ABSTRACT OF COST

Name of Work: - Restoration/removal of snow on Bathri Sundla J&K Boundary road Km. 28/0 to 93/400

(SH:- Hiring of JCB for removal of Snow at R.D.

Sr. No. Description /items of work. Quantity Unit Rate Amount.

1 Hiring of J.C.B./Excavator for removal of snow of all kind i.e. hard/loose and Hours Per Hour
disposing of snow from road surface upto any leads and lifts up to any height
and depth as per direction and entire satisfactions of Engineer-in-Charge.
The machine/J.C.B. should work minimum 8.00 hours daily and excavate at
least 600.00 Cum. quantity of snow per hour. Any loss to the public/private
property or any accident etc. happened during the course of hiring
period/execution shall be the absolute responsibility of the J.C.B./Exacavator
owner which shall have to be fully compensated by the contrator in all cases.
The fuel and operational staff for machinery will be provided by the owner.
The repair and spare, watch and ward of machinery also be borne by the
contractor/owner. The daily log book will be maintained at site which should
be duly verified by the Engineer-in-Charge.

Total:-
Draft Schedule of Quantity Estimated cost: Rs. 43138/-
Name of work:-A/R & M/O Chamba Tissa road Km 32/250 to 56/500. (S.H:-Providing and Earnest money: Rs. 870/-
applying painting on Sarella Nallah Bridge and Pangola Nallah Bridge)
Time : One Month.
Rate
S. No. Description /items of work. Quantity In figure In words Unit Amount

1 Providing and applying two coats of ready mix paint of approved 660.82 Sqm. 56.20 Rupees Fifty Six Per square 37138.00
brand on old steel surface after through cleaning of surface to give And Paise Twenty metre
an even shade as per drawing and Technical Specification Clause Only
1701 or as per direction of Engineer-in-Charge including carriage
of materials within all leads and lifts and other incidentals.The rate
includes octroi, royality, Malkana, toll tax ,sales tax, G.S.T. or any
other taxes imposed by the Government.

2 Providing and applying two coats of synthetic enamel paint in all 99.25 Sqm. 60.45 Rupees Sixty And Per square 6000.00
sahde of approved brand on old concrete masonary/plaster etc. Paise Forty Five metre
after through cleaning of surface to give an even shade as per Only
drawing and Technical Specification clause 1701 or as per direction
of Engineer-in-Charge including carriage of materials within all
leads and lifts and other incidentals.The rate includes octroi,
royality, Malkana, toll tax ,sales tax, G.S.T. or any other taxes
imposed by the Government.

Total 43138.00
DRAFT SCHEDULE OF QUANTITY
Estimate cost- 49581.00
Name of Work: - Restoration of rain /snow damages on varous roads under Tissa Sub Division. Earnest money- Rs. 1000/-
Sub Head: - Hiring of JCB for removal of Slip / snow at vario Time limit- One month

Sr. Description /items of work. Quantity Unit Rate in Amount.


No. Figures Words
1 Hiring of J.C.B./Excavator for removal of snow of all kind 63.00 Hours Per 787.00 Rupees seven 49581.00
i.e. hard/loose and disposing of snow from road surface Hour hundred eighty
upto any leads and lifts up to any height and depth as per seven.
direction and entire satisfactions of Engineer-in-Charge.
The machine/J.C.B. should work minimum 8.00 hours
daily and excavate at least 600.00 Cum. quantity of snow
per hour. Any loss to the public/private property or any
accident etc. happened during the course of hiring
period/execution shall be the absolute responsibility of the
J.C.B./Exacavator owner which shall have to be fully
compensated by the contrator in all cases. The fuel and
operational staff for machinery will be provided by the
owner. The repair and spare, watch and ward of
machinery also be borne by the contractor/owner. The
daily log book will be maintained at site which should be
duly verified by the Engineer-in-Charge.

Total:- 49581.00
DRAFT SCHEDULE OF QUANTITY Estimate cost-
Name of Work:- Restoration/removal of snow on Earnest money-
Sub Head: - Hiring of JCB/Excavator for removal of snow in Time limit- One month

Sr. Description /items of work. Quantity Unit Rate in Amount.


No. Figures Words
1 Hiring of J.C.B./Excavator for removal of snow of all kind i.e.
hard/loose and disposing of snow from road surface upto
any leads and lifts up to any height and depth as per
direction and entire satisfactions of Engineer-in-Charge. The
machine/J.C.B. should work minimum 8.00 hours daily and
excavate at least 600.00 Cum. quantity of snow per hour.
Any loss to the public/private property or any accident etc.
happened during the course of hiring period/execution shall
be the absolute responsibility of the J.C.B./Exacavator
owner which shall have to be fully compensated by the
contrator in all cases. The fuel and operational staff for
machinery will be provided by the owner. The repair and
spare, watch and ward of machinery also be borne by the
contractor/owner. The daily log book will be maintained at
site which should be duly verified by the Engineer-in-
Charge.

Total:-
DNIT

Name of Work:- Restoration of rain damages on Chamba Tissa road KM 32/250 to 48/0 Estimated cost- 49950/-

Earnest money- 1000/-


(Sub Head:- Hiring of Excavator cum Loader/Poke lane for removal of slips at various RDs) Time limit- One month

Sr. Rate in
Description /items of work. Quantity Unit Amount.
No. Figures Words
1 Hiring of Excavator cum loader/ Pock Lane (Tata Hitachi) for 45.00 Hours Per hour 1100.00 Rupees One 49500.00
removal of slips, debries and boulders clear from road surface thousand one
upto any height and depth in all kind and classification of soil hundred and paise
including rocky portion and saturated soil and then disposalof un- zero only
serviceable materials from road surface upto any leads and
lifts,upto any height and depth as per direction and entire
satisfactions of Engineer-in-Charge.The Excavator cum Pock
Lane(Tata Hitachi) should work minimum 8.00 hours from 9.00 AM
to 5.00 PM daily and excavate at least 100 cum. quantity of
snow/slips as per hour. Any loss to the public/private property or
any accident etc. happened during the course of hiring
period/execution shall be the absolute responsibility of the
Exacavator cum Pock Lane(Tata Hitachi) owner, which shall have
to be fully compensated by the contrator in all cases. The fuel and
operational staff for machinery will be provided by the owner. The
repair and spare, watch and ward of machinery also be borne by
the contractor/owner. The daily log book will be maintained at site
which should be duly verified by the Engineer-in-Charge.

