CONTRACT No.

:
4600002203

PECIKO FIELD DEVELOPMENT PROJECT – PHASE 7A

MWP-A

HYDRAULIC NETWORK FLUSHING

PRECOMMISSIONING PROCEDURE

CLASS 1

C1 9-Feb-10 SAB Re-issued for Approval SSA/SAK SUR

C 30-Jan-10 SAB Approved SSA/SAK SUR

B 25-Jan-10 SAB Issued for Approval SSA/SAK SUR

A 29-Des-09 SAB Issued for Comments SSA/SAK SUR

CHECK APPR. ENG/PJC PJT/CMS


REV. DATE BY DESCRIPTION
COMPANY
CONTRACTOR
APPROVAL
STATUS CODE : A = Issued for comments - B = Issued for approval - C = Approved - D = As Built

TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN


WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNER

PECIKO FIELD DEVELOPMENT PROJECT – PHASE 7A


CONTRACT PCK7A / EPCI - 2

Document Number Rev Status

ID-PCK-PA-IBP-7011004
C1 C
Doc. Type PRC Discipline INS
PT. INDOKOMAS BUANA PERKASA

T h i s d o c u m e n t i s t h e p r o p e r t y o f C O M PA N Y. I t m u s t n o t b e s t o r e d , r e p r o d u c e d o r d i s c l o s e d t o o t h e r w i t h o u t w r i t t e n a u t h o r i z a t i o n f r o m C O M PA N Y.
Doc. Title: MWP-A HYDRAULIC NETWORKFLUSHING
PROCEDURE
PT. INDOKOMAS BUANA PERKASA

Doc. Type PRC Discipline INS Page 2 / 6

TABULATION OF REVISED PAGES

REVISIONS REVISIONS
SHEET SHEET
A B C C1 D E F G A B C C1 D E F G
1 X X 51
2 X 52
3 X X X X 53
4 X X X X 54
5 X X 55
6 X 56
7 57
8 58
9 59
10 60
11 61
12 62
13 63
14 64
15 65
16 66
17 67
18 68
19 69
20 70
21 71
22 72
23 73
24 74
25 75
26 76
27 77
28 78
29 79
30 80
31 81
32 82
33 83
34 84
35 85
36 86
37 87
38 88
39 89
40 90
41 91
42 92
43 93
44 94
45 95
46 96
47 97
48 98
49 99
50 100

PECIKO FIELD DEVELOPMENT PROJECT – PHASE 7A Doc. No : ID-PCK-PA-IBP-7011004


PCK7A/EPCI 2 Rev. : C1 Status: C
Date : 09-02-2010
T his document is t he propert y of CO MPANY. I t must not be st ored, reproduc ed or disclose d t o ot her wit hout writ t en aut horizat io n from CO MPA NY
Doc. Title: MWP-A HYDRAULIC NETWORKFLUSHING
PROCEDURE
PT. INDOKOMAS BUANA PERKASA

Doc. Type PRC Discipline INS Page 3 / 6

1 GENERAL OBJECTIVES

This procedure is guidance for Peciko 7A Field Development Project EPCI 2 Instrument Tube Flushing
Execution.

2 REFERENCE
GS EP INS 101 : Document Identification and Numbering
GS EP INS 107 : Design and installation of instrumentation links
GS EP INS 146 : Design of generation and distribution of hydraulic energy
GS EP SPS 023 : Cleaning and Flushing of Hydraulic Systems
ID-PCK-PA-IBP-7002415 : MWP-A WHCP Hydraulic Network Layout
ID-PCK-PA-IBP-7002004 : MWP-A WHCP Overall Tubing Block Diagram
ID-PCK-PA-IBP-7007007 : MWP-A Instrument Tubing Schedule
ID-PCK-GP-IBP-7011101 : Hydraulic Oil Cleaning Procedure

1. PREPARATION
The following Tools & Material shall available prior start the work:
 Check initial Hydraulic oil Total Azzola ZS 32 ISO-4406 (previously NAS 6) cleanliness level
C1
 Inspected Electric Hydraulic Flushing pump
 Tube / hose, fitting & valve
 Nitrogen bottle
 Air regulator
 Nut & double ferrule

2. TUBE BLOWING
Prior hydraulic flushing, new installed tube shall be blowed using nitrogen to reduce amount of tube
cutting chip during fitting & tubing installation. Nitrogen pressure to be applied to new installed tube
shall not exceed tube working pressure. Below is general step for tube blowing:
1. Set nitrogen regulator ( R ) to desired blowing pressure
2. Conect new installed tube to testing line
3. Open valve (V-1) to blow tube line.
4. Cap both end of tube to keep it clean.

