We print buildings
Construction technology
http://apis-cor.com/en/faq/texnologiya-stroitelstva/ 1/4
04/04/2018 Construction technology | Apis Cor. We print buildings
Pic. 2
http://apis-cor.com/en/faq/texnologiya-stroitelstva/ 2/4
04/04/2018 Construction technology | Apis Cor. We print buildings
How much time is required for the installation and configuration of the
If the construction site is fully prepared (leveled flat with special equipment, supplied with water a
the installation of construction 3D printer is 30 minutes.
http://apis-cor.com/en/faq/texnologiya-stroitelstva/ 3/4
04/04/2018 Construction technology | Apis Cor. We print buildings
What if the wall is above the max height of the 3D printer, for example,
pediment?
In this case, you can print the item, in this case, the pediment, on the ground, and then mount it wi
construction equipment on the main structure.