Sie sind auf Seite 1von 6

MYSORE DIVISION-ENGINEERING/SOUTH WESTERN RLY

TENDER DOCUMENT
Tender No: 48MYS2019of27-9-19itemno6 Closing Date/Time: 21/10/2019 11:00

DRM/W/MYS acting for and on behalf of The President of India invites E-Tenders against Tender No 48MYS2019of27-9-19itemno6
Closing Date/Time 21/10/2019 11:00 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only.
Manual offers are not allowed against this tender, and any such manual offer received shall be ignored.

Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only
payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker
cheque, Deposit receipts, FDR etc. are not allowed.

1. NIT HEADER

Mysore Division: ADEN/Shivamogga Town Sub Division:- Cleaning and lubrication of slide
Name of Work chairs of Point & Crossing under SSE/P.WAY/Shivamogga Town Section for a period of one
year.
Bidding type Normal Tender
Tender Type Open Bidding System Single Packet System
Tender Closing Date Time 21/10/2019 11:00 Date Time Of Uploading Tender 27/09/2019 19:07
Pre-Bid Required No Pre-Bid Query Date Time Not Applicable
Advertised Value 4991988.56 Tendering Section DEN/C
Bidding Style [ Decision at Schedule level ] Bidding Unit
Earnest Money (Rs.) 99800.00 Validity of Offer ( Days) 45
Tender Doc. Cost (Rs.) 3540.00 Period of Completion 12 Months
Contract Type Works Contract Category Expenditure
Are Joint Venture (JV) firms
Bidding Start Date 07/10/2019 No
allowed to bid
Ranking Order For Bids Lowest to Highest Expenditure Type Revenue

2. SCHEDULE

S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding
Unit
Schedule B-The list of items that are not covered under USSOR-2011 4991988.56
NS 104.00 Each 405.00 42120.00 AT Par 42120.00 Rs.
Item Description:- Cleaning and lubrication of slide chairs of points by using using railway supplied graphite
powder with contractor's men, T&P, kerosene oil, hand gloves, wire brush, consumable, transportation of
1 graphite from SSE/P.WAY store to site etc., complete duly following all safety precaution and as directed by the
Engineer-in-charge. The above works involves 1. Cleaning of surface of points chair plate from sleeper no 6 -20
for 1 in 12 and Sleeper no 6 -13 for 1 in 8.5 of turnouts by using iron scriber. 2. clean the surface with dry waste
cotton. 3. Remove the dust by waste cotton soaked in kerosene oil grade 1450-1974. 4. clean again with waste
cotton to dry chair plate. 5. Apply graphite supplied by Railway. a) 1 in 16
NS 3848.00 Each 432.00 1662336.00 AT Par 1662336.00 Rs.
Item Description:- Cleaning and lubrication of slide chairs of points by using using railway supplied graphite
powder with contractor's men, T&P, kerosene oil, hand gloves, wire brush, consumable, transportation of
2 graphite from SSE/P.WAY store to site etc., complete duly following all safety precaution and as directed by the
Engineer-in-charge. The above works involves 1. Cleaning of surface of points chair plate from sleeper no 6 -20
for 1 in 12 and Sleeper no 6 -13 for 1 in 8.5 of turnouts by using iron scriber. 2. clean the surface with dry waste
cotton. 3. Remove the dust by waste cotton soaked in kerosene oil grade 1450-1974. 4. clean again with waste
cotton to dry chair plate. 5. Apply graphite supplied by Railway. b) 1 in 12
NS 4888.00 Each 216.00 1055808.00 AT Par 1055808.00 Rs.
Item Description:- Cleaning and lubrication of slide chairs of points by using using railway supplied graphite
powder with contractor's men, T&P, kerosene oil, hand gloves, wire brush, consumable, transportation of
3 graphite from SSE/P.WAY store to site etc., complete duly following all safety precaution and as directed by the
Engineer-in-charge. The above works involves 1. Cleaning of surface of points chair plate from sleeper no 6 -20
for 1 in 12 and Sleeper no 6 -13 for 1 in 8.5 of turnouts by using iron scriber. 2. clean the surface with dry waste
cotton. 3. Remove the dust by waste cotton soaked in kerosene oil grade 1450-1974. 4. clean again with waste
cotton to dry chair plate. 5. Apply graphite supplied by Railway. c) 1 in 8.5
NS 25558.00 Kg 87.32 2231724.56 AT Par 2231724.56 Rs.