Total:- 49500.00

Assistant Engineer
Nakrot Sub- Division
HPPWD Nakrot.
DNIT
Name of Work:- Restoration of rain damages on Nakrot Tikkrigarh to Bagheigarh road KM 0/0 to 15/0 Estimated cost- 49950/-
Earnest money- 1000/-
(Sub Head:- Hiring of Excavator cum Loader/Poke lane for removal of slips at various RDs)
Time limit- One month
Sr. Rate in
Description /items of work. Quantity Unit Amount.
No. Figures Words
1 Hiring of Excavator cum loader/ Pock Lane (Tata Hitachi) for 45.00 Hours Per hour 1100.00 Rupees One 49500.00
removal of slips, debries and boulders clear from road surface thousand one
upto any height and depth in all kind and classification of soil hundred and paise
including rocky portion and saturated soil and then disposalof un- zero only
serviceable materials from road surface upto any leads and
lifts,upto any height and depth as per direction and entire
satisfactions of Engineer-in-Charge.The Excavator cum Pock
Lane(Tata Hitachi) should work minimum 8.00 hours from 9.00 AM
to 5.00 PM daily and excavate at least 100 cum. quantity of
snow/slips as per hour. Any loss to the public/private property or
any accident etc. happened during the course of hiring
period/execution shall be the absolute responsibility of the
Exacavator cum Pock Lane(Tata Hitachi) owner, which shall have
to be fully compensated by the contrator in all cases. The fuel and
operational staff for machinery will be provided by the owner. The
repair and spare, watch and ward of machinery also be borne by
the contractor/owner. The daily log book will be maintained at site
which should be duly verified by the Engineer-in-Charge.

Total:- 49500.00

Assistant Engineer
Nakrot Sub- Division
HPPWD Nakrot.
DRAFT SCHEDULE OF QUANTITY
Estimate cost- 46800.00
Name of Work: - Construction of 42.73 metre span Bailley Bridge oiver river Chander Bagha on Saichu Earnest money- 936.00
Nallah on Saichu to Chasak Bhatori road. Time limit- Two month
Sub Head: - Hiring of JCB/Excavator for launching of Bailley Bridge).

Sr. No. Description /items of work. Quantity Unit Rate in Amount.


Figures Words
1 2 3 4 5 6 7
1 Hiring of J.C.B./Excavator for cutting/widening work for launching Bailley 90.00 Hours Per 520.00 Rupees: - five 46800.00
Bridge in kinds of soil suach as pick work, jumper work, soft work, hard rock Hours hundred twenty
blasting work chiselling/wedging out of rock where blasting in prohibted & paise zero)
including rocky portion and saturated soil up to any height and depth as per only
direction and entire satisfactions of Engineer-in-Charge. The machine/J.C.B.
should work minimum 8.00 hours from 9.00 AM to 5: 00PM daily and
excavate at least 40.00 Cum. quantity of slips per hour. Any loss to the
public/private property or any accident etc. happened during the course of
hiring period/execution shall be the absolute responsibility of the
J.C.B./Exacavator owner which shall have to be fully compensated by him in
all cases. The fule and operational staff for Excavator will be provided by the
owner. The repair and spare, watch and ward of Excavator also be borne by
the contractor/owner. The daily log book will be maintained at site which
should be duly verified by the Engineer-in-Charge.

Total:- 46800.00
DNIT
Name of Work:- Restoration of rain damages on Tissa Ganed Bihali road KM 0/0 to 10/0. Estimate cost- 49500/-
Earnest money- 1000/-
(Sub Head:- Hiring of Pick-up for shifiting of material at various RDs ).
Time limit- One month

Sr. Rate in
Description /items of work. Quantity Unit Amount.
No. Figures Words
1 Hiring of Pick-up having 1.35 cum. per trip capacity for shifiting of 33.00 Days Per 1500.00 Rupees One 49500.00
construction material or earth upto allleads as perdirections and entire Day thousand five
satisfaction of Engineer-in-Charge. Any loss to the public/private property hundred and
or any accident etc. happened during the course of hiring paise zero only
period/execution shall be the absolute responsibility of the Exacavator
cum Pock Lane(Tata Hitachi) owner, which shall have to be fully
compensated by the contrator in all cases. The fuel and operational staff
for machinery will be provided by the owner. The repair and spare, watch
and ward of machinery also be borne by the contractor/owner. The daily
log book will be maintained at site which should be duly verified by the
Engineer-in-Charge.

Total:- 49500.00

Assistant Engineer
Tissa Sub Division
HP PWD Tissa
DNIT
Estimate cost- 49500/-
Name of Work:- Restoration of rain damages on various roads under Tissa Sub Division HPPWD Tissa.
Earnest money- 1000/-

(Sub Head:- Hiring of Tipper for shifiting of material/muck at various RDs). Time limit- One month

Sr. Rate in
Description /items of work. Quantity Unit Amount.
No. Figures Words
1 Hiring of Tipper having 5.5 cum. per trip capacity for shifiting of 180.00 Hours Per 275.00 Rupees Two 49500.00
construction material or earth upto all leads as perdirections and Hour Hundred Seventy
entire satisfaction of Engineer-in-Charge. Any loss to the public/private Five Only
property or any accident etc. happened during the course of hiring
period/execution shall be the absolute responsibility of the Tipper
owner, which shall have to be fully compensated by the contrator in all
cases. The fuel and operational staff for machinery will be provided by
the owner. The repair and spare, watch and ward of machinery also
be borne by the contractor/owner. The daily log book will be
maintained at site which should be duly verified by the Engineer-in-
Charge.

Total:- 49500.00
DNIT

Name of Work:- Restoration of rain damages on Tissa Ganed Bihali road KM 0/0 to 17/780 Estimate cost- 48300/-
Earnest money- 966/-
(Sub Head:- Hiring of Tractor for shifiting of material/muck)
Time limit- One month
Sr. Description /items of work. Quantity Unit Rate in Amount.
No. Figures Words
1 Hiring of tractor with trolley for transportation of material/earth at site of 140.00 Hours Per 345.00 Rupees One 48300.00
work including cost of P.O.L. Complete within all leads and lifts as per the hour thousand one
direction of Engineer-in-charge. Anyloss to the public/private property or hundred only
any accident etc. happened during the course of hiring period/excavation
shall be the absolutely responsbility of the owner of the machinery which
shall have to be compensated by the conteractor in all cases. The fuel and
operational staff for machine will be provided by the owner at his own cost
and repair & spair,watch and ward of the machine will also be borne by the
conteractor/owner. The daily log book will be maintained at site which shall
be duly verified by the Engineer-in-Charge.

