Sie sind auf Seite 1von 4

CURRICULUM VITAE

Sarabjit Singh

Contact: +91-9988300220 E-Mail: sarabjit82@gmail.com

PROFESSIONAL SNAPSHOT
 B-Tech in Electrical Engineering from Punjab Technical University, Jalandhar in Year 2008.
 3-year Diploma in Electrical Engineering from Punjab State Board of Technical Education &
Industrial Training, Chandigarh in 2004.
 Currently working with M/s MACAWBER BEEKAY PVT LTD at GGSSTP Ropar as Assistant
Manager looking after whole Electrical system.(reflect some electrical position).
 A competent professional with more than 11 years of experience in electrical Operation and
Maintenance, Erection and Commissioning Field/electrical engineering field) WITH M/s
MACAWBER BEEKAY PVT LTD at different sites.
 Professional experience in Pressure Cum Pressure Pneumatic Conveying (low Velocity dense
phase) System for Bed, Coarse & Fine Ash along with Dome valve, Ash vessel, PD Pumps, D-
Pumps & K Pumps.
 Professional experience in High Concentrated Slurry disposal (HCSD) system.

WORK EXPERIENCE AND RESPONSIBILITIES

1. Worked as (Electrical) Electrical Trainee Engineer at Guru Gobind Singh Super Thermal Plant
GSSTP (6x210 MW) Ropar (Operation and Maintenance site), Punjab and Mejia Thermal Power
Station (4x210 MW), Durlabhpur, Bankura, West Bengal(Erection site) from 03.03.2008 to
05.05.2009.

CONTACT DETAILS AND REFERENCES:-

JASWINDER SINGH HUD (Manager at GGSSTP Ropar) -+918146665001, EMAIL-


jaswinderhud@yahoo.com

Position details of Jaswinder Singh. How is he related to you in workplace? Is he manager,


supervisor??

RESPONSIBILITIES:-

 As Shift Charge Engineer for smooth and uninterrupted Operation (Electrical, Mechanical
and Control & Instrumentation ) for ash handling package in thermal power plant.

 Preparation of As build PLC system for ash handling package in thermal power plants : - C & I
Cable schedules, PLC Configurations, TB Interconnection diagrams , IO List, Instrument hook up
drawings & Schedule etc.
 Reviewing existing systems , procedures and checks for various operational areas for Achieving
higher operational efficiency, resource rationalization, managing Resources and cost reduction.

 Strong Follow up for Day to day activities as per given schedule to complete targets.

2. Worked as ELECTRICAL Engineer (Where did you work?) From 06.05.2009 to 04.05.2013 at
Guru Gobind Singh Super Thermal Plant ( 6x210 Mw) Ropar (Operation and Maintenance site),
Chhabra Thermal Power Plant (3x250 MW), Baran (Erection and Commissioning site) Rajashtan and
KaliSindh Thermal Power Plant (2x600 MW), Jhalawar (Erection and Commissioning site) , Rajashtan.

CONTACT DETAILS AND REFERENCES:-

ROHIT VIJ - (Assistant Manager at GGSSTP, Ropar)+919815544593,EMAIL- er.rohitvij@gmail.com


DEV RAJ SINGH (Site Incharge at Jhalawar)- +919587880872, EMAIL- devraj1982@gmail.com

Position details of Rohit Vij and Dev Raj Singh. How is he related to you in workplace? Is he manager,
supervisor??

RESPONSIBILITIES:-

 Key player in scheduling, planning and implementing Preventive & Defect Maintenance to
ensure Smooth Functioning of all equipment’s in power plant & Introduced a well chalked out
program of condition monitoring and rectification of defects of critical machinery identified through
it.
 Maintaining Mandatory Spares & Planning for Manpower to achieve the zero breakdowns in
running plant during O&M.
 Attending for Emergency Breakdowns.
 Directing site execution activities involving erection & commissioning of electrical e.g.
High Tension/Low Tension (HT/LT) Motor Circuit Control, HT/LT Transformers, HT/LT , Bus
Ducts, Uninterrupted Power Supply (UPS) , Direct Current (DC) Chargers, Cable tray, Earthing,
Lighting, Programmable Logic Control PLC (Full form), Relay Based Control Panels, Alternating
Current/Direct Current AC/DC (Full form), Distribution Boards, HT/LT Motors, HT/LT Cables, AC &
Ventilation System.
 Close tie-up with different agencies for project execution at project site with client & Head
office.
 Directing site execution activities involving erection & commissioning of Mechanical e.g.
Water, Slurry & Vacuum Pumps, reciprocating & screw compressors, Fludizing Blowers, Bag filters,
Hydro ejectors, fluid couplings & Gear boxes, Bottom & Buffer Hoppers, Clinker grinders, EOT
Cranes, Central AC & Ventilation Fans etc.

