1 NOVOTEL SIHANOUKVILLE HOLIDAY RESORT 649 days Wed 6/6/18 Sun 3/15/20
2 NHP Main Building 595 Mon 7/30/18 Sun 3/15/20
days?
3 Remaining structure work 22 days Sat 7/6/19 Sat 7/27/19
4 L9&L10 7 days Sat 7/13/19 Fri 7/19/19
5 L8 Column、Wall and L9 Slab、Beam Casting 1 day Sat 7/13/19 Sat 7/13/19 L8 Column、Wall and L9 Slab、Beam Casting
7/13 7/13
6 L9 Wall reinforcement installation 2 days Sun 7/14/19 Mon 7/15/19 5 L9 Wall reinforcement installation
7/14 7/15
7 L10 Slab and beam Scaffolding installation 2 days Sun 7/14/19 Mon 7/15/19 5 L10 Slab and beam Scaffolding installation
7/14 7/15
8 L10 Slab and beam Formwork installation 1 day Tue 7/16/19 Tue 7/16/19 7 L10 Slab and beam Formwork installation
7/16 7/16
9 L9 Wall formwork installation 2 days Mon 7/15/19 Tue 7/16/19 7SS+1 day L9 Wall formwork installation
7/15 7/16
10 L10 Slab and beam reinforcement installation 2 days Wed 7/17/19 Thu 7/18/19 8 L10 Slab and beam reinforcement installation
7/17 7/18
11 L9 Wall Casting and L10 Slab、Beam Casting 1 day Fri 7/19/19 Fri 7/19/19 10 L9 Wall Casting and L10 Slab、Beam Casting
7/19 7/19
12 Handover to elevator team 1 day Sat 7/20/19 Sat 7/20/19 11 Handover to elevator team
7/20 7/20
13 Zone D remaining structure work 22 days Sat 7/6/19 Sat 7/27/19
14 Zone D2 L1 Beam formwork installation 3 days Sat 7/6/19 Mon 7/8/19 one D2 L1 Beam formwork installation
7/6 7/8
15 Zone D2 L1 Slab formwork installation 4 days Tue 7/9/19 Fri 7/12/19 14 Zone D2 L1 Slab formwork installation
7/9 7/12
16 Zone D2 L1 Slab Reinforcement installation 3 days Sat 7/13/19 Mon 7/15/19 15 Zone D2 L1 Slab Reinforcement installation
7/13 7/15
17 Zone D2 L1 Slab Casting 1 day Tue 7/16/19 Tue 7/16/19 16 Zone D2 L1 Slab Casting
7/16 7/16
18 Zone D2 L1 Wall and Column reinforcement installation 2 days Wed 7/17/19 Thu 7/18/19 17 D2 L1 Wall and Column reinforcement installation
7/17 7/18
19 Zone D2 L2 sacffolding installation 3 days Wed 7/17/19 Fri 7/19/19 18SS Zone D2 L2 sacffolding installation
7/17 7/19
20 Zone D2 L1 Wall and Column formwork installation 3 days Sat 7/20/19 Mon 7/22/19 19 Zone D2 L1 Wall and Column formwork installation
7/20 7/22
21 Zone D2 L2 Slab and Beam formwork installation 4 days Sat 7/20/19 Tue 7/23/19 19 Zone D2 L2 Slab and Beam formwork installation
7/20 7/23
22 Zone D2 L2 Slab、Beam reinforcement installation 3 days Wed 7/24/19 Fri 7/26/19 21 Zone D2 L2 Slab、Beam reinforcement installation
7/24 7/26
23 Zone D2 L1 Wall、Column and L2 Slab、Beam Casting 1 day Sat 7/27/19 Sat 7/27/19 22 Zone D2 L1 Wall、Column and L2 Slab、Beam Casting
7/27 7/27
24 Masonry work and Decoration  days?
25 Mock‐up Room 99 days Fri 5/31/19 Fri 9/6/19
26 Brick Wall Construction(Include Balcony Brick)  6 days Mon 6/24/19 Sat 6/29/19 Construction(Include Balcony Brick)
6/24 6/29
27 MEP‐ElECTRICAL SYSTEM 2 days Sun 6/30/19 Mon 7/1/19
28 Installation of LV & ELV Upvc conduit above ceiling 2 days Sun 6/30/19 Mon 7/1/19 26 n of LV & ELV Upvc conduit above ceiling
6/30 7/1
29 Installation of LV & ELV Upvc conduit in Brick Wall 2 days Sun 6/30/19 Mon 7/1/19 28SS n of LV & ELV Upvc conduit in Brick Wall
6/30 7/1
30 MEP‐PLUMBING SYSTEM 6 days Sun 6/30/19 Fri 7/5/19
31 Installation of supports and PPR Pipes For Cold/Hot 2 days Sun 6/30/19 Mon 7/1/19 29SS n of supports and PPR Pipes For Cold/Hot
6/30 7/1
32 Installation of supports and PVC Pipe For Soil/Waste 2 days Tue 7/2/19 Wed 7/3/19 31 on of supports and PVC Pipe For Soil/Waste
7/2 7/3
33 Installation of supports and PVC Pipe For Rain Water 2 days Thu 7/4/19 Fri 7/5/19 32 on of supports and PVC Pipe For Rain Water
7/4 7/5
34 MEP‐FIRE FIGHTING SYSTEM 5 days Sat 7/6/19 Wed 7/10/19
35 Installation of balck steel pipes and supports 5 days Sat 7/6/19 Wed 7/10/19 33 llation of balck steel pipes and supports
7/6 7/10
36 MEP‐MECHANICAL SYSTEM 13 days Sat 7/6/19 Thu 7/18/19
37 Installation of supports and Chiller Pipes 5 days Sat 7/6/19 Wed 7/10/19 35SS tallation of supports and Chiller Pipes
7/6 7/10
38 Installation of supports and Insulation PVC pipe Drain 1 day Sat 7/6/19 Sat 7/6/19 37SS on of supports and Insulation PVC pipe Drain
7/6 7/6
39 Installation of FCU 2 days Thu 7/11/19 Fri 7/12/19 37 Installation of FCU
7/11 7/12
40 Installation of supports and Fresh Air Ducting 3 days Sat 7/13/19 Mon 7/15/19 39 stallation of supports and Fresh Air Ducting
7/13 7/15
41 Installation of supports and Exaust Ducting 3 days Tue 7/16/19 Thu 7/18/19 40 Installation of supports and Exaust Ducting
7/16 7/18

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 1 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9 un 1un 2un 3
Sun 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un 2
Sun 3
un 1un 1un S2un Sun
1 8un 1un
42 Cement Plastering 2 days Mon 6/24/19 Tue 6/25/19 Cement Plastering
6/24 6/25
43 LV & ELV Cable Pulling 2 days Tue 7/2/19 Wed 7/3/19 29,42 LV & ELV Cable Pulling
7/2 7/3
44 Handover to CCD 1 day Wed 6/26/19 Wed 6/26/19 42 Handover to CCD
6/26 6/26
45 GUEST ROOM FINSHES FOR MOCK‐UP CONSTRUCTION(CCD) 63 days Thu 6/27/19 Wed 8/28/19
46 Setting‐out 4 days Thu 6/27/19 Sun 6/30/19 44 Setting-out
6/27 6/30
47 Floor Screeding 2 days Mon 7/1/19 Tue 7/2/19 46,44 Floor Screeding
7/1 7/2
48 Ceiling and Wall Light Keel Installation 7 days Wed 7/3/19 Tue 7/9/19 47 ling and Wall Light Keel Installation
7/3 7/9
49 Ceiling Concealed Work and Test Eligible 2 days Wed 7/10/19 Thu 7/11/19 48 Ceiling Concealed Work and Test Eligible
7/10 7/11
50 Ceiling and Wall Gypsum Board Installation 4 days Fri 7/12/19 Mon 7/15/19 49 Ceiling and Wall Gypsum Board Installation
7/12 7/15
51 Installation of sprinkler heads(MEP‐FIRE FIGHTING SYSTEM) 2 days Mon 8/5/19 Tue 8/6/19 56 Installation of sprinkler heads(MEP-FIRE FIGHTING SYSTEM)
8/5 8/6
52 Installation of fans, grilles and louvers 2 days Wed 8/7/19 Thu 8/8/19 51 Installation of fans, grilles and louvers
8/7 8/8
53 Ceiling and Wall Two Skim Coat 5 days Tue 7/16/19 Sat 7/20/19 50 Ceiling and Wall Two Skim Coat
7/16 7/20
54 Waterproofing On Bathroom Floor、Wall And Tested Eligible 5 days Sun 7/21/19 Thu 7/25/19 53 erproofing On Bathroom Floor、Wall And Tested Eligible
7/21 7/25
55 Wall And Floor Stone、Tile Installa on 7 days Fri 7/26/19 Thu 8/1/19 54 Wall And Floor Stone、Tile Installation
7/26 8/1
56 Ceiling and Wall Paint 3 days Fri 8/2/19 Sun 8/4/19 55 Ceiling and Wall Paint
8/2 8/4
57 Installation of LV Wiring Device (Switch, Socket, Lighting ) 2 days Mon 8/5/19 Tue 8/6/19 56 Installation of LV Wiring Device (Switch, Socket, Lighting )
8/5 8/6
58 Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV) 2 days Wed 8/7/19 Thu 8/8/19 57 Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV)
8/7 8/8
59 Installation of DB Panel 2 days Fri 8/9/19 Sat 8/10/19 58 Installation of DB Panel
8/9 8/10
60 Installation of ELV Panel 2 days Sun 8/11/19 Mon 8/12/19 59 Installation of ELV Panel
8/11 8/12
61 Base and laminate Wall and Wall graphic installation 7 days Mon 8/5/19 Sun 8/11/19 56 Base and laminate Wall and Wall graphic installation
8/5 8/11
62 Wardrobe、Bathroom Cabinet Installa on 4 days Mon 8/5/19 Thu 8/8/19 56 Wardrobe、Bathroom Cabinet Installation
8/5 8/8
63 Door and Skirting Installation 4 days Fri 8/9/19 Mon 8/12/19 62 Door and Skirting Installation
8/9 8/12
64 Glass Partition Installation In Bathroom 3 days Fri 8/9/19 Sun 8/11/19 62 Glass Partition Installation In Bathroom
8/9 8/11
65 Sanitary wares, Fittings and Accessories Installation 4 days Mon 8/12/19 Thu 8/15/19 64 Sanitary wares, Fittings and Accessories Installation
8/12 8/15
66 Installation of Sanitary Ware 2 days Mon 8/12/19 Tue 8/13/19 65SS Installation of Sanitary Ware
8/12 8/13
67 Carpet And Wallpaper Installation 3 days Fri 8/16/19 Sun 8/18/19 65 Carpet And Wallpaper Installation
8/16 8/18
68 Cleaning And Handover 3 days Mon 8/19/19 Wed 8/21/19 67 Cleaning And Handover
8/19 8/21
69 Snagging & rectification 7 days Thu 8/22/19 Wed 8/28/19 68 Snagging & rectification
8/22 8/28
70 Decoration Work(CCY SCOPE BALCONY AREA) 92 days Fri 5/31/19 Fri 8/30/19
71 Setting‐out 1 day Wed 7/3/19 Wed 7/3/19 44FS+6 days Setting-out
7/3 7/3
72 Concrete footing for partition 1 day Wed 7/3/19 Wed 7/3/19 71SS Concrete footing for partition
7/3 7/3
73 Plastering and skim coat 1 day Wed 7/3/19 Wed 7/3/19 26,72SS Plastering and skim coat
7/3 7/3
74 Ceiling and Frame Partition 1 day Fri 7/19/19 Fri 7/19/19 73 Ceiling and Frame Partition
7/19 7/19
75 Waterproof and test 2 days Sat 7/20/19 Sun 7/21/19 74 Waterproof and test
7/20 7/21
76 Floor Screeding 1 day Mon 7/22/19 Mon 7/22/19 75 Floor Screeding
7/22 7/22
77 Painting(wall and edge of slab) 1 day Fri 5/31/19 Fri 5/31/19 d edge of slab)
5/31
78 Partitions Installation(P1,P2) 1 day Sat 6/1/19 Sat 6/1/19 77 allation(P1,P2)
6/1
79 Balcony wood handrail 1 day Sat 6/1/19 Sat 6/1/19 77 od handrail
6/1
80 Painting(wood) 1 day Sun 6/2/19 Sun 6/2/19 79 ng(wood)
6/2
81 Floor tiles 1 day Fri 8/30/19 Fri 8/30/19 Floor tiles
8/30 8/30
82 Cleaning And Handover 1 day Fri 8/30/19 Fri 8/30/19 80 Cleaning And Handover
8/30 8/30

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 2 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un 3
Sun 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un 2
Sun 3
un 1un 1un S2un Sun
1 8un 1un
83 Snagging & Rectification 7 days Sat 8/31/19 Fri 9/6/19 82 Snagging & Rectification
8/31 9/6
84 Basement 192 days Fri 5/3/19 Sun 11/10/19
85 Zone A&B&C(Masonry and decoration) 192 days Fri 5/3/19 Sun 11/10/19
86 Cleaning 2 days Fri 5/3/19 Sat 5/4/19
87 Brick Wall Construction 8 days Wed 5/8/19 Wed 5/15/19 n

88 MEP First FIX 85 days Sun 5/5/19 Sun 7/28/19


89 Installation of LV&ELV Upvc conduit in Brick Wall 20 days Sun 5/5/19 Fri 5/24/19 86 it in Brick Wall
4
90 Installation of Support and LV&ELV Cable Tray 20 days Sun 5/5/19 Fri 5/24/19 89SS ELV Cable Tray
4
91 Installation of Support and Busduct 30 days Sun 5/5/19 Mon 6/3/19 89SS and Busduct
6/3
92 LV&ELV Cable Pulling 20 days Sat 5/25/19 Thu 6/13/19 90 ble Pulling
6/13
93 Testing and Commissioning Electrical System 7 days Fri 6/14/19 Thu 6/20/19 92,91 mmissioning Electrical System
6/14 6/20
94 Installation of supports and PPR Pipes For Cold/Hot 35 days Sun 5/5/19 Sat 6/8/19 86 PR Pipes For Cold/Hot
6/8
95 Installation of supports and PVC Pipe For Soil/Waste 25 days Sun 6/9/19 Wed 7/3/19 94 supports and PVC Pipe For Soil/Waste
6/9 7/3
96 Installation of supports and PVC Pipe For Rain Water 15 days Sun 5/5/19 Sun 5/19/19 94SS e For Rain Water

97 Installation of supports and C.I for Kitchen 10 days Wed 5/15/19 Fri 5/24/19 94SS+10 days C.I for Kitchen
4
98 Installation of pipes and supports of Fire Suppression 15 days Sun 5/5/19 Sun 5/19/19 94SS Fire Suppression

99 Installation of balck steel pipes and supports For Fire Fighting 30 days Mon 5/20/19 Tue 6/18/19 98 es and supports For Fire Fighting
6/18
100 Installation of pipes and supports For LPG GAS 15 days Mon 5/20/19 Mon 6/3/19 98 supports For LPG GAS
6/3
101 Testing and Commissioning Plumbing System 20 days Thu 7/4/19 Tue 7/23/19 100,99,98,97,96,95,94 Testing and Commissioning Plumbing System
7/4 7/23
102 Installation of supports and Chiller Pipes 30 days Sun 5/5/19 Mon 6/3/19 86 Chiller Pipes
6/3
103 Installation of supports and Insulation PVC pipe Drain 20 days Tue 6/4/19 Sun 6/23/19 102 rts and Insulation PVC pipe Drain
6/23
104 Installation of FCU and PAU 20 days Mon 6/24/19 Sat 7/13/19 103 Installation of FCU and PAU
6/24 7/13
105 Installation of supports and Fresh Air Ducting 35 days Sun 5/5/19 Sat 6/8/19 102SS Fresh Air Ducting
6/8
106 Installation of supports and Exaust Ducting 30 days Sun 5/5/19 Mon 6/3/19 102SS Exaust Ducting
6/3
107 Installation of supports and Hood Ducting 20 days Sun 5/5/19 Fri 5/24/19 102SS ood Ducting
4
108 Testing and Commissioning MVAC System 15 days Sun 7/14/19 Sun 7/28/19 102,104 Testing and Commissioning MVAC System
7/14 7/28
109 Cement Plastering 15 days Sun 5/12/19 Sun 5/26/19 ng
26
110 Decoration Work(KITCHEN SCOPE) 20 days Tue 7/30/19 Sun 8/18/19 Decoration Work(KITCHEN SCOPE)
7/30 8/18
111 Decoration Work(CCY SCOPE,MEP to insert 2rd fix) 104 days Tue 7/30/19 Sun 11/10/19
112 Setting‐out 7 days Tue 7/9/19 Mon 7/15/19 325SS+7 days Setting-out
7/9 7/15
113 Ceiling Light Stud Installation 15 days Tue 7/16/19 Tue 7/30/19 112SS+7 days Ceiling Light Stud Installation
7/16 7/30
114 Ceiling Concealed Work and Test Eligible 4 days Wed 7/31/19 Sat 8/3/19 113 Ceiling Concealed Work and Test Eligible
7/31 8/3
115 Ceiling Gypsum Board Installation 14 days Sun 8/4/19 Sat 8/17/19 114 Ceiling Gypsum Board Installation
8/4 8/17
116 Ceiling and Wall Two Skim Coat 20 days Wed 8/14/19 Mon 9/2/19 115SS+10 days Ceiling and Wall Two Skim Coat
8/14 9/2
117 Waterproofing On Bathroom Floor、Wall And Tested Eligible 14 days Sat 8/24/19 Fri 9/6/19 116SS+10 days Waterproofing On Bathroom Floor、Wall And Tested Eligible
8/24 9/6
118 Wall And Floor Stone、Tile Installa on 35 days Tue 9/3/19 Mon 10/7/19 117SS+10 days Wall And Floor Stone、Tile Installation
9/3 10/7
119 Ceiling and Wall Paint 14 days Mon 9/23/19 Sun 10/6/19 118SS+20 days Ceiling and Wall Paint
9/23 10/6
120 Base and laminate Wall and Wall graphic installation 25 days Mon 9/30/19 Thu 10/24/19 119SS+7 days Base and laminate Wall and Wall graphic installation
9/30 10/24
121 Wardrobe、Bathroom Cabinet Installa on 20 days Thu 10/3/19 Tue 10/22/19 119SS+10 days Wardrobe、Bathroom Cabinet Installation
10/3 10/22
122 Door and Skirting Installation 15 days Mon 10/7/19 Mon 10/21/19 119 Door and Skirting Installation
10/7 10/21
123 Glass Partition Installation In Bathroom 15 days Tue 10/22/19 Tue 11/5/19 122 Glass Partition Installation In Bathroom
10/22 11/5