Total:- 48300.00

Assistant Engineer
Nakrot Sub Division
HP PWD Nakrot .
DNIT

Name of work:- Restoration of rain/snow damages on various roads under Trella Sub-Division HPPWD
Bairagarh. Estimate cost-
Earnest money-
(Sub Head:- Hiring of JCB for removel of slips/snow at various RDs. )
Time limit-
Sr. Description /items of work. Quantity Unit Rate in
No.
Figures Words
1 Hiring of J.C.B./Excavator cum loader for removal of snow of all kind i.e. 63.00 Per hour 787.00 Rupees seven
hard/loose or removal of slips in all kinds of soil and disposing of all hundred eighty
excavated earth/snow or un-servieable materials from road surface upto seven and paise
any leads and lifts up to any height and depth as per direction and entire zero only
satisfactions of Engineer-in-Charge. Any loss to the public/private
property or any accident etc. happened during the course of hiring
period/execution shall be the absolute responsibility of the
J.C.B./Exacavator owner which shall have to be fully compensated by the
contrator in all cases. The fuel and operational staff for machinery will be
provided by the owner. The repair and spare, watch and ward of
machinery also be borne by the contractor/owner. The daily log book will
be maintained at site which should be duly verified by the Engineer-in-
Charge.

Total:-

Assistant Engineer
Trella Sub- Division
HPPWD Bairagarh
49581/-
1000/-
One month
Amount.

49581.00

49581.00
DNIT

Name of work:- Restoration of rain/snow damages on various roads under Tissa Sub-Division HPPWD Tissa.
Estimate cost-
Earnest money-
(Sub Head:- Hiring of JCB for removel of slips/snow at various RDs. )
Time limit-
Sr. Description /items of work. Quantity Unit Rate in
No.
Figures Words
1 Hiring of J.C.B./Excavator cum loader for cutting/widening work of road or 63.00 Per hour 787.00 Rupees seven
removal of slips in all kinds of soil and disposing of all excavated earth or un- hundred eighty
servieable materials from road surface upto any leads and lifts up to any seven and paise
height and depth as per direction and entire satisfactions of Engineer-in- zero only
Charge. Any loss to the public/private property or any accident etc. happened
during the course of hiring period/execution shall be the absolute responsibility
of the J.C.B./Exacavator owner which shall have to be fully compensated by
the contrator in all cases. The fuel and operational staff for machinery will be
provided by the owner. The repair and spare, watch and ward of machinery
also be borne by the contractor/owner. The daily log book will be maintained at
site which should be duly verified by the Engineer-in-Charge.

Total:-
49581/-
1000/-
One month
Amount.

49581.00

49581.00
DNIT

Name of Work:- A/R & M/O various roads under Nakrot Sub-Division HPPWD Nakrot. (S.H.:- Supplying and
stacking of dual directional speed breaker).

Sr. Description /items of work. Quantity Unit


No.

1 Supplying and stacking of dual directional speed breaker 110.00 No Each


GL-07-06 having high intensity cube corner reflector
bounded/welded to impect resistant plastic ADC body of
colour yellow and black of size 250X345X50 mm (Two
hundred fifty in to three hundred forty five in to fifty
millimetre (height) providing with 4 (Four) steel
nails,shape of side body to interlocking pattern to keep
all speed breakers in a row including carriage of
materials with in all leads and lifts as per the direction of
Engineer-in-Charge.
D Nakrot. (S.H.:- Supplying and
Estimate cost- 49581/-
Earnest money- 1000/-
Time limit- One month
Rate in Amount.
Figures Words
450.00 Rupees four 49500.00
hundred fifty and
paise zero only

Total:- 49500.00

Assistant Engineer
Tissa Sub Division
HP PWD Tissa.
Abstract of cost

Name of Work:- Restoration of rain damages on Bathri Sundla Langera J & K boundary road KM 28/0 to 49/0.

(Sub Head:- Hiring of JCB)

Sr. Description /items of work. Quantity Unit Rate Amount.


No.
1 Hiring of J.C.B./Excavator cum loader for cutting/widening work of 45.00 Hours Per hour 1100.00 49500.00
road or removal of slips in all kinds of soil and disposing of all
excavated earth or un-servieable materials from road surface upto
any leads and lifts up to any height and depth as per direction and
entire satisfactions of Engineer-in-Charge. Any loss to the
public/private property or any accident etc. happened during the
course of hiring period/execution shall be the absolute
responsibility of the J.C.B./Exacavator owner which shall have to
be fully compensated by the contrator in all cases. The fuel and
operational staff for machinery will be provided by the owner. The
repair and spare, watch and ward of machinery also be borne by
the contractor/owner. The daily log book will be maintained at site
which should be duly verified by the Engineer-in-Charge.

Total 49500.00

Assistant Engineer
Salooni Sub Division
HP PWD Salooni.
DNIT
Name of Work:- A/R & M/O Bagheigarh Charda road KM 0/0 to 5/0. Estimate cost- 49513/-
Earnest money- 1000/-
(Sub Head:- Providing and laying premix carpet at RD 6/680 to 6/765).
Time limit- One month
Rate in
Sr. No. Description /items of work. Quantity Unit Amount.
Figures Words
1 Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distrubutor at 268.00 Per 12.25 Rupees twelve and 3283.00
the rate of 0.275 killogram.(zero point two seven five kilograme) per square metre on prepared granular Square paise twenty five only
surfaces treated with primer and cleaned with hydraulic brooms as per Technical Specification clause metre
503 including hauling of materils in all leasd and lifts as per entire statisfacation and direction of
Engineer-in Charge including carriage of materials with all leads and lifts and other incidentals. The rate
inclusive octroi,roality,malkana,toll tex,sale tax or other taxes imposed by the Government.

2 Providing,laying and rooling by manual means of open-graded pre mix carpet of 20mm (Twenty 268.00 Per 125.20 Rupees one hundred 33554.00
millimetre) compacted thickness composed of type-"B" 13.2 mm to 5.6 mm (Thirteen point two millimetrs Square twenty five and paise
to five point six millmetrs) aggregate at the rate of 0.27 Cum. (Zero point twenty seven cubic metre) metre twenty only
mixed with penetration grade VG-10 (VG-ten) bitumen at the rate of 14.6 kg. (Forteen point six
Kilograme) per ten square metre of road surface to required line ,grade and level two serve as wearing
course on a previuosly prepared base, including mixing and heating binder and aggregate in hot mix
plant 30/40 (thirty/forty) Ton per hour capacity tranporting mixed materials with tipper and laying with
paver finisher to required grade and camber and rolling with three wheel 80-100 (eighty-hundred) KN
static road roller finished to required level and grades to be followed by seal coat as perTechnical
Specification clause 508 and 511 of MORT & H specification including hauling of materils in all lead and
lifts as per entire statisfacation and direction of Engineer-in Charge excluding the cost of tack coat and
seal coat but including carriage of materials with all leads and lifts and other incidentals. The rate
inclusive octroi,roality,malkana,toll tex,sale tax or other taxes imposed by the Government. Rate is except
cost of bitumen which is to be provided by the Department free of cost.

