Beruflich Dokumente
Kultur Dokumente
2016
No. &
name of
the
Whether
parties
Type of bidding contract Schedule
Mode of tender Date of publication of Last date of tender No. of tender not Contract No. and Name of Value of the
S.No. Tender No Item/Nature of work Single/Two bid awarded date of
enquiry NIT receipt receiv ed qualifie date contractor contract (In crore)
system to lowest completion
d after
tenderer
tech.
evaluati
on
M/S Vivek
LOA No: NOIDA
Travels (Regd), 1.85 19/07/2013
NOIDA Unit/DFCC/ Hiring of Vehicles for DFCCIL under CPM/ 21-5-2013 on website and Unit/DFCC/Vehicle
3 Open tender Single 25/06/2013 2 Under TC Under TC SD Block, Main revised to extended to
Vehicle/13/0 1 NOIDA 28- 5-2013 in newspapers /13/01/197 Dt. 19-
Road, 2.72 31/01/2017
07- 2013
Pitampura, Delhi
Expression Of Interest:
Expression Of
15.05.2015
Project Management Consultancy Services for Interest: 17 Contract
EOI invited on and
ICB No: construction of single line electrified (2x25 KV) Short listing Single stage Awarded 68 Months
27.03.2015and Request HQ/EN/Procurement DB Engineering
HQ/EN/Procurement/PMC Railway Track complete with Signaling & followed by Single bidding from Request for to Highest EURO: 1674538 and from date of
4 for Proposal invited Request for Proposal NIL /PMC SNL-PKY, and Consulting
/SNL-PKY, Telecommunication System and related Stage and Two Shortlisted Proposal Combined INR 53,34,40,133/- Commenceme
(Technical + Financial (Technical + Financial): Dated 09.09.2016 GmbH, Germany
Dated 30.10.2015 infrastructure for Sahnewal - Pilkhani Section of Packet System Consultants (Technical + Score nt
Proposal) on 30.10.2015 17.12.2015
Eastern Dedicated Freight corridor Project-3 Financial):3 Consultant
Extended up to 18.04.
M/s
Security
Solution
Engagement of Manpower Service Provider Noida/Hiring of M/s JMD
Noida/ Hiring of and 1.07 31/08/2016
agency for providing various categories of Single packet Manpower Consultants,
5 Manpower Services/01/ Open tender 02/07/2015 24/07/2015 6 Manpow Yes revised to extended to
outsourced staff for Chief Project Manager/ system Services/01/2015 Shakarpur, Delhi-
2015 er 1.51 30/06/2017
DFCCIL, Noida Unit dated 26.08.2015 92
Services,
Noida,
UP
23/02/2010
extended to
M/s VKS
HQ/EN/BB/Rewari- 1.83 25/07/2015
HQ/EN/BB/ Preliminary works and detail engg survey Infratech &
6 Open tender 24/02/2009 Single bid system 25/03/2009 7 N/A Yes Dadri/15 & 16 dated revised to (Work
RewariDadri/15 & 16 Rewari-Dadri dection & land facilitation work Management
12.05.2009 2.19 Completed,
Pvt Ltd
final payment
done)
08 Nos
1)M/s -
Chansm
a taluka
sarvoda
y
mazoor
kamdar
sahakari
mandli
ltd.-
Mehsan
No. DFCC/ ADI/
DFCC/ ADI/ a. 2)M/s - M/s-Komal
Manpower Hiring/ Rs. 1.006
7 Manpower Hiring/ 08 Hiring of manpower Open tender 26.02.2016 Single 05.04.2016 9 Prime Yes Enterprise. - 19.05.2018
08 (R1)/ 2015 Cr.
(R1)/ 2015 one Mehsana
Date: 20.05.2018
work
force
Pvt.Ltd. -
Bhopal.
3)M/s -
Jagdam
ba
services
solution
s Pvt.
Ltd.-
West
6,
M/s
CEG
PROJECT MANAGEMENT Ltd, M/s
CONSULTANCY for RBP
Design and Construction of Formation in I&E
Embankments/Cuttings including Works,
blanketing, Viaducts, Rail Flyover, Bridges M/s
(Major, Minor & RUBs), Supply and SOWiL
Spreading of Ballast and other related Ltd, M/s Rodic
IFB No.
infrastructural works for double track M/s SN Consultants 900 days +
HQ/EN/EC/ SEB 07.12.2015, single stage two
8 electrified railway line on Design Build Open 08.03.2016 8 Bhobe& Yes Date: 20.05.2018 Pvt. 8.6 DLP 24
JN/CS/PMC 10.12.2015 packet
Lump Sum Basis from Howrah end A P Ltd Ltd., Gurgaon, months
dated 07.12.2015
approach of DFC Sone bridge to JV Haryana.