PECIKO FIELD DEVELOPMENT PROJECT – PHASE 7A Doc. No : ID-PCK-PA-IBP-7011004


PCK7A/EPCI 2 Rev. : C1 Status: C
Date : 09-02-2010
T his document is t he propert y of CO MPANY. I t must not be st ored, reproduc ed or disclose d t o ot her wit hout writ t en aut horizat io n from CO MPA NY
Doc. Title: MWP-A HYDRAULIC NETWORKFLUSHING
PROCEDURE
PT. INDOKOMAS BUANA PERKASA

Doc. Type PRC Discipline INS Page 4 / 6

Fig.1. Tube blowing ilustration

3. TUBE HYDRAULIC FLUSHING


This procedure applicable on new installed tube network only. As mentioned in GS EP INS 146,
the battery limit between the HPU and hydraulic network shall be the bulkhead connectors. Special
attention shall be paid to the cleaning and passivation of the hydraulic lines. Hydraulic lines shall be
flushed to reach level 6 cleanliness according to ISO as recommended by GS EP INS 101 & GS EP
INS 107 (previously NAS 6).
Hydraulic pressure to be applied to new installed tube shall not exceed tube working pressure.
Below is general step for tube blowing:
1. Ensure hydraulic oil ISO-4406 (previously NAS 6) cleanliness level is available & in enough
level to perform the work
2. Electric hydraulic pump already inspected & ready for operation
3. Run the electric pump
4. Let hydraulic oil pass through hydraulic filter & circulate through tube network

C1 5. After circulating 5 minutes, stop the pump


6. Run Particle counter Unit to measure circulated oil cleanliness, it shall indicate ISO-4406
(previously NAS 6) cleanliness level.
7. In case of circulated oil contaminant particle counting result is not ISO-4406 (previously NAS 6)
cleanliness level, follow the following step:
i. Replace hydraulic filter with the new one.
ii. Re-circulate hydraulic oil until it`s contaminant level reach oil ISO-4406 (previously
NAS 6), 150 time of tube volume circulation is recommended by GS EP SPS 023
8. Cap shall be installed on flushed hydraulic network to avoid contaminant.

PECIKO FIELD DEVELOPMENT PROJECT – PHASE 7A Doc. No : ID-PCK-PA-IBP-7011004


PCK7A/EPCI 2 Rev. : C1 Status: C
Date : 09-02-2010
T his document is t he propert y of CO MPANY. I t must not be st ored, reproduc ed or disclose d t o ot her wit hout writ t en aut horizat io n from CO MPA NY
Doc. Title: MWP-A HYDRAULIC NETWORKFLUSHING
PROCEDURE
PT. INDOKOMAS BUANA PERKASA

Doc. Type PRC Discipline INS Page 5 / 6

Fig.2. Hydraulic flushing on field instrument tube network ilustration

Fig.3. Hydraulic flushing on WHCP interconnection ilustration

PECIKO FIELD DEVELOPMENT PROJECT – PHASE 7A Doc. No : ID-PCK-PA-IBP-7011004


PCK7A/EPCI 2 Rev. : C1 Status: C
Date : 09-02-2010
T his document is t he propert y of CO MPANY. I t must not be st ored, reproduc ed or disclose d t o ot her wit hout writ t en aut horizat io n from CO MPA NY
Doc. Title: MWP-A HYDRAULIC NETWORKFLUSHING
PROCEDURE
PT. INDOKOMAS BUANA PERKASA

Doc. Type PRC Discipline INS Page 6 / 6

4. ATTACHMENT

PECIKO FIELD DEVELOPMENT PROJECT – PHASE 7A Doc. No : ID-PCK-PA-IBP-7011004


PCK7A/EPCI 2 Rev. : C1 Status: C
Date : 09-02-2010
T his document is t he propert y of CO MPANY. I t must not be st ored, reproduc ed or disclose d t o ot her wit hout writ t en aut horizat io n from CO MPA NY

Das könnte Ihnen auch gefallen