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 3 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un S3un 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8 un 1un 2un S2un 6
un 1un 2un 2
Sun 3un 1un 1un S2un Sun
1 8 un 1un
124 Sanitary wares, Fittings and Accessories Installation 15 days Tue 10/29/19 Tue 11/12/19 123SS+7 days Sanitary wares, Fittings and Accessories Installati
10/29 11/12
125 Carpet And Wallpaper Installation 15 days Tue 10/29/19 Tue 11/12/19 123SS+7 days Carpet And Wallpaper Installation
10/29 11/12
126 snagging & rectification 30 days Wed 11/13/19 Thu 12/12/19 125,124,123,122,121,12 snagging & rectification
11/13 12/12
127 MEP SECOND FIX  47 days Wed 8/14/19 Sun 9/29/19
128 Installation of LV Wiring Device (Switch, Socket, Lighting ) 15 days Wed 8/14/19 Wed 8/28/19 111SS+15 days Installation of LV Wiring Device (Switch, Socket, Lighting )
8/14 8/28
129 Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV) 20 days Wed 8/14/19 Mon 9/2/19 128SS Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV)
8/14 9/2
130 Installation of DB Panel 15 days Thu 8/29/19 Thu 9/12/19 128 Installation of DB Panel
8/29 9/12
131 Installation of ELV Panel 20 days Tue 9/3/19 Sun 9/22/19 129 Installation of ELV Panel
9/3 9/22
132 Installation of Support and Transformer 15 days Fri 9/13/19 Fri 9/27/19 130 Installation of Support and Transformer
9/13 9/27
133 Testing and Commissioning Electrical System 7 days Mon 9/23/19 Sun 9/29/19 130,131 Testing and Commissioning Electrical System
9/23 9/29
134 Installation of Novec tanks 5 days Wed 8/14/19 Sun 8/18/19 128SS Installation of Novec tanks
8/14 8/18
135 Connection of pipes to Novec tank 5 days Mon 8/19/19 Fri 8/23/19 134 Connection of pipes to Novec tank
8/19 8/23
136 Installation of sprinkler heads 10 days Wed 8/14/19 Fri 8/23/19 128SS Installation of sprinkler heads
8/14 8/23
137 Installation of fire hose cabinet 7 days Wed 8/14/19 Tue 8/20/19 128SS Installation of fire hose cabinet
8/14 8/20
138 Installation of gas alarm panel 10 days Wed 8/14/19 Fri 8/23/19 128SS Installation of gas alarm panel
8/14 8/23
139 Testing and Commissioning Plumbing System 10 days Sat 8/24/19 Mon 9/2/19 138,134 Testing and Commissioning Plumbing System
8/24 9/2
140 Installation of fans, grilles 20 days Wed 8/14/19 Mon 9/2/19 128SS Installation of fans, grilles
8/14 9/2
141 Testing and Commissioning MVAC System 10 days Tue 9/3/19 Thu 9/12/19 140 Testing and Commissioning MVAC System
9/3 9/12
142 Level 1(Include Mezznize Floor) 190 days Mon 6/24/19 Mon 12/30/19
143 Zone A&B&C 102 days Mon 6/24/19 Thu 10/3/19
144 Cleaning 2 days Mon 6/24/19 Tue 6/25/19 86 Cleaning
6/24 6/25
145 Brick Wall Construction 4 days Mon 6/24/19 Thu 6/27/19 Brick Wall Construction
6/24 6/27
146 MEP First FIX 100 days Wed 6/26/19 Thu 10/3/19
147 Installation of LV&ELV Upvc conduit in Brick Wall 15 days Wed 6/26/19 Wed 7/10/19 144 ion of LV&ELV Upvc conduit in Brick Wall
6/26 7/10
148 Installation of Support and LV&ELV Cable Tray 20 days Wed 6/26/19 Mon 7/15/19 147SS lation of Support and LV&ELV Cable Tray
6/26 7/15
149 Installation of Support and Busduct  20 days Wed 6/26/19 Mon 7/15/19 147SS nstallation of Support and Busduct
6/26 7/15
150 LV&ELV Cable Pulling  20 days Tue 7/16/19 Sun 8/4/19 148 LV&ELV Cable Pulling
7/16 8/4
151 Testing and Commissioning  Electrical System 7 days Mon 8/5/19 Sun 8/11/19 149,150 Testing and Commissioning Electrical System
8/5 8/11
152 Installation of supports and PPR Pipes For Cold/Hot 25 days Wed 6/26/19 Sat 7/20/19 144 ation of supports and PPR Pipes For Cold/Hot
6/26 7/20
153 Installation of supports and PVC Pipe For Soil/Waste 25 days Sun 7/21/19 Wed 8/14/19 152 Installation of supports and PVC Pipe For Soil/Waste
7/21 8/14
154 Installation of supports and PVC Pipe For Rain Water 15 days Wed 6/26/19 Wed 7/10/19 152SS on of supports and PVC Pipe For Rain Water
6/26 7/10
155 Installation of supports and C.I for Kitchen 15 days Sat 7/6/19 Sat 7/20/19 152SS+10 days nstallation of supports and C.I for Kitchen
7/6 7/20
156 Installation of pipes and supports of Fire Suppression  15 days Fri 7/26/19 Fri 8/9/19 157 Installation of pipes and supports of Fire Suppression
7/26 8/9
157 Installation of balck steel pipes and supports For Fire Fighting  30 days Wed 6/26/19 Thu 7/25/19 152SS of balck steel pipes and supports For Fire Fighting
6/26 7/25
158 Installation of pipes and supports For LPG GAS 20 days Wed 6/26/19 Mon 7/15/19 157SS lation of pipes and supports For LPG GAS
6/26 7/15
159 Installation of PVC pipes for Pool (TBC) 5 days Wed 6/26/19 Sun 6/30/19 152SS ation of PVC pipes for Pool (TBC)
6/26 6/30
160 Installation of PVC pipes for Pond  (TBC) 5 days Wed 6/26/19 Sun 6/30/19 152SS ation of PVC pipes for Pond (TBC)
6/26 6/30
161 Testing and Commissioning Plumbing System 20 days Thu 8/15/19 Tue 9/3/19 152,153,154,155,157,158 Testing and Commissioning Plumbing System
8/15 9/3
162 Installation of supports and Chiller Pipes  30 days Wed 6/26/19 Thu 7/25/19 144 stallation of supports and Chiller Pipes
6/26 7/25
163 Installation of supports and Insulation PVC pipe Drain 20 days Fri 7/26/19 Wed 8/14/19 162 Installation of supports and Insulation PVC pipe Drain
7/26 8/14
164 Installation of FCU,AHU and PAU 30 days Thu 8/15/19 Fri 9/13/19 163 Installation of FCU,AHU and PAU
8/15 9/13

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 4 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un S3un 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un 2
Sun 3
un 1un 1un S2un Sun
1 8 un 1un
165 Installation of supports and Fresh Air Ducting  30 days Wed 6/26/19 Thu 7/25/19 162SS allation of supports and Fresh Air Ducting
6/26 7/25
166 Installation of supports and Exaust Ducting  30 days Wed 6/26/19 Thu 7/25/19 162SS tallation of supports and Exaust Ducting
6/26 7/25
167 Installation of supports and Hood Ducting  25 days Wed 6/26/19 Sat 7/20/19 162SS tallation of supports and Hood Ducting
6/26 7/20
168 Testing and Commissioning MVAC System 20 days Sat 9/14/19 Thu 10/3/19 162,164 Testing and Commissioning MVAC System
9/14 10/3
169 Cement Plastering(link to MEP) 8 days Fri 6/28/19 Fri 7/5/19 145 Cement Plastering(link to MEP)
6/28 7/5
170 Zone D 44 days Mon 6/24/19 Tue 8/6/19
171 Cleaning 2 days Mon 6/24/19 Tue 6/25/19 Cleaning
6/24 6/25
172 Brick Wall Construction 3 days Mon 6/24/19 Wed 6/26/19 Brick Wall Construction
6/24 6/26
173 MEP First FIX 44 days Mon 6/24/19 Tue 8/6/19
174 Installation of LV&ELV Upvc conduit in Brick Wall 7 days Wed 6/26/19 Tue 7/2/19 171 n of LV&ELV Upvc conduit in Brick Wall
6/26 7/2
175 Installation of Support and LV&ELV Cable Tray 10 days Wed 6/26/19 Fri 7/5/19 174SS tion of Support and LV&ELV Cable Tray
6/26 7/5
176 LV&ELV Cable Pulling  7 days Sat 7/6/19 Fri 7/12/19 175 LV&ELV Cable Pulling
7/6 7/12
177 Testing and Commissioning  Electrical System 7 days Sat 7/13/19 Fri 7/19/19 176 Testing and Commissioning Electrical System
7/13 7/19
178 Installation of supports and PPR Pipes For Cold/Hot 7 days Wed 6/26/19 Tue 7/2/19 171 of supports and PPR Pipes For Cold/Hot
6/26 7/2
179 Installation of supports and PVC Pipe For Soil/Waste 10 days Wed 7/3/19 Fri 7/12/19 178 tion of supports and PVC Pipe For Soil/Waste
7/3 7/12
180 Installation of supports and PVC Pipe For Rain Water 10 days Wed 6/26/19 Fri 7/5/19 178SS n of supports and PVC Pipe For Rain Water
6/26 7/5
181 Installation of balck steel pipes and supports For Fire Fighting  20 days Wed 6/26/19 Mon 7/15/19 178SS balck steel pipes and supports For Fire Fighting
6/26 7/15
182 Installation of PVC pipes for Pool (TBC) 5 days Mon 6/24/19 Fri 6/28/19 tion of PVC pipes for Pool (TBC)
6/24 6/28
183 Installation of PVC pipes for Pond  (TBC) 5 days Wed 6/26/19 Sun 6/30/19 178SS ation of PVC pipes for Pond (TBC)
6/26 6/30
184 Testing and Commissioning Plumbing System 20 days Tue 7/16/19 Sun 8/4/19 178,179,180,181 Testing and Commissioning Plumbing System
7/16 8/4
185 Installation of supports and Chiller Pipes  10 days Wed 6/26/19 Fri 7/5/19 171 ation of supports and Chiller Pipes
6/26 7/5
186 Installation of supports and Insulation PVC pipe Drain 7 days Sat 7/6/19 Fri 7/12/19 185 tion of supports and Insulation PVC pipe Drain
7/6 7/12
187 Installation of FCU and PAU 10 days Sat 7/13/19 Mon 7/22/19 186 Installation of FCU and PAU
7/13 7/22
188 Installation of supports and Fresh Air Ducting  12 days Wed 6/26/19 Sun 7/7/19 185SS tion of supports and Fresh Air Ducting
6/26 7/7
189 Installation of supports and Exaust Ducting  12 days Wed 6/26/19 Sun 7/7/19 185SS ation of supports and Exaust Ducting
6/26 7/7
190 Testing and Commissioning MVAC System 15 days Tue 7/23/19 Tue 8/6/19 185,187 Testing and Commissioning MVAC System
7/23 8/6
191 Cement Plastering 4 days Mon 6/24/19 Thu 6/27/19 Cement Plastering
6/24 6/27
192 Decoration Work(CCY SCOPE internal,MEP to insert 2rd fix) 40 days Wed 7/31/19 Sun 9/8/19 169,191,193SS Decoration Work(CCY SCOPE internal,MEP to insert 2rd fix)
7/31 9/8
193 BALLROOM AND PREFUNCTION HALL LOBBY PUBLIC AREA CONSTRUCTION SCHEDULE 131 days Tue 7/23/19 Sat 11/30/19
194 Setting‐out 15 days Tue 7/23/19 Tue 8/6/19 Setting-out
7/23 8/6
195 Check The Main Structure Size 10 days Tue 7/30/19 Thu 8/8/19 194SS+7 days Check The Main Structure Size
7/30 8/8
196 Ceiling Light Stud Installation 25 days Fri 8/2/19 Mon 8/26/19 194SS+10 days Ceiling Light Stud Installation
8/2 8/26
197 Ceiling Concealed Work and Test Eligible 5 days Sun 8/25/19 Thu 8/29/19 196SS+23 days Ceiling Concealed Work and Test Eligible
8/25 8/29
198 Ceiling Gypsum Board Installation 30 days Wed 8/28/19 Thu 9/26/19 197SS+3 days Ceiling Gypsum Board Installation
8/28 9/26
199 Ceiling and Wall Two Skim Coat 25 days Sat 9/7/19 Tue 10/1/19 198SS+10 days Ceiling and Wall Two Skim Coat
9/7 10/1
200 Waterproofing On Bathroom Floor、Wall And Tested Eligible 15 days Sat 9/21/19 Sat 10/5/19 199SS+14 days Waterproofing On Bathroom Floor、Wall And Tested Eligible
9/21 10/5
201 Wall And Floor Stone、Tile Installa on 30 days Sat 9/28/19 Sun 10/27/19 200SS+7 days Wall And Floor Stone、Tile Installation
9/28 10/27
202 Ceiling and Wall Paint 20 days Sun 10/13/19 Fri 11/1/19 201SS+15 days Ceiling and Wall Paint
10/13 11/1
203 Base and laminate Wall and Wall graphic installation 25 days Sun 10/20/19 Wed 11/13/19 202SS+7 days Base and laminate Wall and Wall graphic installation
10/20 11/13
204 Wardrobe、Bathroom Cabinet Installa on 20 days Wed 10/23/19 Mon 11/11/19 202SS+10 days Wardrobe、Bathroom Cabinet Installation
10/23 11/11
205 Door and Skirting Installation 15 days Sat 11/2/19 Sat 11/16/19 202 Door and Skirting Installation
11/2 11/16

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 5 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un S3un 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un 2
Sun 3un 1un 1un S2un Sun
1 8 un 1un
206 Glass Partition Installation In Bathroom 15 days Sat 11/9/19 Sat 11/23/19 205SS+7 days Glass Partition Installation In Bathroo
11/9 11/23
207 Sanitary wares, Fittings and Accessories Installation 15 days Sat 11/16/19 Sat 11/30/19 206SS+7 days Sanitary wares, Fittings and Accessories I
11/16 11/30
208 Carpet And Wallpaper Installation 15 days Sat 11/16/19 Sat 11/30/19 206SS+7 days Carpet And Wallpaper Installatio
11/16 11/30
209 snagging & rectification 30 days Sun 12/1/19 Mon 12/30/19 208,207,206,205,204,20 snagging & rectif
12/1
210 LEVEL 1 MEP SECOND FIX  37 days Sun 10/20/19 Mon 11/25/19
211 Installation of LV Wiring Device (Switch, Socket, Lighting ) 15 days Sun 10/20/19 Sun 11/3/19 202SS+7 days Installation of LV Wiring Device (Switch, Socket, Lighting
10/20 11/3
212 Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV) 15 days Sun 10/20/19 Sun 11/3/19 211SS Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV)
10/20 11/3
213 Installation of DB Panel 15 days Mon 11/4/19 Mon 11/18/19 211 Installation of DB Panel
11/4 11/18
214 Installation of ELV Panel 15 days Mon 11/4/19 Mon 11/18/19 212 Installation of ELV Panel
11/4 11/18
215 Testing and Commissioning Electrical System 7 days Tue 11/19/19 Mon 11/25/19 213,214 Testing and Commissioning Electrical S
11/19 11/25
216 Installation of Novec tanks 5 days Sun 10/20/19 Thu 10/24/19 211SS Installation of Novec tanks
10/20 10/24
217 Connection of pipes to Novec  tank 5 days Fri 10/25/19 Tue 10/29/19 216 Connection of pipes to Novec tank
10/25 10/29
218 Installation of sprinkler heads 10 days Sun 10/20/19 Tue 10/29/19 211SS Installation of sprinkler heads
10/20 10/29
219 Installation of fire  hose cabinet 7 days Sun 10/20/19 Sat 10/26/19 211SS Installation of fire hose cabinet
10/20 10/26
220 Testing and Commissioning Plumbing System 10 days Wed 10/30/19 Fri 11/8/19 218,219 Testing and Commissioning Plumbing System
10/30 11/8
221 Installation of fans, grilles 15 days Sun 10/20/19 Sun 11/3/19 211SS Installation of fans, grilles
10/20 11/3
222 Testing and Commissioning MVAC System 10 days Mon 11/4/19 Wed 11/13/19 221 Testing and Commissioning MVAC System
11/4 11/13
223 Level 2 210 days? Mon 6/24/19 Sun 1/19/20
224 Zone A&B&C 74 days Mon 6/24/19 Thu 9/5/19
225 Cleaning 2 days Mon 6/24/19 Tue 6/25/19 Cleaning
6/24 6/25
226 Brick Wall Construction 6 days Mon 6/24/19 Sat 6/29/19 Brick Wall Construction
6/24 6/29
227 MEP First FIX 72 days Wed 6/26/19 Thu 9/5/19
228 Installation of LV&ELV Upvc conduit in Brick Wall 15 days Wed 6/26/19 Wed 7/10/19 225 ion of LV&ELV Upvc conduit in Brick Wall
6/26 7/10
229 Installation of Support and LV&ELV Cable Tray 15 days Wed 6/26/19 Wed 7/10/19 228SS ation of Support and LV&ELV Cable Tray
6/26 7/10
230 Installation of Support and Busduct  20 days Wed 6/26/19 Mon 7/15/19 228SS nstallation of Support and Busduct
6/26 7/15
231 LV&ELV Cable Pulling  15 days Thu 7/11/19 Thu 7/25/19 229 LV&ELV Cable Pulling
7/11 7/25
232 Testing and Commissioning  Electrical System 7 days Fri 7/26/19 Thu 8/1/19 230,231 Testing and Commissioning Electrical System
7/26 8/1
233 Installation of supports and PPR Pipes For Cold/Hot 15 days Wed 6/26/19 Wed 7/10/19 225 on of supports and PPR Pipes For Cold/Hot
6/26 7/10
234 Installation of supports and PVC Pipe For Soil/Waste 20 days Thu 7/11/19 Tue 7/30/19 233 stallation of supports and PVC Pipe For Soil/Waste
7/11 7/30
235 Installation of supports and PVC Pipe For Rain Water 15 days Wed 6/26/19 Wed 7/10/19 233SS on of supports and PVC Pipe For Rain Water
6/26 7/10
236 Installation of supports and C.I for Kitchen 15 days Sat 7/6/19 Sat 7/20/19 233SS+10 days nstallation of supports and C.I for Kitchen
7/6 7/20
237 Installation of balck steel pipes and supports For Fire Fighting  21 days Wed 6/26/19 Tue 7/16/19 233SS balck steel pipes and supports For Fire Fighting
6/26 7/16
238 Installation of pipes and supports For LPG GAS 10 days Wed 6/26/19 Fri 7/5/19 237SS tion of pipes and supports For LPG GAS
6/26 7/5
239 Testing and Commissioning Plumbing System 15 days Wed 7/31/19 Wed 8/14/19 233,234,235,236,237,238 Testing and Commissioning Plumbing System
7/31 8/14
240 Installation of supports and Chiller Pipes  21 days Wed 6/26/19 Tue 7/16/19 225 allation of supports and Chiller Pipes
6/26 7/16
241 Installation of supports and Insulation PVC pipe Drain 15 days Wed 7/17/19 Wed 7/31/19 240 nstallation of supports and Insulation PVC pipe Drain
7/17 7/31
242 Installation of FCU,AHU and PAU 21 days Thu 8/1/19 Wed 8/21/19 241 Installation of FCU,AHU and PAU
8/1 8/21
243 Installation of supports and Fresh Air Ducting  21 days Wed 6/26/19 Tue 7/16/19 240SS lation of supports and Fresh Air Ducting
6/26 7/16
244 Installation of supports and Exaust Ducting  21 days Wed 6/26/19 Tue 7/16/19 240SS llation of supports and Exaust Ducting
6/26 7/16
245 Installation of supports and Hood Ducting  21 days Wed 6/26/19 Tue 7/16/19 240SS allation of supports and Hood Ducting
6/26 7/16
246 Testing and Commissioning MVAC System 15 days Thu 8/22/19 Thu 9/5/19 240,242 Testing and Commissioning MVAC System
8/22 9/5

