DESIGN CALCULATION

DFC LOADING - SURCHARGE INTENSITY 16.25 t/sq.m


EARTH FILL HEIGHT FROM 3.0m TO 6.0m
GROUND LEVEL TO FORMATION LEVEL

Doc. No.: Date: 30/10/2018


L-TYPE RETAINING WALL/2018/3.0m
FILL/01
This document is the property of Myladoor File Path: C:\Documents and
Consultancy Services/ RVNL / Chennai and Settings\Administrator\Desktop\ RCC
must not be passed to any person or body not L-TYPE Retaining Wall \Des.xls
authorized by us to receive it nor be copied or
otherwise be made use of either in full or in
part by such person or body with our prior
permission in writing.

Notes:
Revision Details:

AJV PS JM
Rev. Date Details Init./ Sign Init./Sign Init./Sign
Prepared Checked Approved
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

Design of L-TYPE Retaining wall for a Height of 3.0 m

All dimensions are in 'm'


0.3 CL OF TRACK

2.7

0.6
2.4
1.75
0.6

3
Dimensional details of L-TYPE Retaining Wall

(Code : Sub structure and Foundation code)


Clause:5.7.1.4
Cos² (Ф-α)
Ka =
Cos² α Cos(α+δ) [(1+sqrt Sin (Ф+δ)Sin (Ф-i)/Cos(α+δ)Cos(α-i)]2
Ф = 30 (compacted soil assumed)
α = 0 cos² ( 30 - 0) = 0.75
δ = 10 cos² 0 = 1
I = 0 cos ( 0+10 ) = 0.98
sin ( 30 + 10) = 0.64
sin ( 30 - 0) = 0.5
cos ( 0-0 ) = 1

Ka = (cos²(30-0))/(cos² 0.cos(0+10)[(1+sqrt(sin(30+10)Sin(30- 0)/cos(0+10)cos(0-0))]^2)

Ka = 0.75/ (1x0.98[ 1 + sqrt (0.64x0.5/0.98x1) ]²


Ka = 0.31

Coefficient of Active EP,Ka = 0.31


Weight of soil = 1.8 t/m3
Overall Height of retaining wall = 4.75 m
Height of Earth Fill on Earth side, h = 4.15 m
LL surcharge for unit length, S = 16.25 t/m
DL surcharge for unit length, V = 6 t/m
Height between RL and FRL = 0.74 m
Width of uniform distribution at FRL = 3 m

1
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

Active Earth Pressure:

Moment due to Active EP = wh3/6 x Ka


= ( 1.8 x 4.75 ^3/6)x 0.31
= 32.1515625 x 0.31
= 9.97 tm

Live load Surcharge :

Surcharge Pressure , P1 = (S+V)h1xKa


(B+2D)
D = 1.027 m
h1 = 4.076 m

Therefore, Surcharge pressure P1 = (16.25+6)x4.076x0.31 = 28.11


(3+2x1.027) 5.054
P1 = 5.56 t/m

Moment due to surcharge load = 5.56x4.076 = 22.66 = 11.331


2 2

LL Surcharge at 0.5H (2.075m) height:

Surcharge Pressure , P1 = (S+V)h1xKa


(B+2D)
D = 1.027 m
h1 = 1.401 m

Therefore, Surcharge pressure P1 = (16.25+6)x1.401x0.31 = 9.663


(3+2x1.027) 5.054
P1 = 1.91 t/m

Moment due to surcharge load = 1.91x1.401 = 2.676 = 1.338


2 2

Horizontal Load , P = wh² x Ka


2
= 1.8 x 4.75 ^2 x
2
Load = 6.29 t

Section Modulus , Z = 1/6 bd²

breadth of section = 1 m
Depth of the section(base width) = 3 m

1/6 bd² = 1/6x1x3^2


= 1.50 m³

2
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

.0 m

CL OF TRACK

i)/Cos(α+δ)Cos(α-i)]2

3
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

tm

tm

0.31

4
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

Stability of Retaining wall (With Live Load):


Taking moment about extreme end of toe side
S.no Description No. L(m) B(m) D(m) U.W(t) L(t) L.A(m)

