Cost Estimates for Pipeline Abandonment per NEB Guidance Notes in Amended Table A-3

NEB Order Field Location From Facility Location To Facility Length Substance Pipe Spec Status Year Land Crossings 1.0 Engineering and 2.0 Abandonment Preparation 3.0 Abandonment In-Place 4.0 Special Treatment 5.0 Pipeline Removal 6.0 Above-Ground Facilities 7.0 Contingency

(m) OD (mm) WT (mm) Material Constructed Use Project Mgmt (20%) Access & Clean-up Purging & Cleaning Cut/Cap/Plug Post Abd Monitoring Plugging @ Crossings If Apoplicable Block Valves & Meter Stn (25%) Total

XG-056-54-95 Compeer 07-06-035-28W3 Well 07-01-035-01 W4M Pipeline 2,130 Natural Gas 114.3 3.20 Steel Operating 1995 Agriculture Cultivated None $ 15,505.13 $ 11,182.50 $ 2,795.63 $ 33,547.50 $ 44,730.00 no plans to remove $ 30,000.00 $ 19,381.41 $ 157,142.16

XC-P166-1-96 Esther 10-01-033-01W4 Injection Pump 08-11-033-29 W3M Injection Well 1,460 Salt Water 91.0 8.10 Fibreglass Operating 1996 Agriculture Cultivated None $ 12,898.50 $ 7,665.00 $ 3,832.50 $ 22,995.00 $ 30,660.00 no plans to remove $ 30,000.00 $ 16,123.13 $ 124,174.13

XG-P166-67-98 Wildboy b-33-A/94-P-10 Pipeline 01-34-120-12 W6M Nova Meter Station 34,000 Natural Gas 323.9 7.90 Steel Operating 1999 Low-productive Forest None $ 157,725.00 $ 178,500.00 $ 44,625.00 $ 535,500.00 $ 714,000.00 no plans to remove $ 30,000.00 $ 197,156.25 $ 1,857,506.25

XG-P166-5-99 Esther/Fusilier 10-24-032-29W3 Pipeline 15-13-032-01 W4M Pipeline 2,100 Natural Gas 114.3 3.20 Steel Operating 1999 Agriculture Cultivated None $ 15,371.25 $ 11,025.00 $ 2,756.25 $ 33,075.00 $ 44,100.00 no plans to remove $ 30,000.00 $ 19,214.06 $ 155,541.56

XO-P166-7-99 Esther/Court 09-02-033-29W3 Satellite 10-01-033-01 W4M Battery 1,200 Emulsion 163.1 6.10 Fibreglass Operating 1999 Agriculture Cultivated None $ 11,670.00 $ 6,300.00 $ 3,150.00 $ 18,900.00 $ 25,200.00 no plans to remove $ 30,000.00 $ 14,587.50 $ 109,807.50

XG-V037-17-2006 Chinchaga A-1-A/094-H-8 Pipeline 04-23-095-13W6 Pipeline 300 Natural Gas 168.3 4.80 Steel Operating 2006 Low-productive Forest None $ 7,338.75 $ 1,575.00 $ 393.75 $ 4,725.00 $ 6,300.00 no plans to remove $ 30,000.00 $ 9,173.44 $ 59,505.94

XG-H109-09-2006 Esther/Cout 07-01-033-01W4 Pipeline 10-31-032-28W3 Pipeline 4,400 Sweet Natural Gas 168.0 26.71 Pol Operating Agriculture Cultivated None $ 25,635.00 $ 23,100.00 $ 5,775.00 $ 69,300.00 $ 92,400.00 no plans to remove $ 30,000.00 $ 32,043.75 $ 278,253.75

$ 2,741,931.28
Cost Estimate Formulae Per NEB Guidance Table A-3
1.0 Engineering And Project General Project Management costs associated with regulatory, legal, financial, external relations, land, envl, helalth, safety, operations and other stakeholders.
Management Enginering and project management costs. Estimate 20% of parts 2, 3a, 4, 5, and 6.
2.0 Abandonment
Preparation

2a Land Access and Clean-up Access rights, permits, temp work space, damages, surveys, etc. Estimate $5,250/km based on NEB guidance.
2b Pipeline Purging and Pump clean or draw down gas, pigging, cleaning and purging. Isolate sections as required. Testing and analysis for cleanliness. Waste storage and disposal.
Cleaning Estimate a function of part 2a based on substance (1/4 for gas, 1/2 for liquid).
3.0 Pipeline Abandonment-
in-Place
3a Basic Abandonment-in- Install plugs to prevent water movement, removal of underground appurtenances, backfilling and reclamation.
Place Estimate $15,750/km based on non-challenging terrain.
3b Post-Abandonment Financial provisions for periodic monitoring and for contingencies, such as later removal of some facilities. Includes subsidence, floating pipe or discovery of
Activities contamination. Estimate $21,000/km based on NEB 66:1 annuity factor.
4.0 Special Treatment
(Crossings) Funds to facilitate cut/fill/cap of road/rail/utility crossings and treatment of environmentally sensitive areas such as water crossings. Estimate $35,000 per crossing.

Provisions for pipeline removal where anticipated - costs include removal of impediments and topsoil, excavation, cutting, capping, removal, transportation and
5.0 Pipeline Removal disposal of pipeline and associated facilities. Backfil, compaction and land restoration. Estimate $150,000/km, where applicable.
Purging, cleaning and site reclamation including demolition and disposal of material and land restoration and reclamation. Estimate $15,000 per block valve, $50,000
6.0 Above-Ground Facilities per meter station.
7.0 Contingency Allowances to cover quality of project cost estimate and project uncertainty. Estimate 25% of parts 2, 3a, 4, 5, and 6.