Chirailapathu station of IR towards Howrah DIMMTS
& to New Sonnagar station towards Ltd,
Garhwa and at Dehri-on- Sone yard from M/s
Km. 3.16 to Km. 5.38 in connection with Feedbac
Eastern Dedicated Freight Corridor in the k Infra P
state of Bihar in India. Ltd, M/s
SM
Consult
ants.
M/S BC-VGS
01 M/s
Infra JV (M/S
MAN
Binod
Shifting and Commissioning of Three Structur
construction,
Phase Double Circuit 132 KV NCR al Pvt.
LOA NO Industrial
Transmission line in connection with Ltd.
CPM/MTC/ DFCCIL/ CPM/MTC/DFCCI estate Kokar
proposed DFCCIL ALIGNMENT at Double Bid P.B. No. INR
9 132KV NCR Open Tender 10.12.2015 13.01.2016 2 Yes L/132KV NCR Tr. Ranchi- 25.04.2018
BORAKI, WEIR, DANKAUR, and System 189, 7.18 Crore
Tr. Line/OT/ 2015-16 Line/OT/2015-16 834001 & VGS
KHURJA in Khurja- Dadri section in the Near
dated 26.04.2016 Infrastructure
Jurisdiction of Chief Project Loco,
Pvt. Ltd 140-B,
Manager/DFCCIL/Meer ut unit. Jaipur
Pocket- F, GTB
(Rajasth
Enclave Delhi-
an)
110093)
M/s
Security
Solution LOA No.
Engagement of Manpower Service Provider M/s JMD
Noida/ Hiring of and DFCC/Noida Unit/
agency for providing various categories of Single packet Consultants,
10 Manpower Services/01/ Open Tender 02/07/2015 24/07/2015 6 Manpow Yes Tender/Hiring of 1.07 31/08/2016
outsourced staff for Chief Project Manager/ system Shakarpur,
2015 er Manpower dtd. 22-
DFCCIL, Noida Unit Delhi-92
Services 08-15
, Noida,
UP
M/S Vivek
21-5-2013 on LOA No: NOIDA Travels (Regd), 3 years after
NOIDA
Hiring of Vehicles for DFCCIL under CPM/ website and 28- Under Unit/DFCC/Vehicle SD Block, Main issue of
11 Unit/DFCC/ Vehicle/13/0 Open Tender Single 25/06/2013 Two Under TC 1.85
NOIDA 5-2013 in TC /13/01 Dt. 19-07- Road, Letter Of
1
newspapers 2013 Pitampura, Acceptance
Delhi
1, M/s
Social and Environmental Safeguards SAI
M/s Haskoning
Monitoring and Review Consultancy Consulti HQ/SEMU/SESM
HQ/SEMU/ SESMRC/E Two Packet DHV
13 (SESMRC)for Bhaupur EOI 05.05.2013 29.04.14 4 ng Yes RC/02/13 Dated: 1.97 1.12.2018
OI/APL-2/13 System Consulting
– Mughalsarai Sec. Enginee 2.12.2014
Pvt.Ltd.
(APL-2) of EDFC rs Pvt.
Ltd.
Design, Construction,
Supply, Installation,
Testing and
Commissioning of 2x25
SPN PQ issued on
AC 50 Hz 16.07.2012 JV of Alstom
08.08.2014 (First
Electrification, Signalling and and first stage bid 3 during first HQ/SYS/EC/D-B/ India Limited 1100 days
HQ/SYS/ EC/D-B/ Pre Qualification Two stage stage bid) 27.04.2015
Telecommunication and associated works invitation issued on stage and 3 Bhaupura Khurja/ (AIL) and from
14 Bhaupur- Khurja Dated followed by two Bidding from Pre- (Second stage bid from Nil Yes Rs. 1497.11
of Double Track Railways Lines Under 31.01.2014 and during second CP-104 dated Alstom commencem
31.01.2014 stage bidding qualified bidders technically qualified
construction on A Design Buid Lump Sum second stage bid stage 21.07.2015 Transport ent date
bidders)
Basis for Bhaupur- Khurja Section of invitation issued on S.A. (ATSA)
21.02.2015
Eastern Dedicated
Freight Corridor (
System Works
Contract Package-104)
M/s
Siddhivinayak
LOA No.