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 6 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9 un 1un 2un S3un 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un 2
Sun 3
un 1un 1un S2un Sun
1 8 un 1un
247 Cement Plastering 8 days Mon 6/24/19 Mon 7/1/19 Cement Plastering
6/24 7/1
248 Zone D 210 days? Mon 6/24/19 Sun 1/19/20
249 Cleaning 7 days Mon 6/24/19 Sun 6/30/19 Cleaning
6/24 6/30
250 Brick Wall Construction 7 days Mon 7/1/19 Sun 7/7/19 249 Brick Wall Construction
7/1 7/7
251 MEP First FIX 42 days Mon 7/1/19 Sun 8/11/19
252 Installation of LV&ELV Upvc conduit in Brick Wall 7 days Mon 7/1/19 Sun 7/7/19 249 tion of LV&ELV Upvc conduit in Brick Wall
7/1 7/7
253 Installation of Support and LV&ELV Cable Tray 10 days Mon 7/1/19 Wed 7/10/19 252SS lation of Support and LV&ELV Cable Tray
7/1 7/10
254 LV&ELV Cable Pulling 7 days Thu 7/11/19 Wed 7/17/19 253 LV&ELV Cable Pulling
7/11 7/17
255 Testing and Commissioning Electrical System 7 days Thu 7/18/19 Wed 7/24/19 254 Testing and Commissioning Electrical System
7/18 7/24
256 Installation of supports and PPR Pipes For Cold/Hot 7 days Mon 7/1/19 Sun 7/7/19 249 ion of supports and PPR Pipes For Cold/Hot
7/1 7/7
257 Installation of supports and PVC Pipe For Soil/Waste 10 days Mon 7/8/19 Wed 7/17/19 256 lation of supports and PVC Pipe For Soil/Waste
7/8 7/17
258 Installation of supports and PVC Pipe For Rain Water 10 days Mon 7/1/19 Wed 7/10/19 256SS ion of supports and PVC Pipe For Rain Water
7/1 7/10
259 Installation of balck steel pipes and supports For Fire Fighting 20 days Mon 7/1/19 Sat 7/20/19 256SS of balck steel pipes and supports For Fire Fighting
7/1 7/20
260 Testing and Commissioning Plumbing System 20 days Sun 7/21/19 Fri 8/9/19 256,257,258,259 Testing and Commissioning Plumbing System
7/21 8/9
261 Installation of supports and Chiller Pipes 10 days Mon 7/1/19 Wed 7/10/19 249 allation of supports and Chiller Pipes
7/1 7/10
262 Installation of supports and Insulation PVC pipe Drain 7 days Thu 7/11/19 Wed 7/17/19 261 lation of supports and Insulation PVC pipe Drain
7/11 7/17
263 Installation of FCU and PAU 10 days Thu 7/18/19 Sat 7/27/19 262 Installation of FCU and PAU
7/18 7/27
264 Installation of supports and Fresh Air Ducting 12 days Mon 7/1/19 Fri 7/12/19 261SS lation of supports and Fresh Air Ducting
7/1 7/12
265 Installation of supports and Exaust Ducting 12 days Mon 7/1/19 Fri 7/12/19 261SS allation of supports and Exaust Ducting
7/1 7/12
266 Testing and Commissioning MVAC System 15 days Sun 7/28/19 Sun 8/11/19 261,263 Testing and Commissioning MVAC System
7/28 8/11
267 Cement Plastering 5 days Thu 6/27/19 Mon 7/1/19 247FF Cement Plastering
6/27 7/1
268 Kitchen Fit-out Award 0 days Wed 7/31/19 Wed 7/31/19
7/31
269 Kitchen works Fit-out 120 Fri 8/23/19 Fri 12/20/19 276,268
days?
270 Kitchen works Fit-out T&C 30 days Sat 12/21/19 Sun 1/19/20 269 Kitchen
12/21
271 Decoration Work in coord with KITCHEN WORKS 90 days Fri 8/23/19 Wed 11/20/19 273SS,269SS Decoration Work in coord with KITCHEN WORKS
8/23 11/20
272 Decoration Work(CCY SCOPE internal,MEP to insret 2rd fix) 90 days Wed 7/31/19 Mon 10/28/19 273SS Decoration Work(CCY SCOPE internal,MEP to insret 2rd fix)
7/31 10/28
273 L1‐L2 ID Fit‐out: BALLROOM AND PREFUNCTION HALL LOBBY PUBLIC AREA  131 days Tue 7/23/19 Sat 11/30/19
274
CONSTRUCTION SCHEDULE
Setting-out 15 days Tue 7/23/19 Tue 8/6/19 Setting-out
7/23 8/6
275 Check The Main Structure Size 10 days Tue 7/30/19 Thu 8/8/19 274SS+7 days Check The Main Structure Size
7/30 8/8
276 Floor screed - wet works 14 days Fri 8/9/19 Thu 8/22/19 275 Floor screed - wet works
8/9 8/22
277 Ceiling Light Stud Installation 25 days Fri 8/2/19 Mon 8/26/19 274SS+10 days Ceiling Light Stud Installation
8/2 8/26
278 Ceiling Concealed Work and Test Eligible 5 days Sun 8/25/19 Thu 8/29/19 277SS+23 days Ceiling Concealed Work and Test Eligible
8/25 8/29
279 Ceiling Gypsum Board Installation 30 days Wed 8/28/19 Thu 9/26/19 278SS+3 days Ceiling Gypsum Board Installation
8/28 9/26
280 Ceiling and Wall Two Skim Coat 25 days Sat 9/7/19 Tue 10/1/19 279SS+10 days Ceiling and Wall Two Skim Coat
9/7 10/1
281 Waterproofing On Bathroom Floor、Wall And Tested Eligible 15 days Sat 9/21/19 Sat 10/5/19 280SS+14 days Waterproofing On Bathroom Floor、Wall And Tested Eligible
9/21 10/5
282 Wall And Floor Stone、Tile Installation 30 days Sat 9/28/19 Sun 10/27/19 281SS+7 days Wall And Floor Stone、Tile Installation
9/28 10/27
283 Ceiling and Wall Paint 20 days Sun 10/13/19 Fri 11/1/19 282SS+15 days Ceiling and Wall Paint
10/13 11/1
284 Base and laminate Wall and Wall graphic installation 25 days Sun 10/20/19 Wed 11/13/19 283SS+7 days Base and laminate Wall and Wall graphic installation
10/20 11/13
285 Wardrobe、Bathroom Cabinet Installation 20 days Wed 10/23/19 Mon 11/11/19 283SS+10 days Wardrobe、Bathroom Cabinet Installation
10/23 11/11
286 Door and Skirting Installation 15 days Sat 11/2/19 Sat 11/16/19 283 Door and Skirting Installation
11/2 11/16
287 Glass Partition Installation In Bathroom 15 days Sat 11/9/19 Sat 11/23/19 286SS+7 days Glass Partition Installation In Bathroo
11/9 11/23

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 7 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un S3un 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un S
2un 3un 1un 1un S2un Sun
1 8 un 1un
288 Sanitary wares, Fittings and Accessories Installation 15 days Sat 11/16/19 Sat 11/30/19 287SS+7 days Sanitary wares, Fittings and Accessories I
11/16 11/30
289 Carpet And Wallpaper Installation 15 days Sat 11/16/19 Sat 11/30/19 287SS+7 days Carpet And Wallpaper Installatio
11/16 11/30
290 Snagging & Rectification 30 days Sun 12/1/19 Mon 12/30/19 289,288,287,286,285,28 Snagging & Rectif
12/1
291 LEVEL 2 MEP SECOND FIX  37 days Sun 10/20/19 Mon 11/25/19 TBC
292 Installation of LV Wiring Device (Switch, Socket, Lighting ) 15 days Sun 10/20/19 Sun 11/3/19 283SS+7 days Installation of LV Wiring Device (Switch, Socket, Lighting
10/20 11/3
293 Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV) 15 days Sun 10/20/19 Sun 11/3/19 292SS Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV)
10/20 11/3
294 Installation of DB Panel 15 days Mon 11/4/19 Mon 11/18/19 292 Installation of DB Panel
11/4 11/18
295 Installation of ELV Panel 15 days Mon 11/4/19 Mon 11/18/19 293 Installation of ELV Panel
11/4 11/18
296 Testing and Commissioning Electrical System 7 days Tue 11/19/19 Mon 11/25/19 294,295 Testing and Commissioning Electrical S
11/19 11/25
297 Installation of sprinkler heads 10 days Sun 10/20/19 Tue 10/29/19 292SS Installation of sprinkler heads
10/20 10/29
298 Installation of fire  hose cabinet 7 days Sun 10/20/19 Sat 10/26/19 292SS Installation of fire hose cabinet
10/20 10/26
299 Testing and Commissioning Plumbing System 10 days Wed 10/30/19 Fri 11/8/19 297,298 Testing and Commissioning Plumbing System
10/30 11/8
300 Installation of fans, grilles 15 days Sun 10/20/19 Sun 11/3/19 292SS Installation of fans, grilles
10/20 11/3
301 Testing and Commissioning MVAC System 10 days Mon 11/4/19 Wed 11/13/19 300 Testing and Commissioning MVAC System
11/4 11/13
302 Level 3 190 days Mon 6/24/19 Mon 12/30/19
303 Zone A&B&C 80 days Mon 6/24/19 Wed 9/11/19
304 Cleaning 2 days Wed 6/26/19 Thu 6/27/19 225 Cleaning
6/26 6/27
305 Brick Wall Construction 14 days Mon 6/24/19 Sun 7/7/19 Brick Wall Construction
6/24 7/7
306 MEP First FIX 76 days Fri 6/28/19 Wed 9/11/19
307 Installation of LV&ELV Upvc conduit in Brick Wall 15 days Fri 6/28/19 Fri 7/12/19 304 tion of LV&ELV Upvc conduit in Brick Wall
6/28 7/12
308 Installation of Support and LV&ELV Cable Tray 15 days Fri 6/28/19 Fri 7/12/19 307SS lation of Support and LV&ELV Cable Tray
6/28 7/12
309 Installation of Support and Busduct  20 days Fri 6/28/19 Wed 7/17/19 307SS Installation of Support and Busduct
6/28 7/17
310 LV&ELV Cable Pulling  15 days Sat 7/13/19 Sat 7/27/19 308 LV&ELV Cable Pulling
7/13 7/27
311 Testing and Commissioning  Electrical System 7 days Sun 7/28/19 Sat 8/3/19 309,310 Testing and Commissioning Electrical System
7/28 8/3
312 Installation of supports and PPR Pipes For Cold/Hot 15 days Fri 6/28/19 Fri 7/12/19 304 ion of supports and PPR Pipes For Cold/Hot
6/28 7/12
313 Installation of supports and PVC Pipe For Soil/Waste 20 days Sat 7/13/19 Thu 8/1/19 312 nstallation of supports and PVC Pipe For Soil/Waste
7/13 8/1
314 Installation of supports and PVC Pipe For Rain Water 15 days Fri 6/28/19 Fri 7/12/19 312SS ion of supports and PVC Pipe For Rain Water
6/28 7/12
315 Installation of pipes and supports of Fire Suppression  15 days Fri 7/19/19 Fri 8/2/19 316 Installation of pipes and supports of Fire Suppression
7/19 8/2
316 Installation of balck steel pipes and supports For Fire Fighting  21 days Fri 6/28/19 Thu 7/18/19 312SS f balck steel pipes and supports For Fire Fighting
6/28 7/18
317 Testing and Commissioning Plumbing System 15 days Fri 8/2/19 Fri 8/16/19 312,313,314,316 Testing and Commissioning Plumbing System
8/2 8/16
318 Installation of supports and Chiller Pipes  21 days Fri 6/28/19 Thu 7/18/19 304 tallation of supports and Chiller Pipes
6/28 7/18
319 Installation of supports and Insulation PVC pipe Drain 15 days Fri 7/19/19 Fri 8/2/19 318 Installation of supports and Insulation PVC pipe Drain
7/19 8/2
320 Installation of FCU,AHU and PAU 25 days Sat 8/3/19 Tue 8/27/19 319 Installation of FCU,AHU and PAU
8/3 8/27
321 Installation of supports and Fresh Air Ducting  21 days Fri 6/28/19 Thu 7/18/19 318SS llation of supports and Fresh Air Ducting
6/28 7/18
322 Installation of supports and Exaust Ducting  21 days Fri 6/28/19 Thu 7/18/19 318SS allation of supports and Exaust Ducting
6/28 7/18
323 Installation of supports and Hood Ducting  21 days Fri 6/28/19 Thu 7/18/19 318SS tallation of supports and Hood Ducting
6/28 7/18
324 Testing and Commissioning MVAC System 15 days Wed 8/28/19 Wed 9/11/19 318,320 Testing and Commissioning MVAC System
8/28 9/11
325 Cement Plastering 9 days Tue 7/2/19 Wed 7/10/19 305SS+8 days Cement Plastering
7/2 7/10
326 Handover 1 day Thu 7/11/19 Thu 7/11/19 325 Handover
7/11 7/11
327    Decoration Work(CCY SCOPE internal,MEP to insret 2rd fix) 90 days Tue 7/30/19 Sun 10/27/19 328SS Decoration Work(CCY SCOPE internal,MEP to insret 2rd fix)
7/30 10/27
328 LEVEL 3 GUEST‐ROOM CONSTRUCTION SCHEDULE 172 days Fri 7/12/19 Mon 12/30/19

