DETAILS OF TENDERS AWARDED (more than Rs. 1 crore value) upto 09.09.

2016
No. &
name of
the
Whether
parties
Type of bidding contract Schedule
Mode of tender Date of publication of Last date of tender No. of tender not Contract No. and Name of Value of the
S.No. Tender No Item/Nature of work Single/Two bid awarded date of
enquiry NIT receipt receiv ed qualifie date contractor contract (In crore)
system to lowest completion
d after
tenderer
tech.
evaluati
on

First stage Bid (Technical


Design and Construction of civil, Sructures and bid): 26.08.2015 Extended
Track Works for Railway, involving Formation in up to 16.09.2015
Embankment/Cuttings, Ballast on Formation, SPN issued on 05.03.2014
01
ICB No: HQ/EN/EC/D- Track Works, Bridges, Structures, Buildings, and first stage Bid and 9 for Technical bid HQ/EN/EC/D-
Prequalification Two stage bidding (Jaipraka
B/sahnewal-Pilkhani and yards, Integration with Indian Rialway’s existing invitation issued on (1st stage) and 6 B/Sahnewal – 25th Mach,
1 followed by two from Pre-qualified sh Yes GIL-TPL JV INR 1769.40 Crores
Dadri-Khurja sections , Railway system and Testing & Commissioning 26.06.2015. Second stage Second Stage Bid (Financial for Financial bid Pilkhani/CP-301, 2020
stage bidding bidders Associate
dated 26.06.2015 on Design-Build Lump-Sum Basis for Sahnewal- bid invitation issued on Bid from technically (2nd stage) Dated 29.08.2016
s Ltd)
Pilkhani (approx.. 175 route Km of Single Line) 25.02.2016. qualified bidders):
of Eastern Dedicated freight Corrdor (Contract 29.03.2016 and it was
Package-301) extended up to 19.04.2016

First stage Bid (Technical


Design and Construction of civil, Sructures and bid): 26.08.2015 Extended
Track Works for Railway, involving Formation in up to 16.09.2015
Embankment/Cuttings, Ballast on Formation, SPN issued on 05.03.2014
01
ICB No: HQ/EN/EC/D- Track Works, Bridges, Structures, Buildings, and first stage Bid and 10 for Technical HQ/EN/EC/D-
Prequalification Two stage bidding (Jaipraka
B/sahnewal-Pilkhani and yards, Integration with Indian Rialway’s existing invitation issued on bid (1st stage) and B/Dadri - Khurja/CP-
2 followed by two from Pre-qualified sh Yes GIL-TPL JV INR 511.30 Crores 19th July, 2019
Dadri-Khurja sections , Railway system and Testing & Commissioning 26.06.2015. Second stage Second Stage Bid (Financial 6 for Financial bid 302, Dated
stage bidding bidders associate
dated 26.06.2015 on Design-Build Lump-Sum Basis for Dadri- bid invitation issued on Bid from technically (2nd stage) 29.08.2016
s Ltd)
Khurja section (approx.. 46 route Km of double 25.02.2016. qualified bidders):
Line) of Eastern Dedicated freight Corrdor 29.03.2016 and it was
(Contract Package-302 extended up to 19.04.2016

M/S Vivek
LOA No: NOIDA
Travels (Regd), 1.85 19/07/2013
NOIDA Unit/DFCC/ Hiring of Vehicles for DFCCIL under CPM/ 21-5-2013 on website and Unit/DFCC/Vehicle
3 Open tender Single 25/06/2013 2 Under TC Under TC SD Block, Main revised to extended to
Vehicle/13/0 1 NOIDA 28- 5-2013 in newspapers /13/01/197 Dt. 19-
Road, 2.72 31/01/2017
07- 2013
Pitampura, Delhi
Expression Of Interest:
Expression Of
15.05.2015
Project Management Consultancy Services for Interest: 17 Contract
EOI invited on and
ICB No: construction of single line electrified (2x25 KV) Short listing Single stage Awarded 68 Months
27.03.2015and Request HQ/EN/Procurement DB Engineering
HQ/EN/Procurement/PMC Railway Track complete with Signaling & followed by Single bidding from Request for to Highest EURO: 1674538 and from date of
4 for Proposal invited Request for Proposal NIL /PMC SNL-PKY, and Consulting
/SNL-PKY, Telecommunication System and related Stage and Two Shortlisted Proposal Combined INR 53,34,40,133/- Commenceme
(Technical + Financial (Technical + Financial): Dated 09.09.2016 GmbH, Germany
Dated 30.10.2015 infrastructure for Sahnewal - Pilkhani Section of Packet System Consultants (Technical + Score nt
Proposal) on 30.10.2015 17.12.2015
Eastern Dedicated Freight corridor Project-3 Financial):3 Consultant
Extended up to 18.04.