3. Worked as SENIOR ELECTRICAL Engineer (Where did you work?) From 06.05.2013 to
05.09.2018 at Guru Gobind Singh Super Thermal Plant(6x210 Mw) Ropar, Talwandi Sabo Super
Critical Thermal Power Plant (3x660 MW), Bathinda.

CONTACT DETAILS AND REFERENCES:-

PARVEEN SINGH (Manager at Talwandi Sabo Super Critical Power Plant) -+917986075961, EMAIL-
salaria.parveen@gmail.com

Position details of Parveen Singh. How is he related to you in workplace? Is he manager, supervisor??
RESPONSIBILITIES:-

 Analysis of Functional Requirements of the project & co-ordinate with the Higher Management
(Head office) for the short supplies & other miscellaneous requirements.
 Developing on-site and off-site Emergency Management Plans and conduct safety drills
periodically to familiarize the personnel with Emergency Management Plans & ensuring compliance
to Health Safety Norms to minimize/achieve ZERO accidents through appropriate fire protection
system, safety equipment’s & Practice.

 Preparation of As build Electrical Layouts for ash handling package in thermal power plants :-
Cable Tray & Equipment layout, Earthing Layout, Lighting Layout, Lightning Layout etc.

 Preparation of As build Electrical Drawings for ash handling package in thermal power plants :-
Key SLD & HT & LT Power cable schedules, HT Switch Gear & LT PMCC/MCC Schematic modified
wiring drawings etc.

 Proficient in Troubleshooting & Testing of HT & LT (Full form) Switchgear, HT & LT Motors, UPS
(Full form) & Distribution Transformers pressure transmitters, IP controllers, power cylinders,
actuators, RTD, temperature scanners, level transmitters, level switches, and pressure switches
instruments used in automation.etc. Also Arranged Timely Calibration of all instruments/relays
for complete reliability and functional correctness.

 Introduced several Modifications to reduce incidences of breakdowns.

4. Worked as ASSISTANT MANAGER (Where did you work?) From 06.09.2018 to TILL DATE at
Guru Gobind Singh Super Thermal Plant ( 6x210 Mw) Ropar( Operation and Maintenance Site) Punjab.

CONTACT DETAILS AND REFERENCES:-

DOST DALJIT SINGH (Site Incharge at Guru Gobind Singh Super Thermal Plant)+919269400100,
EMAIL-dostdaljit.mbpl@yahoo.in

Position details of Daljit Singh. How is he related to you in workplace? Is he manager, supervisor??

RESPONSIBILITIES:-
 Over all responsible for preparation of Field Quality Reports, taking remedial measures,
providing Slippage Solutions, daily & weekly Progress Monitoring Reports on regular basis to
keep in control of risk management. Propagated Quality Circle movement and developed quality
culture in the work force to achieve quality leadership in the industry.

 To co-ordinate with Labour commissioner’s office, Director Factories office to compliance the
Labour laws & Factory acts.
 To co-ordinate with the Accounts department for the site fund requirement, contractor
payments & other miscellaneous commercial activities.

 Ensured maintenance of clean & green work ambience for hygiene/aesthetic appeals.

 To co-ordinate with users of fly ash i.e M/s Ambuja Cement, M/s ACC, and other small scale
cement & brick manufacturers.

Your Job responsibilities as Assistant Manager does not reflect that you are doing any
electrical related work
PERSONAL DOSSIER

Date of Birth : 27-04-1982.

Marital status : Married

Language known : Hindi, English, Punjabi.

Permanent Address : #220, Vasant vihar, D.C road,Hoshiarpur (Punjab)

Academic Qualification : 10+2 from Punjab school Education Board, Mohali(Pb.),

I hereby certify that the above-mentioned information is correct & true to the best of my
knowledge.

Date : (Sarabjit Singh)

Das könnte Ihnen auch gefallen