Engagement of Manpower service provider Sushikshit
MUM/HR/ MUM/HR/Manpow
for outsourcing of support services at Single Bid Berojgar Seva Rs. 1.22
15 Manpower/ OA, EA & Open Tender 31.02.2015 09.03.2015 10 NA Yes er/OA, EA & 31/05/2017
offices in the Jurisdiction of System Sarkari Crore
ACO/303 ACO/303 dtd :
CPM/DFCCIL/Mumbai Sanstha
02/05/15
Maryadit
Mumbai
Design and Construction of Civil,
Structures and Track Works for Double
Line Railway involving Formation in
Embankments/Cuttings, Ballast on
SPN for PQ issued on
Formation, Track Works, Bridges,
11.04.2013 and 29.05.2014 (First HQ/EN/EC/D-
HQ/EN/EC/ D-B/ Structures, Buildings, Yards, Integration 7 during first
Pre Qualificaiton first stage bid invitation Two stage stage bid) , 24.11.2014 B/Mughalsarai -
Mughalsarai with IR Existing Railway System and stage and 5 Rs. 2664.09
16 followed by two issued on 12.02.2014 bidding from pre (Second stage bid from Nil Yes New Bhaupur /CP - GIL - SIL JV 20.01.2019
- New Bhaupur Dated Testing & Commissioning on Design-Build during second Crores
stage bidding and second stage bid qualified bidders. technically qualified 202 Dated
12.02.2014 Lump Sum Basis for New Karchana Station stage
invitation issued on bidders) 27.05.2015
(excluding) – New Bhaupur station
01.10.2014.
(excluding) (Approx.
236 Route Km out of which 229.5 Km is
double line and 6.7 km is single line) of
Eastern Dedicated Freight Corridor.
One
Sanjeev
Bahl
(Contrac M/s Durga Co-
Construction of Station Buildings, Relay tor), LOA No. operative L&C
CPM/UMB/ S&T- Rooms and Gate Goomties in connection Marble CPM/UMB/S&T- Society Ltd.,
18 Open Tender 24.01.2015 Single 16.02.2015 2 Yes 1.03 08.09.2015
Utility/2015/ PB-01 with shifting of S&T Utilities in the Punjab House, Utlity/2015/PB-01 #16, Jawahar
State under the jurisdiction of CPM/Ambala Punjabi dated 09.03.2015 Nagar, Ambala
Mohalla, City.
Ambala
Cantt-
133001
None (It
was a
single
The Durga Co-
Construction of Boundary wall, supplying & packet 6 Months
LOA No. op L&C Society
CPM/UMB/ fixing of boundary posts along newly bid & from the date
CPM/UMB/BW/2/ Ltd., 16
22 BW/2/Const acquired land by DFCCIL from Kalanaur to Open Tender 25.10.2013 Single 25.11.2013 3(Three) work Yes 1.16 of Start
Const. dated Jawahar
. Ambala city in Haryana within the was i.e.22.08.201
22.02.2014 Nagar, Ambala
Jurisdiction of CPM/DFCCIL/Ambala. awarded 4
City
to L1
tenderer
)
M/s
Kardam
Constru
ctions
Pvt.
Ltd., C-
8, Road M/s S.G.
No.-11, CPM/ Constructions, 6 Months
CPM/
23 Civil Work Open Tender 25.10.2013 Single Bid 25.11.2013 Two Nitya Yes UMB/BW/3/Const. 951,Urban 1.35 after issue of
UMB/BW/3/ Const.
Nand dated: 25.04.2014 Estate Phase, LOA.
Nagar, Jalandhar.
Gandhi
Path,
Vaishali
Nagar,
Jaipur-
302021.
M/s Vivek
Travels(regd.),
Hiring of Vehicles for DFCCIL at Corporate ROB/254 SD Block, main
25 NA NA NA NA NA NA NA 1.84 19.07.2016
office dt.19/12/2012 Road,
Pitampura
Delhi
PMC for Design and Construction of
Important Bridge across river Sone(approx.
lengh 3.06.km), its approaches (on both
sides) and other miscellaneous works for
double track electrified railway line on
Design Build Lump Sum Basis between
Sonnagar(Rly.km M/s
549) and Dehri-on- Sone(Rly. km. 554) LOA No. Intercontinental
NCB No.
