Beruflich Dokumente
Kultur Dokumente
Breakdown of Estimated Project Cost % of Total Unit Amount in Pesos Total Cost
A. Direct Cost
1. Materials 82.45% 581,244.00 581,244.00
2. Labor Cost 15.28% 107,736.00 107,736.00
Sub-Total ( A ) 97.73% 688,980.00 688,980.00
B. Indirect Cost
Permit and Fees 2.27% 16,020.00 16,020.00
Sub-Total ( B ) 2.27% 16,020.00 16,020.00
GRAND TOTAL 100.00% 705,000.00
Prepared by:
A. DIRECT COST