Sie sind auf Seite 1von 30

MANUAL of INSTALACION ‐ ZTE USMS

Unite Supervision Management System


Site Installation

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 1


MANUAL of INSTALACION ‐ ZTE USMS

Date Version Editor Approved by Remarks


V1 Xu
22/07/2018 Version 2 Rain Yu

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 2


MANUAL of INSTALACION ‐ ZTE USMS

1 Solution of USMS
1.1 Diagram

Database App Main


Server Server Console
Existing Supervision
SMSCenter of Libyana
Alarm
Box
Switch

IP/E1 Network
IP/E1 IP/E1
Indoor Site Outdoor Site

AC meter
AC meter

Smoke Temperature Door Water Infrared Smoke Temperature Door


sensor sensor sensor sensor sensor sensor sensor sensor

Air-Condition
Controller

ATS Rectifer ATS Rectifer


Air-Condition

1. Supervision center - include server installation ,cabinet installation ,wiring.

2. Transmission - to know which port we can use.

3. Site installation - include EISU , all kinds of sensors and intelligent devices installation work.

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 3


MANUAL of INSTALACION ‐ ZTE USMS

2 Site layout

2.1 Layout of Outdoor site(Cabinet):

1.EISU installation location


2.DTH installation location
3.Door switch installation location
4.Smoke sensor installation location
5.Power meter installation location
6.Rectifier communication port

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 4


MANUAL of INSTALACION ‐ ZTE USMS

2.2 Layout of Indoor site(shelter):

1. EISU Location , mount on the wall.


2. Infrared sensor location
3. DTH location , digital temperature and humidity sensor
4. IIC location, infrared air-condition controller
5. Installation Box for power meter , near the AC distribution box

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 5


MANUAL of INSTALACION ‐ ZTE USMS

Door switch installation location

Water sensor installation location,must be under the air-condition .

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 6


MANUAL of INSTALACION ‐ ZTE USMS

Smoke sensor location , should be on the top of rectifier

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 7


MANUAL of INSTALACION ‐ ZTE USMS

3 Equipments of site:

3.1 EISU
ZNV EISU100 V2 intelligent supervision unit is based on advanced embedded hardware
platform to analysis and storage the collected analog signal, digital signal, image and other data from
intelligent device and transmission to the supervision center.

Front-Panel

Back-Panel

ITEM Port Description


EISU S1 Ethernet port
S2 Smoke channel 1 - 2
S3 Water sensor channel 1-2
S4 Door switch channel3-4
S5 Smoke channel 3 - 4
S6 Power for EISU 48v
S7 Grounding
S8 Battery voltage channel(Total voltage)
S9 Common AI/DI channel

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 8


MANUAL of INSTALACION ‐ ZTE USMS

S10 12v power source


S11 Infrared channel
S12 Water sensor channel 3-4
EISU S13 Common AI/DI channel
S14 DTH
S15 Door switch channel1-2
S16 12v power source
EISU S17 DO1-4 channels
S18 12v power source
S19 Serial port 1-8
S20 USB Interface
Extend Board S21 Depend on the type of extend board
S22 Depend on the type of extend board
S23 Depend on the type of extend board
S24 Depend on the type of extend board

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 9


MANUAL of INSTALACION ‐ ZTE USMS

indicates what sensor will be connect to here

Data Cable for connecting sensors or devices

This side is connected to end-device or sensors

Terminal for connection to EISU

Power Supply cable for 48V from Rectifier to EISU

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 10


MANUAL of INSTALACION ‐ ZTE USMS

UTP cable From EISU to transmission device

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 11


MANUAL of INSTALACION ‐ ZTE USMS

3.2 Infrared sensor

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 12


MANUAL of INSTALACION ‐ ZTE USMS

PIN Description
Tamper 1 To prevent to be dismantled
Tamper 2
Alarm 1 Alarm signal(Relay, 2 Status: opened and closed )
Alarm 2
+12v Power +
GND Power -

3.3 Smoke Sensor

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 13


MANUAL of INSTALACION ‐ ZTE USMS

Attention: if the site has LI‐Battery Rack , please

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 14


MANUAL of INSTALACION ‐ ZTE USMS

connect the smoke sensor according to part2 of the


diagram.
PIN Color Description
1 Green Alarm (Relay, 2 Status opened and closed)
2 Brown
3 Gray 12 Voltage
4 Red

3.4 Power meter

X4

X3

X1

X2

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 15


MANUAL of INSTALACION ‐ ZTE USMS

PIN Color Description


X1
1 Brown 48V Power from rectifier
2 Blue
3 Red A Communication with EISU
4 Gray B
X2
2 Ua Connect to Fire wire Ua(Phase A)
4 Ub Connect to Fire wire Ub(Phase B)
6 Uc Connect to Fire wire Uc(Phase C)
8 Un Connect to neutral wire Un
X3 Gray Connect to current transducers
X4 Gray Connect to current transducers

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 16


MANUAL of INSTALACION ‐ ZTE USMS

3.5 TH sensor

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 17


MANUAL of INSTALACION ‐ ZTE USMS

3.6 DTH

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 18


MANUAL of INSTALACION ‐ ZTE USMS

Attention: each DTH should have a different


address when you connect multiple DTHs.

Attention: If the site has the LI‐Battery rack ,


please connect the DTH in Li‐battery rack
according to the diagram.

3.7 Flood sensor

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 19


MANUAL of INSTALACION ‐ ZTE USMS

Attention: In sensor side , just connect the Red color and green color cable, and in EISU
side , find the label, connect the the male an female head together according to the label.

3.8 Door Contact

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 20


MANUAL of INSTALACION ‐ ZTE USMS

Attention: In sensor side , just connect the Red color and green color cable, and in EISU
side , find the label, connect the the male an female head together according to the label.

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 21


MANUAL of INSTALACION ‐ ZTE USMS

Attention: If the site has Li-battery rack , please connect the door magnetic switch
according to the following diagram.

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 22


MANUAL of INSTALACION ‐ ZTE USMS

3.9 Rectfier

In EISU side ,find the label “Rec Com” , and join the connectors together .

In Rectifier side , Find the Rs232 port , and connect the 9‐Pins port to Rectifier RS232 port.

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 23


MANUAL of INSTALACION ‐ ZTE USMS

4.0 HP Battery Monitoring

4.0.1HP Battery Current monitoring

4.0.2HP Battery Voltage Monitoring

There are two different modules for battery management , BM31 and BM30.

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 24


MANUAL of INSTALACION ‐ ZTE USMS

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 25


MANUAL of INSTALACION ‐ ZTE USMS

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 26


MANUAL of INSTALACION ‐ ZTE USMS

Attention:

After the cable connection ,need to set the address


for each BM30 according to the following picture.

About the battery connection details ,please refer to BM31 manual . if

don’t have the manual ,please ask from ZTE team.

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 27


MANUAL of INSTALACION ‐ ZTE USMS

4.1 Fire System and LI‐Battery

Attention: After the battery cable connection , need to


set the address for each battery according to the
following picture.

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 28


MANUAL of INSTALACION ‐ ZTE USMS

4.2 IIC Sensor

4.3 Outdoor site

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 29


MANUAL of INSTALACION ‐ ZTE USMS

4.2 Indoor site

ZTE Confidential Proprietary © 2019ZTE CORPORATION. All rights reserved. 30

Das könnte Ihnen auch gefallen