M/s
Security
Solution
Engagement of Manpower Service Provider Noida/Hiring of M/s JMD
Noida/ Hiring of and 1.07 31/08/2016
agency for providing various categories of Single packet Manpower Consultants,
5 Manpower Services/01/ Open tender 02/07/2015 24/07/2015 6 Manpow Yes revised to extended to
outsourced staff for Chief Project Manager/ system Services/01/2015 Shakarpur, Delhi-
2015 er 1.51 30/06/2017
DFCCIL, Noida Unit dated 26.08.2015 92
Services,
Noida,
UP
23/02/2010
extended to
M/s VKS
HQ/EN/BB/Rewari- 1.83 25/07/2015
HQ/EN/BB/ Preliminary works and detail engg survey Infratech &
6 Open tender 24/02/2009 Single bid system 25/03/2009 7 N/A Yes Dadri/15 & 16 dated revised to (Work
RewariDadri/15 & 16 Rewari-Dadri dection & land facilitation work Management
12.05.2009 2.19 Completed,
Pvt Ltd
final payment
done)
08 Nos
1)M/s -
Chansm
a taluka
sarvoda
y
mazoor
kamdar
sahakari
mandli
ltd.-
Mehsan
No. DFCC/ ADI/
DFCC/ ADI/ a. 2)M/s - M/s-Komal
Manpower Hiring/ Rs. 1.006
7 Manpower Hiring/ 08 Hiring of manpower Open tender 26.02.2016 Single 05.04.2016 9 Prime Yes Enterprise. - 19.05.2018
08 (R1)/ 2015 Cr.
(R1)/ 2015 one Mehsana
Date: 20.05.2018
work
force
Pvt.Ltd. -
Bhopal.
3)M/s -
Jagdam
ba
services
solution
s Pvt.
Ltd.-
West
6,
M/s
CEG
PROJECT MANAGEMENT Ltd, M/s
CONSULTANCY for RBP
Design and Construction of Formation in I&E
Embankments/Cuttings including Works,
blanketing, Viaducts, Rail Flyover, Bridges M/s
(Major, Minor & RUBs), Supply and SOWiL
Spreading of Ballast and other related Ltd, M/s Rodic
IFB No.
infrastructural works for double track M/s SN Consultants 900 days +
HQ/EN/EC/ SEB 07.12.2015, single stage two
8 electrified railway line on Design Build Open 08.03.2016 8 Bhobe& Yes Date: 20.05.2018 Pvt. 8.6 DLP 24
JN/CS/PMC 10.12.2015 packet
Lump Sum Basis from Howrah end A P Ltd Ltd., Gurgaon, months
dated 07.12.2015
approach of DFC Sone bridge to JV Haryana.
Chirailapathu station of IR towards Howrah DIMMTS
& to New Sonnagar station towards Ltd,
Garhwa and at Dehri-on- Sone yard from M/s
Km. 3.16 to Km. 5.38 in connection with Feedbac
Eastern Dedicated Freight Corridor in the k Infra P
state of Bihar in India. Ltd, M/s
SM
Consult
ants.
M/S BC-VGS
01 M/s
Infra JV (M/S
MAN
Binod
Shifting and Commissioning of Three Structur
construction,
Phase Double Circuit 132 KV NCR al Pvt.
LOA NO Industrial
Transmission line in connection with Ltd.
CPM/MTC/ DFCCIL/ CPM/MTC/DFCCI estate Kokar
proposed DFCCIL ALIGNMENT at Double Bid P.B. No. INR
9 132KV NCR Open Tender 10.12.2015 13.01.2016 2 Yes L/132KV NCR Tr. Ranchi- 25.04.2018
BORAKI, WEIR, DANKAUR, and System 189, 7.18 Crore
Tr. Line/OT/ 2015-16 Line/OT/2015-16 834001 & VGS
KHURJA in Khurja- Dadri section in the Near
dated 26.04.2016 Infrastructure
Jurisdiction of Chief Project Loco,
Pvt. Ltd 140-B,
Manager/DFCCIL/Meer ut unit. Jaipur
Pocket- F, GTB
(Rajasth
Enclave Delhi-
an)
110093)

M/s
Security
Solution LOA No.
Engagement of Manpower Service Provider M/s JMD
Noida/ Hiring of and DFCC/Noida Unit/
agency for providing various categories of Single packet Consultants,
10 Manpower Services/01/ Open Tender 02/07/2015 24/07/2015 6 Manpow Yes Tender/Hiring of 1.07 31/08/2016
outsourced staff for Chief Project Manager/ system Shakarpur,
2015 er Manpower dtd. 22-
DFCCIL, Noida Unit Delhi-92
Services 08-15
, Noida,
UP

M/S Vivek
21-5-2013 on LOA No: NOIDA Travels (Regd), 3 years after
NOIDA
Hiring of Vehicles for DFCCIL under CPM/ website and 28- Under Unit/DFCC/Vehicle SD Block, Main issue of
11 Unit/DFCC/ Vehicle/13/0 Open Tender Single 25/06/2013 Two Under TC 1.85
NOIDA 5-2013 in TC /13/01 Dt. 19-07- Road, Letter Of
1
newspapers 2013 Pitampura, Acceptance
Delhi

Design and Construction of Formation in


Embankments/Cuttings including
blanketing, Viaducts, Rail Flyover,Bridges
(Major, Minor & RUBs),Supply and
IFP No:
Spreading of Ballast and other related
HQ/EN/EC/ PQ/SEB-
infrastructural works for double track M/s ATEPL-
BCJ-CPBH PQ followed by LOA No.
electrified railway line on Design Build Issued PQ on MGCPL
dated 01/06/2015 bidding single PQ 23.07.2015, PQ-3, PQ-Nil, HQ/EN/EC/SEB
12 Lump Sum Basis from Howrah end Open PQ 01.06.2015, Bid Yes Joint 365.22 900 days
& IFB No: stage two Bid 29.12.2015 Bid-2. Bid-Nil. Jn.Works/Bid Doc
approach of DFC Sone bridge to on 09.10.2015 Venture,New
HQ/EN/EC/ SEB packet. dated 26.04.2016
Chirailapathu station of IR towards Howrah Delhi.
JN.Works dated
& to New Sonnagar station towards
09.10.2015
Garhwa and at Dehri-on- Sone yard from
Km. 3.16 to Km. 5.38 in connection with
Eastern Dedicated Freight Corridor in the
state of Bihar in India.