3 Providing and laying seal coat for sealing the voids in a bitumenious surface laid to the specified 268.00 Per 47.30 Rupees forty seven 12676.00
level,grade and cross fall using type B as per Technical Specification clause 510 using bitumen grades Square and paise thirty only
VG-10 (VG-ten) at the rate of 6.8 Kg (six point eight kilograme) premixed with 0.06 (zero point zero six) metre
cubic metre of fine aggregate per ten square meters heated in hot mixed plant and laying manualy of
mixed matrials and rolling with power road roller 8-10 (eight-ten) Tonne capacity as per direction of
Engineer-in-Charge including carriage of materials,labour and equipment required to execute the work to
the site of work complete in all respect.The rate inclusive octroi,roality,malkana,toll tex,sale tax or other
taxes imposed by the Government. Rate is except cost of bitumen which is to be provided by the
Department free of cost.
Total 49513.00
SCHEDULE OF QUANTITY

Estimate cost- 480000/-


Name of Work:- i) C/o double lane bridge over Chanju Nallah on Chamba Tissa road (ii) C/o 16.75
Mtr. Span bridge over Baghei Nallah on Nakrod Tikarigarh Bagheigarh road (ii) C/o bridge over
Earnest money- 9600/-
Banjali Nallah on Tissa Ganed Bihali road. (Sub Head:-Providing Geo-technical investigation and
sub-surface exploration).
Time limit- One month
Sr. Description /items of work. Quantity Unit Rate in Amount.
No.
Figures Words

1 Carryout planning & monitoring geo-technical investigation and sub- 80.00 Mtr. Per
surface exploration at the proposed location of the bridge by drilling Rmt.
bore holes as per IS 2800-1979 using percussion/ catyx/ RC.
ODEX/method required for drilling in collapsible strata conglomerate
boulders, pebbles, sand, graval, silt,clay etc. including cost of
attachments extractable casing consumable stores, bits water, POL
gravel pack in annular space etc. complete in all respects as per
direction of Engineer-in-charge.

Total:-

Executive Engineer
Tissa Division HPPWD,
Tissa.
SCHEDULE OF QUANTITY

Estimate cost- 48000/-


Name of Work:-C/o double lane bridge over Chanju Nallah on Chamba Tissa road. (Sub Head:-
Earnest money- 960/-
Providing Geo-technical investigation and sub-surface exploration (Madhubar Side).
Time limit- One month
Sr. Description /items of work. Quantity Unit Rate in Amount.
No.
Figures Words

1 Carryout planning & monitoring geo-technical investigation and 8.00 Mtr. Per
sub-surface exploration at the proposed location of the bridge by Rmt.
drilling bore holes as per IS 2800-1979 using percussion/ catyx/
RC. ODEX/method required for drilling in collapsible strata
conglomerate boulders, pebbles, sand, graval, silt,clay etc.
including cost of attachments extractable casing consumable
stores, bits water, POL gravel pack in annular space etc. complete
in all respects as per direction of Engineer-in-charge.

Total:-
DRAFT SCHEDULE OF QUANTITY

Estimate cost-
Name of Work:-C/o double lane bridge over Chanju Nallah on Chamba Tissa road. (Sub Head:-Providing Geo-
Earnest money-
technical investigation and sub-surface exploration (Madhubar Side).
Time limit-
Sr. Description /items of work. Quantity Unit Rate in
No.
Figures Words

1 Carryout planning & monitoring geo-technical investigation and sub-surface 8.00 Mtr. Per 6000.00 Rupees Six
exploration at the proposed location of the bridge by drilling bore holes as Rmt. thousand and
per IS 2800-1979 using percussion/ catyx/ RC. ODEX/method required for paise zero only
drilling in collapsible strata conglomerate boulders, pebbles, sand, graval,
silt,clay etc. including cost of attachments extractable casing consumable
stores, bits water, POL gravel pack in annular space etc. complete in all
respects as per direction of Engineer-in-charge.

Total:-
48000/-

960/-

One month
Amount.

48000.00

48000.00
DNIT

Name of Work:- Estimate cost- 49454/-

Earnest money- 1000/-


(Sub Head:-
Time limit- One month

Rate in
Sr. No. Description /items of work. Quantity Unit Amount.
Figures Words
1 Providing,laying and rooling by manual means of open-graded pre mix carpet of 20mm (Twenty 395.00 Per 125.20 Rupees one 49454.00
millimetre) compacted thickness composed of type-"B" 13.2 mm to 5.6 mm (Thirteen point two millimetrs Square hundred twenty
to five point six millmetrs) aggregate at the rate of 0.27 Cum. (Zero point twenty seven cubic metre) metre five and paise
mixed with penetration grade VG-10 (VG-ten) bitumen at the rate of 14.6 kg. (Forteen point six twenty only
Kilograme) per ten square metre of road surface to required line ,grade and level two serve as wearing
course on a previuosly prepared base, including mixing and heating binder and aggregate in hot mix
plant 30/40 (thirty/forty) Ton per hour capacity tranporting mixed materials with tipper and laying with
paver finisher to required grade and camber and rolling with three wheel 80-100 (eighty-hundred) KN
static road roller finished to required level and grades to be followed by seal coat as perTechnical
Specification clause 508 and 511 of MORT & H specification including hauling of materils in all lead and
lifts as per entire statisfacation and direction of Engineer-in Charge excluding the cost of tack coat and
seal coat but including carriage of materials with all leads and lifts and other incidentals. The rate
inclusive octroi,roality,malkana,toll tex,sale tax or other taxes imposed by the Government. Rate is except
cost of bitumen which is to be provided by the Department free of cost.

