Sie sind auf Seite 1von 2

Value Cycle Time Analysis v1.

Value Cycle Time Analysis

Process Step 1 2 3 4 5 6 7 8 9 10 Total

Value - Added 0
VALUE

Value - Enabled 0

Non-Value Added 0

Total 0

Process Step 1 2 3 4 5 6 7 8 9 10 Total

Work Time 0
TIME

Wait Time 0

Total Time 0 0 0 0 0 0 0 0 0 0 0

Time Notation In: Minutes Instructions

Step 1: Develop process map


Total Value-Added Work Time: 60 Minutes Step 2: Determine status of each step (VA, VE, or NVA)
Step 3: Measure time for each step (work time, wait time, total cycle time)
Total % Value-Added Work Time: Step 4: Subtract VE and NVA time from work time

_x000D_Copyright 2014 GoLeanSixSigma.com. All Rights Reserved.


Value Cycle Time Analysis v1.0

ue Cycle Time Analysis

% Total

#DIV/0!

#DIV/0!

#DIV/0!

% Total

#DIV/0!

#DIV/0!

_x000D_Copyright 2014 GoLeanSixSigma.com. All Rights Reserved.

Das könnte Ihnen auch gefallen