1, M/s
Social and Environmental Safeguards SAI
M/s Haskoning
Monitoring and Review Consultancy Consulti HQ/SEMU/SESM
HQ/SEMU/ SESMRC/E Two Packet DHV
13 (SESMRC)for Bhaupur EOI 05.05.2013 29.04.14 4 ng Yes RC/02/13 Dated: 1.97 1.12.2018
OI/APL-2/13 System Consulting
– Mughalsarai Sec. Enginee 2.12.2014
Pvt.Ltd.
(APL-2) of EDFC rs Pvt.
Ltd.
Design, Construction,
Supply, Installation,
Testing and
Commissioning of 2x25
SPN PQ issued on
AC 50 Hz 16.07.2012 JV of Alstom
08.08.2014 (First
Electrification, Signalling and and first stage bid 3 during first HQ/SYS/EC/D-B/ India Limited 1100 days
HQ/SYS/ EC/D-B/ Pre Qualification Two stage stage bid) 27.04.2015
Telecommunication and associated works invitation issued on stage and 3 Bhaupura Khurja/ (AIL) and from
14 Bhaupur- Khurja Dated followed by two Bidding from Pre- (Second stage bid from Nil Yes Rs. 1497.11
of Double Track Railways Lines Under 31.01.2014 and during second CP-104 dated Alstom commencem
31.01.2014 stage bidding qualified bidders technically qualified
construction on A Design Buid Lump Sum second stage bid stage 21.07.2015 Transport ent date
bidders)
Basis for Bhaupur- Khurja Section of invitation issued on S.A. (ATSA)
21.02.2015
Eastern Dedicated
Freight Corridor (
System Works
Contract Package-104)
M/s
Siddhivinayak
LOA No.
Engagement of Manpower service provider Sushikshit
MUM/HR/ MUM/HR/Manpow
for outsourcing of support services at Single Bid Berojgar Seva Rs. 1.22
15 Manpower/ OA, EA & Open Tender 31.02.2015 09.03.2015 10 NA Yes er/OA, EA & 31/05/2017
offices in the Jurisdiction of System Sarkari Crore
ACO/303 ACO/303 dtd :
CPM/DFCCIL/Mumbai Sanstha
02/05/15
Maryadit
Mumbai
Design and Construction of Civil,
Structures and Track Works for Double
Line Railway involving Formation in
Embankments/Cuttings, Ballast on
SPN for PQ issued on
Formation, Track Works, Bridges,
11.04.2013 and 29.05.2014 (First HQ/EN/EC/D-
HQ/EN/EC/ D-B/ Structures, Buildings, Yards, Integration 7 during first
Pre Qualificaiton first stage bid invitation Two stage stage bid) , 24.11.2014 B/Mughalsarai -
Mughalsarai with IR Existing Railway System and stage and 5 Rs. 2664.09
16 followed by two issued on 12.02.2014 bidding from pre (Second stage bid from Nil Yes New Bhaupur /CP - GIL - SIL JV 20.01.2019
- New Bhaupur Dated Testing & Commissioning on Design-Build during second Crores
stage bidding and second stage bid qualified bidders. technically qualified 202 Dated
12.02.2014 Lump Sum Basis for New Karchana Station stage
invitation issued on bidders) 27.05.2015
(excluding) – New Bhaupur station
01.10.2014.
(excluding) (Approx.
236 Route Km out of which 229.5 Km is
double line and 6.7 km is single line) of
Eastern Dedicated Freight Corridor.

Design and Construction of Civil,


Structures and Track Works for Double
Line Railway involving Formation in
Embankments/Cuttings, Ballast on SPN for PQ issued on
Formation, Track Works, Bridges, 11.04.2013 and 29.05.2014 (First HQ/EN/EC/D-
HQ/EN/EC 8 during first
Structures, Buildings, Yards, Integration Pre Qualificaiton first stage bid invitation Two stage stage bid) , 24.11.2014 B/Mughalsarai -
/D-B/ Mughalsarai stage and 5 Rs.2416.68
17 with IR existing Railway System and followed by two issued on 12.02.2014 bidding from pre (Second stage bid from Nil Yes New Bhaupur /CP - GIL - SIL JV 20.01.2019
- New Bhaupur Dated during second Crores
Testing & Commissioning on Design-Build stage bidding and second stage bid qualified bidders. technically qualified 201 Dated
12.02.2014 stage
Lump Sum Basis for Mughalsarai – New invitation issued on bidders) 27.05.2015
Karchana Station (including) (Approx. 181 01.10.2014.
Route Km out of which
158.6 Km is double line and 22.43 is single
line) of Eastern Dedicated Freight Corridor

One
Sanjeev
Bahl
(Contrac M/s Durga Co-
Construction of Station Buildings, Relay tor), LOA No. operative L&C
CPM/UMB/ S&T- Rooms and Gate Goomties in connection Marble CPM/UMB/S&T- Society Ltd.,
18 Open Tender 24.01.2015 Single 16.02.2015 2 Yes 1.03 08.09.2015
Utility/2015/ PB-01 with shifting of S&T Utilities in the Punjab House, Utlity/2015/PB-01 #16, Jawahar
State under the jurisdiction of CPM/Ambala Punjabi dated 09.03.2015 Nagar, Ambala
Mohalla, City.
Ambala
Cantt-
133001

Project management Consultancy for HQ/EN/PWC/RFP/ M/s


HQ/EN/PW C/RFP/PMC Single Bid JYP-294.45 INR-
19 Rewari to Vododara Section of Phase-I of PMC/PHASE-I N.K.Constortiu 06 Years
/PHASE-I System 474.25
WDFC Dated 21.02.2014 m

Design and construction of


Civil,Building<trackwork s for double line
HQ/EN/PWC/PRE-
Railway involving embankments/cutting,st
HQ/EN/PW C/PRE- WORKS/PHASE-
ructure,building,ballast on formation,track SOJITZ-L&T
20 WORKS/PH ASE- Single Bid System I/PKG1&2/D&B/1/ 6699.5 208 WEEKS
works,including testing,abnd CONSORTIUM
I/PKG1&2/ D&B/1 SOJITZ-L&T
commissioning on designbuild lump-sum
06.08.2013
price basis for Rewari- Iqbalgarh Section of
WDFC-PH-I
Contract
awarded
to the
firm who
Joint Venture
scored
of Mott
RFP issued to Quality and Cost highest
HQ/EN/PROCURE MacDonald
Quality and Safety Audit Consultancy shortlisted EOI published on base combined GBP 920056/- + INR
HQ/EN/PR OCUREME Last date of submission MENT/QSAC/BAU- Limited ,UK
21 services for Bhaupur-Khurja consultants in 11/10/12, RFP issued selection(QCBS) 2 0 technical 177,670,06 42 months
NT/QSAC/ BAU-KRJ of RFP was 27/08/2013 KRJ dated and Mott
section of EDFC Project- I response to on date 25/04/2013 with 2 packet and 6
06.05.2014 MacDonald
published EOI system financial
Private Limited
score
India
based on
QCBS
selection
process

None (It
was a
single
The Durga Co-
Construction of Boundary wall, supplying & packet 6 Months
LOA No. op L&C Society
CPM/UMB/ fixing of boundary posts along newly bid & from the date
CPM/UMB/BW/2/ Ltd., 16
22 BW/2/Const acquired land by DFCCIL from Kalanaur to Open Tender 25.10.2013 Single 25.11.2013 3(Three) work Yes 1.16 of Start
Const. dated Jawahar
. Ambala city in Haryana within the was i.e.22.08.201
22.02.2014 Nagar, Ambala
Jurisdiction of CPM/DFCCIL/Ambala. awarded 4
City
to L1
tenderer
)
M/s
Kardam
Constru
ctions
Pvt.
Ltd., C-
8, Road M/s S.G.
No.-11, CPM/ Constructions, 6 Months
CPM/
23 Civil Work Open Tender 25.10.2013 Single Bid 25.11.2013 Two Nitya Yes UMB/BW/3/Const. 951,Urban 1.35 after issue of
UMB/BW/3/ Const.
Nand dated: 25.04.2014 Estate Phase, LOA.
Nagar, Jalandhar.
Gandhi
Path,
Vaishali
Nagar,
Jaipur-
302021.

