NPM : 13315974 Title : Bored pile planning on the Jakarta - Cikampek elevated toll Road at STA. 17+763 – STA. 17+808 level : Bachelor degree in civil engineering at Gunadarma University Keywords : Bored pile, carrying capacity of the foundation, foundation drop, pile cap
(xiv + 104 + attachment)
Study of (bored pile) foundation planning was conducted at the "Jakarta -
Cikampek 2 Elevated Toll Road Construction Project STA. 17+763 – STA. 17+808”. The bored pile in this project is planned to hold the burden of the toll flyover structure. The purpose of the planning study (bored pile) is to calculate the carrying capacity of the bored pile group and foundation drop, and to plan the reinforcement of the bored pile foundation. The first method used in the bored pile foundation planning process is the Meyerhof (1976) method with the results of the Standard Penetration Test to determine the carrying capacity of the foundation permit. The second method is a semi-empirical method used to calculate the decrease of a single pile foundation bored pile. The third method is the vesic method, this method is used to calculate the immediate decrease in the pile group on the bored pile foundation. The fourth method is the davisson & gill method, this method is used to get the value of the pile deflection that occurs on a bored pile foundation. Based on the results of soil investigations at (BH-20) precisely at STA. 17 + 808 obtained the characteristics of the type of soil is sandy clay with the majority of clay and the depth of hard soil is at a depth of 19 m with an N-spt value of 66. Based on the results of the calculation of the bored pile foundation on pier 122 with a drill pole diameter of 1 m and into a 19 m pole the carrying capacity of a single pile permit is 567,085 tons. The decrease of single pile foundation on pier 122 is 14,884 mm, while for the decrease in pile foundation group on pier 122 is 34,850 mm. Based on the results of the calculation of the reinforcement analysis, the result of longitudinal reinforcement in the bored pile foundation is 16D25 while for the shear reinforcement of the bored pile foundation is D13-270. The total cost for the construction of this foundation is detailed in the form of RAB with a value of Rp 4,422,959,675.39