MAHARASHTRA STATE POWER GENERATION CO. LTD.

NOTIFICATION OF INVITATION OF BIDS

Competitive Bidding for selection of solar power developer for development of 750MWAC cumulative
capacity grid interactive solar PV power plant to cater the AG feeder load of various substations in
Maharashtra with additional capacity of 250MWAC under Green-shoe option.

(TO BE SUBMITTED ONLINE DULY FILLED IN AND DIGITALLY SIGNED)


Date of issuance of invitation:

The Maharashtra State Power Generation Co. Ltd., Mumbai, India (MAHAGENCO) invites online Bids (T
System i.e. separate bid for technical/commercial and price bid) from eligible bidders for development of
750MWAC cumulative capacity grid interactive solar PV power plant to cater the AG feeder load of
various substations in Maharashtra with additional capacity of 250MWAC under Green-shoe option.

Bid specification shall be available for download on website https://sets.mahagenco.in after acceptance of
vendor registration fee (Rs. 5000/-+ Applicable tax exclusive) and tender fees (Rs. 25000/-+ Applicable tax
exclusive).
1 Start date of acceptance of tender fee by Mahagenco and download 20.06.2018, at 12.00 Hrs. IST
of tender document
2 Second Pre-Bid Meeting 08.08.2018, at 11.00 Hrs. IST
3 Last date of on-line sale of bid document 13.08.2018, at 15.00 Hrs. IST
4 Last date for Submission of Online Bid 14.08.2018, at 12.00 Hrs. IST
5 Last date of submission of physical support documents 14.08.2018, at 15.00 Hrs. IST

6 Opening of techno-commercial bid 14.08.2018, at 16.30 Hrs. IST

7 Due date for opening of Price-Bid Will be intimated later

8 Reverse bidding Will be intimated later

9 Ceiling Tariff Rs.3.25 per Unit.

MAHAGENCO reserves the right to cancel/withdraw this Invitation for Bids without assigning any
reason for such decision.
CHIEF ENGINEER (SPGD - P)
NOTE:
This is an e-tender. Offers shall be submitted and processed in electronic mode only. Physical copies of
required document will additionally need to be supplied for verification. The instructions to bidder/terms
and conditions appearing in this specification only shall be applicable.
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Company Name : MSPGCL


Unit Name : SOLAR POWER GENERATION DEPARTMENT
Kindly go through the details, In case of any problems/ issues related to the reported data email to
dycespgd@mahagenco.in

TENDER DETAILS
Tender Code 71217(Amendment - 4)
Mode Quantity Contract
Is Over All No
Tender Type OPEN
Tender Category Type WORKS
Section SPGD PROJECT
Type Of Bid Two Bid

y
Material Description SELECTION OF SOLAR POWER DEVELOPER FOR
DEVELOPMENT OF 750MWAC CUMULATIVE CAPACITY GRID
op
INTERACTIVE SOLAR PV POWER PLANT TO CATER THE AG
FEEDER LOAD OF VARIOUS SUBSTATIONS IN MAHARASHTRA
WITH ADDITIONAL CAPACITY OF 250MWAC UNDER GREEN SHOE
OPTION.
Estimated Cost [In Rupees] NA
C
Submission Date Tuesday, 14 August, 2018 12:00:00 PM
Tender Validity 180 Days
Delivery Period 395 Days
eb

Tender Fees [In Rupees] 1180.0


Contact Email Id dycespgd@mahagenco.in
Commencement Period 7 days from 'HANDING OVER OF SITE'
Basis Of Prices Firm Price
W

Sample Required Not Required


Deviation No
BID OPENING DETAILS
Techno-Commercial Bid Tuesday, 14 August, 2018 4:30:00 PM
Price bid Will be declared later

TENDER DOCUMENTS
Total Number of documents : 6

Page 1 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

750MWAC CUMULATIVE CAPACITY GRID INTERACTIVE SOLAR PV POWER


PROJECTS UNDER ‘CHIEF MINISTER SOLARAGRICULTURAL FEEDER SCHEME’