4 Item Description:- Supply of graphite flake for lubricant to IS 495-1967 suitable packing strong enough to with
stand hazards of Rails/Road (the packing should be in 20kg bag) to the concerned SSE/P.WAY/Stores or site with
contractor's own men, transportation etc complete., and as directed by the Engineer-in-charge.

3. ITEM BREAKUP

Pa g e 1 o f 6 Ru n Da te/Time: 2 7/0 9 /2 0 19 19 :0 8 :0 2
MYSORE DIVISION-ENGINEERING/SOUTH WESTERN RLY
TENDER DOCUMENT
Tender No: 48MYS2019of27-9-19itemno6 Closing Date/Time: 21/10/2019 11:00

No item break up added

4. ELIGIBILITY CONDITIONS

Standard Financial Criteria

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
For works costing above 50 Lakh: Total contract amount received during the last 3
financial years and in the current financial year, should be a minimum of 150 percentage
of the Advertised tender value. The certificate from the employer/client or audited
Allowed
1 balance sheet duly certified by the Chartered Accountant or certificate issued by charted No No
(Mandatory)
Accountant indicating explicitly contract receipts details of various organizations Name
of organization, Agreement wise receipts etc during qualifying period etc., is to be
attached.
For works costing less than Rs 50 lakhs : Following documents shall be submitted along
with the tender offer. 1. Undertaking from the tenderer in separate sheet in following
format. UNDER TAKING NAME OF THE WORK: I hereby certify that I/We am/are
having sufficient financial capability to execute the captioned work in given contract Allowed
1.1 No No
period. Name and Signature of the Tenderer & Address with phone no. 2. Details of (Mandatory)
works on hand at the time of submission of tender offer. Note: - Non- submission of
these shall not result in summarily rejection of tenderer offer and it is left to the
judgement of the tender committee.

Submission of Affidavit

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Please submit notarized affidavit on a non-judicial stamp paper in the prescribed format
(please download format from the link given below) for verification / confirmation of the
documents submitted for compliance of eligibility/qualifying criteria. Non submission of Allowed
1 No No
properly filled affidavit in the prescribed format shall lead to summary rejection of your (Mandatory)
offer.
Click here to download the format for Affidavit

5. COMPLIANCE

Check Lst

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Whether copies of the certificates in support of the receipt of contractual
1 payments obtained from employer/clients and audited balance sheet duly No No Not Allowed
certified by CA as prescribed in the tender for the last three years enclosed.
a)Payment of Earnest Money Deposit (EMD) & Tender Document Cost(TDC)
2 in respect of E tendering should be accepted through net banking or payment No No Not Allowed
gateway only.

Commercial-Compliance

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
Please enter the percentage of local content in the material being offered.
Please enter 0 for fully imported items, and 100 for fully indigenous items. The Allowed
1 No Yes
definition and calculation of local content shall be in accordance with the Make (Optional)
in India policy as incorporated in the tender conditions.
AFFIDAVIT to be filled and attached along with the document as enclosed in Allowed
2 Yes Yes
Special conditions. (Mandatory)
Please submit your bank details i.e.Name of the Bank along with Bank Branch Allowed
3 No Yes
Code, Account Number, IFSC Code, and PAN Number (Mandatory)

Pa g e 2 o f 6 Ru n Da te/Time: 2 7/0 9 /2 0 19 19 :0 8 :0 2
MYSORE DIVISION-ENGINEERING/SOUTH WESTERN RLY
TENDER DOCUMENT
Tender No: 48MYS2019of27-9-19itemno6 Closing Date/Time: 21/10/2019 11:00

