Transformer Bushing Tan δ Test Before Erection

SUBSTATION : - - 220/22 kV LONIKAND SUBSTATION DATE :- 24.05.13

EQPT. LOCATION: - Transformer New bay

TEMPERATURE :- 36°C TEST EQUPT. USED: - Eltel ACTS 12 Plus

TESTED BY : - M/S BNC Power Project Ltd., Pune.

Sr. Equipment Volts Current Capacitance Tan δ


No. Details V In mA in pF (∆F)
Corrected
Ambient at 20 ̊
0.001557
2049 0.204 317.3 0.00278
(UST B) 1U
0.001546
1 Sr. No – 5024 0.501 317.3 0.00276
96960563
0.001512
10026 0.999 317.2 0.00270
0.000991
2016 0199 313.9 0.00177
(UST B) 1V
0.000913
2 Sr. No – 5032 0.498 313.8 0.00163
969603164
0.00089
10025 0.992 313.8 0.00159
(UST B) 1W 0.001534
2054 0.205 316.5 0.00274
Sr. No –
96960564 0.001534
3 5082 0.505 317.2 0.00274
0.001534
10011 1.001 317.1 0.00274

M/S MSETCL M/S BNC PPL; Pune

Authorized Signatory Authorized Signatory


TURRET CT TESTING
SUBSTATION : - 220/22 kV LONIKAND SUBSTATION DATE: - 24.05.13

EQPT. LOCATION: - Transformer new bay

TEMPERATURE :- 36°C

TESTED BY : - M/S BNC Power Project Ltd., Pune.

NAMEPLATE DATA
Sr no:-1U:- 135993 PD 1V:-1369-3PD 1W:-1359 -3PD
HV SIDE REF CT: CTR-300/1A CLASS-PS Vk-660V

1) KNEE POINT VOLTAGE

1U PHASE (mA) 1V PHASE (mA) 1W PHASE (mA)


% APPLIED V
1S1-1S2 1S1-1S2 1S1-1S2
20 120 23.0 20.25 23.13
40 240 34.1 33.0 35.4
60 360 43.8 43.0 46.2
80 480 56.8 57.1 63.2
100 600 74.6 72.0 81.1
110 660 91.6 83.5 99.3

2) IR MEASUREMENT

HV SIDE REF CT: CTR-300/1A CLASS-PS Vk-660V


PHASE 1U 1V 1W
CORE 1S1-E 1S1-E 2S1-E 1S1-E
IR VALUE (1 KV) 2.76 GΩ 2.80 GΩ 20.8 GΩ 2.81GΩ
3) REF CT RATIO TEST: CTR-300/1A

PRIM CURRENT INJECTED 1U 1V 1W


60 A 0.202A 0.19A 0.19A
120 A 0.36A 0.37A 0.8A
150 A 0.48A 0.47A 0.49A

4) WTI CT RATIO TEST: CTR-145.8/1.5A

PRIM CURRENT 1V
INJECTED
100 A 1.11 A

6) POLARITY TEST:- All core in forward direction.

M/S MSETCL M/S BNC PPL; Pune