Sie sind auf Seite 1von 8

DAFTAR PUSTAKA

Ash, R.L, 1990, “Design of Blasting Round, Surface Mining”, B.A. Kennedy Editor,
Society for Mining, Metallurgy, and Explotion, Inc. Page. 565-584.

C.V.B. Cunningham. 2005. “The Kuz-Ram fragmentation model – 20 years”


Brighton Conference Proceedings R. Holmberg et al, European Federation of
Explosives Engineers, ISBN 0-9550290-0-7,.on.page. 201-202

FTM-ITB,LPM-ITB, TIM Pengelola IWPL Pertambangan Umum.1992.”Diklat


Supervisi Teknik Peledakan Angkatan II, Karimun-Riau”,1992.pp.neraca energi-5.

Engin, I,C, (2008), “Practical Method of Bench Blasting Design for Disired
Fragmentation base on Digital Emage processing Technique and Kuz-ram Model”
Afyon Kocatepe University: Turky.

Fitriani, M. taufik, Bochori (2014)”Technical Study Of Fragmentation Effect To


Digging Time PC 2000 exavator in blasting of interburden B2C at Air Laya Mine in
PT Bukit Asam (PERSERO), Tbk. Tanjung Enim, South Sumatra”

F.I. Siddiqui, S.M. Ali Shah and M. Y. Behan. 2009. ”Measurement of Size
Distribution of Blasted Rock Using Digital Image Processing”. JKAU: Eng. Sci.,
Vol.20 No. 2, pp;88-93.

Jemino, Lopez, Carlos, (1995), ”Drill and Blast of Rock” Revised and Updated
Eddition by A.A Blaskena: Rotterdam, Netherlands.

Karim, Arifin, (1998), “Teknik Pemboran”, Pusat Pengembangan Tenaga


Pertambangan, ITB, Bandung.

Koesnaryo. S., (2001), ”Teori Peledakan”, Pusat Pendidikan dan Pelatihan Teknologi
Mineral dan Batubara,Bandung.

Rai, Astawa M., (2000), ”Klasifikasi Massa Batuan”, Tim Dana Pengembangan
Keahlian Sub Sektor Pertambangan Umum dan Lembaga Pengembangan Masyarakat,
ITB, Bandung.

Suwandi,Awang.2009.Modul 1 Pengetahuan Dasar Bahan Peledak, pendidikan dan


pelatihan juru ledak panambangan bahan galian. Bandung: Departemen Energi dan
Sumberdaya Mineral R.I. Badan Pendidikan dan Pelatihan Energi dan Sumberdaya
Mineral Pusatdiklat Teknologi Mineral dan Batubara.

ArghaMiners.2012.”Geometri Peledakan”. Http://fileq.wordpress.com/. 2019


LAMBPIRAN A

GEOMETRI PELEDAKAN AKTUAL

Tabel A.1 Geometri aktual (Meter)

No Tanggal B(m) S (m) H (m) PC (m) T (m) J (m) PF (Kg/m3)


1 9 Maret 2019 6.8 7.9 6.7 3.3 3.1 0.5 0.17
2 10 Maret 2019 7.2 8 6.9 4.1 2.7 0.5 0.19
3 11 Maret 2019 7.2 8.3 7.2 3.75 3.45 0.5 0.16
4 12 Maret 2019 7.2 8.1 6.5 3.34 3.1 0.5 0.16
5 14 Maret 2019 6.8 8 6.52 3.98 3.62 0.5 0.18
6 16 Maret 2019 7.1 8 6.79 4.23 2.56 0.5 0.18
7 21 Maret 2019 7.2 8 6.5 3.42 3.18 0.5 0.17
8 23 Maret 2019 7 8.2 6.17 3.02 3.15 0.5 0.16
9 25 Maret 2019 6.9 7.8 6.04 3.54 2.04 0.5 0.20
10 26 Maret 2019 7 8.2 6.91 3.56 3.35 0.5 0.17
11 27 Maret 2019 7.2 8.1 6.46 3.3 3.16 0.5 0.16
12 28 Maret 2019 6.9 8 6.75 3.4 3.35 0.5 0.17
13 30 Maret 2019 7.1 8.1 6.7 3.8 2.9 0.5 0.18
14 3-Apr-19 7 8.3 6.42 2.43 3.26 0.5 0.12
15 4-Apr-19 7.1 8.3 6.31 2.31 3.6 0.5 0.12
16 6-Apr-19 6.9 8.1 6.57 3.29 3.28 0.5 0.17
17 8-Apr-19 7.3 8.2 6.38 3.15 3.23 0.5 0.15
18 9-Apr-19 7.3 8.2 6.76 3.79 2.97 0.5 0.17
19 10-Apr-19 7 7.8 6.23 3.83 2.4 0.5 0.18
20 11-Apr-19 6.8 7.9 6.17 3.49 2.25 0.5 0.20
21 15-Apr-19 7.2 8.1 6.78 3.51 3.27 0.5 0.16
22 16-Apr-19 6.9 7.8 6.4 3.75 2.75 0.5 0.17
23 23-Apr-19 7.1 7.8 6.73 3.21 3.21 0.5 0.16
24 24-Apr-19 7.1 8.1 7.1 3.8 3.4 0.5 0.17
25 25-Apr-19 6.8 8 6.2 3.15 3.05 0.5 0.17
Rata - Rata 7.04 8.05 6.58 3.46 3.05 0.50 0.17
LAMPIRAN B