AT VARIOUS PLACES IN MAHARASHTRA

BID SPECIFICATION FOR

y
COMPETITIVE BIDDING PROCESS (FOLLOWED BY E-REVERSE AUCTION) FOR SELECTION OF

op
SOLAR POWER DEVELOPER FOR DEVELOPMENT OF 750MWAC CUMULATIVE CAPACITY GRID
INTERACTIVE SOLAR PV POWER PLANT TO CATER THE AG FEEDER LOAD OF VARIOUS
SUBTATIONS IN MAHARASHTRA WITH ADDITIONAL CAPACITY OF 250MWAC UNDER GREEN-
SHOE OPTION.
C
Competitive Bidding Bid Specification No:
eb

CE/SPGD-P/ PH-IV/ 750MW /Green-shoe / AG/ PV- 47


W

CHIEF ENGINEER (SPGD- PROJECTS) SOLAR POWER


GENERATION DEPARTMENT MAHARASHTRA STATE POWER
GENERATION CO. LTD. Prakashgad, 3rd Floor, Bandra (East),
Mumbai - 400051 Email: dycespgd@mahagenco.in Phone No: 91-22-
26474211/2315/2448/3534, Fax No: 91-22-26476518

Page 2 of 194
Page 1 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Document Description Competitive Bidding for selection of solar power developer for
development of 750MWAC cumulative capacity grid interactive
solar PV power plant to cater the AG feeder load of various
substations in Maharashtra with additional capacity of 250MWAC
under Green-shoe option.

RfS No.& Date CE/SPGD-P/ PH-IV/ 750MW /Green-shoe / AG/ PV- 47

Downloading of tender 20.06.2018, at 12.00 Hrs. IST


documents
Pre-bid Conference / Date: 29.06.2018, at 11.00 Hrs.IST.
Clarification 6th Floor,“Prakashgad”, MSPGCL,
Meeting Date & Location Station Road, Bandra (E), Mumbai -400051.

Last date & Time for

y
a) Online Submission of a) Date : 20.07.2018, Time: 12:00 Hrs.
Response to RFP and
b) All documents as per
Section 3.21A physically
at MSPGCL office,
Mumbai
op
b) Date : 20.07.2018, Time: 15:00 Hrs.
C
Technical Bid Opening Date : 20.07.2018, at 16.30 Hrs.
eb

Financial Bid Opening Will be intimated to the technical qualified bidder.

Ceiling Tariff Rs. 3.25 per unit

EMD Earnest Money @ Rs. 8 Lakh / MW / Project is to be


W

submitted in the form of Bank Guarantee along with


response to RfS.

Name, Designation, Address Chief Engineer (SPGD-Projects)


and other details (For Maharashtra State Power Generation Co. Ltd.,
Submission of Response to Solar Power Generation Department, 3rd Floor,
RfS) Prakashgad‟,Bandra (East), Mumbai - 400 051
Tel No. 91-22-26474211/2315/2448/3534
Email : dycespgd@mahagenco.in

Page 3 of 194
Page 2 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Details of persons to be 1. Mr. R.B. Chavan


contacted in case of any Superintending Engineer(SPGD)
assistance required Ph.02226582424/02226582999 extn. 351
2. Mr. N.R. Salve
Executive Engineer(SPGD)
Ph.02226582424/02226582999 extn. 333
3. Mrs. Archana Chopde
Dy. Executive Engineer(SPGD)
Ph.02226582424/02226582999 extn. 362

Bank Details of MSPGCL


Name of Bank Canara bank
Branch Name Prime Corporate
branch II
Account No. 0239201022329
Name of account Director Finance
holder by designation MSPGCL
IFSC code CNRB0001903
Type of Account Current account

y
Address 7th Floor,Maker
Chambers III,nariman

op Point,Mumbai-400021
C
Important Note: Prospective Bidders are requested to remain updated for any
notices/amendments/clarifications etc. to the RfP document through the websites
www.mahagenco.in & https://sets.mahagenco.in. No separate notifications will be
issued for such notices/amendments/clarifications etc. in the print media or individually.
eb
W