Total 49454.00
DNIT

Name of Work:- Improvement and widening of Sanwal to Makkan Chachul road Estimate cost- 48501.00
Earnest money- 970.00
(Sub Head:- Formation cutting RD 0/522 to 0/555, 0/960 to 1/030 and 1/160 to 1/170). Time limit- One month

Sr. Rate in
Description /items of work. Quantity Unit Amount.
No. Figures Words
1 Excavation in hilly area in all heights and depths and in all soil by 558.83 Cum. Per 86.79 Rupees eighty six 48501.00
manual/ mechanical means including saturated soil comprising of Cum. and paise seventy
ordinay soil,soft rock,hard rock chiselling, wedghing out of rock nine only.
(where blasting is prohibted) and their intermediate classification
of soil complete including setting out true to the required lines
grades,width,cutting and trimming of side slopes and level as
shownin the drawing and as directed by Engineer-in-charge at site
according to the MORD technical specification clause 302,1603.1
and 1603.2 and sorting out useful materials and stacking the same
within all leads and lifts in acuired widh of road and transportation
of un-useful material for filling in road ways camber, embakements
for grade improvements and disposal of all surplus material to
approved dumping site through all mods of transportation including
head load or animal transport or mechanical means alongwith its
levelling fine dressing and carriage of machineries, materials,tools,
equipment and safety measures and other incidentals necessaty
to complete the work by mechanical means/ labour if required.Any
loss to the public private property during the course of execution
shallbe the absolute responibility of the conteractor which shall
have to be compensated by him in all cases.

Total:- 48501.00
DNIT

Name of Work:- A/R & M/O various Govt. (Residential) building under Nakrot Sub-Division. Estimate cost- 48400.00
Earnest money- 968.00
(Sub Head:- Supplying and stacking of ordinary stone )
Time limit- One month
Sr. Description /items of work. Quantity Unit Rate in Amount.
No. Figures Words
1 Supplying and stacking of ordinary stone free from cavity and orgainic 100.00 Cum. Per 484.00 Rupees Four 48400.00
matter, hard dense, from approved quarry as directed by the Engineer-in- Cum. hundred eigthy
charge including all leads and lifts and other incidentals.The rate inclusive four and paise
octroi,roality,malkana,toll tex,sale tax or other taxes imposed by the zero only.
Government.

Total:- 48400.00
DNIT

Name of Work:- A/R & M/O on Chamba Tissa Road KM 32/250 to 56/0 Estimate cost- 48462.00

Earnest money- 1000.00


(Sub Head:- Supplying and stacking of crushed stone aggregate 20mm & 40mm size at various RDs.) Time limit- One month

Rate in
Sr. No. Description /items of work. Quantity Unit Amount.
Figures Words
1 Supplying and stacking of approved quality crushed stone aggregate/chiping 20mm (twenty 30.00 Per 556.60 Rupees five 16698.00
millimetre nominal ) nominal size free from deleterious,organic or any other foreign matter Cum. hundred fifty six
properly washed and stacked in proper stacks of half cubic metre along road side clear from and paise sixty
the road formation as per the direction fo Engineer in Charge. The material shall confirm to the only
MORD specification. The rate coated by the contractor shall be inclusive of all taxe such as
muncipal, octroi, forest Malkana royality toll tax and other local taxes and including carriage of
material within all leads and lifts and other incidentals. The voids will be deducted as per latest
instructions of the Department.

2 Supplying and stacking of approved quality crushed stone aggregate 40mm (forty millimetre) 60.00 Per 532.40 Rupees Five 31944.00
nominal size free from deleterious, organic or any other foreign matter properly washed and Cum. Hundred Thirty
stacked in proper stacks of half cubic metre along road side clear from the road side clear two and paise
from the road formation as per the direction of Engineer in Charge. The material shall confirm forty only
to the MORD specification. the rate coated by the contractor shall be incusive of all the taxes
such as municipal, octroi, forest Malkana royality toll tax and other local taxes and including
carriage of material within all leads and lifts and other incidentals. The voids will be deducted
as per latest instructions of the department.

Total 48642.00
DNIT

Name of Work:-A/R & M/O various roads under Trella Sub-Division. Estimate cost- 49658.00

Earnest money- 1000/-


(Sub Head:- Supplying and stacking of hard fuel wood in Kalhel Section ).
Time limit- One month

Sr. Rate in
Description /items of work. Quantity Unit Amount.
No. Figures Words
1 Supplying and stacking of hard dry fuel wood in logs having 300 mm (three 108.00 Per 459.80 Rupees four 49658.00
hundred millimetre) dia and stacked at site in proper stackes as per the direction Quintal hundred fifty nine
fo Engineer in Charge. The rate coated by the contractor shall be inclusive of all and paise eighty
taxe such as muncipal, octroi, forest Malkana royality toll tax and other local only
taxes and including carriage of material within all leads and lifts and other
incidentals.

Total 49658.00
DNIT
Name of Work:- Restoration of rain damages on various roads under Tissa Sub-Division HPPWD Tissa. Estimate cost-
Earnest money-
(Sub Head:- Hiring of Pick-up for shifting of material/earth at various RDs )
Time limit-
Sr. No. Description /items of work. Quantity Unit Rate in
Figures Words
1 Hirring of pick-up having 1.35 cum.per trip capacity for shifiting of construction 33.00 Days Per Day 1500.00 Rupees One
material or earth upto all leads as per directions of and entire satisfaction of thousand five
engineer in charge. Any loss to the public/private property or any accident etc. hundred only
Happend during the coarse of hirring period/execution shell be the absolute
resposibilty of the pick-up owner, which shall have to be fully copensated by
the contractor in all cases. the fuel and oprational staff for machinary will be
provided by the owner. the repair and spare watch and ward of machinary also
be borne by the contractor/owner. The daily log book will be maintained at site
which should be duly verified by the Engineer-in-charge.

Total:-

Assistant Engineer
Tissa Sub Division
HP PWD Tissa.
49500/-
1000/-
One month
Amount.

49500.00

49500.00
DNIT

Name of Work:- Restoration of rain damages on Nakror khagura talli road KM 0/0 to 7/100.

(Sub Head:- Stone filling behind retainig wall/under floor.)

Sr. Description /items of work. Quantity Unit


No.
1 Supplying and stacking of ordinary stone free from cavity and orgainic 100.00 Cum. Per
matter, hard dense, from approved quarry as directed by the Engineer-in- Cum.
charge including all leads and lifts and other incidentals.The rate inclusive
octroi,roality,malkana,toll tex,sale tax or other taxes imposed by the
Government.
0 to 7/100. Estimate cost- 48400.00
Earnest money- 968.00
Time limit- One month
Rate in Amount.
Figures Words
484.00 Rupees Four 48400.00
hundred eigthy
four and paise
zero only.