1 STEM (RECT) 1 1 0.30 4.15 2.5 3.1125 0.15


2 STEM (TRI) 0.5 1 0.30 4.15 2.5 1.55625 0.4
3 FOOTING (RECT) 1 1 3.00 0.60 2.5 4.5 1.5
4 EARTH WT. (RECT) 1 1 2.40 4.15 1.8 17.928 1.8
5 EARTH WT. (TRI) 0.5 1 0.30 4.15 1.8 1.1205 0.5
6 DL SURCHARGE 1 1 6 1.5
7 LL SURCHARGE 1 1 16.25 1.5

8 ACTIVE E.P
9 SURCHARGE PRESSURE
50.47

All dimensions are in 'm' CL OF TRACK

0.30 3

Taking moment about this point

3.00

0.60
2.40
1.75
0.60

3.00

3
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

Calculation for Stabilty :-


Resultant 'R' from 'X' = Total Moment / Total Load
= 52.75 / 50.47
= 1.05 m

Actual eccentricity ,e = R-(B/2) = 1.05 - (3/2)


= 0.45 m
Permissible eccentricity, e = b\6 = 3/6
= 0.50 m
= 0.50 > 0.45
Hence Ok...
Pressure on Foundation Level :
Foundation Size = 3.00 x 1 m
Total Load, P = 50.47 t
Area (A) = 3 m2
Section Modulus, Z = 1.50 m3
Actual eccentricity = 0.45 m
Resultant Moment = Total Load x Actual Eccentricity
= 50.47x0.45
= 22.71 tm
Maximum Pressure = P/A + M/Z
= (50.47/3)+(22.7115/1.5)
= 31.96 t/m2

Minimum Pressure = P/A - M/Z = (50.47/3)-(22.7115/1.5)


= 1.68 t/m2
Check for Stability:-

Stabilizing moment = 74.05 tm


Anti Stabilizing moment = 21.3 tm
= (Stabilizing Moment/Anti Stabilizing Moment) > 1.5
= 74.05/21.3 > 1.5
= 3.48 > 1.5
Hence Ok...
******** Ok...Section is passed ********
Check for Sliding :-
Coefficient of friction, µ = 0.6
Vertical load, w = 50.47 t
Horizontal load, p = 11.85 t
Check, µw/p > 1.5 = (0.6x50.47) / 11.85 > 1.5
= 2.56 > 1.5

4
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

Hence Ok...
******** Ok...Section is passed ********

5
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

M(tm)

0.467
0.623
6.750
32.270
0.560
9.000
24.375

-9.967
-11.331
52.750

oment about this point

6
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

bilizing Moment) > 1.5

7
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

Stability of Retaining wall (Without Live Load):


Taking moment about extreme end of toe side
S.no Description No. L(m) B(m) D(m) U.W(t) L(t) L.A(m)

1 STEM (RECT) 1 1 0.30 4.15 2.5 3.1125 0.15


2 STEM (TRI) 0.5 1 0.30 4.15 2.5 1.55625 0.4
3 FOOTING (RECT) 1 1 3.00 0.60 2.5 4.5 1.5
4 EARTH WT. (RECT) 1 1 2.40 4.15 1.8 17.928 1.8
5 EARTH WT. (TRI) 0.5 1 0.30 4.15 1.8 1.1205 0.5
6 DL SURCHARGE 1 1 6 1.5

7 ACTIVE E.P
34.22

All dimensions are in 'm' CL OF TRACK

0.30 3

Taking moment about this point

3.00

0.60
2.40
1.75
0.60

3.00

5
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

Calculation for Stabilty :-


Resultant 'R' from 'X' = Total Moment / Total Load
= 39.7 / 34.22
= 1.16 m

Actual eccentricity ,e = R-(B/2) = 1.16 - (3/2)


= 0.34 m
Permissible eccentricity, e = b\6 = 3/6
= 0.50 m
= 0.50 > 0.34
Hence Ok...
Pressure on Foundation Level :
Foundation Size = 3.00 x 1 m
Total Load, P = 34.22 t
Area (A) = 3 m2
Section Modulus, Z = 1.50 m3
Actual eccentricity = 0.34 m
Resultant Moment = Total Load x Actual Eccentricity
= 34.22x0.34
= 11.63 tm
Maximum Pressure = P/A + M/Z
= (34.22/3)+(11.6348/1.5)
= 19.16 t/m2

Minimum Pressure = P/A - M/Z = (34.22/3)-(11.6348/1.5)