Partnership Deeds, Power Of Attorney Etc.: The tenderer shall clearly specify
whether the tender is submitted on his own or on behalf of a partnership
concern. If the tender is submitted on behalf of a partnership concern, he
should upload the certified copy of partnership deed along with the tender and
authorization to sign the tender documents on behalf of partnership firm. If
these documents are not enclosed along with tender, the tender will be treated Allowed
4 Yes Yes
as having been submitted by individual signing the tender documents. The (Optional)
Railway will not be bound by any power of attorney granted by the tenderer or
by changes in the composition of the firm made subsequent to the execution
of the contract. It may, however, recognize such power of attorney and
changes after obtaining proper legal advice, the cost of which will be
chargeable to the contractor.
The tenderer whether sole proprietor, a limited company or a partnership firm
if they want to act through agent or individual partner s should submit along
with the tender or at a later stage, a power of attorney duly stamped and
authenticated by a Notary Public or by Magistrate in favour of the specific
Allowed
5 person whether he/they be partner s of the firm or any other person Yes Yes
(Optional)
specifically authorising him/them to submit the tender, sign the agreement,
receive money, witness measurements, sign measurement books,
compromise, settle, relinquish any claim s preferred by the firm and sign No
Claim Certificate and refer all or any disputes to arbitration

General Instructions

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
a)Payment of Earnest Money Deposit (EMD) & Tender Document Cost(TDC)
in respect of E tendering should be accepted through net banking or payment
1 No No Not Allowed
gateway only. Note: Fixed Deposit Receipt (FDR) will not be accepted as EMD
for tenders invited on IREPS (E-tender portal)
Drawings For The Work : The Drawing for the work can be seen in the office of
the DRM/W/MYS and / or Chief Engineer, SOUTH WESTERN Railway at any
time during the office hours. The drawings are only for the guidance of
2 No No Not Allowed
Tenderers . Detailed working drawings if required based generally on the
drawing mentioned above, will be given by the Engineer or his representative
from time to time.
The Tenderer s shall quote his / their rates as a percentage above or below
the Schedule of Rates of South Western Railway as applicable to Mysore
Division except where he/they are required to quote item rates and must
tender for all the items shown in the Schedule of approximate quantities
3 No No Not Allowed
attached. The quantities shown in the Schedule are given as a guide and are
approximate only and are subject to variation according to the needs of the
Railway. The Railway does not guarantee work under each item of the
Schedule.
The works are required to be completed within the period as mentioned from
4 No No Not Allowed
the date of issue of acceptance letter.
The Tenderer s shall keep the offer open for a minimum period of 90 days
from the date of opening of the Tender. It is understood that the Tenderer s ,
is / are permitted to tender in consideration of the stipulation on his / their part
that after submitting his / their tender subject to the period being extended
further, if required by mutual agreement from time to time, he will not resile
5 No No Not Allowed
from his offer or modify the terms and conditions thereof in a manner not
acceptable to the DRM/Divisional Engineer of SW Railway, Should the
tenderer fail to observe or comply with the foregoing stipulation, the amount
deposited as Earnest Money for the due performance of the above stipulation,
shall be forfeited to the Railway.

Pa g e 3 o f 6 Ru n Da te/Time: 2 7/0 9 /2 0 19 19 :0 8 :0 2
MYSORE DIVISION-ENGINEERING/SOUTH WESTERN RLY
TENDER DOCUMENT
Tender No: 48MYS2019of27-9-19itemno6 Closing Date/Time: 21/10/2019 11:00