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 8 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un S3un 7
un 1un 2un 2
Sun 4un 1un 1un S2un Sun
1 8un 1un 2un S2un 6un 1un 2un 2
Sun 3un 1un 1un S2un Sun
1 8 un 1un
329 Setting‐out Zones ABC 10 days Fri 7/12/19 Sun 7/21/19 326 Setting-out Zones ABC
7/12 7/21
330 Setting-out Zone D 10 days Fri 7/12/19 Sun 7/21/19 326 Setting-out Zone D
7/12 7/21
331 Floor Screeding wet-works/acoustic layer 14 days Mon 7/22/19 Sun 8/4/19 329 Floor Screeding wet-works/acoustic layer
7/22 8/4
332 Ceiling Light Stud Installation 20 days Fri 7/19/19 Wed 8/7/19 329SS+7 days Ceiling Light Stud Installation
7/19 8/7
333 Ceiling Concealed Work and Test Eligible 4 days Thu 8/8/19 Sun 8/11/19 332 Ceiling Concealed Work and Test Eligible
8/8 8/11
334 Ceiling Gypsum Board Installation 14 days Mon 8/12/19 Sun 8/25/19 333 Ceiling Gypsum Board Installation
8/12 8/25
335 Ceiling and Wall Two Skim Coat 25 days Thu 8/22/19 Sun 9/15/19 334SS+10 days Ceiling and Wall Two Skim Coat
8/22 9/15
336 Waterproofing On Bathroom Floor、Wall And Tested Eligible 15 days Sun 9/1/19 Sun 9/15/19 335SS+10 days Waterproofing On Bathroom Floor、Wall And Tested Eligible
9/1 9/15
337 Wall And Floor Stone、Tile Installa on 11 days Wed 9/11/19 Sat 9/21/19 336SS+10 days Wall And Floor Stone、Tile Installation
9/11 9/21
338 Ceiling and Wall Paint 14 days Tue 10/1/19 Mon 10/14/19 337SS+20 days Ceiling and Wall Paint
10/1 10/14
339 Base and laminate Wall and Wall graphic installation 25 days Tue 10/8/19 Fri 11/1/19 338SS+7 days Base and laminate Wall and Wall graphic installation
10/8 11/1
340 Wardrobe、Bathroom Cabinet Installa on 20 days Fri 10/11/19 Wed 10/30/19 338SS+10 days Wardrobe、Bathroom Cabinet Installation
10/11 10/30
341 Door and Skirting Installation 15 days Tue 10/15/19 Tue 10/29/19 338 Door and Skirting Installation
10/15 10/29
342 Glass Partition Installation In Bathroom 15 days Wed 10/30/19 Wed 11/13/19 341 Glass Partition Installation In Bathroom
10/30 11/13
343 Sanitary wares, Fittings and Accessories Installation 15 days Wed 11/6/19 Wed 11/20/19 342SS+7 days Sanitary wares, Fittings and Accessories Instal
11/6 11/20
344 Carpet And Wallpaper Installation 15 days Wed 11/6/19 Wed 11/20/19 342SS+7 days Carpet And Wallpaper Installation
11/6 11/20
345 Snagging & rectification Zones ABC 30 days Thu 11/21/19 Fri 12/20/19 344,343,342,341,340,33 Snagging & rectification Zo
11/21 1
346 Snagging & rectification Zones D 10 days Sat 12/21/19 Mon 12/30/19 345 Snagging & recti
12/21
347 LEVEL 3 MEP SECOND FIX  37 days Tue 10/8/19 Wed 11/13/19 TBC
348 Installation of LV Wiring Device (Switch, Socket, Lighting ) 15 days Tue 10/8/19 Tue 10/22/19 338SS+7 days,119SS+7 days Installation of LV Wiring Device (Switch, Socket, Lighting )
10/8 10/22
349 Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV) 15 days Tue 10/8/19 Tue 10/22/19 348SS Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV)
10/8 10/22
350 Installation of DB Panel 15 days Wed 10/23/19 Wed 11/6/19 348 Installation of DB Panel
10/23 11/6
351 Installation of ELV Panel 15 days Wed 10/23/19 Wed 11/6/19 349 Installation of ELV Panel
10/23 11/6
352 Testing and Commissioning Electrical System 7 days Thu 11/7/19 Wed 11/13/19 350,351 Testing and Commissioning Electrical System
11/7 11/13
353 Installation of sprinkler heads 10 days Tue 10/8/19 Thu 10/17/19 348SS Installation of sprinkler heads
10/8 10/17
354 Installation of fire  hose cabinet 7 days Tue 10/8/19 Mon 10/14/19 348SS Installation of fire hose cabinet
10/8 10/14
355 Testing and Commissioning Plumbing System 10 days Fri 10/18/19 Sun 10/27/19 353,354 Testing and Commissioning Plumbing System
10/18 10/27
356 Installation of fans, grilles 15 days Tue 10/8/19 Tue 10/22/19 348SS Installation of fans, grilles
10/8 10/22
357 Testing and Commissioning MVAC System 10 days Wed 10/23/19 Fri 11/1/19 356 Testing and Commissioning MVAC System
10/23 11/1
358 Level 4 192 days Mon 5/13/19 Wed 11/20/19
359 Zone A&B&C 82 days Mon 5/13/19 Fri 8/2/19
360 Cleaning 6 days Mon 5/13/19 Sat 5/18/19
361 Brick Wall Construction 11 days Sat 6/15/19 Tue 6/25/19 ick Wall Construction
6/15 6/25
362 MEP First FIX 76 days Sun 5/19/19 Fri 8/2/19
363 Installation of LV&ELV Upvc conduit in Brick Wall 15 days Thu 6/20/19 Thu 7/4/19 361SS+5 days of LV&ELV Upvc conduit in Brick Wall
6/20 7/4
364 Installation of Support and LV&ELV Cable Tray 15 days Thu 6/20/19 Thu 7/4/19 363SS on of Support and LV&ELV Cable Tray
6/20 7/4
365 Installation of Support and Busduct  20 days Thu 6/20/19 Tue 7/9/19 363SS allation of Support and Busduct
6/20 7/9
366 LV&ELV Cable Pulling  15 days Fri 7/5/19 Fri 7/19/19 364 LV&ELV Cable Pulling
7/5 7/19
367 Testing and Commissioning  Electrical System 7 days Sat 7/20/19 Fri 7/26/19 365,366 Testing and Commissioning Electrical System
7/20 7/26
368 Installation of supports and PPR Pipes For Cold/Hot 15 days Sun 5/19/19 Sun 6/2/19 360 PPR Pipes For Cold/Hot
6/2
369 Installation of supports and PVC Pipe For Soil/Waste 20 days Mon 6/3/19 Sat 6/22/19 368 orts and PVC Pipe For Soil/Waste
6/22

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 9 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9 un 1un 2un S3un 7un 1un 2un 2
Sun 4un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un 2
Sun 3
un 1un 1un S2un Sun
1 8 un 1un
370 Installation of supports and PVC Pipe For Rain Water 15 days Sun 5/19/19 Sun 6/2/19 368SS PVC Pipe For Rain Water
6/2
371 Installation of balck steel pipes and supports For Fire Fighting  21 days Sun 5/19/19 Sat 6/8/19 368SS and supports For Fire Fighting
6/8
372 Testing and Commissioning Plumbing System 15 days Sun 6/23/19 Sun 7/7/19 368,369,370,371 g and Commissioning Plumbing System
6/23 7/7
373 Installation of supports and Chiller Pipes  21 days Sun 5/19/19 Sat 6/8/19 360 s and Chiller Pipes
6/8
374 Installation of supports and Insulation PVC pipe Drain 15 days Sun 6/9/19 Sun 6/23/19 373 orts and Insulation PVC pipe Drain
6/9 6/23
375 Installation of FCU,AHU and PAU 25 days Mon 6/24/19 Thu 7/18/19 374 Installation of FCU,AHU and PAU
6/24 7/18
376 Installation of supports and Fresh Air Ducting  21 days Sun 5/19/19 Sat 6/8/19 373SS and Fresh Air Ducting
6/8
377 Installation of supports and Exaust Ducting  21 days Sun 5/19/19 Sat 6/8/19 373SS s and Exaust Ducting
6/8
378 Installation of supports and Hood Ducting  21 days Sun 5/19/19 Sat 6/8/19 373SS ts and Hood Ducting
6/8
379 Testing and Commissioning MVAC System 15 days Fri 7/19/19 Fri 8/2/19 373,375 Testing and Commissioning MVAC System
7/19 8/2
380 Cement Plastering 7 days Thu 7/4/19 Wed 7/10/19 360,361SS+7 days
381 Handover 1 day Thu 7/11/19 Thu 7/11/19 380 Handover
7/11 7/11
382 Zone D 118 days Mon 5/13/19 Sat 9/7/19
383 Cleaning 5 days Mon 5/13/19 Fri 5/17/19
384 Brick Wall Construction 11 days Tue 6/25/19 Fri 7/5/19 Brick Wall Construction
6/25 7/5
385 MEP First FIX 113 days Sat 5/18/19 Sat 9/7/19
386 Installation of LV&ELV Upvc conduit in Brick Wall 7 days Sun 6/30/19 Sat 7/6/19 384SS+5 days ion of LV&ELV Upvc conduit in Brick Wall
6/30 7/6
387 Installation of Support and LV&ELV Cable Tray 10 days Sun 6/30/19 Tue 7/9/19 386SS lation of Support and LV&ELV Cable Tray
6/30 7/9
388 LV&ELV Cable Pulling  7 days Wed 7/10/19 Tue 7/16/19 387 LV&ELV Cable Pulling
7/10 7/16
389 Testing and Commissioning  Electrical System 7 days Wed 7/17/19 Tue 7/23/19 388 Testing and Commissioning Electrical System
7/17 7/23
390 Installation of supports and PPR Pipes For Cold/Hot 7 days Fri 8/9/19 Thu 8/15/19 275 Installation of supports and PPR Pipes For Cold/Hot
8/9 8/15
391 Installation of supports and PVC Pipe For Soil/Waste 10 days Fri 8/16/19 Sun 8/25/19 390 Installation of supports and PVC Pipe For Soil/Waste
8/16 8/25
392 Installation of supports and PVC Pipe For Rain Water 10 days Fri 8/9/19 Sun 8/18/19 390SS Installation of supports and PVC Pipe For Rain Water
8/9 8/18
393 Installation of balck steel pipes and supports For Fire Fighting  20 days Fri 8/9/19 Wed 8/28/19 390SS Installation of balck steel pipes and supports For Fire Fighting
8/9 8/28
394 Testing and Commissioning Plumbing System 10 days Thu 8/29/19 Sat 9/7/19 390,391,392,393 Testing and Commissioning Plumbing System
8/29 9/7
395 Installation of supports and Chiller Pipes  10 days Sat 5/18/19 Mon 5/27/19 383 nd Chiller Pipes
/27
396 Installation of supports and Insulation PVC pipe Drain 7 days Tue 5/28/19 Mon 6/3/19 395 d Insulation PVC pipe Drain
6/3
397 Installation of FCU and PAU 10 days Tue 6/4/19 Thu 6/13/19 396 on of FCU and PAU
6/13
398 Installation of supports and Fresh Air Ducting  12 days Sat 5/18/19 Wed 5/29/19 395SS Fresh Air Ducting
5/29
399 Installation of supports and Exaust Ducting  12 days Sat 5/18/19 Wed 5/29/19 395SS nd Exaust Ducting
5/29
400 Testing and Commissioning MVAC System 10 days Fri 6/14/19 Sun 6/23/19 395,397 d Commissioning MVAC System
6/14 6/23
401 Cement Plastering 3 days Sun 7/14/19 Tue 7/16/19 383,384 Cement Plastering
7/14 7/16
402 Handover 1 day Wed 7/17/19 Wed 7/17/19 401 Handover
7/17 7/17
403 Decoration Work(CCY SCOPE internal TBC) 90 days Tue 7/30/19 Sun 10/27/19 404SS Decoration Work(CCY SCOPE internal TBC)
7/30 10/27
404 LEVEL 4 GUEST‐ROOM CONSTRUCTION SCHEDULE 172 days Fri 7/12/19 Mon 12/30/19
405 Setting-out Zones ABC 10 days Fri 7/12/19 Sun 7/21/19 381 Setting-out Zones ABC
7/12 7/21
406 Setting-out Zone D 10 days Thu 7/18/19 Sat 7/27/19 402 Setting-out Zone D
7/18 7/27
407 Floor screed wet works/acoustic layer 14 days Mon 7/22/19 Sun 8/4/19 405 Floor screed wet works/acoustic layer
7/22 8/4
408 Ceiling Light Stud Installation 20 days Fri 7/19/19 Wed 8/7/19 405SS+7 days Ceiling Light Stud Installation
7/19 8/7
409 Ceiling Concealed Work and Test Eligible 4 days Thu 8/8/19 Sun 8/11/19 408 Ceiling Concealed Work and Test Eligible
8/8 8/11
410 Ceiling Gypsum Board Installation 14 days Mon 8/12/19 Sun 8/25/19 409 Ceiling Gypsum Board Installation
8/12 8/25

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 10 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un S3un 7
un 1un 2un S
2un 4
un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un 2
Sun 3un 1un 1un S2un Sun
1 8 un 1un
411 Ceiling and Wall Two Skim Coat 25 days Thu 8/22/19 Sun 9/15/19 410SS+10 days Ceiling and Wall Two Skim Coat
8/22 9/15
412 Waterproofing On Bathroom Floor、Wall And Tested Eligible 15 days Sun 9/1/19 Sun 9/15/19 411SS+10 days Waterproofing On Bathroom Floor、Wall And Tested Eligible
9/1 9/15
413 Wall And Floor Stone、Tile Installation 11 days Wed 9/11/19 Sat 9/21/19 412SS+10 days Wall And Floor Stone、Tile Installation
9/11 9/21
414 Ceiling and Wall Paint 14 days Tue 10/1/19 Mon 10/14/19 413SS+20 days Ceiling and Wall Paint
10/1 10/14
415 Base and laminate Wall and Wall graphic installation 25 days Tue 10/8/19 Fri 11/1/19 414SS+7 days Base and laminate Wall and Wall graphic installation
10/8 11/1
416 Wardrobe、Bathroom Cabinet Installation 20 days Fri 10/11/19 Wed 10/30/19 414SS+10 days Wardrobe、Bathroom Cabinet Installation
10/11 10/30
417 Door and Skirting Installation 15 days Tue 10/15/19 Tue 10/29/19 414 Door and Skirting Installation
10/15 10/29
418 Glass Partition Installation In Bathroom 15 days Wed 10/30/19 Wed 11/13/19 417 Glass Partition Installation In Bathroom
10/30 11/13
419 Sanitary wares, Fittings and Accessories Installation 15 days Wed 11/6/19 Wed 11/20/19 418SS+7 days Sanitary wares, Fittings and Accessories Instal
11/6 11/20
420 Carpet And Wallpaper Installation 15 days Wed 11/6/19 Wed 11/20/19 418SS+7 days Carpet And Wallpaper Installation
11/6 11/20
421 Snagging & rectification Zones ABC 30 days Thu 11/21/19 Fri 12/20/19 420,419,418,417,416,41 Snagging & rectification Zo
11/21 1
422 Snagging & rectification Zone D 10 days Sat 12/21/19 Mon 12/30/19 421 Snagging & rect
12/21
423 LEVEL 4 MEP SECOND FIX  55 days Mon 9/16/19 Sat 11/9/19 TBC
424 Installation of LV Wiring Device (Switch, Socket, Lighting ) 20 days Mon 9/16/19 Sat 10/5/19 411 Installation of LV Wiring Device (Switch, Socket, Lighting )
9/16 10/5
425 Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV) 20 days Mon 9/16/19 Sat 10/5/19 424SS Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV)
9/16 10/5
426 Installation of DB Panel 20 days Sun 10/6/19 Fri 10/25/19 424 Installation of DB Panel
10/6 10/25
427 Installation of ELV Panel 20 days Sun 10/6/19 Fri 10/25/19 425 Installation of ELV Panel
10/6 10/25
428 Testing and Commissioning Electrical System 15 days Sat 10/26/19 Sat 11/9/19 426,427 Testing and Commissioning Electrical System
10/26 11/9
429 Installation of sprinkler heads 10 days Mon 9/16/19 Wed 9/25/19 424SS Installation of sprinkler heads
9/16 9/25
430 Installation of fire  hose cabinet 10 days Mon 9/16/19 Wed 9/25/19 424SS Installation of fire hose cabinet
9/16 9/25
431 Testing and Commissioning Plumbing System 10 days Thu 9/26/19 Sat 10/5/19 429,430 Testing and Commissioning Plumbing System
9/26 10/5
432 Installation of fans, grilles 20 days Mon 9/16/19 Sat 10/5/19 424SS Installation of fans, grilles
9/16 10/5
433 Testing and Commissioning MVAC System 15 days Sun 10/6/19 Sun 10/20/19 432 Testing and Commissioning MVAC System
10/6 10/20
434 Level 5 217 days Sun 6/2/19 Sat 1/4/20
435 Zone A&B&C 178 days Sun 6/2/19 Tue 11/26/19
436 Cleaning 2 days Sun 6/2/19 Mon 6/3/19
437 Brick Wall Construction 12 days Thu 6/20/19 Mon 7/1/19 Brick Wall Construction
6/20 7/1
438 MEP First FIX 76 days Tue 6/25/19 Sun 9/8/19
439 Installation of LV&ELV Upvc conduit in Brick Wall 15 days Tue 6/25/19 Tue 7/9/19 437SS+5 days ion of LV&ELV Upvc conduit in Brick Wall
6/25 7/9
440 Installation of Support and LV&ELV Cable Tray 15 days Tue 6/25/19 Tue 7/9/19 439SS ation of Support and LV&ELV Cable Tray
6/25 7/9
441 Installation of Support and Busduct  20 days Tue 6/25/19 Sun 7/14/19 439SS nstallation of Support and Busduct
6/25 7/14
442 LV&ELV Cable Pulling  15 days Wed 7/10/19 Wed 7/24/19 440 LV&ELV Cable Pulling
7/10 7/24
443 Testing and Commissioning  Electrical System 7 days Thu 7/25/19 Wed 7/31/19 441,442 Testing and Commissioning Electrical System
7/25 7/31
444 Installation of supports and PPR Pipes For Cold/Hot 15 days Tue 6/25/19 Tue 7/9/19 439SS on of supports and PPR Pipes For Cold/Hot
6/25 7/9
445 Installation of supports and PVC Pipe For Soil/Waste 20 days Wed 7/10/19 Mon 7/29/19 444 stallation of supports and PVC Pipe For Soil/Waste
7/10 7/29
446 Installation of supports and PVC Pipe For Rain Water 15 days Tue 6/25/19 Tue 7/9/19 444SS n of supports and PVC Pipe For Rain Water
6/25 7/9
447 Installation of balck steel pipes and supports For Fire Fighting  21 days Tue 6/25/19 Mon 7/15/19 444SS balck steel pipes and supports For Fire Fighting
6/25 7/15
448 Testing and Commissioning Plumbing System 15 days Tue 7/30/19 Tue 8/13/19 444,445,446,447 Testing and Commissioning Plumbing System
7/30 8/13
449 Installation of supports and Chiller Pipes  21 days Tue 6/25/19 Mon 7/15/19 439SS llation of supports and Chiller Pipes
6/25 7/15
450 Installation of supports and Insulation PVC pipe Drain 15 days Tue 7/16/19 Tue 7/30/19 449 nstallation of supports and Insulation PVC pipe Drain
7/16 7/30
451 Installation of FCU,AHU and PAU 25 days Wed 7/31/19 Sat 8/24/19 450 Installation of FCU,AHU and PAU
7/31 8/24

