around them.
5. Wrap the bare ground wire from the cable in the wall around the ground
screw on the fixture, if the fixture has one. Twist the ground wire from the
cable with the ground wire from the fixture. The ground wire on the fixture
can be bare or covered in green insulation.
6. Tuck the wiring into the electrical box inside the wall and attach the light
fixture to the wall.
Assessment Method:
Demonstration with Oral Questioning

Date Developed: Document No. AIT-EIM-NCII-001


Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00
Performance Criteria Checklist 3.3-1

CRITERIA
YES NO
Did you….
1. Select appropriate tools and equipment and materials for
Installing wiring devices and lighting fixtures /switches
in line with the job requirements?
2. Demonstrate correct procedures for installation of wiring
3. Devices based on procedures?

4. Followed safety procedures/protocol?

Date Developed: Document No. AIT-EIM-NCII-001


Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00
References:

http:/electrical.wordpress.com

Colgrove,Debbie.About.com Guide to electrical installation.2000

Google.com/search?=pliers

Date Developed: Document No. AIT-EIM-NCII-001


Electrical Installation and
Maintenance NC II September 2019 Issued by:
Installing Wiring Devices of Floor Developed by: AL-HIDAYAH
and Wall Mounted Outlets, Lighting INSTITUTE OF Page __ of ___
Fixture/Switches And Auxiliary ADIAMIN U. ABDULHAMID TECHNOLOGY INC.
Outlets
Revision # 00

Das könnte Ihnen auch gefallen