Total:- 48400.00

Assistant Engineer
Tissa Sub Division
HP PWD Tissa.
DNIT
Name of Work:- A/R & M/O varios roads under Nakrot Sub-Division HPPWD Nakrot. Estimate cost- 46656.00
Earnest money- 950.00
(Sub Head:- Providing and supplying of shuttering plates for Parapet etc).
Time limit- One month
Sr. Description /items of work. Quantity Unit Rate in Amount.
No. Figures Words
1 Supplying of steel shuttering plates for parapets etc. welded 8.64 Qtl. Per 5400.00 Rupees Five 46656.00
in built up section including cutting and fixing in position in Qtl. Thousand Four
angles, plates etc. complete in all respect and applying a Hundred Only
priming coat of red lead paint as per direction of Engineer-in-
charge including all leads and lifts and other incidentals. The
rate including octroi, royality ,Malkana, toll tax, sales tax or
any other taxes imposed by the Government .

Total:- 46656.00

Assistant Engineer
Nakrot Sub-Division
HP,PWD Nakrot.
933.12
DNIT
Name of Work:- Improvement of black spot on various roads under Tissa Division. Estimate cost- 321600.00

(Sub Head:- Providing and laying thermoplastic paint edge lines on various roads under Tissa Sub- Earnest money- 6500.00
Division). Time limit- One month
Sr. No. Description /items of work. Quantity Unit Rate in Amount.
Figures Words
1 Providing and laying of hot thermoplastic road marking paint 960.00 Sqm. Per 335.00 Rupees Three 321600.00
compound 2.5 mm (two point five millimetre) thick including Sqm. Hundred Thirty
reflectorising glass beeds @ 250 gram (two hundred fifty gram) per Five Only
square metre area thicness of 2.50 mm (two point five millimetre)
in exclusive of surface applied glass beeds as per IRC-35 in
accordance with Ministry of Road Transport Specification (latest
revision) and IRC code. In width of 0.10 m ( zero point one zero
metre) in centre lines/edge line and 0.15 m (zero point one five
metre) on curves/curve line including carriage of materials with in
all leads and lifts and as per the direction and entire setisfaction of
the Engineer -in-Charge. The finished surface to be level,uniform
and free from strains and holes. The rate quoted by the
conteractor shall be inclusive of all taxes such as
muncipal,octroi,forest malkana royality toll tax and other local
taxes and including carriage of materials with in all leads and lifts
and other incidetals.

Total:- 321600.00
Schedule of Quantity

Name of Work:- Improvement of black spot on various roads under Tissa Division. Estimate cost- 321600.00
Earnest money- 6500.00
(Sub Head:- Providing and laying thermoplastic paint edge lines on various roads under Tissa Sub-
Division). Time limit- One month
Sr. No. Description /items of work. Quantity Unit Rate in Amount.
Figures Words
1 Providing and laying of hot thermoplastic road marking paint 960.00 Sqm. Per
compound 2.5 mm (two point five millimetre) thick including Sqm.
reflectorising glass beeds @ 250 gram (two hundred fifty gram) per
square metre area thicness of 2.50 mm (two point five millimetre)
in exclusive of surface applied glass beeds as per IRC-35 in
accordance with Ministry of Road Transport Specification (latest
revision) and IRC code. In width of 0.10 m ( zero point one zero
metre) in centre lines/edge line and 0.15 m (zero point one five
metre) on curves/curve line including carriage of materials with in
all leads and lifts and as per the direction and entire setisfaction of
the Engineer -in-Charge. The finished surface to be level,uniform
and free from strains and holes. The rate quoted by the
conteractor shall be inclusive of all taxes such as
muncipal,octroi,forest malkana royality toll tax and other local
taxes and including carriage of materials with in all leads and lifts
and other incidetals.

Total:-
6432
DNIT

Name of Work:- Strengthening of existing School infrastructure of G.H.S. Ganed Distt. Chamba under RMSA. Estimate cost-
Earnest money-
(Sub Head:- Stone filling behind retainig wall/under floor.)
Time limit-
Sr. Description /items of work. Quantity Unit Rate in
No. Figures Words
1 Stone filling behind retaining wall and under floor as per the direction of 62.50 Cum. Per 797.35 Rupees seven
the Engineer-in-charge including all leads and lifts and other Cum. hundred ninty
incidentals.The rate inclusive octroi,roality,malkana,toll tex,sale tax or seven and paise
other taxes imposed by the Government. thirty five only

Total:-

Assistant Engineer
Tissa Sub Division
HP PWD Tissa.
49834.00
997.00
One month
Amount.

49834.00

49834.00
DNIT
Name of Work:- A/R & M/O various Govt. building (Non Residential) under Tissa Sub-Division HPPWD
Estimate cost- 30000.00
Tissa.
Earnest money-600.00
(Sub Head:- Supplying and installation of electric genrator in the Office building).
Time limit- One month
Sr. Description /items of work. Quantity Unit Rate in Amount.
No. Figures Words
1 Supplying and installation of electric Genrator having capacity 1.00 No Each 30000.00 Rupees Thirty 30000.00
of 1 KV (One Kilowatt) of approved manufaturer including Thousand Only
wires, engine oil and other accessories charges etc. complete
in all respect as per direction of Engineer-in-charge including all
leads and lifts and other incidentals. The rate inclusive
octroi,roality,malkana,toll tex,sale tax, G.S.T. or other taxes
imposed by the Governmen.

Total:- 30000.00

Assistant Engineer
Tissa Sub Division
HP PWD Tissa.
DNIT

Name of Work:- A/R & M/O HPPWD Rest House at Bhanjraru. Estimate cost- 41100.00

Earnest money-850.00
(Sub Head:- Providing and fixing energy efficient invertor).
Time limit- One month
Sr. Description /items of work. Quantity Unit Rate in Amount.
No. Figures Words
1 Providing and fixing energy efficient invertor of 1600 V.A. along 1.00 No Each 41100.00 Rupees Forty 41100.00
with 2 (Two) No. tubler invertor battery D.S.T. 1500 (one One Thousand
thousand five hundred) including wire charges etc. complete in One Hundred
all respect as per direction of Engineer-in-charge including all Only
leads and lifts and other incidentals.

Total:- 41100.00

Assistant Engineer
Tissa Sub Division
HP PWD Tissa.
DNIT
Name of Work:- A/R & M/O Bagheigarh Charda road KM 0/0 to 5/0.

(Sub Head:- Providing and laying premix carpet at RD 6/680 to 6/765).

Sr. No. Description /items of work.