Prepartion of GAD for proposed ROBs in


Lieu of LC gates JNPT-BSR on WDFC and
ROBs of Central Railway comprising of
Engineering Survey, Geo-technological
investigation; prepartion
& approval of GADs from concerned Mum/EN/LT/
MUM/EN/LT M/s. SOWIL
24 Railway authorities etc. including temporary Limited Tender 03.10.2012 Single BID 05.11.2012 2 NA Yes ROB/254 1.42 20.11.2014
/ROB/254 Ltd
diversions, temporary LCs, prepartion of dt.19/12/2012
detailed design & drawings of ROBs
(Railway portion including FOBs/Subways
wherever required), and prepartion of BOQ
,Estimate, Schedule if quantites for
construction of ROBs etc

M/s Vivek
Travels(regd.),
Hiring of Vehicles for DFCCIL at Corporate ROB/254 SD Block, main
25 NA NA NA NA NA NA NA 1.84 19.07.2016
office dt.19/12/2012 Road,
Pitampura
Delhi
PMC for Design and Construction of
Important Bridge across river Sone(approx.
lengh 3.06.km), its approaches (on both
sides) and other miscellaneous works for
double track electrified railway line on
Design Build Lump Sum Basis between
Sonnagar(Rly.km M/s
549) and Dehri-on- Sone(Rly. km. 554) LOA No. Intercontinental
NCB No.
Railway Stations on Mughalsarai-Sonnagar HQ/GGM/CO/EC/ Consultants
HQ/EN/EC/ NKWD-
Section of Eastern DFC & Design and Open 06.09.2013 Two Packet 19.11.2013 5 2 Yes PM-SEB- and 13.9 1216 days
NGAQ/Sone RFO/PMC
Construction of Rail Flyover near GAQN/73/2013 Technocrats
dated 06.09.2013
Ganjkhwaja, Formation in dated 02-01-2014 Pvt. Ltd, New
Embankments/Cuttings including Delhi
blanketing, Bridge(Major, Minor & RUBs),
Supply and Spreading of Ballast and oher
related infrastructural works for double
track electrified railway line on Design Build
Lump Sum
Basis in different stretches

Design and Construction of Rail Flyover


near Ganjkhwaja, Formation in
Embankments/Cuttings including
blanketing, Bridges (Major, Minor & RUBs),
IFB No. LOA No.
Supply and Spreading of Ballast and other
HQ/EN/EC/ DOS- Issued PQ on PQ followed by HQ/EN/EC/DOS- M/s ILF&S
related infrastructural works for double PQ 19.03.2013 PQ-10 PQ-2
26 MGS/RFO& Open PQ 31.10.2013 Bid bidding, Single Yes MGS/Bid/RFO & Engg- GPT(JV) 144.65 900 days
track electrified railway line on Design Build Bid 08.08.2013 Bid-3 Bid-Nil
Bal.Works Date 14.06.2013 stage two packet Bal. Works dated hyderabad
Lump Sum Basis in different stretches
14.06.2013 12.11.2013
between Dehri-on-Sone
& Mughalsarai of Eastern Dedicated
Freight Corridor in the states of Bihar and
Uttar Pradesh in India

RFP No. RFP issued to


Project Management Consultancy Services HQ/EN/Procureme
HQ/EN/proc short listed Joint Venture
27 for Bhaupur-Khurja Section of Eastern DFC 31.10.2013 Bidding 19.03.2013 6 nil yes nt/PMC/BAU-KRJ 80.98 72 months
urement/PM C/BAU-KRJ consultants in SAI- TYPSA
Project-1 dated 31.01.13
dated 11.01.13 response to EOI
Design and Construction of important
Bridge across river Sone(approximate
length 3.06 Kms),its approaches(on both
sides) and other miscellaneous works for LOA No. M/s ATEPL-
IFB No.
double track electrified railway line on PQ-14, PQ-Nil HQ/EN/EC/Bid/So MGCPL
28 HQ/EN/EC/ DB/Sone Open PQ id Single Stage Bid Yes 249.84 1216 Days
Design build Lump Sum Basis between Bid-7 Bid-1 ne Bridge/Pt.II Joint Venture,
Bridge Date 23.04.2013
Sonnagar(Rly. Km. 549) and Dehri-on- Dated 24.10.2013 New Delhi
Sone(Rly. Km. 554) railway Station on
Mughalsarai-Sonnagar Section of Eastern
Dedicated Freight Corridor
No. M/s Operations
HQ/SEMU/ SESMRC/E Social & Environmental Safeguard HQ/SEMU/SESM Research
29 EOI 14.06.2013 Two Packet 30.01.1900 3 Nil Yes 1.08 31.07.2017
OI/11-12/2 Monitoring & Review Consultancy RC/EOI/11-12/2 Group Pvt. Ltd.
Dated:01.08.2013 (ORG)
4
Parties:
1) EGIS
India
Consulti
ng
Enginee
PMC for Design and construction of Track,
rs Pvt.
signalling & Telecom works, Traction power
Ltd.. 2)
HQ/EN/ EC/NK supply,SCADA,OHE and M/s Wilbur
SOWIL
WDNGAQ/ T general Electrical works and its testing & smith
Limited. HQ/EN/EC/NKWD
racksystem s/ commissioning for double line electrical associates pvt.
30 Open Tender 15.06.2012 Two Bid System 27.09.2012 5 3) LEA Yes /DGO/PMC-Track 19.02 07.07.2017
PMC railway track from New Karwandiya(Rly. Ltd. JV with
Associat /Adt-d 08.03.2013
dated 22.06.20 Km ardanury
es
12 564) to Durgawati(Km 630) approx. 66 Kms Igeneieria, S.A.
South
on Mughalsarai-Sonnagar section of
Asia Pvt.
Eastern Dedicated freight Corridor
Ltd. 4)
SAI
Consulti
ng
engineer
s Pvt.
Ltd.

