Project: Proposed Dangan Warehouse


Location: Dangan,Reina Mercedes, Isabela
Date: Oct 7 2019

BILL OF MATERIA
ITEM
ITEM DESCRIPTION
NO.
1.0 Demolition Works
Ground Floor
Wall
CR slab
Beam
Columns
Roll up Doors

2nd Floor
Wall
Slab
Beams
Columns
Corridor Grills
Concrete Bleacher

Roofing
Perimeter Fence

Site Clearing
Sub-Total
Total for Structural Works
GRAND TOTAL

PREPARED BY:
PREPARED BY:
Engr. Jake Christopher L. Montero
Site Engineer - Dangan Project
OF MATERIALS
Revised
Qty Unit Unit Cost Total Cost

148.51 m2 150.00 22,276.38


3.80 m2 150.00 570.00
36.46 m3 500.00 18,228.00
41.34 m3 500.00 20,670.00
12.00 sets 1,200.00 14,400.00

694.80 m2 150.00 104,219.79


607.58 m2 280.00 170,121.67
52.74 m3 500.00 26,369.79
5.18 m3 500.00 2,590.00
58.30 m2 150.00 8,745.00
45.60 m3 300.00 13,680.00

1050.7028490107 m2 350.00 367,746.00


1.00 lot 40,000.00

1.00 lot 25,000.00

834,616.62

Ap
Ap
pr
pr
ov
ov
ed
ed
BY
BY
::
En
En
Ngr.
gr.
oRo
Ro
t ss
ss
ean
an
doo
Ca
Ca
Bnlnl
Yasas
:Co
Co
ns
ns
Gtrtr
auc
uc
utio
tio
dnn
iMM
oan
an
sagag
To Date
Percentage
qty unit cost total

###
###
-

###
###
Demolition
1st Floor
Wall
designation Length width depth/height number Area
W-1 3.6 2.8 6 60.48
W-2 2.6 2.8 3 21.84
w-3 1.4 2.8 5 19.6
w-4 3.1 2.8 14 121.52
w-5 3.4 2.8 1 9.52
w-6 5.3 2.8 2 29.68
w-7 2.639 2.8 1 7.3892
270.0292
Column
c-1 0.4 0.4 6.8 38

beam
b-1 3.1 0.4 0.35 31
b-2 5.3 0.4 0.35 31

cr 3.8

2nd Floor Length width depth/height number Area


Slab
S-1 607.57738812

Wall
w-1 17.1 2.1 1 35.91
w=2 17.485 6 1 104.91
w-3 11 2.1 4 92.4
w-4 10.638 2.1 3 67.0194
w-5 21.367 2.1 1 44.8707
w-6 28.635 6 1 171.81
w-7 3.6 2.1 8 60.48
w-8 27.985 2.1 1 58.7685
636.1686
Bleacher
28.5 0.8 0.5 4

Grills 53.3 1.7 1 90.61


wall below 53.3 1.1 1 58.63
roofing
1295.33164357

Column
c-1 0.4 0.4 2.7 12 5.184

3.6 2.8 8
Beam
28.635 0.4 0.35 2 8.0178
11 0.4 0.35 2 3.08
450000
46.6 0.4 0.35 3 19.572
5.3 0.4 0.35 8 5.936
3.1 0.4 0.35 6 2.604
39.2098
Roof bea,
180.397 0.3 0.25 1 13.529775
3rd Floor slab
116.9449271775
volume remarks
chb
chb
chb
roll up door

41.344

13.454
23.002
36.456

45.6 694.7986
m3

b-1
b-2

b-3
b-4
b-5

52.73958