= 3.65 t/m2
Check for Stability:-

Stabilizing moment = 49.67 tm


Anti Stabilizing moment = 9.97 tm
= (Stabilizing Moment/Anti Stabilizing Moment) > 1.5
= 49.67/9.97 > 1.5
= 4.98 > 1.5
Hence Ok...
******** Ok...Section is passed ********
Check for Sliding :-
Coefficient of friction, µ = 0.6
Vertical load, w = 34.22 t
Horizontal load, p = 6.29 t
Check, µw/p > 1.5 = (0.6x34.22) / 6.29 > 1.5
= 3.26 > 1.5

6
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

Hence Ok...
******** Ok...Section is passed ********

7
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

M(tm)

0.467
0.623
6.750
32.270
0.560
9.000

-9.967
39.700

oment about this point

8
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

bilizing Moment) > 1.5

9
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

DESIGN OF STEM :
(Earth face)
Thickness of stem = 600 mm
Coefficient of EP = 0.31
Weight of Soil = 1.8 t/m²
Height of Wall = 4.15 m

Moment acting at the stem = (0.31x1.8x4.15x4.15x4.15)/6


Cp x wh3/6 = 6.65 tm
Moment due to surcharge load = 11.33 tm
Total Moment 17.98
Ultimate Moment = 30.57 tm (17.98 x 1.7)
Design Moment = 299.85 kN.m

Breadth of the Stem = 1000 mm


Grade of Steel,Fe = 500 N/mm²
Grade of Concrete,fck = 25 N/mm²
Clear Cover = 75 mm
Diameter of Main Bar = 20 mm
Diameter of Distributor = 12 mm
Spacing of Main Bar = 150 mm
Spacing of Distributor = 150 mm

Thickness of stem Required :

Mu = 0.15 x fck x b x d²
299.85 x 10^6 = 0.15x25x1000xd²
Eff. Depth Reqd. = 282.77 mm

Eff. Depth Provided = 600 - 75 - 20 / 2


= 600 - 85
= 515 mm

Min. Ast Reqd. = 0.2 %


= 0.2/100x1000x515
= 1030 mm²

Area of Reinforcement Required :

Z = d-((fy x ast)/(fck x b))


Z = 515-((500 ast)/(25x1000)
Z = 515-0.02 Ast

Mu = (0.87 fy) Ast Z


3E+08 = 0.87 X 500 X Ast ( 515 - 0.02 Ast)

3.00E+08 = 2.2E+05 Ast - 8.7 Ast²

= Ast² - 2.2E+05 Ast + 3E+08 = 0


8.7 8.7

= Ast² - 2.6E+04 Ast+ 3E+07 = 0

7
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

A = 1
B = 2.6E+04
C = 3.4E+07

√(b²-4ac) = 2.3E+04
Ast = 1416.38 mm²

Provided Ast ((3.1416/4)x20^2)/150x1000


=
= 2094 mm² > 1416.38 mm²
Hence Ok
Provide, 20# @ 150 mm spacings on Earth Face vertically
Provide, 12# @ 150 mm spacings on outer face vertically

Average thickness of stem = 450 mm


Distributors:
Min. Ast Reqd. for Distributor = 0.12 %
= 0.12/100xbxd
= 0.12/100x1000x450
= 540 mm²

Provided Ast for Distributor = ((3.1416/4)x12^2/150)x1000


= 753.98 mm² > 540 mm²
Hence Ok
Provide, 12# @ 150 mm spacings on both sides

CURTAILMENT AT 0.5H (2.075m):


(Earth face)
Thickness of stem = 450 mm
Coefficient of EP = 0.31
Weight of Soil = 1.8 t/m²
Height of Wall = 2.075 m

Moment acting at the stem = (0.31x1.8x2.075x2.075x2.075)/6


Cp x wh3/6 = 0.83 tm
Moment due to surcharge load = 1.34 tm
Total Moment 2.17
Ultimate Moment = 3.69 tm (2.17 x 1.7)
Design Moment = 36.19 kN.m

Breadth of the Stem = 1000 mm


Grade of Steel,Fe = 500 N/mm²
Grade of Concrete,fck = 25 N/mm²
Clear Cover = 75 mm
Diameter of Main Bar = 20 mm
Diameter of Distributor = 12 mm
Spacing of Main Bar = 300 mm
Spacing of Distributor = 150 mm

Thickness of stem Required :

Mu = 0.15 x fck x b x d²
36.19 x 10^6 = 0.15x25x1000xd²
Eff. Depth Reqd. = 98.24 mm