Railway Stations on Mughalsarai-Sonnagar HQ/GGM/CO/EC/ Consultants
HQ/EN/EC/ NKWD-
Section of Eastern DFC & Design and Open 06.09.2013 Two Packet 19.11.2013 5 2 Yes PM-SEB- and 13.9 1216 days
NGAQ/Sone RFO/PMC
Construction of Rail Flyover near GAQN/73/2013 Technocrats
dated 06.09.2013
Ganjkhwaja, Formation in dated 02-01-2014 Pvt. Ltd, New
Embankments/Cuttings including Delhi
blanketing, Bridge(Major, Minor & RUBs),
Supply and Spreading of Ballast and oher
related infrastructural works for double
track electrified railway line on Design Build
Lump Sum
Basis in different stretches
DFCCIL/HQ
/AD/Tender/ 2011-12-III Hiring of Vehicles for DFCCIL at Corporate M/s Vivek
40 15.11.2011 4.62
Dated office Travels
15.11.2011
Original DOC
HQ/EN/EC/ PETS/Futur TS/EN/PETS/Futu = 11.9.2014
42 e DFC PETS Survey for Future Corridors SINGLE re DFC Date : M/s RITES Ltd 63.552 Extended
Dated 2.9.2011 14.10.2011 upto
29.2.2016
01 Original DOC
Vyam 16/05/2012
Consultancy Service for Overall IT Strategy
44 HQ/IT/PPF/ 1 EOI and RFP 30.06.2009 EOI and RFP 20.01.2010 6 Technol No 17.05.2010 M/S WIPRO 1.08 Extended
and Program Management
ogies upto
Pvt. Ltd. 31.12.2016
M/s Nippon
Koei Co. Ltd,
Japan Railway
JPY 1,79,603,00
Engineering Consulting Services for technical
HQ/EN/WC/ E&S/Pt IV 0 ( INR
45 construction of WDFC- RE-BRC and 12.5.2010 Service, PB
dated 12.5.2010 396,108,00
procurement of Eectric locomotives. Japan Co. Ltd
0)
and Nippon
Koei India Pvt.
Ltd
Contract
Awarded
to the
firm who
scored
RFP issued to Quality and cost highest M/s Scott
Consultancy Service for Design Review short listed EOI published on base combined Wilson Ltd., 12 weeks
Last date of submission HQ/EN/PPF/DRC/
46 HQ/Engg./P PL/DRC/1 Consultancy for Khurja_Bhaupur section of consultants in 27.03.09.RFP selection(QCBS) 6 0 technical U.K & Scott 1.2 after
of RFP was 20.10.2009 1 dated 11.02.10
Eastern DFC response to issued on 14.07.09 with 2 packet and Wilson India 11.02.10
published EOI system financial Pvt. Ltd.
score
based on
QCBS
selection
process
23 feb 2010,
extended to
M/s VKS 23.01.2014,
Preliminary works and detail engg survey HQ/EN/BB/Rewari-
HQ/EN/BB/ Rewari- Single bid Infratech & further
47 Rewari-Dadri dection & land facilitation Open tender 24.02.2009 25.03.2009 7 N/A Yes Dadri/15 & 16 2.8
Dadri/15 & 16 system Management extension
work dated 12.05.2009
Pvt Ltd upto 23-4-
2014 is under
process
Consortium
consisting of
parsons
Contract
Brinckerhoff
Awarded
India private
to the
Ltd., New
RFP issued to firm who
Delhi(lead
short listed scored
partner),
General Consultancy services for the work consultants in Quality and cost highest LOA No.
Halcrow
of Double line Electrified railway track response to base combined HQ/EN/GC/1 dt.
RFP issued on date Last date of submission Consulting
60 HQ/EN/GC/ 1 complete with S&T etc. for Bhaupur- notice in selection(QCBS) 3 0 technical 22.09.2008 133.86 21.09.2014
10.04.08 of RFP was 08.07.2008 India Private
Mandrak of Kanpur - Khurja section of newspaper for with 2 packet and Agreement dated
Ltd., New delhi,
EFC. short listing of system financial 04.03.2009
Wilbur Smith
detail design score
Associates
consultants based on
Inc.,
QCBS
Bangalore, Lea
selection
Associates
process
South asia
private Ltd.,
New Delhi
M/s Skylark
MTC/EN/DFCCIL/
MTC/EN/DF Detail Engg. Construction Survey from designer &
Single Bid Detour
76 CCIL/Detour Survvey/20 Hafizpur to Daurala and Khatauli to Rohana Open Tender 23/02/2014 28.04.2014 6 NA YES enginnering INR: 1,49,94,4311 04/12/2015
System Survvey/2014-15
14-15 Kalan Pvt.
Dated 26.06.2014
Ltd. Noida
HQ/EN/WC/BRID
PMC for Design and Construction of 54 M/S SNC 25.09.2012
HQ/EN/WC/ BRIDGES/ GES/PMC/1/SPA 10.71
78 Major Bridges in WDFC between Vaitarana Open Tender 01.10.2008 Two BID System 06.11.2008 NA YES Lavanin Pvt. extended
PMC/1 N dated revised C>A. 17.85
and UTRAN Ltd. upto 29.12.14
12.06.2009