If the tender is accepted, the amount of Earnest Money will be retained and
adjusted as Security Deposit for the due and faithful fulfilment of the contract.
This amount of Security Deposit shall be forfeited, if the Tenderer s
/Contractor s fail to execute the Agreement Bond within 7 days after receipt of
notice issued by Railway that such documents are ready or to commence the
work within 15 days after receipt of the order to that effect. Earnest Money of
6 No No Not Allowed
the unsuccessful tenderer s will, save as here-in-before provided, be returned
to the unsuccessful tenderer s within a reasonable time, but the Railway shall
not be responsible for any loss or depreciation that may happen to the
Security for the due performance of the stipulation to keep the offer open for
the period specified in the tender documents or to the Earnest Money while in
their possession nor be liable to pay interest thereon.
Rights Of The Railway To Deal With Tender : The authority for the acceptance
of the tender will rest with the Railway. It shall not be obligatory on the said
authority to accept the lowest tender or any other tender and no tenderers s
7 No No Not Allowed
shall demand any explanation for the cause of rejection of his/their tender nor
the Railway to assign reasons for declining to consider or reject any particular
tender or tenders.
If the tenderer s expires after the submission of his / their tender or after the
acceptance of his their tender, the Railway shall deem such tender cancelled.
8 If a partner of a firm expires after the submission of their tender or after the No No Not Allowed
acceptance of their tender, the Railway shall deem such tender as cancelled,
unless the firm retains its character.
Execution Of Contract Documents : The successful Tenderer s shall be
required to execute an agreement with the President of India acting through
the DRM/W/ Mysore Division, South Western Railway for carrying out the work
9 No No Not Allowed
according to General Conditions of Contract, Special Conditions /
Specifications and Specification for work and materials of Railway as
amended/corrected upto latest Correction Slips.
The following documents form part of Tender / Contract : a.General Conditions
of Contract and Standard Specifications for Materials and Works of Indian
Railway as amended/corrected upto latest Correction Slips, copies of which
can be seen in the office of DRM/Works/MYS or obtained from the office of the
Sr Divisional Engineer/Co Ord, Mysore Division on payment of prescribed
10 charges. b.Schedule of Rates as amended / corrected upto latest Correction No No Not Allowed
Slips, copies of which can be seen in the office of DRM/Works/MYS or
obtained from the office of the Sr Divisional Engineer/Co Ord, Mysore Division
on payment of prescribed charges. c.All general and detailed drawings
pertaining to this work which will be issued by the Engineer or his
representatives from time to time with all changes and modifications.
The responsibility of uploading the correct documents lies with the tenderers.
In case, the documents uploaded are found manipulated/forged, the offers of
such tenderers will not be considered and such tenderers are liable to be
debarred to participate for future works duly forfeiting their Earnest Money and
11 No No Not Allowed
the tenderer/contractor shall have no claims whatsoever in this regard.
Railway reserves the right to determine/rescind the contract entered into in
case of such false certificates/documents at any stage of the contract treating
it as default of the contractor.
12 Tender cost is not transferable and the amount once paid is non-refundable. No No Not Allowed
The tenderers shall not add any conditions on their own in the tender
documents while submitting their offer. Any such conditions if stated and if are
13 in violation of the Railway s tender conditions, may lead to summary rejection No No Not Allowed
of the offer. Railway reserves the right to reject such tenders summarily
without assigning any reasons whatsoever.
No post tender correspondence will be permitted and the tender shall be
14 No No Not Allowed
decided based on the documents uploaded with the offer only.
Even for the working contractors of this railway, the onus of establishing the
credentials of the tender s from the office records or otherwise does not lie
15 No No Not Allowed
with the railway. Railway shall evaluate the offer only from the certificates/
documents uploaded along with the offer.

Pa g e 4 o f 6 Ru n Da te/Time: 2 7/0 9 /2 0 19 19 :0 8 :0 2
MYSORE DIVISION-ENGINEERING/SOUTH WESTERN RLY
TENDER DOCUMENT
Tender No: 48MYS2019of27-9-19itemno6 Closing Date/Time: 21/10/2019 11:00