PERHITUNGAN FAKTOR BATUAN

C.1 Index Faktor batuan menurut Lilly,1986

ROCK MASS DESCRIPTION (RMD) RATING

Powder/friable 10
Blocky 20
Tottally massive 50
JOINT PLANE SPACING(JPS)
Close (<0,1) 10
Intermediet (0,1-1,0m) 20
Wide (>1,0) 50
JOINT PLANE ORIENTATION (JPO)
Horizontal 10
Dip out of face 20
Strike normal to face 30
Dip into face 40
SPECIFIC GRAVITY INFLUENCE (SGI) (SGI=25x0.8-50) = 30
HARDNESS 6 skala mosh

C.2 Perhitungan Blastingan Indeks dan Faktor Batuan

 BI = 0.5 x ( RMD + JPS + JPO + SGI +H)


= 0.5 x (20 + 20 + 30 + 30 + 6)
= 53
 A = 0.12 x BI
= 0.12 x 53
= 6.36
LAMPIRAN C

DISTRIBUSI FRAGMENTASI LAPANGAN DENGAN

METODE KUZ-RAM

A.1 perhitungan ukuran fragmentasi dengan metode Kuz – Ram

 Volume batuan yang terbongkar

V = (B x S x H )

= 7.04 x 8.05 x 6.58

= 372.9 m3

 Perhitungan loading Density

De = 0.508 x De2 x SG

=0.508 x (6.75)2x 0.8

=18.52 kg/m

 Perhitungan jumlah bahan peledak tiap Luabang Ledak

Qe = PC x de

= 3.46 x 18.52

= 64.08 kg

 Perhitungan Ukuran Rata – rata Fragmentasi Batuan 𝑋 =


𝑉 0.8 𝐸 −0.63
𝐴 𝑥 (𝑄𝑒) 𝑥 𝑄𝑒 0.167 (115)

372.9 0.8 100 −0.63


𝑋 = 6.36 𝑥 ( ) 𝑥 64.080.167 ( ) 𝑋=
64.08 115

6.36𝑥 (5.81)0.8 𝑥(64.08)0.167 𝑥(0.87)−0.63

𝑋 = 6.36 𝑥 4.09 𝑥2.003𝑥1.09

𝑋 = 57.79 𝑐𝑚
 Perhitungan persentase bongkah adalah sebagai berikut :
𝑋 𝑛
𝑅𝑥 = (𝑒 −(𝑋𝑐) ) 100 %

Keterangan :
Rx = Persentase material yang tertahan pada ayakan (%)
X = Ukuran ayakan (cm)
n = Indek keseragaman
e = 2.72

Maka persentase distribusi fragmentasi batuan adalah :

10 0.6
𝑅10 = (𝑒 −(96.63) ) 100%

= (2.72−0.26 )100%

= 0.77 𝑥 100%

= 77%

= 77 % (≥ 10 cm)

= 23 % (< 10 cm)

20 0.6
−( )
𝑅20 = (𝑒 96.63 ) 100%

= (2.72−0.38 )100%

= 0.684 𝑥 100%

= 68.4%

= 68.4 % (≥ 20 cm)

= 31.6 % (< 20 cm)


30 0.6
−( )
𝑅30 = (𝑒 96.63 ) 100%

= (2.72−0.496 )100%

= 0.61 𝑥 100%

= 61%

= 61 % (≥ 30 cm)

= 39 % (< 30 cm)

40 0.6
𝑅40 = (𝑒 −(96.63) ) 100%

= (2.72−0.59 )100%

= 0.554 𝑥 100%

= 55.4%

= 55.4% (≥ 40 cm)

= 44.6% (< 40 cm)

50 0.6
−( )
𝑅50 = (𝑒 96.63 ) 100%

= (2.72−0.67 )100%

= 0.511 𝑥 100%

= 51.1%

= 51.1 % (≥ 50 cm)

= 48.9 % (< 50 cm)


60 0.6
−( )
𝑅60 = (𝑒 96.63 ) 100%

= (2.72−0.75 )100%

= 0.472 𝑥 100%

= 47.2%

= 47.2 % (≥ 60 cm)

= 52.8 % (< 60 cm)

70 0.6
𝑅70 = (𝑒 −(96.63) ) 100%

= (2.72−0.82 )100%

= 0.44 𝑥 100%

= 44%

= 56 % (≥ 70 cm)

= 44 % (< 70 cm)

80 0.6
𝑅80 = (𝑒 −(96.63) ) 100%

= (2.72−0.89 )100%

= 0.41 𝑥 100%

= 41%

= 41 % (≥ 80 cm)

= 58 % (< 80 cm)
90 0.6
−( )
𝑅90 = (𝑒 96.63 ) 100%

= (2.72−0.95 )100%

= 0.38 𝑥 100%

= 38%

= 38 % (≥ 80 cm)

= 62 % (< 80 cm)

100 0.6
𝑅100 = (𝑒 −(96.63) ) 100%

= (2.72−1.02 )100%

= 0.36 𝑥 100%

= 36%

= 36 % (≥ 100 cm)

= 64 % (< 100 cm)