Sie sind auf Seite 1von 5

E-Business Dot Com Pvt.Ltd.

Block No 7 & 8, Sarda House,


14/2 ,South Tukoganj,
Indore (MP) 452001
India

“E- Procurement of Logistics Services of JMC PROJECT (INDIA) LTD from various
locations.”
Buyer:

JMC PROJECT (INDIA) LTD


Date: 4TH JULY 2018
Auction Conducted By:

www.Steelez.net

Due Date & Time of Submission of RFQ in Scan & Hard Copy

On or before 4TH JULY 2018

Date & Time of Online Auctions


Date: 4th JULY 2018
Time: 3.00PM TO 4.00PM
CONTRACT COMMENCEMENT: IMMEDIATE EFFECT

Highly Confidential:

The enclosed document is meant for limited circulation. Individuals in receipt of this document without specific
authorization from Steelez.net, are requested to return the same without accessing/ duplicating its contents.
E-Business Dot Com Pvt.Ltd.
Block No 7 & 8, Sarda House,
14/2 ,South Tukoganj,
Indore (MP) 452001
India

E- Procurement of Logistics Services of JMC PROJECT (INDIA) LTD.

1 OVERVIEW OF THE SERVICE PROVIDER & THE CLIENT

Steelez.net e-Trans - your platform on the web for all kinds of logistics solutions
About Steelez.net for your business. Functioning on the reverse auction model, Steelez.com e-
1.01
Trans ensures your business gets the advantage of operational performance
from professional service provider’s at the most competitive prices possible.

Over the last 3 decades, JMC has been instrumental in making our country
infrastructure more efficient through building & integrating terrains and
cityscapes. JMC has constructed landmark edifices across the country. JMC
About JMC touches our lives through landmark edifices including highways, expressways,
1.02 PROJECT (INDIA) bridges, flyovers, townships, tall buildings, hospitals, industrial units, power
LTD plants etc. Of late, the company has started expanding vistas by taking orders
from international counterparts. We strive to achieve excellence through
speedy execution, cost efficiency, management of sustainability concerns,
safety and all regulatory compliances etc.
JMC PROJECT (INDIA) LTD
JMC PROJECT
1.03 (INDIA) LTD 6th Floor, Kalpataru Synergy, Opp. Grand Hyatt, Santacruz (East), Mumbai
PLANT ADDRESS 400055

Mrs. Nidhi Sabarwal


Phone: 9752492139 (M)
0731-4715401
Email ID: nidhi@steelez.com

Mrs. Kavita Tiwari


Phone: 9752492131 (M)
Project Auction 0731-4715402
1.04 Contact:
Email ID: kavita@steelez.com
Steelez.net

Address -
eBusiness Dot Com Pvt.Ltd.
Block No 7 & 8 ,Sarda House,
14/2 ,South Tukoganj,
Indore (MP) 452001
India
E-Business Dot Com Pvt.Ltd.
Block No 7 & 8, Sarda House,
14/2 ,South Tukoganj,
Indore (MP) 452001
India

1. To participate in the online Auctions, interested Service provider are


requested to submit this RFQ (duly stamped and signed in all pages) along
with refundable / adjustable Earnest Money Deposit (EMD) of Rs. 50,000
(Rs. Fifty Thouand) payable by Demand Draft in favor of “eBusiness Dot
Com Pvt Ltd” payable at Indore and submit the physical instrument at
Steelez as per the Address & Contact persons mentioned in Clause No. –
1.04, latest by 04th JULY 18, failing which the participation in the bidding
will not be allowed or deposit the same in:
NAME: e-Business Dotcom Pvt. Ltd.
HDFC BANK A/C No.- 00362560011912
ADDRESS: UG-1&2, TRADE HOUSE
SOUTH TUKOGANJ,
INDORE MADHYA PRADESH
452001
1.05 Earnest Money
Deposit and Bank IFSC CODE: HDFC0000036
Guarantee BRANCH CODE: 000036

2. Existing service provider of JMC PROJECT (INDIA) LTD need to submit a


declaration in their Company Letter Head mentioning the equivalent EMD
amount to be considered from their outstanding bills.
3. The successful service provider shall have to submit a SD of Rs. 1,00,000
(One lakh Only) in the name of “JMC PROJECT (INDIA) LTD “
4. JMC needs SD of 1,00,000 immediately after approval OR ELSE EMD will
be forfeited, Contract will be null and void & we will award contract to
alternate source.
5. There will be no interest on EMD/SD.
6. EMD shall be forfeited if H1 party fails to place the vehicles.

