7. Electrical Works
Labor and Materials 1 lot
direct cost
8. Doors and Windows
a. door (Complete set) 1 set
b. CR door (complete set) 4 set
d Jalousie Window(0.7x0.47) 14 set
material cost
labor cost 40%
direct cost
10 .Wood Truss & Roofing
a. 2x3 wood 7 bdft
b. Corrugated Sheet 25 length
c. Umbrela Nails 14 length
material cost
labor cost 40%
direct cost
Prepared by:
Antonietta L. Sangutan, RCE
UNIT COST TOTAL COST
300.00 4,007
300.00 832
4,839 NOTE: WALA NI 40 % MAAM KAY LABOR RA MAN NI SIYA WALA
1,500
240.00 121,200
1,200.00 36,000
1,250.00 36,250
12.00 21,672
60.00 80,820
360.00 31,680 NOTE: 88 NA MAAM KAY PLUS FORMS SA SLAB
20,000
7,000
27,000
120.00 66,480
188.00 31,772
328.00 90,528
60.00 2,040
7,000
2,450
9,450
6,000.00 6,000
1,000.00 1,000
500.00 500
1,000.00 1,000
8,500
9,000.00 9,000
9,000
5,500.00 5,500
3,500.00 14,000
450.00 6,300
4,000
1,400
5,400
495.00 3,465
780.00 19,500
635.00 8,890
6,000
2,100
8,100
A SLAB