8
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

Eff. Depth Provided = 450 - 75 - 20 / 2


= 450 - 85
= 365 mm

Min. Ast Reqd. = 0.2 %


= 0.2/100x1000x365
= 730 mm²

Area of Reinforcement Required :

Z = d-((fy x ast)/(fck x b))


Z = 365-((500 ast)/(25x1000)
Z = 365-0.02 Ast

Mu = (0.87 fy) Ast Z


4E+07 = 0.87 X 500 X Ast ( 365 - 0.02 Ast)

3.62E+07 = 1.6E+05 Ast - 8.7 Ast²

= Ast² - 1.6E+05 Ast + 36190000 = 0


8.7 8.7

= Ast² - 1.8E+04 Ast+ 4E+06 = 0

A = 1
B = 1.8E+04
C = 4.2E+06

√(b²-4ac) = 1.8E+04
Ast = 230.85 mm²

Provided Ast ((3.1416/4)x20^2)/300x1000


=
= 1047 mm² > 730.00 mm²
Hence Ok
Provide, 20# @ 300 mm spacings on Earth Face vertically
Provide, 12# @ 300 mm spacings on outer face vertically

DESIGN OF BASE SLAB ON HEEL SIDE :

Heel length = 2.4 m


Pressure variation = 10.09 t/m² (31.96+1.68)/3
per 'm' length
Min. pressure = 1.68 t/m²

2.4

1.68 t/m²
25.896 t/m²

BM = 1.68x2.4² + 24.216x2.4²
2 6
= 4.8384 + 23.24736

9
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

= 28.09 tm

10
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

SF = 1.68 x 2.4 + 24.216 x 2.4 x 0.5


= 4.032 + 29.0592
= 33.0912 t

Reducing, BM due to earth fill = 4.15 m

= 1.8 x 4.15 x 2.4 ²


2
= 21.51 tm

SF = 1.8 x 4.15 x 2.4


= 17.928 t

Net BM = 21.51 - 28.1


= 6.58 tm
Net SF = 33.0912 - 18
= 15.1632 t

Ultimate Moment = 6.58 x 1.7


= 11.186 tm

Ultimate Shear Force = 15.1632 x 1.7


= 25.78 t

Design Moment = 109.73 kN.m

Breadth of the heel = 1000 mm


Grade of Steel,Fe = 500 N/mm²
Grade of Concrete,fck = 25 N/mm²
Clear Cover = 75 mm
Diameter of Main Bar = 16 mm
Diameter of Distributor = 12 mm
Spacing of Main Bar = 150 mm
Spacing of Distributor = 150 mm

Thickness of Heel Required :

Mu = 0.15 x fck x b x d²
109.73 x 10^6 = 0.15x25x1000xd²
Eff. Depth Reqd. = 171.06 mm

Eff. Depth Provided = 600 - 75 - 16 / 2


= 600 - 83
= 517 mm

Min. Ast Reqd. = 0.2 %


= 0.2/100x1000x517
= 1034 mm²

Area of Reinforcement Required :

Z = d-((fy x ast)/(fck x b))


Z = 517-((500 ast)/(25x1000)

11
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

Z=517-0.02 Ast

12
Myladoor Consultancy Services
DESIGN CALCULATION FOR L-TYPE RCC RETAINING WALL

Mu = (0.87 fy) Ast Z


1E+08 = 0.87 X 500 X Ast ( 517 - 0.02 Ast)

1.10E+08 = 2.2E+05 Ast - 8.7 Ast²

= Ast² - 2.2E+05 Ast + 109730000 = 0


8.7 8.7

= Ast² - 2.6E+04 Ast+ 1E+07 = 0

A = 1
B = 2.6E+04
C = 1.3E+07

√(b²-4ac) = 2.5E+04
Ast = 497.49 mm²

Provided Ast ((3.1416/4)x16^2)/150x1000


=
= 1340 mm² > 1034.00 mm²
Hence Ok
Provide, 16# @ 150 mm spacings both top and bottom

Distributors:
Min. Ast Reqd. for Distributor = 0.12 %
= 0.12/100xbxd
= 0.12/100x1000x517
= 620.4 mm²

Provided Ast for Distributor = ((3.1416/4)x12^2/150)x1000


= 753.98 mm² > 620 mm²
Hence Ok
Provide, 12# @ 150 mm Spacing on both sides