Preparation of GAD, & detail design ,


NIL
modification/rebuilding of ROB Engineering M/s Construma
(Awarde DFC / ADI / GAD
DFC / ADI / Survey; Geotechnical investigation; 15.12.2012 Consultancy
31 Open Tender Single 21.01.2013 10 d to Yes /4 / 2012-13 3.51 21.04.2017
GAD / 4 / 2012-13 Preparation of Land Acquisition Plans; (Indian Exp.) Pvt.
Lowest 14.03.2013
estimate, Schedule of quantities and Ltd
offer)
Comprehensive tender documents.
Dismantling of acquired structures from JP/EN/Dismantling
JP/EN/Dism antling of Rewari to Madar along DFCC alignment in of
M/s Miral
32 structures/2 012/102/01- the State of Haryana and Rajasthan on Website & office 04.12.12 Single 07.01.13 6 Nil Yes structures/2012/10 1.05 22.09.13
Infrastructure
R Western Freight Corridor under CPM/ 2/01-R Dated
JAIPUR 23.3.13
LOA No.
HQ/Admin/Tender/
Engagement of manpower service provider Not Housekeeping
HQ/Admin/T ender/Hous GA Digital Web
33 for outsourcing of housekeeping services in Open Tender 16.10.12 Single Bid 16.11.12 7 Applicab Yes services/12 dated 1.12 31.12.2014
ekeeping services/12 word(P) Ltd
DFCCIL's Corporate office le 20.12.12 Date of
start of work-
01.01.13
PQ No.
HQ/EN/EC/ Track/NKW
M/s Ferrovia
D-DGO Issued PQ 18.11.2011, HQ/EN/EC/NKWD-
Single stage two PQ 16.01.2012 PQ-22 PQ Nil Transrail
34 dated 18.11.2011 Track Works Open PQ Bid Yes DGO/Track Bid 147.61 540 days
packet after PQ Bid 30.05.2012 Bid-11 Bid-9 Solutions Pvt.
Bid No. HQ/EN/EC/ 17.04.2012 Dated 20.07.2012
Ltd.
Track/NKW D-DGO
dated 17.04.2012
2
Parties:(
1)
INECO
S.A.
in JV
with Contract
Prointec Awarded
S.A. and to the
LEA firm who
Associat scored
HQ/EN/Proc Quality and cost e South highest HQ/EN/Procureme
RFP issued to
urement/GC General consultancy Services for Bhaupur- base asia Pvt. combined nt/GC/MGS- AECOM Asia
short listed EOI published on
35 /MGS- BAU(PH-2), KRJ- Mughalsarai and Khurja- Ludhiana Section selection(QCBS) 03.05.2012 6 Ltd. technical BAU(PH-2), KRJ- Company 18.18 36 months
consultant in 03.05.2011
LDH(PH-3) of EDFC with 2 packet (2) and LDH(PH-3) Dated Limited
response to EOI
Dated 11.04.2012 system SYSTR financial 09.01.2013
A score
S.A. based on
France QCBS
JV with selection
CANA process
RAIL
Consult
ant INC.
CANAD
A and
SYSTR
Design and construction of Civil, Structures
and Track works for double line railway
involving Formation in SPN for PQ issued on
30.03.2012(First
Embankments/Cuttings Ballast on 05.04.2010 and
Stage Bid), 13
HQ/EN/DB/ Bhaupur- Formation, Track Works, Bridges, Prequalificatio n first stage Bid invitation Two stage HQ/EN/DB/Bhaup
20.12.2012(Seco during First stage TATA-
36 Khurja Lot 101 dt. Structures, Buildings including Testing and followed by two issued on 24.12.2011 Bidding from Pre- NIL Yes ur-Khurja Lot 101 1329.5 21.04.2017
nd stage bid from and 9 during ALDESA(JV)
24.12.2011 Commisioning on Design-Build Lump- Sum stage bidding and Second stage bid qualified bidders dt. 08.03.2013
Technically qualified second stage
basis for bhaupur- khurja section of invitation issued on
bidders)
Eastern Dedicated Freight Corridor Lot 08.11.2012
101(Bhaupur village to Bhathura village rly.
1040-1170)

Design and construction of Civil, Structures


and Track works for double line railway
involving Formation in SPN for PQ issued on
30.03.2012(First
Embankments/Cuttings Ballast on 05.04.2010 and
Stage Bid), 13
HQ/EN/DB/ Bhaupur- Formation, Track Works, Bridges, Prequalificatio n first stage Bid invitation Two stage HQ/EN/DB/Bhaup
20.12.2012(Seco during First stage TATA-
37 Khurja Lot 102 dt. Structures, Buildings including Testing and followed by two issued on 24.12.2011 Bidding from Pre- NIL Yes ur-Khurja Lot 102 925.9 21.04.2017
nd stage bid from and 9 during ALDESA(JV)
24.12.2011 Commisioning on Design-Build Lump- Sum stage bidding and Second stage bid qualified bidders dt. 08.03.2013
Technically qualified second stage
basis for bhaupur- khurja section of invitation issued on
bidders)
Eastern Dedicated Freight Corridor Lot 08.11.2012
102(Bhathura village to Birauni village rly.
1170- 1266)
Design and construction of Civil, Structures
and Track works for double line railway
involving Formation in SPN for PQ issued on
30.03.2012(First
Embankments/Cuttings Ballast on 05.04.2010 and
Stage Bid), 13 1(OHL-
HQ/EN/DB/ Bhaupur- Formation, Track Works, Bridges, Prequalificatio n first stage Bid invitation Two stage HQ/EN/DB/Bhaup
20.12.2012(Seco during First stage PUNJ TATA-
38 Khurja Lot 103 dt. Structures, Buildings including Testing and followed by two issued on 24.12.2011 Bidding from Pre- Yes ur-Khurja Lot 1012.14 21.04.2017
nd stage bid from and 9 during LIOYD(J ALDESA(JV)
24.12.2011 Commisioning on Design-Build Lump- Sum stage bidding and Second stage bid qualified bidders 103dt. 08.03.2013
Technically qualified second stage V))
basis for bhaupur- khurja section of invitation issued on
bidders)
Eastern Dedicated Freight Corridor Lot 08.11.2012
103( Birauni village to Khurja rly. Km. 1266-
1368)
M/s Nippon
Koei Co. Ltd,
Japan Railway
JPY 1,069,968,1
The Project for Construction of Freight technical
HQ/EN/WC/ E&S dated 01 ( INR
39 Corridor: Dadri-Rewarri 05.12.2011 Service, PB
30.11.2011 302,702,30
& Vadodara-JNPT Section under Phase-2. Japan Co. Ltd
1)
and Nippon
Koei India Pvt.
Ltd

