Sie sind auf Seite 1von 5

BILL OF MATERIALS

DESCRIPTION QNTY UNIT


1.Earthworks
a. Excavation & Backfill
Footings 13.357 cu. m
Septic vault 2.772 cu. m
labor cost
direct cost
2. Concrete Works, Masonry Works and Formworks
a. Cement 505 bags
b. Sand 30 cu.m
c. Gravel 29 cu.m
d 4" CHB 1806 pieces
6" CHB
e. 2"x2" Coco Lumbers 1347 bd.ft
f. Plywood Forms Paneling 88 pieces
Nails pcs
material cost
labor cost 40%
direct cost
3. Steel Reinforcement Works 6m Length
10 mm dia. Bars 554 pieces
12 mm dia. Bars 169 pieces
16 mm dia. Bars 276 pieces
b. Tie wires # 16 34 kg
material cost
labor cost 40%
direct cost
6.Plumbing Fixtures and Installation
Labor and Materials 1 lot
Water Closet 1 set
Lavatory with faucet (CR) 1 set
Lavatory with faucet (Kitchen Sink) 1 set
direct cost

7. Electrical Works
Labor and Materials 1 lot

direct cost
8. Doors and Windows
a. door (Complete set) 1 set
b. CR door (complete set) 4 set
d Jalousie Window(0.7x0.47) 14 set
material cost
labor cost 40%
direct cost
10 .Wood Truss & Roofing
a. 2x3 wood 7 bdft
b. Corrugated Sheet 25 length
c. Umbrela Nails 14 length
material cost
labor cost 40%
direct cost

TOTAL PROJECT COST

Prepared by:
Antonietta L. Sangutan, RCE
UNIT COST TOTAL COST

300.00 4,007
300.00 832
4,839 NOTE: WALA NI 40 % MAAM KAY LABOR RA MAN NI SIYA WALA
1,500

240.00 121,200
1,200.00 36,000
1,250.00 36,250
12.00 21,672

60.00 80,820
360.00 31,680 NOTE: 88 NA MAAM KAY PLUS FORMS SA SLAB

20,000
7,000
27,000

120.00 66,480
188.00 31,772
328.00 90,528
60.00 2,040
7,000
2,450
9,450

6,000.00 6,000
1,000.00 1,000
500.00 500
1,000.00 1,000
8,500

9,000.00 9,000

9,000

5,500.00 5,500
3,500.00 14,000
450.00 6,300
4,000
1,400
5,400

495.00 3,465
780.00 19,500
635.00 8,890
6,000
2,100
8,100

Php. 68,950 6,895.00