1.06 VALIDITY PRICES SHALL BE FIRM FOR IMMEDIATE CONTRACT.

Route List for today's auction dated 04th JULY 2018 : JMC Projects from 3 to 4pm
E-Business Dot Com Pvt.Ltd.
Block No 7 & 8, Sarda House,
14/2 ,South Tukoganj,
Indore (MP) 452001
India

PLS FIND THE EXCEL FILE FOR DESTINATION ROUTES

JMC PROJECT (INDIA) LTD


TRANSPORTATION CONTRACT TERMS AND CONDITIONS

1. Payment
Payment of the bills shall be released within 60 days from receipt of bills duly supported by clear receipt from the
consignee, in absence of which payment shall be withheld till confirmation of receipt of material by the consignee.

2. Supply of Vehicle for outgoing material


Vehicle shall be supplied within Twenty-four (24) hours from our intimation on E-mail. Vehicle shall report at
loading location before 12.00 pm. Failure in reporting of Vehicle before stipulated time may result in loading on
next working day. If Vehicle are not arranged within 2 days from our intimation, we shall arrange from other
transporter and any additional cost shall be recovered from your outstanding. No Vehicle shall be loaded /
unloaded on Sundays & Holidays unless prior intimation is given by the transporter and loading / unloading
arrangements are confirmed by us.

3. Shortage / Damage
It shall be sole responsibility of transporter to deliver the material to consignee within the reasonable time in full
and in intact condition. Any loss suffered due to shortage, damage or transit delay shall be to the transporter’s
account. Material shall be reconciled based on number of pieces and not tonnage.

4. Detention of Vehicle
Any detention caused to Incoming / Outgoing Vehicle in our factory under any circumstances & force-majeure shall
not be entertained. Under no circumstances any consignment, in part or full, shall be detained or unloaded by
transporter in his godown for any reason or dispute. In case any transporter does so, Company shall take legal
action against such erring transporter and recover material cost and other loss suffered by the Company. Company
reserves the right of imposing penalty for Detention / Unloading of consignment enroute and same shall be
recovered from transporter’s pending bills, security deposit or by any other legal means

5. Subcontract
Subcontracting to any other transporter by you is prohibited under this contract.

6. Awarding Contract to other transporter


Company reserves its right to transfer a part or balance quantity of the contract to any other transporter without
assigning any reason or compensation in case transporter is unable to lift the material or fulfill contractual
obligations of the contract.

7. Weight
Weight as per supplier’s invoice shall be considered final for billing

8. Taxes and Duties


Transporter shall comply with all applicable provisions provided in CGST / SGST / IGST as applicable.
E-Business Dot Com Pvt.Ltd.
Block No 7 & 8, Sarda House,
14/2 ,South Tukoganj,
Indore (MP) 452001
India

9. Termination
In case Company feels that the services of transport are not satisfactory, Company reserves its right to cancel the
contract and forfeit the security deposit and also recover losses from the transporter for nonfulfillment of
contractual obligations.

10. Liability
Company shall not be liable in case of any accident or damage to the vehicle directly or indirectly occurred or
caused, sustained or incurred in the event of death of person(s) employed by the contractor during execution of the
contract.

11. Penalty
11.1 – Placement of Vehicle
Timely delivery of material is essence of this contract. Post receipt of intimation from our procurement department
you shall arrange Vehicle to lift material within 24 hours. In case of failure to lift material within required time
penalty at the rate of Rs. 100/- per day per tonne shall be levied and recovered from you. Repeated failure would
be treated as breach of contract and losses incurred will be recovered from your outstanding or security deposit;
further company reserves right to terminate contract.
11.2 – Transit Time
Standard Transit time (including grace period) within Chhattisgarh state is 2 days and from outside state is 5 days
from the date of LR till physical delivery at our plant. In case of failure in delivery of material within standard transit
time, a penalty of Rs. 100/- per day per tonne shall be levied and recovered from you.

12. Return Journey Cost


Transportation charges indicated therein do not include cost of transportation for the return journey of the empty
Vehicle/ vehicle, the deduction of the said transportation charges will not be admissible.

13. Transit Insurance


JMC shall arrange for transit insurance

14. Transshipment
Transshipment of material not permitted except in case of breakdown of truck with prior permission from the
company.

15. Price Variation clause


Rates mentioned above shall remain firm for first six months from the date of this contract. Thereafter, Price Variation
clause would be applicable in case of any Increase / decrease in diesel price beyond 5% from the diesel price level as
on date of Contract. Increase / decrease in % diesel price beyond 5% shall be applicable on 35% of agreed Contract
price.
16. Jurisdiction
All disputes are Subject to Mumbai Jurisdiction only.

Regards,
SteelEZ Team

Das könnte Ihnen auch gefallen