1 Providing,laying,spreading and compecting stone aggregates of specific size to water bound macadam
specification including spreading in uniform thickness,hand packing,rolling with three wheel 80-100 KN
static roller in stages to proper grade and camber applying and brooming stone screening/binding
materials to fillup the interstices of coarse aggregate,watering and compacting to the required density
Grading-1 as per technical specification clause 405 including hauling of materils in all leads and lifts as
per entire statisfacation and direction of Engineer-in Charge including carriage of materials with all leads
and lifts and other incidentals. The rate inclusive octroi,roality,malkana,toll tex,sale tax or other taxes
imposed by the Government.
Providing,laying,spreading and compecting stone aggregates of specific size to water bound macadam
specification including spreading in uniform thickness,hand packing,rolling with smooth wheel roller 80-
100 KN in stages to proper grade and camber applying and brooming stone screening materials to fillup
the interstices of coarse aggregate,watering and compacting to the required density Grading-3 as per
technical specification clause 405 including hauling of materils in all leads and lifts as per entire
2 statisfacation and direction of Engineer-in Charge including carriage of materials with all leads and lifts
and other incidentals. The rate inclusive octroi,roality,malkana,toll tex,sale tax or other taxes imposed by
the Government.

Providing and applying priming coat with bitumen emulsion (SS-1) on prepared surface of granular base
including claening of road surface and spraying primer at the rate of 0.70-1.0 Kg per square metre using
machenical means as per technical specification Clause 502 including hauling of materils in all leasd and
3 lifts as per entire statisfacation and direction of Engineer-in Charge including carriage of materials with all
leads and lifts and other incidentals. The rate inclusive octroi,roality,malkana,toll tex,sale tax or other
taxes imposed by the Government.

4 Providing and applying tack coat with bitumen emulsion (RS-1) using emulsion pressure distrubutor at
the rate of 0.275 killogram.(zero point two seven five kilograme) per square metre on prepared granular
surfaces treated with primer and cleaned with hydraulic brooms as per Technical Specification clause
503 including hauling of materils in all leasd and lifts as per entire statisfacation and direction of
Engineer-in Charge including carriage of materials with all leads and lifts and other incidentals. The rate
inclusive octroi,roality,malkana,toll tex,sale tax or other taxes imposed by the Government.

5 Providing,laying and rooling by manual means of open-graded pre mix carpet of 20mm (Twenty
millimetre) compacted thickness composed of type-"B" 13.2 mm to 5.6 mm (Thirteen point two millimetrs
to five point six millmetrs) aggregate at the rate of 0.27 Cum. (Zero point twenty seven cubic metre)
mixed with penetration grade VG-10 (VG-ten) bitumen at the rate of 14.6 kg. (Forteen point six
Kilograme) per ten square metre of road surface to required line ,grade and level two serve as wearing
course on a previuosly prepared base, including mixing and heating binder and aggregate in hot mix
plant 30/40 (thirty/forty) Ton per hour capacity tranporting mixed materials with tipper and laying with
paver finisher to required grade and camber and rolling with three wheel 80-100 (eighty-hundred) KN
static road roller finished to required level and grades to be followed by seal coat as perTechnical
Specification clause 508 and 511 of MORT & H specification including hauling of materils in all lead and
lifts as per entire statisfacation and direction of Engineer-in Charge excluding the cost of tack coat and
seal coat but including carriage of materials with all leads and lifts and other incidentals. The rate
inclusive octroi,roality,malkana,toll tex,sale tax or other taxes imposed by the Government. Rate is except
cost of bitumen which is to be provided by the Department free of cost.

6 Providing and laying seal coat for sealing the voids in a bitumenious surface laid to the specified
level,grade and cross fall using type B as per Technical Specification clause 510 using bitumen grades
VG-10 (VG-ten) at the rate of 6.8 Kg (six point eight kilograme) premixed with 0.06 (zero point zero six)
cubic metre of fine aggregate per ten square meters heated in hot mixed plant and laying manualy of
mixed matrials and rolling with power road roller 8-10 (eight-ten) Tonne capacity as per direction of
Engineer-in-Charge including carriage of materials,labour and equipment required to execute the work to
the site of work complete in all respect.The rate inclusive octroi,roality,malkana,toll tex,sale tax or other
taxes imposed by the Government. Rate is except cost of bitumen which is to be provided by the
Department free of cost.
Estimate cost- 43216.00
Earnest money- 864.00
Time limit- One month
Rate in
Quantity Unit Amount.
Figures Words
11.1 957.75 Rupees nine hundred 10631.00
fifty seven and paise
seventy five only

8.32 995.50 Rupees nine hundred 8283.00


ninty five and paise
fifty only

110.97 34.25 Rupees thirty four 3801.00


and paise twenty five
only

110.97 Per 12.25 Rupees twelve and 1359.00


Square paise twenty five only
metre

110.97 Per 125.20 Rupees one hundred 13893.00


Square twenty five and paise
metre twenty only

110.97 Per 47.30 Rupees forty seven 5249.00


Square and paise thirty only
metre
Total 43216.00
Schedule of quantity

Name of Work:-A/R & M/O various roads under Trella Sub-Division. Estimate cost-

Earnest money-
(Sub Head:- Supplying and stacking of hard fuel wood).
Time limit-

Sr. Rate in
Description /items of work. Quantity Unit
No. Figures Words
1 Supplying and stacking of hard dry fuel wood in logs having 300 mm 108.00 Per
(three hundred millimetre) dia and stacked at site in proper stackes Quintal
as per the direction fo Engineer in Charge. The rate coated by the
contractor shall be inclusive of all taxe such as muncipal, octroi,
forest Malkana royality toll tax and other local taxes and including
carriage of material within all leads and lifts and other incidentals.

Total
49658.00

1000/-
One month

Amount.
DNIT

Name of Work:- A/R & M/O Tissa Satyas road KM 0/0 to 7/0. Estimate cost- 49775.00
Earnest money- 1000.00
(Sub Head:- Providing and laying stone aggregate wearing course (Grading-III) at KM 5/0 to 6/0.
Time limit- One month
Sr. Rate in
Description /items of work. Quantity Unit Figures Words Amount.
No.
1 Providing,laying,spreading and compecting stone aggregates of 50.00 Per 995.50 Rupees nine 49775.00
specific size to water bound macadam specification including spreading Cubic hundred ninty five
in uniform thickness,hand packing,rolling with smooth wheel roller 80- Mtere and paise fifty
100 KN in stages to proper grade and camber applying and brooming only
stone screening materials to fillup the interstices of coarse
aggregate,watering and compacting to the required density Grading-3
as per technical specification clause 405 including hauling of materils
in all leads and lifts as per entire statisfacation and direction of
Engineer-in Charge including carriage of materials with all leads and
lifts and other incidentals. The rate inclusive octroi,roality,malkana,toll
tex,sale tax or other taxes imposed by the Government.