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 11 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9 un 1un 2un S3un 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un 2
Sun 3
un 1un 1un S2un Sun
1 8 un 1un
452 Installation of supports and Fresh Air Ducting  21 days Tue 6/25/19 Mon 7/15/19 449SS ation of supports and Fresh Air Ducting
6/25 7/15
453 Installation of supports and Exaust Ducting  21 days Tue 6/25/19 Mon 7/15/19 449SS llation of supports and Exaust Ducting
6/25 7/15
454 Installation of supports and Hood Ducting  21 days Tue 6/25/19 Mon 7/15/19 449SS allation of supports and Hood Ducting
6/25 7/15
455 Testing and Commissioning MVAC System 15 days Sun 8/25/19 Sun 9/8/19 449,451 Testing and Commissioning MVAC System
8/25 9/8
456 Cement Plastering 6 days Wed 7/10/19 Mon 7/15/19 437SS+9 days Cement Plastering
7/10 7/15
457 Handover 1 day Tue 7/16/19 Tue 7/16/19 Handover
7/16 7/16
458 Zone D 51 days Mon 6/24/19 Tue 8/13/19
459 Cleaning 5 days Mon 6/24/19 Fri 6/28/19 383 Cleaning
6/24 6/28
460 Brick Wall Construction 12 days Wed 7/3/19 Sun 7/14/19 459 Brick Wall Construction
7/3 7/14
461 MEP First FIX 37 days Mon 7/8/19 Tue 8/13/19
462 Installation of LV&ELV Upvc conduit in Brick Wall 7 days Mon 7/8/19 Sun 7/14/19 460SS+5 days llation of LV&ELV Upvc conduit in Brick Wall
7/8 7/14
463 Installation of Support and LV&ELV Cable Tray 10 days Mon 7/8/19 Wed 7/17/19 462SS stallation of Support and LV&ELV Cable Tray
7/8 7/17
464 LV&ELV Cable Pulling  7 days Thu 7/18/19 Wed 7/24/19 463 LV&ELV Cable Pulling
7/18 7/24
465 Testing and Commissioning  Electrical System 7 days Thu 7/25/19 Wed 7/31/19 464 Testing and Commissioning Electrical System
7/25 7/31
466 Installation of supports and PPR Pipes For Cold/Hot 7 days Mon 7/8/19 Sun 7/14/19 462SS lation of supports and PPR Pipes For Cold/Hot
7/8 7/14
467 Installation of supports and PVC Pipe For Soil/Waste 10 days Mon 7/15/19 Wed 7/24/19 466 stallation of supports and PVC Pipe For Soil/Waste
7/15 7/24
468 Installation of supports and PVC Pipe For Rain Water 10 days Mon 7/8/19 Wed 7/17/19 466SS lation of supports and PVC Pipe For Rain Water
7/8 7/17
469 Installation of balck steel pipes and supports For Fire Fighting  20 days Mon 7/8/19 Sat 7/27/19 466SS on of balck steel pipes and supports For Fire Fighting
7/8 7/27
470 Testing and Commissioning Plumbing System 10 days Sun 7/28/19 Tue 8/6/19 466,467,468,469 Testing and Commissioning Plumbing System
7/28 8/6
471 Installation of supports and Chiller Pipes  10 days Mon 7/8/19 Wed 7/17/19 462SS nstallation of supports and Chiller Pipes
7/8 7/17
472 Installation of supports and Insulation PVC pipe Drain 7 days Thu 7/18/19 Wed 7/24/19 471 stallation of supports and Insulation PVC pipe Drain
7/18 7/24
473 Installation of FCU and PAU 10 days Thu 7/25/19 Sat 8/3/19 472 Installation of FCU and PAU
7/25 8/3
474 Installation of supports and Fresh Air Ducting  12 days Mon 7/8/19 Fri 7/19/19 471SS tallation of supports and Fresh Air Ducting
7/8 7/19
475 Installation of supports and Exaust Ducting  12 days Mon 7/8/19 Fri 7/19/19 471SS nstallation of supports and Exaust Ducting
7/8 7/19
476 Testing and Commissioning MVAC System 10 days Sun 8/4/19 Tue 8/13/19 471,473 Testing and Commissioning MVAC System
8/4 8/13
477 Cement Plastering 3 days Sat 7/20/19 Mon 7/22/19 460 Cement Plastering
7/20 7/22
478 Handover 1 day Tue 7/23/19 Tue 7/23/19 477 Handover
7/23 7/23
479 Decoration Work(CCY SCOPE internal,MEP to insret 2rd fix) 100 days Wed 7/17/19 Thu 10/24/19 480SS Decoration Work(CCY SCOPE internal,MEP to insret 2rd fix)
7/17 10/24
480 LEVEL 5 GUEST‐ROOM CONSTRUCTION SCHEDULE 172 days Wed 7/17/19 Sat 1/4/20
481 Setting-out Zones ABC 10 days Wed 7/17/19 Fri 7/26/19 457 Setting-out Zones ABC
7/17 7/26
482 Setting-Out Zone D 10 days Wed 7/24/19 Fri 8/2/19 478 Setting-Out Zone D
7/24 8/2
483 Floor Screed wet works/acoustic layer 14 days Sat 7/27/19 Fri 8/9/19 481 Floor Screed wet works/acoustic layer
7/27 8/9
484 Ceiling Light Stud Installation 20 days Wed 7/24/19 Mon 8/12/19 481SS+7 days Ceiling Light Stud Installation
7/24 8/12
485 Ceiling Concealed Work and Test Eligible 4 days Tue 8/13/19 Fri 8/16/19 484 Ceiling Concealed Work and Test Eligible
8/13 8/16
486 Ceiling Gypsum Board Installation 14 days Sat 8/17/19 Fri 8/30/19 485 Ceiling Gypsum Board Installation
8/17 8/30
487 Ceiling and Wall Two Skim Coat 25 days Tue 8/27/19 Fri 9/20/19 486SS+10 days Ceiling and Wall Two Skim Coat
8/27 9/20
488 Waterproofing On Bathroom Floor、Wall And Tested Eligible 15 days Fri 9/6/19 Fri 9/20/19 487SS+10 days Waterproofing On Bathroom Floor、Wall And Tested Eligible
9/6 9/20
489 Wall And Floor Stone、Tile Installation 11 days Mon 9/16/19 Thu 9/26/19 488SS+10 days Wall And Floor Stone、Tile Installation
9/16 9/26
490 Ceiling and Wall Paint 14 days Sun 10/6/19 Sat 10/19/19 489SS+20 days Ceiling and Wall Paint
10/6 10/19
491 Base and laminate Wall and Wall graphic installation 25 days Sun 10/13/19 Wed 11/6/19 490SS+7 days Base and laminate Wall and Wall graphic installation
10/13 11/6
492 Wardrobe、Bathroom Cabinet Installation 20 days Wed 10/16/19 Mon 11/4/19 490SS+10 days Wardrobe、Bathroom Cabinet Installation
10/16 11/4

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 12 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un 3
Sun 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un 2
Sun 3un 1un 1un 2
Sun Sun
1 8un 1un
493 Door and Skirting Installation 15 days Sun 10/20/19 Sun 11/3/19 490 Door and Skirting Installation
10/20 11/3
494 Glass Partition Installation In Bathroom 15 days Mon 11/4/19 Mon 11/18/19 493 Glass Partition Installation In Bathroom
11/4 11/18
495 Sanitary wares, Fittings and Accessories Installation 15 days Mon 11/11/19 Mon 11/25/19 494SS+7 days Sanitary wares, Fittings and Accessories Inst
11/11 11/25
496 Carpet And Wallpaper Installation 15 days Mon 11/11/19 Mon 11/25/19 494SS+7 days Carpet And Wallpaper Installation
11/11 11/25
497 Snagging & rectification Zone ABC 30 days Tue 11/26/19 Wed 12/25/19 496,495,494,493,492,49 Snagging & rectification
11/26
498 Snagging & rectification Zone D 10 days Thu 12/26/19 Sat 1/4/20 497 Snagging & re
12/26
499 LEVEL 5 MEP SECOND FIX  50 days Sun 10/13/19 Sun 12/1/19 TBC
500 Installation of LV Wiring Device (Switch, Socket, Lighting ) 18 days Sun 10/13/19 Wed 10/30/19 490SS+7 days Installation of LV Wiring Device (Switch, Socket, Lighting )
10/13 10/30
501 Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV) 18 days Sun 10/13/19 Wed 10/30/19 500SS Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV)
10/13 10/30
502 Installation of DB Panel 18 days Thu 10/31/19 Sun 11/17/19 500 Installation of DB Panel
10/31 11/17
503 Installation of ELV Panel 18 days Thu 10/31/19 Sun 11/17/19 501 Installation of ELV Panel
10/31 11/17
504 Testing and Commissioning Electrical System 14 days Mon 11/18/19 Sun 12/1/19 502,503 Testing and Commissioning Electrical
11/18 12/1
505 Installation of sprinkler heads 10 days Sun 10/13/19 Tue 10/22/19 500SS Installation of sprinkler heads
10/13 10/22
506 Installation of fire  hose cabinet 10 days Sun 10/13/19 Tue 10/22/19 500SS Installation of fire hose cabinet
10/13 10/22
507 Testing and Commissioning Plumbing System 10 days Wed 10/23/19 Fri 11/1/19 505,506 Testing and Commissioning Plumbing System
10/23 11/1
508 Installation of fans, grilles 20 days Sun 10/13/19 Fri 11/1/19 500SS Installation of fans, grilles
10/13 11/1
509 Testing and Commissioning MVAC System 15 days Sat 11/2/19 Sat 11/16/19 508 Testing and Commissioning MVAC System
11/2 11/16
510 Level 6 215 days Sat 6/8/19 Wed 1/8/20
511 Zone A&B&C 178 days Sat 6/8/19 Mon 12/2/19
512 Brick Wall Construction 18 days Sat 6/22/19 Tue 7/9/19 Brick Wall Construction
6/22 7/9
513 MEP First FIX 76 days Sat 6/29/19 Thu 9/12/19
514 Installation of LV&ELV Upvc conduit in Brick Wall 15 days Sat 6/29/19 Sat 7/13/19 512SS+7 days ation of LV&ELV Upvc conduit in Brick Wall
6/29 7/13
515 Installation of Support and LV&ELV Cable Tray 15 days Sat 6/29/19 Sat 7/13/19 514SS llation of Support and LV&ELV Cable Tray
6/29 7/13
516 Installation of Support and Busduct  20 days Sat 6/29/19 Thu 7/18/19 514SS Installation of Support and Busduct
6/29 7/18
517 LV&ELV Cable Pulling  15 days Sun 7/14/19 Sun 7/28/19 515 LV&ELV Cable Pulling
7/14 7/28
518 Testing and Commissioning  Electrical System 7 days Mon 7/29/19 Sun 8/4/19 516,517 Testing and Commissioning Electrical System
7/29 8/4
519 Installation of supports and PPR Pipes For Cold/Hot 15 days Sat 6/29/19 Sat 7/13/19 514SS tion of supports and PPR Pipes For Cold/Hot
6/29 7/13
520 Installation of supports and PVC Pipe For Soil/Waste 20 days Sun 7/14/19 Fri 8/2/19 519 Installation of supports and PVC Pipe For Soil/Waste
7/14 8/2
521 Installation of supports and PVC Pipe For Rain Water 15 days Sat 6/29/19 Sat 7/13/19 519SS ion of supports and PVC Pipe For Rain Water
6/29 7/13
522 Installation of balck steel pipes and supports For Fire Fighting  21 days Sat 6/29/19 Fri 7/19/19 519SS f balck steel pipes and supports For Fire Fighting
6/29 7/19
523 Testing and Commissioning Plumbing System 15 days Sat 8/3/19 Sat 8/17/19 519,520,521,522 Testing and Commissioning Plumbing System
8/3 8/17
524 Installation of supports and Chiller Pipes  21 days Sat 6/29/19 Fri 7/19/19 514SS tallation of supports and Chiller Pipes
6/29 7/19
525 Installation of supports and Insulation PVC pipe Drain 15 days Sat 7/20/19 Sat 8/3/19 524 Installation of supports and Insulation PVC pipe Drain
7/20 8/3
526 Installation of FCU,AHU and PAU 25 days Sun 8/4/19 Wed 8/28/19 525 Installation of FCU,AHU and PAU
8/4 8/28
527 Installation of supports and Fresh Air Ducting  21 days Sat 6/29/19 Fri 7/19/19 524SS llation of supports and Fresh Air Ducting
6/29 7/19
528 Installation of supports and Exaust Ducting  21 days Sat 6/29/19 Fri 7/19/19 524SS tallation of supports and Exaust Ducting
6/29 7/19
529 Installation of supports and Hood Ducting  21 days Sat 6/29/19 Fri 7/19/19 524SS stallation of supports and Hood Ducting
6/29 7/19
530 Testing and Commissioning MVAC System 15 days Thu 8/29/19 Thu 9/12/19 524,526 Testing and Commissioning MVAC System
8/29 9/12
531 Cement Plastering 6 days Sun 7/14/19 Fri 7/19/19 512 Cement Plastering
7/14 7/19
532 Handover 1 day Sat 7/20/19 Sat 7/20/19 531 Handover
7/20 7/20
533 Zone D 59 days Mon 6/24/19 Wed 8/21/19

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 13 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un 3
Sun 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un 2
Sun 3
un 1un 1un 2
Sun Sun
1 8un 1un
534 Cleaning 5 days Mon 6/24/19 Fri 6/28/19 Cleaning
6/24 6/28
535 Brick Wall Construction 8 days Thu 7/11/19 Thu 7/18/19 534 Brick Wall Construction
7/11 7/18
536 MEP First FIX 37 days Tue 7/16/19 Wed 8/21/19
537 Installation of LV&ELV Upvc conduit in Brick Wall 7 days Tue 7/16/19 Mon 7/22/19 535SS+5 days nstallation of LV&ELV Upvc conduit in Brick Wall
7/16 7/22
538 Installation of Support and LV&ELV Cable Tray 10 days Tue 7/16/19 Thu 7/25/19 537SS Installation of Support and LV&ELV Cable Tray
7/16 7/25
539 LV&ELV Cable Pulling  7 days Fri 7/26/19 Thu 8/1/19 538 LV&ELV Cable Pulling
7/26 8/1
540 Testing and Commissioning  Electrical System 7 days Fri 8/2/19 Thu 8/8/19 539 Testing and Commissioning Electrical System
8/2 8/8
541 Installation of supports and PPR Pipes For Cold/Hot 7 days Tue 7/16/19 Mon 7/22/19 537SS stallation of supports and PPR Pipes For Cold/Hot
7/16 7/22
542 Installation of supports and PVC Pipe For Soil/Waste 10 days Tue 7/23/19 Thu 8/1/19 541 Installation of supports and PVC Pipe For Soil/Waste
7/23 8/1
543 Installation of supports and PVC Pipe For Rain Water 10 days Tue 7/16/19 Thu 7/25/19 541SS stallation of supports and PVC Pipe For Rain Water
7/16 7/25
544 Installation of balck steel pipes and supports For Fire Fighting  20 days Tue 7/16/19 Sun 8/4/19 541SS lation of balck steel pipes and supports For Fire Fighting
7/16 8/4
545 Testing and Commissioning Plumbing System 10 days Mon 8/5/19 Wed 8/14/19 541,542,543,544 Testing and Commissioning Plumbing System
8/5 8/14
546 Installation of supports and Chiller Pipes  10 days Tue 7/16/19 Thu 7/25/19 537SS Installation of supports and Chiller Pipes
7/16 7/25
547 Installation of supports and Insulation PVC pipe Drain 7 days Fri 7/26/19 Thu 8/1/19 546 Installation of supports and Insulation PVC pipe Drain
7/26 8/1
548 Installation of FCU and PAU 10 days Fri 8/2/19 Sun 8/11/19 547 Installation of FCU and PAU
8/2 8/11
549 Installation of supports and Fresh Air Ducting  12 days Tue 7/16/19 Sat 7/27/19 546SS Installation of supports and Fresh Air Ducting
7/16 7/27
550 Installation of supports and Exaust Ducting  12 days Tue 7/16/19 Sat 7/27/19 546SS Installation of supports and Exaust Ducting
7/16 7/27
551 Testing and Commissioning MVAC System 10 days Mon 8/12/19 Wed 8/21/19 546,548 Testing and Commissioning MVAC System
8/12 8/21
552 Cement Plastering 4 days Tue 7/23/19 Fri 7/26/19 535 Cement Plastering
7/23 7/26
553 Handover 1 day Sat 7/27/19 Sat 7/27/19 552 Handover
7/27 7/27
554 Decoration Work(CCY SCOPE internal) 100 days Sun 7/21/19 Mon 10/28/19 555SS Decoration Work(CCY SCOPE internal)
7/21 10/28
555 LEVEL 6 GUEST‐ROOM CONSTRUCTION SCHEDULE 172 days Sun 7/21/19 Wed 1/8/20
556 Setting‐out Zone ABC 10 days Sun 7/21/19 Tue 7/30/19 532 Setting-out Zone ABC
7/21 7/30
557 Setting-out Zone D 10 days Sun 7/28/19 Tue 8/6/19 553 Setting-out Zone D
7/28 8/6
558 Floor Screed wet works/Acoustic layer 14 days Wed 7/31/19 Tue 8/13/19 556 Floor Screed wet works/Acoustic layer
7/31 8/13
559 Ceiling Light Stud Installation 20 days Sun 7/28/19 Fri 8/16/19 556SS+7 days Ceiling Light Stud Installation
7/28 8/16
560 Ceiling Concealed Work and Test Eligible 4 days Sat 8/17/19 Tue 8/20/19 559 Ceiling Concealed Work and Test Eligible
8/17 8/20
561 Ceiling Gypsum Board Installation 14 days Wed 8/21/19 Tue 9/3/19 560 Ceiling Gypsum Board Installation
8/21 9/3
562 Ceiling and Wall Two Skim Coat 25 days Sat 8/31/19 Tue 9/24/19 561SS+10 days Ceiling and Wall Two Skim Coat
8/31 9/24
563 Waterproofing On Bathroom Floor、Wall And Tested Eligible 15 days Tue 9/10/19 Tue 9/24/19 562SS+10 days Waterproofing On Bathroom Floor、Wall And Tested Eligible
9/10 9/24
564 Wall And Floor Stone、Tile Installa on 11 days Fri 9/20/19 Mon 9/30/19 563SS+10 days Wall And Floor Stone、Tile Installation
9/20 9/30
565 Ceiling and Wall Paint 14 days Thu 10/10/19 Wed 10/23/19 564SS+20 days Ceiling and Wall Paint
10/10 10/23
566 Base and laminate Wall and Wall graphic installation 25 days Thu 10/17/19 Sun 11/10/19 565SS+7 days Base and laminate Wall and Wall graphic installation
10/17 11/10
567 Wardrobe、Bathroom Cabinet Installa on 20 days Sun 10/20/19 Fri 11/8/19 565SS+10 days Wardrobe、Bathroom Cabinet Installation
10/20 11/8
568 Door and Skirting Installation 15 days Thu 10/24/19 Thu 11/7/19 565 Door and Skirting Installation
10/24 11/7
569 Glass Partition Installation In Bathroom 15 days Fri 11/8/19 Fri 11/22/19 568 Glass Partition Installation In Bathroom
11/8 11/22
570 Sanitary wares, Fittings and Accessories Installation 15 days Fri 11/15/19 Fri 11/29/19 569SS+7 days Sanitary wares, Fittings and Accessories In
11/15 11/29
571 Carpet And Wallpaper Installation 15 days Fri 11/15/19 Fri 11/29/19 569SS+7 days Carpet And Wallpaper Installation
11/15 11/29
572 Snagging & rectification Zones ABC 30 days Sat 11/30/19 Sun 12/29/19 571,570,569,568,567,56 Snagging & rectificati
11/30
573 Snagging & rectification Zone D 10 days Mon 12/30/19 Wed 1/8/20 572 Snagging &
12/3
574 LEVEL 6 MEP SECOND FIX  45 days Thu 10/17/19 Sat 11/30/19 TBC

