REF CALCULATION OUTPUT
150 450
Area 550
Area 1 = 0.107 710.6
Area 2 = 0.026
175
Total area = 0.133

730
INPUT DATA:
fcu = 30 KN/m2 height of fascia = 550 mm
fy = 460 KN/m2 L, cantilever = 730 mm
fyv = 250 KN/m2 effective depth = 175 mm
Slab thickness = 200 mm b = 1000 mm
Fascia thickness = 150 mm

Loadings
Characteristic load Dead Load = 4.8 KN/m2
For W Finishes = 1.8 KN/m2
Live Load = 0 KN/m2

Characteristic load Dead Load = 3.19 KN/m2


For P

considered 1 m length
Design Load = 9.24 KN/m
Design point load = 4.46 KN

Bending Reinforcement
Moment = 5.72 KNm/m
k = 0.006
z = 166.3 mm
As(required) = 79 mm2/m
As (min) = 300 mm2/m
Main bar Distribution bar
Bar diameter = 10 mm Bar diameter = 10 mm Main bar
spacing = 200 mm spacing = 200 mm T10-200

As provided = 393 mm2 OK As provided = 393 mm2 OK Distr. bar


T10-200 T10-200 T10-200

Shear Check
V = 11.21 KN
v = 0.06 N/mm2
100As/bd = 0.22
Vc = 0.50 N/mm2 SHEAR OK !

Deflection check
Basic ratio = 7
L/d actual = 4
M/bd2 = 0.19
fs = 234
MF = 2.00
L/d allow = 14.00 DEFLECTION OK!
11/9/19

OUTPUT

Main bar
T10-200

Distr. bar
T10-200
SMHB Sdn. Bhd Job No. 1023
Jurutera Perunding CALC SHEET NO.:
JOB NAME : CENTRALISED SEWAGE TREATMENT PLANT CALCULATIONS BY: ASM Date 10/18/2019
STRUCTURE : REFUSE CHAMBER CHECKED BY: Date
SECTION : APRON REVIEWED BY: Date
REF CALCULATION OUTPUT
CANTILEVER SLAB

100

1150
INPUT DATA:
fcu = 30 KN/m2
fy = 500 KN/m2 L, cantilever = 1150 mm
fyv = 500 KN/m2 effective depth = 90 mm
Slab thickness = 100 mm b = 1000 mm

Loadings
Characteristic load Dead Load = 2.4 KN/m2
Live Load = 1.5 KN/m2

considered 1 m length
Design Load = 5.76 KN/m

Bending Reinforcement

Moment = 3.81 KNm/m


k = 0.02
z = 85.5 mm
As(required) = 102 mm2/m
As (min) = 150 mm2/m

Main bar Distribution bar


Bar diameter = 10 mm Bar diameter = 10 mm Main bar
spacing = 200 mm spacing = 200 mm T10-200

As provided = 393 mm2 OK As provided = 393 mm2 OK Dist. bar


T10-200 T10-200 T10-200

Shear Check
V = 6.62 KN
v = 0.07 N/mm2
100As/bd = 0.44
Vc = 0.74 N/mm2 SHEAR OK !

Deflection check
Basic ratio = 7
L/d actual = 12.78
M/bd2 = 0.47
fs = 119
MF = 2.00
L/d allow = 14.00 DEFLECTION OK!