Total 49775.00

Assistant Engineer
Trella Sub-Division
HP,PWD Bairagarh.
DNIT

Name of Work:- A/R & M/O Chamba Tissa road KM 32/250 to 56/500. Estimate cost- 49918.00
Earnest money- 1000.00
(Sub Head:- Supplying and stacking of mix material for bituminous concrete at various RDs).
Time limit- One month
Sr. Rate in
Description /items of work. Quantity Unit Figures Words Amount.
No.
1 Supplying and stacking of mix material for bituminous concrete having 5.95 Per 8389.54 Rupees eight 49918.00
mix of aggregate sand, filler with bituminous binder VG-10 @ 5.4% to Cubic thousand three
5.6% of mix and filler, Transporting the mix materail to work site as per Mtere hundred eighty
MORTH specification clause 509 including all leads, lifts and other nine and paise
incidentals. fifty four only

Total 49918.00

Assistant Engineer
Nakrot Sub-Division
HP,PWD Nakrot.
DNIT

Name of Work:- A/R & M/O Tissa Satyas road KM 0/0 to 7/0.

(Sub Head:- Supplying of Store T & P Article).

Sr.
Description /items of work. Quantity Unit
No.
1 Supplying of 125 mm (One hundred twenty five millmetre), 90 mm 50.00 Per
(ninety millimetre) 63 mm (sixty three millimtere), 53 mm (fifty three Cubic
millimetre), 45 mm (forty five millimetre), 22.4 mm (twenty two point Mtere
four millimetre), 11.2 mm (eleven point two millimetre) , 13.2 mm
(thirteen point two millimetre), 5.6 mm (five point six millimetre) and 2.8
mm ( two point eight millimetre) size mesh G.I. sieves of 12" (twelve
inches) including carriage of materials with in all leads and other
incidentials and all texes as aplicable as per entire satisfaction of
Engineer-in-charge.

2 So[[laying weighing machine digital/nondigital up to 10Kg (Ten 50.00


kilogram) of approved quality and make/modal including carriage of
materials with in all leads and other incidentials and all texes as
aplicable as per entire satisfaction of Engineer-in-charge.
3 Supplying of rapid moisture metre of approved quality and make 50.00

4 50.00

5 50.00

Assistant Engineer
Trella Sub-Division
HP,PWD Bairagarh.
Estimate cost- 49775.00
Earnest money- 1000.00
Time limit- One month
Rate in
Figures Words Amount.

995.50 Rupees nine 49775.00


hundred ninty five
and paise fifty
only

Total 49775.00

Assistant Engineer
Trella Sub-Division
HP,PWD Bairagarh.
DNIT
Name of Work:- Treatment of varrious sinking portion on Chamba Tissa Road km 32/250 to 56/500
(Sub Head:- Providing and laying Soling and wearing course (GSB and Grading-II) at KM 52/180 to
52/240 and 55/000 to 55/028 .

Sr.
Description /items of work. Quantity Unit
No.
1 Construction of gravel / soil aggregate sub base by providing well 52.2 Per
graded material of nominal maximum size grading 80mm (Eighty Cubic
millimeter) as per table 2.3 of IRC SP 77-2018, spreading in uniform Mtere
layers with Tractor mount grader on prepared surface, mixing by mix in
place method with rotavator at OMC and compacting with three wheel
80-100 KN static roller in stages to proper grade and camber, to
achieve the desired density, complete as per MORD Technical
specification clauses, 402 and as contained in Para 2.2 of IRC SP 77-
2008 in all leads, lifts and other incidental comlete in all respect
including hauling / carriage of materials to various location through all
modes of transportation in and as per the direction of Engineer in
Charge

2 Providing,laying,spreading and compecting to 133mm (one hundred 46.29 Per


thirty three millimeter) compacted thickness, graded, broken /stone Cubic
aggregates of specific size to water bound macadam specification Mtere
including spreading in uniform thickness,hand packing,rolling with
smooth wheel roller 80-100 KN in stages to proper grade and camber
applying and brooming stone screening ,type B, 11.2 mm (eleven point
two millimeter) at the rate of 0.18 (Zero point one eight) cubic meter per
10 square meter (ten square meter) of road surface to fillup the
interstices of coarse aggregate,watering and compacting to the
required density Grading-I as per technical specification clause 405
including hauling of materils in all leads and lifts as per entire
statisfacation and direction of Engineer-in Charge including carriage of
materials with all leads and lifts and other incidentals. The rate
including octroi,roality,malkana,toll tex,sale tax or other taxes imposed
by the Government.
3 Providing,laying,spreading and compecting to 75mm (seventy five 26.1 Per
millimeter) compacted thickness, graded, broken / crushed stone Cubic
aggregates for Gradind II 63mm to 45mm (sixty three millimeter to Mtere
forty five millimeter) nominal size to water bound macadam,
specification including spreading in uniform thickness using
template,hand packing,rolling with smooth wheel roller 80-100(Eighty to
Hundred) KN static roller in stages to proper grade and camber
applying and brooming stone screening ,type B, 11.2 mm (eleven point
two millimeter) at the rate of 0.18 (Zero point one eight) cubic meter per
10 square meter (ten square meter) of road surface to fillup the
interstices of coarse aggregate,watering and compacting to the
required density Grading-II as per MORD technical specification clause
405 including hauling of materils in all leads and lifts as per entire
statisfacation and direction of Engineer-in Charge including carriage of
materials with all leads and lifts and other incidentals. The rate
including octroi,roality,malkana,toll tex,sale tax or other taxes imposed
by the Government.

Assistant Engineer
Nakrot
HP,PWD Nakrot.
m 32/250 to 56/500
II) at KM 52/180 to Estimate cost- 0.00

Earnest money- 1000.00


Rate in
Figures Words Amount.

957.75 Rupees nine 44334.00


hundred fifty
seven and
seventy five
paise only
1015 Rupees one
thousand and
fifteen only

Assistant Engineer
Subdivision
HP,PWD Nakrot.
Detail of Measurement
Rd width Avg WidhtLength Quantity(m2)
52/180 4 0
52/190 4.5 4.25 10 42.5
200 4.5 4.5 10 45
210 4 4.25 10 42.5
220 3.6 3.8 10 38
230 3.4 3.5 10 35
240 3.9 3.65 10 36.5
Total 239.5

Rd width Avg WidhtLength Quantity(m2)


55/0 3.6 0
55/010 3.8 3.7 10 37
20 4.2 4 10 40
28 3.7 3.95 8 31.6
Total 108.6
G. Total 348.1

Das könnte Ihnen auch gefallen