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 14 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un S3un 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un 2
Sun 3 un 1un 1un S2un Sun
1 8 un 1un
575 Installation of LV Wiring Device (Switch, Socket, Lighting ) 15 days Thu 10/17/19 Thu 10/31/19 565SS+7 days Installation of LV Wiring Device (Switch, Socket, Lighting )
10/17 10/31
576 Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV) 16 days Thu 10/17/19 Fri 11/1/19 575SS Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV)
10/17 11/1
577 Installation of DB Panel 16 days Fri 11/1/19 Sat 11/16/19 575 Installation of DB Panel
11/1 11/16
578 Installation of ELV Panel 15 days Sat 11/2/19 Sat 11/16/19 576 Installation of ELV Panel
11/2 11/16
579 Testing and Commissioning Electrical System 14 days Sun 11/17/19 Sat 11/30/19 577,578 Testing and Commissioning Electrical
11/17 11/30
580 Installation of sprinkler heads 9 days Thu 10/17/19 Fri 10/25/19 575SS Installation of sprinkler heads
10/17 10/25
581 Installation of fire  hose cabinet 9 days Thu 10/17/19 Fri 10/25/19 575SS Installation of fire hose cabinet
10/17 10/25
582 Testing and Commissioning Plumbing System 10 days Sat 10/26/19 Mon 11/4/19 580,581 Testing and Commissioning Plumbing System
10/26 11/4
583 Installation of fans, grilles 20 days Thu 10/17/19 Tue 11/5/19 575SS Installation of fans, grilles
10/17 11/5
584 Testing and Commissioning MVAC System 15 days Wed 11/6/19 Wed 11/20/19 583 Testing and Commissioning MVAC System
11/6 11/20
585 Level 7 203 days Mon 6/24/19 Sun 1/12/20
586 Zone A&B&C 81 days Mon 6/24/19 Thu 9/12/19
587 Cleaning 7 days Mon 6/24/19 Sun 6/30/19 588SS‐2 days Cleaning
6/24 6/30
588 Brick Wall Construction 18 days Mon 6/24/19 Thu 7/11/19 Brick Wall Construction
6/24 7/11
589 MEP First FIX 76 days Sat 6/29/19 Thu 9/12/19
590 Installation of LV&ELV Upvc conduit in Brick Wall 15 days Sat 6/29/19 Sat 7/13/19 588SS+5 days ation of LV&ELV Upvc conduit in Brick Wall
6/29 7/13
591 Installation of Support and LV&ELV Cable Tray 15 days Sat 6/29/19 Sat 7/13/19 590SS llation of Support and LV&ELV Cable Tray
6/29 7/13
592 Installation of Support and Busduct 20 days Sat 6/29/19 Thu 7/18/19 590SS Installation of Support and Busduct
6/29 7/18
593 LV&ELV Cable Pulling 15 days Sun 7/14/19 Sun 7/28/19 591 LV&ELV Cable Pulling
7/14 7/28
594 Testing and Commissioning Electrical System 7 days Mon 7/29/19 Sun 8/4/19 592,593 Testing and Commissioning Electrical System
7/29 8/4
595 Installation of supports and PPR Pipes For Cold/Hot 15 days Sat 6/29/19 Sat 7/13/19 590SS tion of supports and PPR Pipes For Cold/Hot
6/29 7/13
596 Installation of supports and PVC Pipe For Soil/Waste 20 days Sun 7/14/19 Fri 8/2/19 595 Installation of supports and PVC Pipe For Soil/Waste
7/14 8/2
597 Installation of supports and PVC Pipe For Rain Water 15 days Sat 6/29/19 Sat 7/13/19 595SS ion of supports and PVC Pipe For Rain Water
6/29 7/13
598 Installation of balck steel pipes and supports For Fire Fighting 21 days Sat 6/29/19 Fri 7/19/19 595SS f balck steel pipes and supports For Fire Fighting
6/29 7/19
599 Testing and Commissioning Plumbing System 15 days Sat 8/3/19 Sat 8/17/19 595,596,597,598 Testing and Commissioning Plumbing System
8/3 8/17
600 Installation of supports and Chiller Pipes 21 days Sat 6/29/19 Fri 7/19/19 590SS tallation of supports and Chiller Pipes
6/29 7/19
601 Installation of supports and Insulation PVC pipe Drain 15 days Sat 7/20/19 Sat 8/3/19 600 Installation of supports and Insulation PVC pipe Drain
7/20 8/3
602 Installation of FCU,AHU and PAU 25 days Sun 8/4/19 Wed 8/28/19 601 Installation of FCU,AHU and PAU
8/4 8/28
603 Installation of supports and Fresh Air Ducting 21 days Sat 6/29/19 Fri 7/19/19 600SS llation of supports and Fresh Air Ducting
6/29 7/19
604 Installation of supports and Exaust Ducting 21 days Sat 6/29/19 Fri 7/19/19 600SS tallation of supports and Exaust Ducting
6/29 7/19
605 Installation of supports and Hood Ducting 21 days Sat 6/29/19 Fri 7/19/19 600SS stallation of supports and Hood Ducting
6/29 7/19
606 Testing and Commissioning MVAC System 15 days Thu 8/29/19 Thu 9/12/19 600,602 Testing and Commissioning MVAC System
8/29 9/12
607 Cement Plastering 6 days Thu 7/18/19 Tue 7/23/19 588 Cement Plastering
7/18 7/23
608 Handover 1 day Wed 7/24/19 Wed 7/24/19 607 Handover
7/24 7/24
609 Zone D 153 days Fri 7/5/19 Wed 12/4/19
610 Cleaning 5 days Fri 7/5/19 Tue 7/9/19 Cleaning
7/5 7/9
611 Brick Wall Construction 9 days Tue 7/16/19 Wed 7/24/19 610 Brick Wall Construction
7/16 7/24
612 MEP First FIX 37 days Sun 7/21/19 Mon 8/26/19
613 Installation of LV&ELV Upvc conduit in Brick Wall 7 days Sun 7/21/19 Sat 7/27/19 611SS+5 days Installation of LV&ELV Upvc conduit in Brick Wall
7/21 7/27
614 Installation of Support and LV&ELV Cable Tray 10 days Sun 7/21/19 Tue 7/30/19 613SS Installation of Support and LV&ELV Cable Tray
7/21 7/30
615 LV&ELV Cable Pulling  7 days Wed 7/31/19 Tue 8/6/19 614 LV&ELV Cable Pulling
7/31 8/6

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 15 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9 un 1un 2un S3un 7
un 1un 2un 2Sun 4un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un S
2un 3un 1un 1un S2un Sun
1 8 un 1un
616 Testing and Commissioning  Electrical System 7 days Wed 8/7/19 Tue 8/13/19 615 Testing and Commissioning Electrical System
8/7 8/13
617 Installation of supports and PPR Pipes For Cold/Hot 7 days Sun 7/21/19 Sat 7/27/19 613SS Installation of supports and PPR Pipes For Cold/Hot
7/21 7/27
618 Installation of supports and PVC Pipe For Soil/Waste 10 days Sun 7/28/19 Tue 8/6/19 617 Installation of supports and PVC Pipe For Soil/Waste
7/28 8/6
619 Installation of supports and PVC Pipe For Rain Water 10 days Sun 7/21/19 Tue 7/30/19 617SS Installation of supports and PVC Pipe For Rain Water
7/21 7/30
620 Installation of balck steel pipes and supports For Fire Fighting  20 days Sun 7/21/19 Fri 8/9/19 617SS tallation of balck steel pipes and supports For Fire Fighting
7/21 8/9
621 Testing and Commissioning Plumbing System 10 days Sat 8/10/19 Mon 8/19/19 617,618,619,620 Testing and Commissioning Plumbing System
8/10 8/19
622 Installation of supports and Chiller Pipes  10 days Sun 7/21/19 Tue 7/30/19 613SS Installation of supports and Chiller Pipes
7/21 7/30
623 Installation of supports and Insulation PVC pipe Drain 7 days Wed 7/31/19 Tue 8/6/19 622 Installation of supports and Insulation PVC pipe Drain
7/31 8/6
624 Installation of FCU and PAU 10 days Wed 8/7/19 Fri 8/16/19 623 Installation of FCU and PAU
8/7 8/16
625 Installation of supports and Fresh Air Ducting  12 days Sun 7/21/19 Thu 8/1/19 622SS Installation of supports and Fresh Air Ducting
7/21 8/1
626 Installation of supports and Exaust Ducting  12 days Sun 7/21/19 Thu 8/1/19 622SS Installation of supports and Exaust Ducting
7/21 8/1
627 Testing and Commissioning MVAC System 10 days Sat 8/17/19 Mon 8/26/19 622,624 Testing and Commissioning MVAC System
8/17 8/26
628 Cement Plastering 6 days Thu 7/25/19 Tue 7/30/19 611 Cement Plastering
7/25 7/30
629 Handover 1 day Wed 7/31/19 Wed 7/31/19 628 Handover
7/31 7/31
630 Decoration Work(CCY SCOPE internal) 100 days Thu 7/25/19 Fri 11/1/19 631SS Decoration Work(CCY SCOPE internal)
7/25 11/1
631 LEVEL 7 GUEST‐ROOM CONSTRUCTION SCHEDULE 172 days Thu 7/25/19 Sun 1/12/20
632 Setting-out Zones ABC 10 days Thu 7/25/19 Sat 8/3/19 608 Setting-out Zones ABC
7/25 8/3
633 Setting-out Zone D 10 days Thu 8/1/19 Sat 8/10/19 629 Setting-out Zone D
8/1 8/10
634 Floor Screed wet works/Acoustic layer 14 days Sun 8/4/19 Sat 8/17/19 632 Floor Screed wet works/Acoustic layer
8/4 8/17
635 Ceiling Light Stud Installation 20 days Thu 8/1/19 Tue 8/20/19 632SS+7 days Ceiling Light Stud Installation
8/1 8/20
636 Ceiling Concealed Work and Test Eligible 4 days Wed 8/21/19 Sat 8/24/19 635 Ceiling Concealed Work and Test Eligible
8/21 8/24
637 Ceiling Gypsum Board Installation 14 days Sun 8/25/19 Sat 9/7/19 636 Ceiling Gypsum Board Installation
8/25 9/7
638 Ceiling and Wall Two Skim Coat 25 days Wed 9/4/19 Sat 9/28/19 637SS+10 days Ceiling and Wall Two Skim Coat
9/4 9/28
639 Waterproofing On Bathroom Floor、Wall And Tested Eligible 15 days Sat 9/14/19 Sat 9/28/19 638SS+10 days Waterproofing On Bathroom Floor、Wall And Tested Eligible
9/14 9/28
640 Wall And Floor Stone、Tile Installation 11 days Tue 9/24/19 Fri 10/4/19 639SS+10 days Wall And Floor Stone、Tile Installation
9/24 10/4
641 Ceiling and Wall Paint 14 days Mon 10/14/19 Sun 10/27/19 640SS+20 days Ceiling and Wall Paint
10/14 10/27
642 Base and laminate Wall and Wall graphic installation 25 days Mon 10/21/19 Thu 11/14/19 641SS+7 days Base and laminate Wall and Wall graphic installation
10/21 11/14
643 Wardrobe、Bathroom Cabinet Installation 20 days Thu 10/24/19 Tue 11/12/19 641SS+10 days Wardrobe、Bathroom Cabinet Installation
10/24 11/12
644 Door and Skirting Installation 15 days Mon 10/28/19 Mon 11/11/19 641 Door and Skirting Installation
10/28 11/11
645 Glass Partition Installation In Bathroom 15 days Tue 11/12/19 Tue 11/26/19 644 Glass Partition Installation In Bathro
11/12 11/26
646 Sanitary wares, Fittings and Accessories Installation 15 days Tue 11/19/19 Tue 12/3/19 645SS+7 days Sanitary wares, Fittings and Accessories
11/19 12/3
647 Carpet And Wallpaper Installation 15 days Tue 11/19/19 Tue 12/3/19 645SS+7 days Carpet And Wallpaper Installati
11/19 12/3
648 Snagging & Rectification Zones ABC 30 days Wed 12/4/19 Thu 1/2/20 647,646,645,644,643,64 Snagging & Rectifica
12/4
649 Snagging & recification Zone D 10 days Fri 1/3/20 Sun 1/12/20 648 Snagging

650 LEVEL 7 MEP SECOND FIX  46 days Mon 10/21/19 Thu 12/5/19 TBC


651 Installation of LV Wiring Device (Switch, Socket, Lighting ) 16 days Mon 10/21/19 Tue 11/5/19 641SS+7 days Installation of LV Wiring Device (Switch, Socket, Lighting
10/21 11/5
652 Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV) 16 days Mon 10/21/19 Tue 11/5/19 651SS Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV)
10/21 11/5
653 Installation of DB Panel 16 days Wed 11/6/19 Thu 11/21/19 651 Installation of DB Panel
11/6 11/21
654 Installation of ELV Panel 16 days Wed 11/6/19 Thu 11/21/19 652 Installation of ELV Panel
11/6 11/21
655 Testing and Commissioning Electrical System 14 days Fri 11/22/19 Thu 12/5/19 653,654 Testing and Commissioning Electrica
11/22 12/5
656 Installation of sprinkler heads 10 days Mon 10/21/19 Wed 10/30/19 651SS Installation of sprinkler heads
10/21 10/30

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 16 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un 3
Sun 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8un 1un 2un S2un 6un 1un 2un 2
Sun 3un 1un 1un 2
Sun Sun
1 8un 1un
657 Installation of fire hose cabinet 10 days Mon 10/21/19 Wed 10/30/19 651SS Installation of fire hose cabinet
10/21 10/30
658 Testing and Commissioning Plumbing System 10 days Thu 10/31/19 Sat 11/9/19 656,657 Testing and Commissioning Plumbing System
10/31 11/9
659 Installation of fans, grilles 20 days Mon 10/21/19 Sat 11/9/19 651SS Installation of fans, grilles
10/21 11/9
660 Testing and Commissioning MVAC System 15 days Sun 11/10/19 Sun 11/24/19 659 Testing and Commissioning MVAC System
11/10 11/24
661 Level 8 207 days Mon 6/24/19 Thu 1/16/20
662 Zone A&B&C 97 days Mon 6/24/19 Sat 9/28/19
663 Cleaning 7 days Mon 6/24/19 Sun 6/30/19 Cleaning
6/24 6/30
664 Brick Wall Construction 12 days Wed 7/10/19 Sun 7/21/19 663 Brick Wall Construction
7/10 7/21
665 MEP 1st/2nd FIX 76 days Mon 7/15/19 Sat 9/28/19
666 Installation of LV&ELV Upvc conduit in Brick Wall 15 days Mon 7/15/19 Mon 7/29/19 664SS+5 days Installation of LV&ELV Upvc conduit in Brick Wall
7/15 7/29
667 Installation of Support and LV&ELV Cable Tray 15 days Mon 7/15/19 Mon 7/29/19 666SS Installation of Support and LV&ELV Cable Tray
7/15 7/29
668 Installation of Support and Busduct  20 days Mon 7/15/19 Sat 8/3/19 666SS Installation of Support and Busduct
7/15 8/3
669 LV&ELV Cable Pulling  15 days Tue 7/30/19 Tue 8/13/19 667 LV&ELV Cable Pulling
7/30 8/13
670 Testing and Commissioning  Electrical System 7 days Wed 8/14/19 Tue 8/20/19 668,669 Testing and Commissioning Electrical System
8/14 8/20
671 Installation of supports and PPR Pipes For Cold/Hot 15 days Mon 7/15/19 Mon 7/29/19 666SS Installation of supports and PPR Pipes For Cold/Hot
7/15 7/29
672 Installation of supports and PVC Pipe For Soil/Waste 20 days Tue 7/30/19 Sun 8/18/19 671 Installation of supports and PVC Pipe For Soil/Waste
7/30 8/18
673 Installation of supports and PVC Pipe For Rain Water 15 days Mon 7/15/19 Mon 7/29/19 671SS nstallation of supports and PVC Pipe For Rain Water
7/15 7/29
674 Installation of balck steel pipes and supports For Fire Fighting  21 days Mon 7/15/19 Sun 8/4/19 671SS lation of balck steel pipes and supports For Fire Fighting
7/15 8/4
675 Testing and Commissioning Plumbing System 15 days Mon 8/19/19 Mon 9/2/19 671,672,673,674 Testing and Commissioning Plumbing System
8/19 9/2
676 Installation of supports and Chiller Pipes  21 days Mon 7/15/19 Sun 8/4/19 666SS Installation of supports and Chiller Pipes
7/15 8/4
677 Installation of supports and Insulation PVC pipe Drain 15 days Mon 8/5/19 Mon 8/19/19 676 Installation of supports and Insulation PVC pipe Drain
8/5 8/19
678 Installation of FCU,AHU and PAU 25 days Tue 8/20/19 Fri 9/13/19 677 Installation of FCU,AHU and PAU
8/20 9/13
679 Installation of supports and Fresh Air Ducting  21 days Mon 7/15/19 Sun 8/4/19 676SS Installation of supports and Fresh Air Ducting
7/15 8/4
680 Installation of supports and Exaust Ducting  21 days Mon 7/15/19 Sun 8/4/19 676SS Installation of supports and Exaust Ducting
7/15 8/4
681 Installation of supports and Hood Ducting  21 days Mon 7/15/19 Sun 8/4/19 676SS Installation of supports and Hood Ducting
7/15 8/4
682 Testing and Commissioning MVAC System 15 days Sat 9/14/19 Sat 9/28/19 676,678 Testing and Commissioning MVAC System
9/14 9/28
683 Cement Plastering 6 days Mon 7/22/19 Sat 7/27/19 664 Cement Plastering
7/22 7/27
684 Handover 1 day Sun 7/28/19 Sun 7/28/19 Handover
7/28 7/28
685 Zone D 53 days Wed 7/10/19 Sat 8/31/19
686 Cleaning 5 days Wed 7/10/19 Sun 7/14/19 610 Cleaning
7/10 7/14
687 Brick Wall Construction 10 days Sun 7/21/19 Tue 7/30/19 686 Brick Wall Construction
7/21 7/30
688 MEP 1st/2nd FIX 37 days Fri 7/26/19 Sat 8/31/19
689 Installation of LV&ELV Upvc conduit in Brick Wall 7 days Fri 7/26/19 Thu 8/1/19 687SS+5 days Installation of LV&ELV Upvc conduit in Brick Wall
7/26 8/1
690 Installation of Support and LV&ELV Cable Tray 10 days Fri 7/26/19 Sun 8/4/19 689SS Installation of Support and LV&ELV Cable Tray
7/26 8/4
691 LV&ELV Cable Pulling  7 days Mon 8/5/19 Sun 8/11/19 690 LV&ELV Cable Pulling
8/5 8/11
692 Testing and Commissioning  Electrical System 7 days Mon 8/12/19 Sun 8/18/19 691 Testing and Commissioning Electrical System
8/12 8/18
693 Installation of supports and PPR Pipes For Cold/Hot 7 days Fri 7/26/19 Thu 8/1/19 689SS Installation of supports and PPR Pipes For Cold/Hot
7/26 8/1
694 Installation of supports and PVC Pipe For Soil/Waste 10 days Fri 8/2/19 Sun 8/11/19 693 Installation of supports and PVC Pipe For Soil/Waste
8/2 8/11
695 Installation of supports and PVC Pipe For Rain Water 10 days Fri 7/26/19 Sun 8/4/19 693SS Installation of supports and PVC Pipe For Rain Water
7/26 8/4
696 Installation of balck steel pipes and supports For Fire Fighting  20 days Fri 7/26/19 Wed 8/14/19 693SS nstallation of balck steel pipes and supports For Fire Fighting
7/26 8/14
697 Testing and Commissioning Plumbing System 10 days Thu 8/15/19 Sat 8/24/19 693,694,695,696 Testing and Commissioning Plumbing System
8/15 8/24