DFCCIL/HQ
/AD/Tender/ 2011-12-III Hiring of Vehicles for DFCCIL at Corporate M/s Vivek
40 15.11.2011 4.62
Dated office Travels
15.11.2011

DFCCIL invites sealed bids from eligible


Bidders for design and development of
package-based integrated IT Solution, 01.
Original DOC
procurement of hardware and software, Infosys M/s HCL
Single stage & DFCCIL/IT/SI/201 30.06.2013
41 DFCCIL/IT/ SI/2011 testing, ensuring security, deployment and Open Tender 04.07.2011 11.11.2011 4 Technol Yes Technologies 23.98
two packet 1 29.03.2012 Extended up
commissioning, training to end-users, post ogies Ltd.
to 30.09.2016
implementation Warranty and Operation Limited
& Maintenance for a period of three years,
for IT Project at DFCCIL

Original DOC
HQ/EN/EC/ PETS/Futur TS/EN/PETS/Futu = 11.9.2014
42 e DFC PETS Survey for Future Corridors SINGLE re DFC Date : M/s RITES Ltd 63.552 Extended
Dated 2.9.2011 14.10.2011 upto
29.2.2016

CPM/ADI/E Geotechnical Investigation, Preparation of


N/Pre ( Works) Wamaj - GAD of bridges, preparation of schedule of Hydropneum
43 20.5.2011 1.17
IGQ ( quantities, Joint measurement survey, Systems,Pune
East)/2 preparation of land plans & land acquisition

01 Original DOC
Vyam 16/05/2012
Consultancy Service for Overall IT Strategy
44 HQ/IT/PPF/ 1 EOI and RFP 30.06.2009 EOI and RFP 20.01.2010 6 Technol No 17.05.2010 M/S WIPRO 1.08 Extended
and Program Management
ogies upto
Pvt. Ltd. 31.12.2016

M/s Nippon
Koei Co. Ltd,
Japan Railway
JPY 1,79,603,00
Engineering Consulting Services for technical
HQ/EN/WC/ E&S/Pt IV 0 ( INR
45 construction of WDFC- RE-BRC and 12.5.2010 Service, PB
dated 12.5.2010 396,108,00
procurement of Eectric locomotives. Japan Co. Ltd
0)
and Nippon
Koei India Pvt.
Ltd

Contract
Awarded
to the
firm who
scored
RFP issued to Quality and cost highest M/s Scott
Consultancy Service for Design Review short listed EOI published on base combined Wilson Ltd., 12 weeks
Last date of submission HQ/EN/PPF/DRC/
46 HQ/Engg./P PL/DRC/1 Consultancy for Khurja_Bhaupur section of consultants in 27.03.09.RFP selection(QCBS) 6 0 technical U.K & Scott 1.2 after
of RFP was 20.10.2009 1 dated 11.02.10
Eastern DFC response to issued on 14.07.09 with 2 packet and Wilson India 11.02.10
published EOI system financial Pvt. Ltd.
score
based on
QCBS
selection
process
23 feb 2010,
extended to
M/s VKS 23.01.2014,
Preliminary works and detail engg survey HQ/EN/BB/Rewari-
HQ/EN/BB/ Rewari- Single bid Infratech & further
47 Rewari-Dadri dection & land facilitation Open tender 24.02.2009 25.03.2009 7 N/A Yes Dadri/15 & 16 2.8
Dadri/15 & 16 system Management extension
work dated 12.05.2009
Pvt Ltd upto 23-4-
2014 is under
process

Design and construction of formation


including blanketing, major Bridges, Minor
Bridges, RUBs,ROBs, Supply and
spreading of ballast and other related
16.12.2011
infrastructural works for Dedicated fright HQ/EN/NKWD-
HQ/EN/NK WD- EOT
48 corridor from chainage 14.108 Km(Near NGAQ/D&B/03/20 BSC-C&C 'JV' 660.31
NGAQ/D&B/ 03/2009 granted upto
New Karwandiya) to chainage 119.437 09 Dt-17.03.2009
20.02.2014
Km(Near New Ganj Khawaja) approx
101.089 Kms, on Mughalsarai-Son nagar
Section of eastern corridor in the state of
Bihar and Uttar Pradesh
None (It
was a
M/s Consulting
single
Engineer
packet
Limited tender fro staking out alignment, Group Ltd., E-
bid & LDH/EN/BB.CEG.
detail engineering construction survey for 12, Moji
49 NA Limited Tender 03.02.09 Single 12.03.2009 3 work Yes Agreement dated 1.54 24.07.09
locations)…. etc… from Kesri to Sanehwal Colony,
was 04.06.2009
on Eastern Dedicated Freight Corridor Malaviya
awarded
Nagar, Jaipur-
to L1
302017
tenderer
)
None (It M/s Pankaj
was a Patel &
Limited tender fro preparation of General single Associates,
arrangement drawings for proposed Road packet 303,
Over Bridges in lieu of level corssing gates bid & LDH/EN/ROB.PPA Chakrawarty
50 NA (approx.43 Nos.) between Kalanaur to Limited Tender 12.06.09 Single 30.06.2009 16 work Yes /Agreement dated Complex, Opp. 1.13 9.12.2009
Sanehwal in the State of Haryana & was 11.11.2009 Kiran Park
Punjab awarded Circle, Nawa
……. Estimates, Schedule of quantities etc. to L1 Vadaj,
tenderer Ahmedabad-
) 380013

