Beruflich Dokumente
Kultur Dokumente
1. For step by step guides to install the AL1x2x in the PLC and configure the module’s
ports for IO-Link communication see folders 1 and 2 of the AL1x2x PLC Schneider
guide found in the AL1x2x Startup Package.
2. The pages in this document explain basic instructions for:
a. Generic Input Process Data DFB Instructions. Use with any brand IO-Link device.
b. ifm specific DFB Instructions. Use with ifm IO-Link devices.
Note: For guides that detail importing the DFB Instructions to a project, assigning tags and
understanding specific sensor data see the AL1x2x_Unity_Setup.pdf in folder 2 of the AL1x2x PLC
Schneider guide in the AL1x2x Startup Package
3. An IO-Link acyclic Add_On Instruction is also available for reading and writing data to
IO-Link devices from the PLC. For specific instructions on using the Acyclic Command DFB
Instructions see the AL1x2x Acyclic Commands.pdf in folder 4 of the AL1x2x PLC
Schneider guide found in the AL1x2x Startup Package.
Basic instruction for Generic DFB Instructions
2
Data
Process
Diag
PQI
Examples Acyclic DFB Instruction and DFB list
4