MATERIAL TEST

FOR PIPING DESIGNER

1. Select suitable Pipe Support Type Arround Column Piping as follows.

Slide Support 1 :
Tight Support 2 :
1
Spring Support 3 :
4 :
2

COLUMN PIPE RACK

2. Select usually required free drain or none Air Pocket Line among following lines.

1. Tower Vapor line


2. Pump Discharge Line
3. Flare Line
4. Pump Suction Line
5. Steam Line
6. Steam Condensate Line
7. Furnace Fuel Oil Line

3. Generaly furnace shall be located in the unit at downword of prevailing find direction or upword
of prevailing wind direction.

4. What kind of support shall be provide around the pump piping for its alignments.

5. What kind of Piping Material shall be used for corrosive fluid.

6. Usually, Nozzle orientation of reboiler return line and first down commer of tower should be
parallel or 90º degree cross or other.

file:///conversion/tmp/scratch/443602974.xls/sp Sheet 1 of 5
7. Safety valve location shall be locate higher than relief header or lower of it and what is the reason.

8. What is the purpose of steam tracer line.

9. What kind of consideration shall be cared to double suction type for pump suction piping.

10. Tube side piping and shell side piping of shell & tube type exchanger their flow should be
counter flow or parallel flow or other.

11. What is the function of globe valve.

12. Control valve assembly should be locate on grade or access platform.

13. Air finned cooler located where mostly in the process unit.

14. Symmetrical design shall be considered usually what kind of equipment.

15. As a designer, before doing piing layout, what kind of documents should be prepared ?
Write down minimum 8 (eight).

16. After making piping layout some informations send to each discipline, what kind of information
should be submitted to civil section.

17. If you arrange some pipes on rack where is the position of :


1. Process piping
2. Utility piping
3. Heavy piping

draw section of rack with good piping arrangement for above items on the following

file:///conversion/tmp/scratch/443602974.xls/sp Sheet 2 of 5
a. one stage pipe rack
b. two stage pipe rack

18. Please see Part-of Plot below.


Please arrange nozzle orientation, while you have to take care of acess are / operation area.
How to locate :
a. Piping Nozzle
b. Instrument Nozzle
c. Man Hole

N
ROAD

270° 90° C DRUM/COLUMN


L

180°

A
RACK

01 02

19. Based on Piping Layout (fig.-1)


Please draw "PIPING PLAN" AND "ISOMETRIC DRAWING" with requirement
- Scale 1/30 (For Piping Plan Only)
- Flange CL.300# RF.WN
- 90º Elbow long radius
- P & ID and Piping Part Dimension Sheet 6 of 6
- Ground level ± 0,000

C-502

CL EL. 12000
1750
4000

BOP.EL. 4800

A
2000

PL-009-8"-3P3
4000

BOP.EL. 4000

3000

Sheet 3 of 5
03A

03B

file:///conversion/tmp/scratch/443602974.xls/sp
B

3000

P-503A

P-503B
2500 1750
6000 6000 6000

1 2 3 4

20. There is piece of 16" sch. 40 pipe with full water, uniform weight = 200 Kg/m its pipe
supporting with several stanchions see sketch below.

Question :

Weight at point "A" WA = Kg


Weight at point "B" WB = Kg

16"-SCH.40 PIPE
WITH FULL WATER
5m 6m 8m UNIFORM WEIGHT
W : 200 kg/m

SUPPORT

A B

21. See sketch below.

Question

Force at Point "A" PA = ………. ?


Force at Point "B" PB = ………. ?

FORCE P=90kg
L=3m

l1 l2
2m 1m

A B

Lampiran

file:///conversion/tmp/scratch/443602974.xls/sp Sheet 4 of 5
C-502

PL-008-10"-3P3

PL-009-8"-3P3

8"x6" 8"x6"

P-503A P-503B

P & ID

file:///conversion/tmp/scratch/443602974.xls/sp Sheet 5 of 5