Project Management Consultancy Services


for design and construction of formation
including blanketing, major Bridges, Minor
M/s SMEC (
Bridges, RUBs,ROBs, Supply and
India ) Pvt.Ltd.,
spreading of ballast and other related 19.04.2012
HQ/EN/EC/NKWD- in Association
HQ/EN/EC/ NKWD- infrastructural works for Dedicated fright EOT
51 NFAQ/PMC/04/20 with M/s Rodic 19.2
NGAQ/ PMC 1 corridor from chainage 14.108 Km(Near granted upto
09 Dt. 10.06.2009 Consultants
New Karwandiya) to chainage 119.437 20.02.2014
Pvt Ltd.
Km(Near New Ganj Khawaja) approx
Gurgaon .
101.089 Kms, on Mughalsarai-Son nagar
Section of eastern corridor in the state of
Bihar and Uttar Pradesh
3 nos.
As
under:
Detail Engineering Construction Survey of 1) M/s
STUP
the proposed alignment of the section,
Consult
preparation of land Plan and Land
ants Pvt.
Acquisition Proposal as per Railway
Ltd 25.06.2010
(Amendment) Act, 2008, identification of Two bid HQ/EN/Ec/Pre- M/s Monarch
2)M/s (original)
HQ/EN/EC/ Pre(Works)/ utilities & preparation of schedule of Open tender (Two system(Technica (Works)/DHN- Surveyors &
52 28.05.2009 22.07.2009 8 EMA Yes 2 extended
DHN-SEB/ quantities for construction of Dedicated packet system) l followed by SEB, dated Contractors
Unihorn upto
Freight Corridor from Dhanbad at Km Financial) 29.09.2009 Pvt. Ltd
(India) 31.07.2013
270.88 to Sonnagar at Km 549.04
Pvt.
(Approx.route length of 278 Kms) on
Ltd 3)
Eastern Dedicated Freight Corridor (KM Lion
00.00 starts from Howrah). Enginee
ring
Consult
ants

Detail Engineering Construction Survey of 2 nos.As


the proposed alignment of the section, under:1)
M/s
preparation of land Plan and Land
STUP M/s Aarvee
Acquisition Proposal as per Railway
Consult Associates 30.04.2010(o
(Amendment) Act, 2008, identification of Two bid HQ/EN/EC/Pre-
HQ/EN/EC/ Pre(Works)/ ants Pvt. Architects rigi nal)
utilities & preparation of schedule of Open tender(Two system(Technica (Works)/DKAE-
53 DKAE-DH, 28.05.2009 22.07.2009 8 Ltd 2) Yes Engineers & 1.43 extended
quantities for construction of Dedicated packet system) l followed by DHN, dated
dated 28.05.2009 M/s consultant Pvt. upto
Freight Corridor from Dankuni at Km 14.81 Financial) 04.08.2009
EMA Ltd. 30.04.2013
To Dhanbad at Km 270.88 (Approx. route
Unihorn( , Hyderabad
length of 256 Kms) on Eastern Dedicated
India
Freight Corridor (KM 00.00 starts from
) Pvt.
Howrah). Ltd

Providing assistance for the acquisition of


land from the stage of Sec. 20A onwards
Rodic
up to transfer of title in favour of
ALD/ EN/ Consultants
54 DFCCIL/Rlys. for construction of Dedicated 14/04/2009 1.01
Tender LA/ 48 Private Limited,
Freight Corridor Corporation from
Ranchi.
Sonnagar (Km 549.04) to Karchana
(Km 807.43).

Limited tender for staking out alignment,


detail engineering construction survey for
location(s) preparation of Land Plan for
section 4 & 6 notification under Indian Land
Acquisition Act, 1989, identification
& preparation of Land Acquisition Plan for Consulting
dumping locations for ballast/ blanket Engineer
55 LDH/EN/Te nder.BB 25/03/2009 1.54
material etc, Geotechnical investigation, Group Ltd.,
preoaration of G.A.D. for Minor & Major Jaipur
bridges along with preparation of schedule
of quantities, estimate and DPR for
construction of Dedicated Frieght Corridor
from Kesri to Sanehwal on Eastern Frieght
Corridor.

Design and Construction of important and


major bridges (54Nos) for Western Freight
M/s Soma
HQ/EN/WC/ Corridors between Vaitarna and Utran on
56 Open Tender 10.07.2008 Two BID System 04.09.2008 5 NIL YES 26/12/2008 Enterprises, 605.15
Bridge/D&B/ 1 Vaisai - Bharuch Section in the states of
Hyderabad
Maharastra and Gujrat, India on Lump Sum
Contract.
Design and Construction of formation
M/s B.Seenah
including blanketing, Major Bridges, for
HQ/EN/EC/ Bridge/DNB/ & Co.
57 DFCC on Mughalsarai-Sone Nagar Section 17/12/2008 781.06
1 (Projects) Ltd.,
of Eastern Corridor in States of Bihar and
Hyderabad
Uttar Pradesh in India.
Prepaaration of GAD for proposed ROBs
etc in lieu of Level Crossing Gates (51 Nos) M/s.Consulting
58 HQ/EN/EC/ LC ROB UP between Mughalsarai to Kalanaur in the 27/10/2008 Engg Group 2.03
State of Uttar Pradesh on Eastern Freight Ltd., Jaipur
Corridor
M/s (IL&FS)
Project Consultancy services for
HQ/OP&BD/ Business Ltd.
59 development of Business Plan of DFC 23-09-2008 6.54
Plan/RFP/ Pt.4 Consortium,
project in India.
New Delhi

Consortium
consisting of
parsons
Contract
Brinckerhoff
Awarded
India private
to the
Ltd., New
RFP issued to firm who
Delhi(lead
short listed scored
partner),
General Consultancy services for the work consultants in Quality and cost highest LOA No.
Halcrow
of Double line Electrified railway track response to base combined HQ/EN/GC/1 dt.
RFP issued on date Last date of submission Consulting
60 HQ/EN/GC/ 1 complete with S&T etc. for Bhaupur- notice in selection(QCBS) 3 0 technical 22.09.2008 133.86 21.09.2014
10.04.08 of RFP was 08.07.2008 India Private
Mandrak of Kanpur - Khurja section of newspaper for with 2 packet and Agreement dated
Ltd., New delhi,
EFC. short listing of system financial 04.03.2009
Wilbur Smith
detail design score
Associates
consultants based on
Inc.,
QCBS
Bangalore, Lea
selection
Associates
process
South asia
private Ltd.,
New Delhi

