Beruflich Dokumente
Kultur Dokumente
UNSWAGATI CIREBON
JOURNAL
STRUCTURE ANALYSIS OF TRANSMART CARREFOUR
CIREBON BUILDING USING BETON STRUCTURE SNI 2847
2013
*Reza Agung Susanto** Aryati Indah K., ST., MT.*
*) Student of Civil Engineering Department Faculty of Engineering Universitas Swadaya Gunung Jati
Cirebon
**) Lecturer at Civil Engineering Department Faculty of Engineering Universitas Swadaya Gunung Jati
Cirebon
ABSTRACT
Cirebon is one of the regencies located in West Java Province. Cirebon is one of the districts
that experienced a fairly rapid development in the field of Economy, Culture, Education, and Building
Development in support of its development process.
Building Construction in Cirebon, there is Structural Analysis which is used as a way or system
to achieve Development as planned.
Transmart is a retail company in Indonesia which is the owner of the Carrefour supermarket
chain and Carrefour Express. Currently, Transmart is one of the subsidiaries of Trans Retail. Carrefour
in Indonesia was present since 1996 by opening its first outlet in Cempaka Putih in October 1998. At the
same time, Continent as a French retail company, opened its first store in Festival. In 1999, Continent
and Promodes (as the main shareholder of Continent) combined all retail business activities worldwide
under the name Carrefour. It makes Carrefour the second largest retailer in the world. As part of a
global company, PT. Carrefour Indonesia strives to deliver world class service standards in Indonesia's
retail industry. Carrefour Indonesia introduced the hypermarket concept and provided a new shopping
alternative in Indonesia for customers
Carrefour Indonesia. Carrefour offers the concept of "One-Stop Shopping" which offers a place of
choice with diverse products, low prices, and also provides the best service to exceed customer
expectations.
PT Trans Retail Indonesia launched Transmart Carrefour Super Center in Cirebon City,
Friday, October 25, 2016. Shopping center that combines hypermarket, entertainment, food, and fashion
in this one region take the middle to upper segment. Transmart Carrefour in Cirebon City occupies three
floors which is a former Carrefour outlet that combines family shopping center with the lifestyle of
modern society. In addition to household necessities, these outlets are available electronics centers,
international brand clothing stores, children's playgrounds and indoor restaurant areas. Currently,
Carrefour already operates in 86 outlets and spread across 28 cities / districts in Indonesia. And
Transmart Carrefour in Cirebon City is occupying the 86th storey after Transmart outlets located in the
City of Tegal.
The development of Transmart Carrefour Cirebon uses a concrete structure based on the
criteria of addressing and service excellence then in the planning of this Transmart Cirebon using SNI
1727 - 2013 while the building structure design refers to SNI - 2847-2013 reinforced concrete, which is a
regulation that has been adapted to the development of technology the latest materials with reference to
AISC, in addition to the earthquake engineering calculations using SNI 1726 - 2013.
1
Analisis Struktur Gedung Transmart Carrefour Cirebon dengan Menggunakan Struktur Beton SNI
2847 2013
2
Reza Agung Susanto,Aryati Indah K., ST., MT.
3
Analisis Struktur Gedung Transmart Carrefour Cirebon dengan Menggunakan Struktur Beton SNI
2847 2013
a. ETABS V.9.0.6.
b. Microsoft Excel
c. AutoCad 2013
BAB III
RESEARCH METHODS
A. RESEARCH METHODS
1. Looking for data in form, existing data
in the form of land area of building
area and function of building to be
planned.
2. Study the literature by collecting
reverensi and methods needed as a
literature review either from books or Picture 3.1 Flow Chart Kerangka Alur
other media (internet). Penelitian
3. Processing and analysis of data
obtained.
4. Transmart Carrefour Cirebon Building C. TYPES AND SOURCES OF DATA
Planning. Based on the origin of the data grouped in:
5. SNI loading 1727-2013. a. Primary Data
6. Taking conclusions and suggestions Primary data is data obtained from
from the results of the study measurement and observation directly in the
field.
B. METHOD USED b. Secondary Data
Secondary data is data obtained from
The research method used is quantitative and
other sources such as government agencies,
qualitative methods, the definition is like this:
private, and individuals who have made
observations directly in the field. For the final
project planning of Transmart Carrefour Cirebon
4
Reza Agung Susanto,Aryati Indah K., ST., MT.
E. ANALYSIS METHODS
Regarding the methods and methods of data
processing that will be used will be discussed in Picture 4.1 Modele Structure Transmart
more detail in separate chapters. This is done 3. The output torque caused by the
because this stage is very important and decisive earthquake
in the design of a building design. The
discussions reviewed will be more detailed and
specific so that required a separate chapter in the
effort of drawing conclusions.
Stages of data analysis used in this paper are
as follows:
a. Calculation of loading
1) Dead load
2) Live load
3) Load Structure
b. Calculation of the structure of the
building
Picture 4.2 The moment of the X Direction due to
1) Plat Dimension the Spectrum Response Earthquake
2) Beam Dimensions
5
Analisis Struktur Gedung Transmart Carrefour Cirebon dengan Menggunakan Struktur Beton SNI
2847 2013
Table 4.2.
Picture 4.3 The moment of the Y Direction due to Comparison of Etabs Beam Calculation Results
the Spectrum Response Earthquake with Manual
6
Reza Agung Susanto,Aryati Indah K., ST., MT.
7
Analisis Struktur Gedung Transmart Carrefour Cirebon dengan Menggunakan Struktur Beton SNI
2847 2013
Requirements for the design of Building Aries Saputra, “Analisis Struktr Gedung Rumah
SNI 1727-2013, and Procedures for Sakit Permata Cirebon” (skripsi)
Earthquake Planning for Building Universitas Swadaya Gunung Jati
Structure SNI 1726-2012 apply. Cirebon, 2011
b. Before structural planning should be
made an initial estimate on the size of the Arka Reka Struktur Grup, 2014 “Aplikasi
structure element, so that there is no Perencanaan Struktur Gedung
determination of structural elements dengan ETABS” Jakarta, Arka
repeatedly. Reka Struktur Grup
c. In the design of structural elements such
as the reinforcement of plates, beams and Rury Mahendra Persada, “Analisis Perencanaan
columns should be used almost uniform Struktur Hotel Dialog Grage
size to facilitate the implementation of Cirebon Menggunakan Struktur
work in the field and still follow the Rules Beton SNI 2013” (skripsi)
of SNI 2013. Universitas Swadaya Gunung
d. In performing data input in the ETABS Jatu Cirebon, 2012
program should be done carefully in
accordance with the assumptions that Drs. Saefudin ; Drs. Djamaluddin, 1999,
have been established before that can be Konstruksi Beton Bertulang,
produced analysis of structures close to Bandung, Angkasa,
the actual situation.
e. We recommend the use of software Ir. Kh Sunggono, 1984, Teknik Sipil, Bandung,
application structural analysis coupled Nova.
with manual counts as a comparison,
because the vulnerability of incorrect Cahya Indra, 1999, Beton Bertulang, Malang.
input or modeling in software
applications, due to lack of accuracy of Noor Cholis Idham,Ph.D,IAI, 2014, Prinsip-
the user. Prinsip Desain Arsitektur Tahan
Gempa, Yogyakarta, Andi
BIBLIOGRAPHY Yogyakarta.