Page 4 of 194
Page 3 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

TABLE OF CONTENTS

I. SECTION I: INSTRUCTIONS TO BIDDER (ITB) Page.no

y
1 Invitation to Bid 14
2 Brief description of Bidding Process 15

3 Vendor Registration
op VENDO
R
REGIST
RATIO
C
N 16

4 Clarification Bid Specification 17


eb

5 Revision of Bid Specification 17

6 Preparation of Bid 17

7 Bid Price 19
W

8 Bid Security 19
9 Signing of Bids 21

10 Submission of Bids 201


11 Qualifying Requirement 23

12 Connectivity With The Grid 245


13 Selection of Technology 26

14 Track Record 26
15 Financial Closure 26

16 Right To Accept Or Reject 27

17 Bid Evaluation Procedure 27

18 Reverse Bidding Auction 28

19 Selection Of successful Bidder 31

Page 5 of 194
Page 4 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

II. SECTION II: TECHNICAL SPECIFICATION Page.no


A General Scope of Work 35

B Technical Specification 36

III. SECTION III: GENERAL TERMS AND CONDITIONS Page.no


1 Performance Guarantee 40

2 Statutory Responsibility 40

y
3 Insolvency and Breach of Contract 40

4
5

6
Time of Completion
Termination for Default

Breach of the Contract


op 41
41

41
C
7 Force Majeure 41

8 Progress Report of Work 42

9 Statutory Acts, Rules and Standards 42


eb

10 Safety Measures 42

11 Hazardous Material 42

12 Stoppage of Work 43
W

13 Governing Language 43

14 Arbitration 43

15 Court of Competent Jurisdiction 43

16 Law & Procedure 43

17 Construction of Contract 43

18 Notices 43

IV. SECTION IV: SPECIAL TERMS & CONDITIONS Page.no


1 Power Generation By SPD, Shortfall/Excess In Generation 46

2 Synchronizing & Commissioning 46

3 Commercial Operation Date 47

Page 6 of 194
Page 5 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

4 Conditions Regarding COD 48


5 Power Purchase Agreement (PPA) 48

V. SECTION V: ANNEXURES Page.no


1 Annexure-1 Formats for Eligibility of offer 51
2 Annexure- 2 Format for Power of Attorney 55
3 Annexure- 3 Format for Consortium Agreement 58
4 Annexure- 4 Format for Letter of Consent from Consortium Members 63
5 Annexure- 5 Format for Bidder's Composition and Ownership Structure 65
6 Annexure- 6 Format for Authorization 69
7 Annexure- 7 Format for Qualification Requirement (As per Clause11.0 of SECTION - 70

y
I)
8 Annexure- 8 Format of Undertaking 72
9

10
op
Annexure-9 Undertaking from the Financially Evaluated Entity and/ or Technically
Evaluated Entity or its Parent Company/ Ultimate Parent Company
Annexure- 10 Format for Board Resolution
75

78
C
11 Annexure- 11 Format for Bid Security against Bid 80
12 Annexure- 12 Format for Disclosure 83
13 Annexure- 13 Format for Certification of Relationship 84
eb

14 Annexure- 14 Format of checklist for submission of Bid 86


15 Annexure-15 Proforma for Contract Performance Security 88
W

16 Annexure-16 Undertaking of financial requirement 90


17 Annexure-17 List of Banks 92
18 Annexure-18 Format for Financial Proposal 93
19 Annexure-19 Reverse auction /Bidding Procedure 95
20 Annexure -20 List of Substations 101