Interior works Flooring partition, false


M/s Godrej &
ceiling complete Elec work for top and
61 HQ/Adm/Off ice/1 07/04/2008 Boyce Mfg. Co. 7.24
middle floor for DFCCIL office Complex at
Ltd., New Delhi
Pragati Maidan
Interior works Flooring partition, false M/s Space
ceiling complete Elec work for bottom floor Furniture
62 HQ/Adm/Off ice/2 07/04/2008 3.73
for DFCCIL office Complex at Pragati System, New
Maidan Delhi
Stacking out alignment Detailed M/s Monarch
Engineering Const.Survey for DFCCIL from Surveyors
63 HQ/EN/Pre- Works/CNB :Prempur at Km 991.2 to Bhavpur (KM 14/03/2008 Contractors 1.9
1037.6) and from Ekdil (KM 1146.69 to Pvt.
Kulwa (Km 1338.40) on EFC. Ltd. Pune
M/s Monarch
Stacking out alignment Detail Engineering
Surveyors
Const. for DFCCIL from
64 HQ/EN/Pre- Works/MTC 12.03.2008 Contractors 2.48
: Kulwa to Khurja, Khurja to Dadri and
Pvt.
Khurja to Talheri
Ltd., Pune
Stacking out alignment, Detailed
M/s Rodic
Engineering Construction Survey for detour
HQ/EN/Pre. (Works)/AL Consultants
65 alignment at Dehri-On- 11.03.2008 3.21
D/E Pvt. Ltd.,
Sone,Sasaram,ROB for Const. from
Ranchi
Sonnagar to Karchana on EFC
M/s
Stacking out alignment Detailed Consultancy
66 HQ/EN/Pre- Works/AII Engineering Const. from :Madar to 07.03.2008 Engineers 5.31
Palanpur Km 290 to Km 648 on WFC Group Ltd.
Jaipur
Stacking out alignment, Detailed
M/s Rodic
Engineering Construction Survey from
Consultants
67 HQ/EN/Pre- Works/ADI Nadiad at Km. 07.03.2008 2.65
Pvt.
451.6 to Palampur (Km.648.4 ex Rewari)
Ltd., Ranchi
on Western Freight Corridor
M/s Monarch
Stacking out alignment, Detailed
Surveyors
HQ/EN/Pre- Works/ALD( Engineering Const. Survey from : Karchana
68 07.03.2008 Contractors 1.51
W) at Km 807.43 to Prempur at Km 991.2 on
Pvt.
EFC.
Ltd., Pune
Stacking out alignment, Detail engineering
construction survey for detour from Ambala
M/s Scott
to Doraha on left side of GT Road and at
Wilson India
any other locations (s) as directed by the
69 HQ/EN/Pre- Works/LDH 07.03.2008 Pvt. Ltd 3.36
Engineer in Charge, preparation of Land
Mathura Road.
Plan for section etc. for construction of
New Delhi.
DFCCIL from Talheri at Km 156 to
Ludhiana on Eastern Freight Corridor.

Stacking out alignment detail Engineering M/s Wilbur


Const. for DFCCIL from Smith
70 HQ/EN/Pre- Works/JP 07.03.2008 2.5
:Khori ( Rewari ) to Madar Km 10 to 290 Associates,
WFC and Rewari Area (35 Kms) Bangalore
M/s
Stacking out alignment, Engg Con Survey
Consultancy
HQ/EN/Pre- work from Sachin at Km.
71 04.03.2008 Engineers 3.19
Works/BRC/ 2008 251.6 to Nadiad at Km.451.6 on Western
Group Ltd.
Freight Corridor
Jaipur
Design, supply installation testing and
commissioning of heating, ventilation and M/s Voltas Ltd,
72 HQ/EL/ Tender- AC/Pt.II 22.02.2008 3.37
air conditioning (HVAC) system at DFCCIL New Delhi
office Complex at Pragati Maidan
M/s STUP
HW/Engg/ Pre-works/ Preliminary works of const. of major and 10.07.2008
Consultants
73 Bridges important bridges from Vaitrana to Utran on Limited Tender 07.01.2008 Two Bid System 23.01.2008 4 NIL YES 11.02.2008 1.24 extended
Pvt.
/Surat Western DFC upto 15.10.11
Ltd.Mumbai
M/s Vivek
2007/GM/E
74 Vehicle Hiring 01.11.2007 Travel Pvt. Ltd 1.67
ngg III/Hiring Vehicle
New Delhi
JP/EN/
Dismantling of structures from Rewari to
JP/EN/Dism antling Dismantling 30.04.2014
Madar along DFCC alignment in the State Single Bid M/s. Miral
75 of structures/2 012/ Website & Office 04.12.2012 07.01.2013 6 NIL Yes of structures/2012/ 1.05 (Contract is
of Haryana and Rajasthan on Western System Infrastructure
102/01- R 102/01-R dated completed)
Freight Corridor under CPM/JAIPUR
23.03.2013

M/s Skylark
MTC/EN/DFCCIL/
MTC/EN/DF Detail Engg. Construction Survey from designer &
Single Bid Detour
76 CCIL/Detour Survvey/20 Hafizpur to Daurala and Khatauli to Rohana Open Tender 23/02/2014 28.04.2014 6 NA YES enginnering INR: 1,49,94,4311 04/12/2015
System Survvey/2014-15
14-15 Kalan Pvt.
Dated 26.06.2014
Ltd. Noida

Design Supply, Erection


HQ/EL/132/KVTR M/s Associate
HQ/EL/132k VTRL- , Testing and Commissioning of 132 KV 3
single stage/Two L-XING/EC/02/ 02 Power
77 XING/EC- Phase Double Circuit Transmission Line Open Tender 14/05/2013 12/07/2013 one one YES Rs.25.45 Cr. 10.04.2015
packet system /2013 DTD Structures Pvt.
02dt. 14.5.2013 Xing Modification work for DFCalignment in
11.10.2013 Ltd.
Allahabad Division of North Centra Railway

HQ/EN/WC/BRID
PMC for Design and Construction of 54 M/S SNC 25.09.2012
HQ/EN/WC/ BRIDGES/ GES/PMC/1/SPA 10.71
78 Major Bridges in WDFC between Vaitarana Open Tender 01.10.2008 Two BID System 06.11.2008 NA YES Lavanin Pvt. extended
PMC/1 N dated revised C>A. 17.85
and UTRAN Ltd. upto 29.12.14
12.06.2009

Design, Construction, Supply, installation,


testing and Commissioning of 2x25 KV
one
electrification, signalling &
(Siemen Yes (out
telecommunication and associated works
Single stage s of two, HQ/SYS/DB/NKW
HQ/SYS/DB for the double track railway line under M/s Larsen &
79 open Tender 26.10.2012 Two packet 05.02.2013 Two infrastru one firm D-DGO/01/2013 Rs. 315 Cr. 18.08.2015
/NKWD- DGO construction on design buid lump sum Toubro Limited
system cture disqualifi dated 08.05.2013
basis from new- karwandiya (Rly km
and ed)
564) approx. 66 kms of route on
cities)
mughalsarai section of Eastern deidcated