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 17 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9 un 1un 2un 3
Sun 7
un 1un 2un 2Sun 4un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un S
2un 3un 1un 1un 2
Sun Sun
1 8un 1un
698 Installation of supports and Chiller Pipes  10 days Fri 7/26/19 Sun 8/4/19 689SS Installation of supports and Chiller Pipes
7/26 8/4
699 Installation of supports and Insulation PVC pipe Drain 7 days Mon 8/5/19 Sun 8/11/19 698 Installation of supports and Insulation PVC pipe Drain
8/5 8/11
700 Installation of FCU and PAU 10 days Mon 8/12/19 Wed 8/21/19 699 Installation of FCU and PAU
8/12 8/21
701 Installation of supports and Fresh Air Ducting  12 days Fri 7/26/19 Tue 8/6/19 698SS Installation of supports and Fresh Air Ducting
7/26 8/6
702 Installation of supports and Exaust Ducting  12 days Fri 7/26/19 Tue 8/6/19 698SS Installation of supports and Exaust Ducting
7/26 8/6
703 Testing and Commissioning MVAC System 10 days Thu 8/22/19 Sat 8/31/19 698,700 Testing and Commissioning MVAC System
8/22 8/31
704 Cement Plastering 4 days Wed 7/31/19 Sat 8/3/19 687 Cement Plastering
7/31 8/3
705 Handover 1 day Sun 8/4/19 Sun 8/4/19 Handover
8/4 8/4
706 Decoration Work(CCY SCOPE internal) 96 days Mon 7/29/19 Fri 11/1/19 707SS Decoration Work(CCY SCOPE internal)
7/29 11/1
707 LEVEL 8 GUEST‐ROOM CONSTRUCTION SCHEDULE 172 days Mon 7/29/19 Thu 1/16/20
708 Setting‐out Zones ABC 10 days Mon 7/29/19 Wed 8/7/19 684 Setting-out Zones ABC
7/29 8/7
709 Setting-out Zone D 10 days Mon 8/5/19 Wed 8/14/19 705 Setting-out Zone D
8/5 8/14
710 Floor Screed wet works/Acoustic layer 14 days Thu 8/8/19 Wed 8/21/19 708 Floor Screed wet works/Acoustic layer
8/8 8/21
711 Ceiling Light Stud Installation 20 days Mon 8/5/19 Sat 8/24/19 708SS+7 days Ceiling Light Stud Installation
8/5 8/24
712 Ceiling Concealed Work and Test Eligible 4 days Sun 8/25/19 Wed 8/28/19 711 Ceiling Concealed Work and Test Eligible
8/25 8/28
713 Ceiling Gypsum Board Installation 14 days Thu 8/29/19 Wed 9/11/19 712 Ceiling Gypsum Board Installation
8/29 9/11
714 Ceiling and Wall Two Skim Coat 25 days Sun 9/8/19 Wed 10/2/19 713SS+10 days Ceiling and Wall Two Skim Coat
9/8 10/2
715 Waterproofing On Bathroom Floor、Wall And Tested Eligible 15 days Mon 9/23/19 Mon 10/7/19 714SS+15 days Waterproofing On Bathroom Floor、Wall And Tested Eligible
9/23 10/7
716 Wall And Floor Stone、Tile Installa on 35 days Mon 9/30/19 Sun 11/3/19 715SS+7 days Wall And Floor Stone、Tile Installation
9/30 11/3
717 Ceiling and Wall Paint 14 days Sun 10/20/19 Sat 11/2/19 716SS+20 days Ceiling and Wall Paint
10/20 11/2
718 Base and laminate Wall and Wall graphic installation 25 days Sun 10/27/19 Wed 11/20/19 717SS+7 days Base and laminate Wall and Wall graphic installat
10/27 11/20
719 Wardrobe、Bathroom Cabinet Installa on 20 days Wed 10/30/19 Mon 11/18/19 717SS+10 days Wardrobe、Bathroom Cabinet Installation
10/30 11/18
720 Door and Skirting Installation 14 days Sun 11/3/19 Sat 11/16/19 717 Door and Skirting Installation
11/3 11/16
721 Glass Partition Installation In Bathroom 14 days Sun 11/17/19 Sat 11/30/19 720 Glass Partition Installation In Bath
11/17 11/30
722 Sanitary wares, Fittings and Accessories Installation 14 days Sun 11/24/19 Sat 12/7/19 721SS+7 days Sanitary wares, Fittings and Accessorie
11/24 12/7
723 Carpet And Wallpaper Installation 14 days Sun 11/24/19 Sat 12/7/19 721SS+7 days Carpet And Wallpaper Installa
11/24 12/7
724 snagging & Rectification Zones ABC 30 days Sun 12/8/19 Mon 1/6/20 723,722,721,720,719,71 snagging & Rectifi
12/8
725 Snagging & Recification Zone D 10 days Tue 1/7/20 Thu 1/16/20 724 Snaggin

726 LEVEL 8 MEP 3rd FIX  46 days Fri 10/25/19 Mon 12/9/19 TBC


727 Installation of LV Wiring Device (Switch, Socket, Lighting ) 17 days Fri 10/25/19 Sun 11/10/19 717SS+5 days Installation of LV Wiring Device (Switch, Socket, Lighti
10/25 11/10
728 Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV) 17 days Fri 10/25/19 Sun 11/10/19 727SS Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV)
10/25 11/10
729 Installation of DB Panel 17 days Mon 11/11/19 Wed 11/27/19 727 Installation of DB Panel
11/11 11/27
730 Installation of ELV Panel 17 days Mon 11/11/19 Wed 11/27/19 728 Installation of ELV Panel
11/11 11/27
731 Testing and Commissioning Electrical System 12 days Thu 11/28/19 Mon 12/9/19 729,730 Testing and Commissioning Electr
11/28 12/9
732 Installation of sprinkler heads 10 days Fri 10/25/19 Sun 11/3/19 727SS Installation of sprinkler heads
10/25 11/3
733 Installation of fire  hose cabinet 10 days Fri 10/25/19 Sun 11/3/19 727SS Installation of fire hose cabinet
10/25 11/3
734 Testing and Commissioning Plumbing System 10 days Mon 11/4/19 Wed 11/13/19 732,733 Testing and Commissioning Plumbing System
11/4 11/13
735 Installation of fans, grilles 20 days Fri 10/25/19 Wed 11/13/19 727SS Installation of fans, grilles
10/25 11/13
736 Testing and Commissioning MVAC System 15 days Thu 11/14/19 Thu 11/28/19 735 Testing and Commissioning MVAC Syst
11/14 11/28
737 Stair Finishing 39 days Mon 9/16/19 Thu 10/24/19
738 Stair handrail installation 15 days Mon 9/16/19 Mon 9/30/19 Stair handrail installation
9/16 9/30

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 18 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un 3
Sun 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un 2
Sun 3un 1un 1un S2un Sun
1 8un 1un
739 Stair Finishing 24 days Tue 10/1/19 Thu 10/24/19 738 Stair Finishing
10/1 10/24
740 Roof Work 45 days Tue 7/30/19 Thu 9/12/19
741 TOP ROOF 45 days Tue 7/30/19 Thu 9/12/19
742 Installation of waterproofing membrane including 300mm wall upturn 10 days Tue 7/30/19 Thu 8/8/19 stallation of waterproofing membrane including 300mm wall upturn
7/30 8/8
743 Installation of 50mm XPS Board 10 days Fri 8/9/19 Sun 8/18/19 742 Installation of 50mm XPS Board
8/9 8/18
744 Installation of a layer of protection fleece 10 days Mon 8/19/19 Wed 8/28/19 743 Installation of a layer of protection fleece
8/19 8/28
745 Installation of 1000X1000X50mm THK cement/sand panel with BRC 3315 mesh and joint  15 days Thu 8/29/19 Thu 9/12/19 744 on of 1000X1000X50mm THK cement/sand panel with BRC 3315 mesh and joint filled with bituminious compou
8/29 9/12
746
filled with bituminious compound
Level 2 Zone D Balcony Roof 40 days Tue 7/30/19 Sat 9/7/19 23 Level 2 Zone D Balcony Roof
7/30 9/7
747 External Wall Finishing 40 days Mon 7/30/18 Fri 9/7/18
748 Elevator Work 123 days Sat 7/20/19 Wed 11/20/19 12
749 L1-L3(Passenger Lifts Installation) 123 days Sat 7/20/19 Wed 11/20/19
750 Temporary Power as per Schindler specification (by Builder) 0 days Sat 7/20/19 Sat 7/20/19
7/20
751 (HS) Handover Lift Shafts for Vertical and Machine Room Survey 1 day Sun 7/28/19 Sun 7/28/19 750 ) Handover Lift Shafts for Vertical and Machine Room Survey
7/28 7/28
752 (VS) Vertical Survey 2 days Mon 7/29/19 Tue 7/30/19 751 (VS) Vertical Survey
7/29 7/30
753 (VS) Submit Survey to Builder 1 day Wed 7/31/19 Wed 7/31/19 752 (VS) Submit Survey to Builder
7/31 7/31
754 (RB) Rectification (by Builder) 0 days Wed 7/31/19 Wed 7/31/19 753
7/31
755 (MI) Mechanical Installation 8 wks Thu 8/1/19 Wed 9/25/19 754 (MI) Mechanical Installation
8/1 9/25
756 (GB) Landing Door Grouting (by Builder) 0 days Wed 8/14/19 Wed 8/14/19 755SS+2 wks
8/14
757 Permanent Power as per Schindler specification (by Builder) 0 days Wed 9/25/19 Wed 9/25/19 755,756
9/25
758 (EI) Electrical Installation 3 wks Thu 9/26/19 Wed 10/16/19 757 (EI) Electrical Installation
9/26 10/16
759 (CD) Car Decoration 1 wk Thu 10/17/19 Wed 10/23/19 758 (CD) Car Decoration
10/17 10/23
760 (TC) Testing & Commisioning 3 wks Thu 10/24/19 Wed 11/13/19 759 (TC) Testing & Commisioning
10/24 11/13
761 (SA) SAIS 1 wk Thu 11/14/19 Wed 11/20/19 760 (SA) SAIS
11/14 11/20
762 Client Handover 0 days Wed 11/20/19 Wed 11/20/19 749
11/20
763 Start of Defects Liability 0 days Wed 11/20/19 Wed 11/20/19 762
11/20
764 SL1(Service Lift Installation) 117 days Sat 7/20/19 Thu 11/14/19
765 Temporary Power as per Schindler specification (by Builder) 0 days Sat 7/20/19 Sat 7/20/19
7/20
766 (HS) Handover Lift Shafts for Vertical and Machine Room Survey 1 day Mon 7/22/19 Mon 7/22/19 765 andover Lift Shafts for Vertical and Machine Room Survey
7/22 7/22
767 (VS) Vertical Survey 2 days Tue 7/23/19 Wed 7/24/19 766 (VS) Vertical Survey
7/23 7/24
768 (VS) Submit Survey to Builder 1 day Thu 7/25/19 Thu 7/25/19 767 (VS) Submit Survey to Builder
7/25 7/25
769 (RB) Rectification (by Builder) 0 days Thu 7/25/19 Thu 7/25/19 768
7/25
770 (MI) Mechanical Installation 8 wks Fri 7/26/19 Thu 9/19/19 769 (MI) Mechanical Installation
7/26 9/19
771 (GB) Landing Door Grouting (by Builder) 0 days Tue 8/6/19 Tue 8/6/19 770SS+1.71 wks
8/6
772 Permanent Power as per Schindler specification (by Builder) 0 days Thu 9/19/19 Thu 9/19/19 770,771
9/19
773 (EI) Electrical Installation 3 wks Fri 9/20/19 Thu 10/10/19 772 (EI) Electrical Installation
9/20 10/10
774 (CD) Car Decoration 1 wk Fri 10/11/19 Thu 10/17/19 773 (CD) Car Decoration
10/11 10/17
775 (TC) Testing & Commisioning 3 wks Fri 10/18/19 Thu 11/7/19 774 (TC) Testing & Commisioning
10/18 11/7
776 (SA) SAIS 1 wk Fri 11/8/19 Thu 11/14/19 775 (SA) SAIS
11/8 11/14
777 Client Handover 0 days Thu 11/14/19 Thu 11/14/19 764
11/14
778 Start of Defects Liability 0 days Thu 11/14/19 Thu 11/14/19 777
11/14
779 SL2(Service Lift Installation) 117 days Sat 7/20/19 Thu 11/14/19

