Sie sind auf Seite 1von 1

LEGEND :

REVISION DESCRIPTION :
RV Date Drawn Description

Section 1-1 Section 2-2 Section 3-3


SCALE 1 : 100 SCALE 1 : 100 SCALE 1 : 100

1' 2' C' B' A' 1' 2'


WARNING :
STR. LEVEL 8 = +28.76 m STR. LEVEL 8 = +28.76 m STR. LEVEL 8 = +28.76 m - This drawing shall not be used for construction
unless certified.
- Contractor to verify all dimensions of existing
works on site before commencing any work or
preparing shop drawings.
- Do not scale drawings , use written dimensions
only.
4500

Co07 - This drawing is to be read in conjunction with


Co03 the specifications and Accor requirements
conditions of contract. In case of discrepancy,

7760
STR. LEVEL 7 = +24.26 m Co01 STR. LEVEL 7 = +24.26 m STR. LEVEL 7 = +24.26 m highest standard shall prevail.

9490
Co09 Co01

PROJECT NAME :
3500

Co04
STR. LEVEL 6 = +20.76 m STR. LEVEL 6 = +20.76 m
Co04
STR. LEVEL 6 = +20.76 m NOVOTEL FIRE ESCAPE
STAIR
Co02
PROJECT OWNER :
Co08
3500

TJN Co.LTD
STR. LEVEL 5 = +17.26 m STR. LEVEL 5 = +17.26 m STR. LEVEL 5 = +17.26 m 50 Norodom Rd, Phnom Penh,
Cambodia

ARCHITECT :

10500
3500

California Social House , 6th Floor 174-175, Russian


Confederation Boulevard (st. 110) Phnom Penh
office@bloom-architecture.com
TEL: +855 17 449 610
STR. LEVEL 4 = +13.76 m STR. LEVEL 4 = +13.76 m STR. LEVEL 4 = +13.76 m WWW. bloom-architecture.com

10500
PROJECT MANAGER :
3500

STR. LEVEL 3 = +10.26 m STR. LEVEL 3 = +10.26 m STR. LEVEL 3 = +10.26 m

INTERIOR DESIGN :
3500

STR. LEVEL 2 = +6.76 m STR. LEVEL 2 = +6.76 m STR. LEVEL 2 = +6.76 m


STRUCTURE :

10500
3000

8770
STR. MEZZANINE = +3.76 m STR. MEZZANINE = +3.76 m STR. MEZZANINE = +3.76 m

MEP CONSULTANTS :
M&E CONSULTANTS - DESIGNERS
3000

UNIT 201-202, COGETEL BUILDING,


STR. LEVEL 1 = +0.76 m STR. LEVEL 1 = +0.76 m STR. LEVEL 1 = +0.76 m #60, PREAH MONIVONG BLVD., 12201
PHNOM PENH, CAMBODIA.
TEL.: +855 23 98 77 70
contact@optima-consultants.com

GROUND LEVEL = ±0.00 m GROUND


GROUND
LEVEL
LVL = ±0.00 m GROUND
GROUND
LEVEL
LVL = ±0.00 m
ACOUSTIC & LIGHTING :
ToF = -1.50 m ToF = -1.50 m ToF = -1.50 m

BoF = -1.80 m BoF = -1.80 m BoF = -1.80 m

QUANTITY SURVEYOR :

GENERAL NOTE: FUNCTION NAME


1. MEASUREMENTS SHOWN IN THE DRAWING ARE IN MM.
2. DIMENSIONS AND INFORMATION HAVE TO BE CHECKED AT BUILDING SITE. DRAWN : B.N.K.
IN CASE OF DISCREPANCY, THE SITE MANAGER MUST BE INFORMED BEFORE
EXECUTION OR CONSULT WITH THE DESIGNER. DESIGNED : V.D.I.
3. ELEVATIONS ARE IN M.
4. LEVEL. ±0.00 = +0.12M T.R.Y.
5. DO NOT SCALE DIMENSIONS FROM DRAWINGS, THE CONTRACTOR SHALL CHECKED :
REQUEST ALL NECESSARY ADDITIONAL DIMENSIONS FROM THE ARCHITECT
OR STRUCTURAL ENGINEER.
6. CONTRACTOR SHALL PROVIDE REINFORCEMENT SHOP DRAWINGS. APPROVED : T.R.Y.
7. STRUCTURAL SPECIFICATION AND GENERAL NOTE S-DD-GN-100 TO 102
TO BE FOLLOWED. DRAWING TITLE :
8. OPENINGS OR PENETRATIONS IN STRUCTURAL MEMBERS NOT INDICATED ON
THE DRAWING AND IF D≥ 50MM ARE NOT PERMITTED WITHOUT APPROVAL OF
STAIR STRUCTURE SECTION
THE CONSULTANT. CONTRACTOR SHALL PROVIDE SHOP DRAWING WITH
PROPOSED LOCATION OF OPENING PRIOR TO CONTRUCTION FOR APPROVAL.
9. CONCRETE GRADE, STEEL GRADE AND CONCRETE COVERS REFER TO
REINFORCEMENT DRAWING. DATE : 21.08.2019 REVISION : 0
10. FOR BUILDING SETTING OUT REFER TO ARCHITECTURAL DRAWINGS.
11. SIZE AND LOCATION OF MEP OPENINGS ON STRUCTURAL SLABS OR WALLS SCALE : 1:100 SHEET :
TO BE IN ACCORDANCE WITH MEP DESIGN DRAWINGS
DRAWING No : S-DD-SC-800
H/W = 594 / 841 (0.50m²)

Das könnte Ihnen auch gefallen