Omissions Discrepancies : Should a tenderer find discrepancies in or


omissions from the drawings or any of the Tender Forms or should he be in
doubt as to their meaning, he should at once notify the authority inviting
tenders who may send a written instruction to all tenders. It shall be
16 No No Not Allowed
understood that every endeavour has been made to avoid any error which can
materially affect the basis of tender and successful tenderer shall take upon
himself and provide for the risk of any error which may subsequently be
discovered and shall make no subsequent claim on account thereof.
Before participating in a tender, the tenderer will be deemed to have satisfied
himself by actual inspection of the site and locality of the works, that all
conditions liable to be encountered during the execution of the works are
17 No No Not Allowed
taken into account and that the rates he quote are adequate and all inclusive
to accord with the provisions in Clause-37 of the General Conditions of
Contract for the completion of works to the entire satisfaction of the Engineer
Payment of each group of items shall be on the basis of rates indicated in
18 above tables duly modified by percent above/below/at par accepted by No No Not Allowed
Railway Administration
Offered rates of each group of items shall be considered to include all Taxes,
Octroi, cost of Labour, T P, Machinery, Vehicles, Lift, Ascent, Descent etc.
19 No No Not Allowed
complete. No compensation of any account will be paid except the accepted
rates.
Every possible fluctuation, in the rate of labour, material and general
commodities and other possibilities of each and every kind which may affect
the rates should be considered and kept in view before quoting the rates. No
20 No No Not Allowed
claim on this account shall be entertained by the Railway under any
circumstances except the price escalation payable as per price variation
clause, if any, provided separately in the tender documents
Tender Opening will be done any time after the tender closing time. Tenderer
21 s are not required to be present during the opening. Railway reserves right to No No Not Allowed
open the tender any time after the time of closing of tender.

Undertakings

S.No. Description Confirmation Remarks Documents


Required Allowed Uploading
I/ We have visited the works site and I / We am / are aware of the site
1 No No Not Allowed
conditions.
I/We have read the various conditions to tender attached hereto and agree to
abide by the said conditions. I/We also agree to keep this tender open for
acceptance for a period of 90 days from the date fixed for opening the same
and in default thereof, I/We will be liable for forfeiture of my/our Earnest Money
2 No No Not Allowed
. I/We offer to do the work for South Western Railway, at the rates quoted in
the attached schedule and hereby bind myself/ourselves to complete the work
in all respects within 06 months from the date of issue of letter of acceptance
of the tender.
I/We also hereby agree to abide by the South Western Railway, Works
contract, General conditions of contract 2014, with all correction slips up-to-
date and to carry out the work according to the Special Conditions of Contract
3 No No Not Allowed
and Specifications of materials and works as laid down by Railway in the
annexed Special Conditions/Specifications, Schedule of Rates with all
correction slips up-to-date for the present contract.
Full value of the earnest Money shall stand forfeited without prejudice to any
other right or remedies in case my/our Tender is accepted and if I/We do not
4 execute the contract documents within seven days after receipt of notice No No Not Allowed
issued by the Railway that such documents are ready a n d I/We do not
commence the work within fifteen days after receipt of orders to that effect.
Until a formal agreement is prepared and executed, acceptance of this tender
shall constitute a binding contract between us subject to modifications, as may
5 No No Not Allowed
be mutually agreed to between us and indicated in the letter of acceptance of
my/our offer for this work.

Pa g e 5 o f 6 Ru n Da te/Time: 2 7/0 9 /2 0 19 19 :0 8 :0 2
MYSORE DIVISION-ENGINEERING/SOUTH WESTERN RLY
TENDER DOCUMENT
Tender No: 48MYS2019of27-9-19itemno6 Closing Date/Time: 21/10/2019 11:00

I/We hereby Confirm that the rates, rebates and/or other financial terms, if
any, quoted by us in the relevant fields of the Financial Bid page will only be
the ruling terms for deciding the inter-se ranking, and any such condition
6 having financial repercussions, if quoted by us anywhere else including No No Not Allowed
attached documents shall not be considered for deciding inter-se ranking.
However, Railways shall have the right to incorporate any such condition
quoted by us, in the contract, at their discretion, if contract is placed on us.

6. Documents attached with tender

S.No. Document Name Document Description


1 Specialconditions.02.07.pdf general guide lines for tenderer

This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued by
Department of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.
2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017.

Signed By: K RAVICHANDRAN

Designation : Sr.DEN/CO/MYS

Pa g e 6 o f 6 Ru n Da te/Time: 2 7/0 9 /2 0 19 19 :0 8 :0 2