601. The ___a)___ in a wet condition 613. A sufficient head of concrete shall 626.

shall 626. The top elevation of the shaft shall


while the walls of the excavation be maintained above the bottom of be within _____of the plan top of
are stabilized by ___b)___ until the casing to overcome the _____ shaft elevation.
the concrete is placed by tremie outside of the casing.
methods for the full length of the 627. The bottom of the shaft
pile. 614. A _____ is applied as protection excavation shall be normal to the
from the presence of surface water axis of the shaft within _____of
602. _____ used in the drilling process during drilling and as support later shaft diameter.
shall have both a mineral grain for the installation of the rebar
size that will remain in suspension cage and as a concrete form in 628. Drilled shaft excavations
and sufficient viscosity and gel drilling under water. constructed in such a manner that
characteristics to transport 615. Concrete spacers or other the concrete shaft cannot be
excavated material to a suitable approved noncorrosive spacing completed within the required
screening system. devices shall be used at sufficient tolerances are _____.
intervals not exceeding ___a)___
603. No _____ will be allowed when along the shaft to insure Steel H-Pile:
slurry tanks are required on the concentric location of the cage 629. When placed in the leads, the pile
project without written permission within the shaft excavation. When shall not exceed the _____
of the Engineer. the size of the longitudinal permitted by allowable mill
reinforcing steel exceeds 25mm, tolerance. Piles bent or otherwise
604. An acceptable range of values for such spacing shall not exceed damaged will be rejected.
those physical properties is: ___b)___.
Increase density values by Unfilled Tubular Steel Piles:
_____in salt water. 616. For piles less than 2.5 meters in
diameter, the elapsed time from
605. If desanding is required; sand the beginning of concrete
content shall not exceed _____ at placement in the shaft to the
any point in the shaft excavation completion of placement shall not
as determined by the American exceed _____.
Petroleum Institute sand content
test. 617. For piles 2.50 meters and greater
in diameter, the concrete placing 630. _____ for piles driven open end
606. Tests to determine density, rate shall not be less than _____ of may be inside or outside of the
viscosity and pH values shall be pile height per each 2-hour period. pipe. They may be high carbon
done _____ to establish a structural steel with a machined
consistent working pattern. 618. The _____ shall be of such design ledged for pile bearing or cast
that the concrete remains in a steel with a ledge, designed for
607. Prior to placing shaft concrete, workable plastic state throughout attachment with a simple weld.
slurry samples shall be taken from the 2-hour placement limit.
the bottom and at intervals not Precast Concrete Piles:
exceeding _____for the full height 619. The upper 1.5 meters of concrete 631. By cutting away the concrete at
of slurry. Any heavily shall be vibrated or rodded to a the end of the pile, leaving the
contaminated slurry that has depth of _____ except where soft reinforcing steel exposed for a
accumulated at the bottom of the uncased soil or slurry remaining in length of ___a)___ for corrugated
shaft shall be eliminated. The the excavation will possibly mix or deformed bars and ___b)___
mineral slurry shall be within with the concrete. for plain bars.
specification requirements
immediately before shaft concrete 620. For at least _____ after pile 632. Just prior to placing concrete, the
placement. concrete has been placed, no top of the pile shall be wetted
construction operations that would thoroughly and covered with a
608. _____ shall be measured after cause soil movement adjacent to ___a)___, retempered mortar, or
final cleaning. the shaft, other than mild other suitable bonding material to
vibration, shall be conducted. the satisfaction of the Engineer.
609. The base of the shaft excavation The forms shall remain in place
may be cleaned using a _____. 621. The drilled shaft shall be within not less than ___b)___. The pile
Reverse circulation techniques _____of the plan position in the shall not be driven until the safe
may also be used to clean the base horizontal plane at the plan design has been reached.
of the shaft. elevation for the top of the shaft.
633. Splicing of prestressed precast
610. The shaft excavation shall be 622. The vertical alignment of the shaft piles will generally not be
cleaned so that a minimum of excavation shall not vary from the permitted, but when permitted, it
___a)___ of the base will have plan alignment by more than shall be made in accordance with
less than ___b)___ and at no place _____of depth. (1) above, but only after driving
on the base more than ___c)___of has been completed.
sediment. The Engineer will 623. After all the shaft concrete is Reinforcement bars shall be
determine shaft cleanliness. placed, the top of the reinforcing included in the pile head for
steel cage shall be no more than splicing to the extension bars. No
611. Casing, if used in operation, shall _____above and no more than additional driving will be
be metal, smooth, clean, _____ below plan position. permitted. True or False?
watertight, and of ample strength
to withstand both handling and 624. When casing is used, its outside 634. If the length of the steel pile, shell
driving stresses and the pressure diameter shall not be ___a)___ or pipe driven is insufficient to
of both concrete and the shown on the plans. When casing obtain the specified bearing
surrounding earth materials. The is not used, the minimum diameter power, an extension of the same
outside diameter of casing shall of the drilled shaft shall be the cross-section shall be spliced to it.
___a)___. It shall conform to diameter shown on the plans for Unless otherwise shown on the
_____ unless otherwise specified. diameters 60.96 cm (24”) or less, Plans, splices shall be made by
and not more than ___b)___less butt-welding the entire cross-
612. Generally the removal of than the diameter shown on the sections to form an integral pile
temporary casing shall not be plans for diameters greater than using the _____. The sections
started until concrete placement in 60.96 cm (24”). connected shall be properly
the shaft is _____. Movement of aligned so that the axis of the pile
casing by rotating, exerting 625. The bearing area of bells shall be shall be straight. Bent and/or
downward pressure and tapping to _____. All other plan dimensions damaged piles shall be rejected.
facilitate extraction or extraction shown for the bells may be varied,
with a vibratory hammer will be when approved, to accommodate 635. Concrete piles shall, when
permitted. Casing extraction shall the equipment used. approved by the Engineer, be cut
be at a slow, uniform rate with the off at such a level that at least
pull in line with the shaft axis.
_____ of undamaged pile can be brushing or by approved pressure 664. All treated timber shall be _____
embedded in the structure above. spray. prior to treating.