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 19 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un S3un 7
un 1un 2un 2
Sun 4
un 1un 1un 2
Sun Sun
1 8un 1un 2un 2
Sun 6
un 1un 2un 2
Sun 3
un 1un 1un S2un Sun
1 8 un 1un
780 Temporary Power as per Schindler specification (by Builder) 0 days Sat 7/20/19 Sat 7/20/19
7/20
781 (HS) Handover Lift Shafts for Vertical and Machine Room Survey 1 day Mon 7/22/19 Mon 7/22/19 780 andover Lift Shafts for Vertical and Machine Room Survey
7/22 7/22
782 (VS) Vertical Survey 2 days Tue 7/23/19 Wed 7/24/19 781 (VS) Vertical Survey
7/23 7/24
783 (VS) Submit Survey to Builder 1 day Thu 7/25/19 Thu 7/25/19 782 (VS) Submit Survey to Builder
7/25 7/25
784 (RB) Rectification (by Builder) 0 days Thu 7/25/19 Thu 7/25/19 783
7/25
785 (MI) Mechanical Installation 8 wks Fri 7/26/19 Thu 9/19/19 784 (MI) Mechanical Installation
7/26 9/19
786 (GB) Landing Door Grouting (by Builder) 0 days Thu 8/8/19 Thu 8/8/19 785SS+1.71 wks
8/8
787 Permanent Power as per Schindler specification (by Builder) 0 days Thu 9/19/19 Thu 9/19/19 785,786
9/19
788 (EI) Electrical Installation 3 wks Fri 9/20/19 Thu 10/10/19 787 (EI) Electrical Installation
9/20 10/10
789 (CD) Car Decoration 1 wk Fri 10/11/19 Thu 10/17/19 788 (CD) Car Decoration
10/11 10/17
790 (TC) Testing & Commisioning 3 wks Fri 10/18/19 Thu 11/7/19 789 (TC) Testing & Commisioning
10/18 11/7
791 (SA) SAIS 1 wk Fri 11/8/19 Thu 11/14/19 790 (SA) SAIS
11/8 11/14
792 Client Handover 0 days Thu 11/14/19 Thu 11/14/19 779
11/14
793 Start of Defects Liability 0 days Thu 11/14/19 Thu 11/14/19 792
11/14
794 Curtain Wall & Door & Glass 236 days Wed 7/24/19 Sun 3/15/20
795 Handover scaffolding to Aliplast 1 day Wed 7/24/19 Wed 7/24/19 Handover scaffolding to Aliplast
7/24 7/24
796 measure up L2-L5 21 days Thu 7/25/19 Wed 8/14/19 795 measure up L2-L5
7/25 8/14
797 Installation fix windows&door panel and level 02,complete frame installation excluding glass 12 days Mon 8/5/19 Fri 8/16/19 272SS+5 days,796FS‐10  n fix windows&door panel and level 02,complete frame installation excluding glass
8/5 8/16
798
days
Installation fix windows&door panel and level 03,  complete frame installation excluding glass 11 days Mon 8/5/19 Thu 8/15/19 405SS+5 days,797SS fix windows&door panel and level 03, complete frame installation excluding glass
8/5 8/15
799 Installation fix windows&door panel and level 04 complete frame 17 days Fri 8/16/19 Sun 9/1/19 798 llation fix windows&door panel and level 04 complete frame installation excluding glass
installation excluding glass 8/16 9/1
800 Installation fix windows&door panel and level 05, complete frame installation excluding glass 18 days Mon 9/2/19 Thu 9/19/19 481SS+5 days,799 Installation fix windows&door panel and level 05, complete frame installation excluding glass
9/2 9/19
801 Installation fix windows&door panel and level 06 complete frame 18 days Fri 9/20/19 Mon 10/7/19 800 Installation fix windows&door panel and level 06 complete frame installation excluding gl
installation excluding glass 9/20 10/7
802 Installation fix windows&door panel and level 07,  complete frame installation excluding glass 19 days Tue 10/8/19 Sat 10/26/19 708SS+5 days,801 Installation fix windows&door panel and level 07, complete frame installation ex
10/8 10/26
803 Installation fix windows&door panel and level 08 complete frame 19 days Sun 10/27/19 Thu 11/14/19 802 Installation fix windows&door panel and level 08 complete frame install
installation excluding glass 10/27 11/14
804 Complete Installation including all glass fix windows&door panel and from level 02 until level  213 days Thu 8/15/19 Sat 3/14/20 796 Complete Installation including all glass fix windows&door panel and from level 02 until level 08(W3.1
8/15
805
08(W3 1 W3 2 W3 3 W3 4 W3 5 W3 6 W3 7 W3 8 W3 9 W4 1 W4 2 W4 3 W4 4 W4 5 W4 6 W
Complete Installation Fins/Louvres 30 days Tue 1/14/20 Wed 2/12/20 804FF-31 days
806 Clean-up & rectify 35 days Mon 2/10/20 Sun 3/15/20 804FS-34 days
807 External Work 125 days Mon 7/15/19 Sat 11/16/19
808 Clean 15 days Mon 7/15/19 Mon 7/29/19 Clean
7/15 7/29
809 Structure external work 50 days Tue 7/30/19 Tue 9/17/19 808 Structure external work
7/30 9/17
810 External works roadside 40 days Wed 9/18/19 Sun 10/27/19 809 External works roadside
9/18 10/27
811 Landscaping and Improvements(Ramp up,Pool bar,Kid Pool,Gourmet,Garden with tables Kid  60 days Wed 9/18/19 Sat 11/16/19 810SS Landscaping and Improvements(Ramp up,Pool bar,Kid Pool,Gourmet,Garden with tabl
9/18 11/16
812
area)
Authority T&C 30 days Mon 1/20/20 Tue 2/18/20 670,675,682,692,697,703,7
813 BOH Building 180 days Mon 6/24/19 Fri 12/20/19
814 Demolition 10 days Mon 6/24/19 Wed 7/3/19 Demolition
6/24 7/3
815 Structure 57 days Sat 7/27/19 Sat 9/21/19
816 Pile Construction 10 days Sat 7/27/19 Mon 8/5/19 814 Pile Construction
7/27 8/5
817 Pile PDA Test 2 days Tue 8/6/19 Wed 8/7/19 816 Pile PDA Test
8/6 8/7
818 Excavation and Pile cap Construction 10 days Thu 8/8/19 Sat 8/17/19 817 Excavation and Pile cap Construction
8/8 8/17
819 Backfill 4 days Sun 8/18/19 Wed 8/21/19 818 Backfill
8/18 8/21
820 L1 7 days Thu 8/22/19 Wed 8/28/19 819 L1
8/22 8/28

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 20 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un 3
Sun 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8 un 1un 2un S2un 6
un 1un 2un 2
Sun 3
un 1un 1un S2un Sun
1 8un 1un
821 L2 7 days Thu 8/29/19 Wed 9/4/19 820 L2
8/29 9/4
822 L3 7 days Thu 9/5/19 Wed 9/11/19 821 L3
9/5 9/11
823 Roof 10 days Thu 9/12/19 Sat 9/21/19 822 Roof
9/12 9/21
824 MEP 154 days Sat 7/20/19 Fri 12/20/19 820SS+5 days
825 BACK OF HOUSE ( GAIN ACCESS BY CLIENT) COLD AND HOT WATER LAYOUT 104 days Thu 8/29/19 Tue 12/10/19
826 1ST FLOOR ‐ BACK OF HOUSE 91 days Thu 8/29/19 Wed 11/27/19
827 1ST FLOOR ‐ ELECTRICAL SYSTEM 91 days Thu 8/29/19 Wed 11/27/19
828 Installation of PVC Sleeves and Wall Opening  3 days Thu 8/29/19 Sat 8/31/19 820SS+7 days Installation of PVC Sleeves and Wall Opening
8/29 8/31
829 Installation of LV&ELV Upvc conduit in Slap 3 days Thu 8/29/19 Sat 8/31/19 828SS Installation of LV&ELV Upvc conduit in Slap
8/29 8/31
830 Installation of LV&ELV Upvc conduit in Brick Wall 10 days Sat 9/14/19 Mon 9/23/19 909SS+7 days Installation of LV&ELV Upvc conduit in Brick Wall
9/14 9/23
831 Installation of Support and LV&ELV Cable Tray 20 days Sat 9/14/19 Thu 10/3/19 830SS Installation of Support and LV&ELV Cable Tray
9/14 10/3
832 Installation of Support and Busduct  30 days Sat 9/14/19 Sun 10/13/19 830SS Installation of Support and Busduct
9/14 10/13
833 LV&ELV Cable Pulling  20 days Fri 10/4/19 Wed 10/23/19 831 LV&ELV Cable Pulling
10/4 10/23
834 Installation of LV Wiring Device (Switch, Socket, Lighting ) 15 days Thu 10/24/19 Thu 11/7/19 833 Installation of LV Wiring Device (Switch, Socket, Lightin
10/24 11/7
835 Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV) 10 days Fri 11/8/19 Sun 11/17/19 834 Installation of ELV Wiring Device (DAC,PAS,FAS,
11/8 11/17
836 Installation of DB Panel 15 days Mon 10/14/19 Mon 10/28/19 832 Installation of DB Panel
10/14 10/28
837 Installation of ELV Panel 20 days Fri 11/8/19 Wed 11/27/19 835SS Installation of ELV Panel
11/8 11/27
838 1ST FLOOR ‐ PLUMBING SYSTEM 35 days Sat 9/14/19 Fri 10/18/19
839 Installation of supports and PPR Pipes For Cold/Hot 35 days Sat 9/14/19 Fri 10/18/19 831SS Installation of supports and PPR Pipes For Cold/Hot
9/14 10/18
840 Installation of supports and PVC Pipe For Soil/Waste 25 days Sat 9/14/19 Tue 10/8/19 839SS Installation of supports and PVC Pipe For Soil/Waste
9/14 10/8
841 Installation of supports and PVC Pipe For Rain Water 15 days Sat 9/14/19 Sat 9/28/19 839SS Installation of supports and PVC Pipe For Rain Water
9/14 9/28
842 Installation of Sanitary Ware 20 days Sun 9/29/19 Fri 10/18/19 841 Installation of Sanitary Ware
9/29 10/18
843 1ST FLOOR‐ BACK OF HOUSE FIRE FIGHTING  LAYOUT 30 days Sat 9/14/19 Sun 10/13/19
844 Installation of pipes and supports above ceiling 20 days Sat 9/14/19 Thu 10/3/19 831SS Installation of pipes and supports above ceiling
9/14 10/3
845 Installation of pipes and supports at pipe shaft 10 days Fri 10/4/19 Sun 10/13/19 844 Installation of pipes and supports at pipe shaft
10/4 10/13
846 1ST FLOOR‐ BACK OF HOUSE FIRE SUPPRESSION  LAYOUT 30 days Sat 9/14/19 Sun 10/13/19
847 Installation of pipes and supports above ceiling 20 days Sat 9/14/19 Thu 10/3/19 831SS Installation of pipes and supports above ceiling
9/14 10/3
848 Installation of pipes and supports at pipe shaft 10 days Fri 10/4/19 Sun 10/13/19 847 Installation of pipes and supports at pipe shaft
10/4 10/13
849 Fire Pump 10 days Sat 9/14/19 Mon 9/23/19 847SS Fire Pump
9/14 9/23
850 Trasfer Pump 10 days Sat 9/14/19 Mon 9/23/19 847SS Trasfer Pump
9/14 9/23
851 1ST FLOOR‐ BACK OF HOUSE  LPG   LAYOUT 30 days Sat 9/14/19 Sun 10/13/19
852 Installation of pipes and supports above ceiling 20 days Sat 9/14/19 Thu 10/3/19 831SS Installation of pipes and supports above ceiling
9/14 10/3
853 Installation of pipes and supports at pipe shaft 10 days Fri 10/4/19 Sun 10/13/19 852 Installation of pipes and supports at pipe shaft
10/4 10/13
854 1ST FLOOR‐ MECHANICAL SYSTEM 40 days Sat 9/14/19 Wed 10/23/19
855 Prepare Plinths (CCY) 10 days Sat 9/14/19 Mon 9/23/19 831SS Prepare Plinths (CCY)
9/14 9/23
856 Pumps Assembly 15 days Tue 9/24/19 Tue 10/8/19 855 Pumps Assembly
9/24 10/8
857 Pipe Installation 10 days Tue 9/24/19 Thu 10/3/19 855 Pipe Installation
9/24 10/3
858 Pressure test and flushing chiller pipe 10 days Fri 10/4/19 Sun 10/13/19 857 Pressure test and flushing chiller pipe
10/4 10/13
859 Water Cooler Chiller  30 days Tue 9/24/19 Wed 10/23/19 855 Water Cooler Chiller
9/24 10/23
860 FCU Installation 16 days Fri 10/4/19 Sat 10/19/19 857 FCU Installation
10/4 10/19
861 2ND FLOOR ‐ BACK OF HOUSE  81 days Wed 9/11/19 Sat 11/30/19

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 21 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un 3
Sun 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8un 1un 2un S2un 6
un 1un 2un 2
Sun 3
un 1un 1un S2un Sun
1 8un 1un
862 2ND FLOOR ‐ ELECTRICAL SYSTEM 81 days Wed 9/11/19 Sat 11/30/19
863 Installation of PVC Sleeves and Wall Opening  3 days Wed 9/11/19 Fri 9/13/19 820SS+20 days Installation of PVC Sleeves and Wall Opening
9/11 9/13
864 Installation of LV&ELV Upvc conduit in Slap 3 days Wed 9/11/19 Fri 9/13/19 863SS Installation of LV&ELV Upvc conduit in Slap
9/11 9/13
865 Installation of LV&ELV Upvc conduit in Brick Wall 10 days Tue 9/17/19 Thu 9/26/19 909SS+10 days Installation of LV&ELV Upvc conduit in Brick Wall
9/17 9/26
866 Installation of Support and LV&ELV Cable Tray 20 days Tue 9/17/19 Sun 10/6/19 865SS Installation of Support and LV&ELV Cable Tray
9/17 10/6
867 Installation of Support and Busduct  30 days Tue 9/17/19 Wed 10/16/19 865SS Installation of Support and Busduct
9/17 10/16
868 LV&ELV Cable Pulling  20 days Mon 10/7/19 Sat 10/26/19 866 LV&ELV Cable Pulling
10/7 10/26
869 Installation of LV Wiring Device (Switch, Socket, Lighting ) 15 days Sun 10/27/19 Sun 11/10/19 868 Installation of LV Wiring Device (Switch, Socket, Lighti
10/27 11/10
870 Installation of ELV Wiring Device (DAC,PAS,FAS,CCTV) 10 days Mon 11/11/19 Wed 11/20/19 869 Installation of ELV Wiring Device (DAC,PAS,FAS
11/11 11/20
871 Installation of DB Panel 15 days Thu 10/17/19 Thu 10/31/19 867 Installation of DB Panel
10/17 10/31
872 Installation of ELV Panel 20 days Mon 11/11/19 Sat 11/30/19 870SS Installation of ELV Panel
11/11 11/30
873 2ND FLOOR ‐ PLUMBING SYSTEM 35 days Tue 9/17/19 Mon 10/21/19
874 Installation of supports and PPR Pipes For Cold/Hot 35 days Tue 9/17/19 Mon 10/21/19 866SS Installation of supports and PPR Pipes For Cold/Hot
9/17 10/21
875 Installation of supports and PVC Pipe For Soil/Waste 25 days Tue 9/17/19 Fri 10/11/19 874SS Installation of supports and PVC Pipe For Soil/Waste
9/17 10/11
876 Installation of supports and PVC Pipe For Rain Water 15 days Tue 9/17/19 Tue 10/1/19 874SS Installation of supports and PVC Pipe For Rain Water
9/17 10/1
877 Installation of Sanitary Ware 20 days Wed 10/2/19 Mon 10/21/19 876 Installation of Sanitary Ware
10/2 10/21
878 2ND  FLOOR ‐ FIRE FIGHTING  LAYOUT 30 days Tue 9/17/19 Wed 10/16/19
879 Installation of pipes and supports above ceiling 20 days Tue 9/17/19 Sun 10/6/19 866SS Installation of pipes and supports above ceiling
9/17 10/6
880 Installation of pipes and supports at pipe shaft 10 days Mon 10/7/19 Wed 10/16/19 879 Installation of pipes and supports at pipe shaft
10/7 10/16
881 2ND FLOOR ‐ LPG   LAYOUT 30 days Tue 9/17/19 Wed 10/16/19
882 Installation of pipes and supports above ceiling 20 days Tue 9/17/19 Sun 10/6/19 866SS Installation of pipes and supports above ceiling
9/17 10/6
883 Installation of pipes and supports at pipe shaft 10 days Mon 10/7/19 Wed 10/16/19 882 Installation of pipes and supports at pipe shaft
10/7 10/16
884 2ND FLOOR‐ MECHANICAL SYSTEM 33 days Tue 9/17/19 Sat 10/19/19
885 Piping and Suport installation 15 days Tue 9/17/19 Tue 10/1/19 866SS Piping and Suport installation
9/17 10/1
886 FCU Installation 18 days Wed 10/2/19 Sat 10/19/19 885 FCU Installation
10/2 10/19
887 Testing and Commissioning  52 days Sun 10/20/19 Tue 12/10/19
888 Electrical System 10 days Sun 12/1/19 Tue 12/10/19 827,862 Electrical System
12/1 12/10
889 Plumbing System 10 days Tue 10/22/19 Thu 10/31/19 838,843,846,851,873,878,8 Plumbing System
10/22 10/31
890 MVAC System 10 days Sun 10/20/19 Tue 10/29/19 884 MVAC System
10/20 10/29
891 External Underground Work 120 days Tue 7/30/19 Tue 11/26/19
892 Chiller Pipe  40 days Sat 7/20/19 Wed 8/28/19 808
893 LPG HDPE Pipe 40 days Sat 7/20/19 Wed 8/28/19 892SS LPG HDPE Pipe
7/20 8/28
894 Fire Fiting HDPE Pipe  40 days Sat 7/20/19 Wed 8/28/19 892SS Fire Fiting HDPE Pipe
7/20 8/28
895 Cold HDPE Pipe 40 days Sat 7/20/19 Wed 8/28/19 892SS Cold HDPE Pipe
7/20 8/28
896 HDPE Corrougad pipe for MV 40 days Sat 7/20/19 Wed 8/28/19 892SS HDPE Corrougad pipe for MV
7/20 8/28
897 Manhole for MV 45 days Thu 8/29/19 Sat 10/12/19 896 Manhole for MV
8/29 10/12
898 WWT Tank 19 days Sun 10/13/19 Thu 10/31/19 897 WWT Tank
10/13 10/31
899 Greas Tank 11 days Fri 11/1/19 Mon 11/11/19 898 Greas Tank
11/1 11/11
900 Earthing System 7 days Sun 10/13/19 Sat 10/19/19 897 Earthing System
10/13 10/19
901 Testing and Commissioning  83 days Thu 8/29/19 Tue 11/19/19
902 Electrical System 7 days Sun 10/13/19 Sat 10/19/19 897 Electrical System
10/13 10/19

任务 摘要 外部里程碑 非活动摘要 手动摘要总成 仅完成时间 手动进度


项目: NOVOTEL SIHANOUKVILLE HO 拆分 项目摘要 非活动任务 手动任务 手动摘要 期限
日期: Wed 7/24/19
里程碑 外部任务 非活动里程碑 仅工期 仅开始时间 进度

第 22 页
ID 任务名称 Duration Start Finish Predecessors Notes
2019
June July August September October November December
Sun Sun
2 9un 1un 2un 3
Sun 7
un 1un 2un 2
Sun 4
un 1un 1un S2un Sun
1 8 un 1un 2un S2un 6
un 1un 2un S
2un 3un 1un 1un S2un Sun
1 8un 1un
903 Plumbing System 8 days Tue 11/12/19 Tue 11/19/19 893,894,895,898,899 Plumbing System
11/12 11/19
904 MVAC System 8 days Thu 8/29/19 Thu 9/5/19 892 MVAC System
8/29 9/5
905 Testing and Commissioning  52 days Wed 10/30/19 Fri 12/20/19
906 Electrical System 10 days Wed 12/11/19 Fri 12/20/19 888,902 Electrical Sy
12/11 1
907 Plumbing System 30 days Wed 11/20/19 Thu 12/19/19 889,903 Plumbing System
11/20 12
908 MVAC System 30 days Wed 10/30/19 Thu 11/28/19 890,904 MVAC System
10/30 11/28
909 Masonry work and Decoration 70 days Sat 9/7/19 Fri 11/15/19 821 Masonry work and Decoration
9/7 11/15
910 BoH glazing works installation 30 days Wed 11/6/19 Thu 12/5/19 909SS+60 days BoH glazing works installation
11/6 12/5