636. The longitudinal reinforcement of 648. Galvanized surfaces which have 665. Any cut made or hole bored in
the piles shall be embedded in the been abraded so that the base treated timber that shall expose
structure above to a length equal metal is exposed, threaded untreated wood shall be given
to at least _____. portions of all fittings and _____ before the exposed part is
fasteners and cut ends of bolts assembled.
637. The distance from the side of any shall be painted with _____.
pile to the nearest edge of the cap 666. Treatment shall consist of the
shall not be less than _____. 649. Moist tamped mortar precast forcing of either creosote oil or a
members shall be removed from creosote petroleum oil mixture
638. When the cut off elevation for a the molds as soon as practicable into the outer fibers of the timber
precast pile or for the steel shell or and shall be kept damp for a by a _____.
pile for a cast in place concrete period of at least _____. Any
pile is below the elevation of the member that shows checking of 667. The minimum penetration of the
bottom of the pile cap, the pile soft corners of surfaces shall be preservative with the surface of
may be _____ by means of rejected. the timber shall be _____.
reinforced concrete extension.
650. _____ shall be constructed as to 668. The minimum retention of
639. Any pile delivered with defects permit freedom of movement. preservative per cubic metre of
shall be _____. timber shall be as follows:
651. The materials used in masonry For general use, _____ by empty
640. A precast concrete pile shall be brick railing and parapet and the cell process
considered defective if _____, or work to be done shall conform to
any defect which, in the opinion the requirements of this 669. The minimum retention of
of the Engineer, affects the Specification. The workmanship preservative per cubic metre of
strength or life of the pile. shall be _____ and the finished timber shall be as follows:
construction shall be neat in For marine use, _____ by full cell
641. When a new pile is driven or cast appearance and true to line and process
to replace a rejected one, the grade.
Contractor at his own expense, 670. The Engineer shall be notified at
shall _____ as deemed necessary 652. This Item shall consist of the least _____ in advance of the date
by the Engineer. construction of timber structures that the treating process will be
to the dimensions, lines and performed in order that the
Protecting Untreated Timber grades as shown on the Plans or as untreated timber, the treatment
Trestle Piles: ordered by the Engineer in process, and the finished treated
642. The sawed surface shall be accordance with these timber may all be inspected.
thoroughly brush-coated with two Specifications. The timber shall be
(2) applications of_____. treated or untreated as called for 671. The _____ shall be determined by
on the Plans or Special Provisions. boring a sufficient number of
643. The Contractor shall keep records well-distributed holes to
of all piles driven or installed. A 653. All hardware shall be of the kind determine the average penetration.
copy of the record shall be given and size specified on the Plans.
to the Engineer within _____ after All bolts, including drift bolts, 672. All such holes shall be plugged
each pile is driven. shall be either _____. with plugs approximately _____
in diameter than the bit used in
644. This Item shall consist of 654. Washers shall be either _____ boring the holes.
furnishing or fabricating and/or unless cut washers are specified
placing railings, for bridges and on the Plans. 673. Any _____ shall be cause for
other structures of the material or rejection of the pieces in which
combination of materials shown 655. Bolts shall have _____, unless the excessive checking occurs.
on the Plans, constructed in otherwise specified.
reasonably close conformity with 674. In structures of untreated timber,
this Specification and to the lines, 656. Nails shall be _____ of standard all of the following surfaces shall
grades and dimensions shown on form. be coated thoroughly with _____
the Plans. Railings shall be before the timber are assembled:
classified as concrete, steel, 657. Spikes shall be _____, as ends, tops and all contact surfaces
aluminum or timber in accordance specified. of posts, sills, caps, floor beams
with the predominating material and stringers, all ends, joints and
contained in each. 658. All hardware shall be galvanized contact surfaces of bracing. The
in conformity with _____, unless back surface of all bulkheads and
645. Aluminum shall conform to the otherwise specified on the Plans any other timber in direct contact
requirements of _____ or as called or Special Provisions. with earth shall be similarly
for on the Plans. treated.
659. The preservative shall be _____ as
646. Rail elements shall be erected called for on the Plans or by the 675. Cast iron washers shall have a
according to Plans and in a Special Provisions, and shall thickness equal to _____ and the
manner resulting in a smooth, conform to the Specifications for diameter of the washer shall be
continuous installation with laps timber preservatives of the _____.
in the direction of traffic flow. All AASHTO M 133.
bolts except adjustment bolts shall 676. For malleable or plate washers,
be drawn tight. Bolts shall be of 660. When timber is intended for the diameter or side size of the
sufficient length to extend beyond _____, creosote petroleum oil square shall be equal to _____.
the nuts by more than _____. blend shall not be used.
677. _____ shall be used when the
647. Where painting of railing 661. All timber which is to be stored on timber is in contact with earth.
component is specified, any the job for any length of time prior
damage to the shop coat of paint to its use in the structure shall be 678. The pile shall be driven as
shall be corrected by an neatly stacked in piles to _____. indicated on the Plans, with a
application of an approved _____ variation of the portion above the
prior to painting. Ungalvanized 662. Untreated timber shall be open- ground of not more than
surfaces inaccessible to painting stacked at least _____ above the _____from the vertical or batter
after erection shall be field painted ground and the stack shall be indicated, or so that the cap may
before erection. The railing sloped so as to shed water. be placed in its proper location
components shall be given the without inducing excessive
specified number of coats of paint 663. _____ shall be close-stacked and stresses on the piles.
uniformly applied by thorough piled to prevent warping.
679. Excessive manipulation of piles staggered so that the spacing of
will _____ and the Contractor will nails along each stringer shall not
be required to redrive or use other be less than _____.
satisfactory methods to avoid such
manipulations. 694. In addition, each piece shall be
nailed horizontally to adjacent
680. No _____ on tops of piles will be pieces at _____, and staggered
permitted. both horizontally and vertically
with nails in adjacent pieces.
681. Dowels for anchoring sills or
posts shall be set the concrete is 695. All railing and rail post materials
cast and shall project at least shall be _____. All rails shall be
_____ above the tops of the continuous and squarely butt-
pedestals. joined at the post.

682. ___a)___ shall have true and even 696. Unless otherwise specified, wheel
bearing on piles or pedestals. They guards shall be surfaced on one
shall be drift-bolted with bolts side and one edge (SISIE). Wheel
extending into the piles or guards shall be laid in sections not
pedestals at least ___b)___. When less than _____.
possible, all earth shall be
removed from contact with sills so 697. This work shall consist of steel
that there will be free circulation structures and the steel structure
of air around the sills. portions of composite structures,
constructed in reasonably close
683. ___a)___ shall be placed to obtain conformity with the lines, grades
even and uniform bearing over the and dimensions shown on the
tops of the supporting posts or Plans or established by the
piles with their ends in alignment. Engineer.
All caps shall be secured by
driftbolts, set approximately at the -The work will include the
center extending at least ___b)___ furnishing, fabricating, hauling,
into the post or piles. erecting, welding and painting of
structural metals called for in the
684. Outside stringers may have Special Provision or shown on the
___a)___ but interior stringers Plans. Structural metals will
shall be ___b)___ to take bearing include structural steel, rivet,
over the full width of the floor welding, special and alloy steels,
beam or cap at each end. steel forgings and castings and
iron castings. This work will also
685. The lapped ends of untreated include any incidental metal
stringers shall be securely fastened construction not otherwise
to caps by _____. provided for, all in accordance
with these Specifications, Plans
686. When stringers are two panels in and Special Provisions.
length, the joints shall be _____.
698. The Contractor shall give the
687. Cross-bridging between stringers Engineer at least _____ notice
shall be neatly and accurately prior to the beginning of work at
framed and securely toe-nailed the mill or shop, so that the
with at least _____. required inspection may be made.

688. All cross-bridging members shall 699. The term “mill” means any rolling
have full bearing at each end mill, shop or foundry where
against the sides of stringers. material for the work is to be
Unless otherwise specified, cross manufactured or fabricated. No
bridging shall be placed at the material shall be rolled or
_____. fabricated until said inspection has
been provided.
689. Roadway and sidewalk floor
planks, unless otherwise 700. The Contractor shall furnish the
stipulated, shall be _____. Engineer with copies of the
certified mill reports of the
690. The planks shall be laid heartside structural steel, preferably _____.
down, with ___a)___ openings
between them for seasoned
materials and with ___b)___ for
unseasoned material.

691. The planks shall be graded


carefully as to thickness, and so
laid that no two adjacent planks
shall vary in thickness by more
than _____.

692. Planks for laminated or strip


floors shall have a nominal
thickness of _____ and shall be
surfaced to a uniform width (SIE),
and when so specified, to a
uniform thickness (SIS). Unless
otherwise stipulated, no splicing
of planks will be allowed.

693. Planks shall be laid with the


surfaced edge down and each
plank shall be toe-nailed to each
alternative stringer. The nailing of
successive planks shall be

Das könnte Ihnen auch gefallen