Page 7 of 194
Page 6 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

1. DEFINITIONS

In the contract the following expression shall, unless the context otherwise requires, have the meanings
thereby respectively assigned to them.
"Act" or "Electricity Act, 2003" shall mean the Electricity Act, 2003 and include any
modifications, amendments and substitution from time to time;

“Affiliate” shall mean a Company that, directly or indirectly,


i. controls, or
ii. is controlled by, or
iii. is under common control with, a Company developing a Project or a Member in a
Consortium d e velo p in g t h e P r o j e c t a n d cont r o l means o w n e r s h i p by one
Company of at least 26% (twenty-six percent) of the voting rights/ paid up share
capital of the other Company;

“Bidder” shall mean Bidding Company or a Limited Liability Partnership (LLP) or a Limited

y
Liability Company (LLC) or a Bidding Consortium submitting the Bid. Any reference to the
Bidder includes Bidding Company/ LLP/Bidding Consortium/Consortium Member of a

op
Bidding Consortium including its successors, executors and permitted assigns and Lead
Member of the Bidding Consortium jointly and severally, as the context may require.;

“Bidding Consortium” o r “Consortium” refers to a group of Companies that has


C
collectively submitted the response in accordance with the provisions of these guidelines.

“Capacity Utilization Factor (CUF)” shall have the same meaning as provided in MEERC
(Terms & Conditions for tariff determination from renewable energy sources)
eb

Regulations,2010 as amended from time to time.

“Chartered Accountant” for bidders or its Parent, Affiliate or Ultimate Parent or any Group
Company incorporated in India, “Chartered Accountant” shall mean a person practicing in
W

India or a firm whereof all the partners practicing in India as a Chartered Accountant(s) within
the meaning of the Chartered Accountants Act, 1949; For bidders or its Parent, Affiliate or
Ultimate Parent or any Group Company incorporated in countries other than India, "Chartered
Accountant" shall mean a person or a firm practicing in the respective country and designated
/ registered under the corresponding Statutes/laws of the respective country.;

“CERC” shall mean Central Electricity Regulatory Authority


“Company” shall mean a body corporate incorporated in India under the Companies Act,
1956 or the Companies Act, 2013, as applicable;
“Commissioning” with respect to the Project/ Unit as certified by M S P G C L / SLDC /
MSEDCL shall mean when all equipment’s as per rated capacity has been installed and
energy has flown into
the grid.
"Commercial Operation Date" with respect to the Project / Unit shall mean the date on which
the Project / Unit is commissioned (certified by MSPGCL/SLDC / MSEDCL) and available for
Page 7 of 122
Page 8 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

commercial operation and such date as specified in a written notice given at least 30 days in
advance by the Successful Bidder to MSEDCL & MSPGCL.”
“Contracted Capacity” shall mean the capacity (in MW AC) contracted with MSPGCL for
supply by the successful bidder at the Delivery Point from the Solar Power Project.
“Contract Year” shall mean, with respect to the initial Contract Year, the period beginning on
the Commercial Operation Date and ending at 12.00 midnight on 31st March of that Fiscal
Year. Each successive Contract Year shall coincide with the succeeding Fiscal Year, i.e., a
period of twelve months commencing on April 1 and ending on following March 31, except
that the final Contract Year shall end on the date of expiry of the Term or on Termination of
this Agreement whichever is earlier.
“Control” shall mean holding not less than 51% of voting rights or of paid up share capital.
“Controlling shareholding” shall mean not less than 51% of the voting rights or paid up share
capital in the Company/Consortium.
“CTU or Central Transmission Utility” s h a l l mean the Central Transmission Utility as

y
defined in Sub-Section (10) of section (2) of the EA-2003.
“Day” shall mean calendar day.

op
“Delivered Energy" means the kilowatt hours of energy actually fed and measured by the
energy meters at the Delivery Point and as certified by SLDC / MSEDCL.
"Delivery Point”; shall mean the point(s) of connection(s) at which energy is delivered into
C
the Grid System i.e. the Interconnection Point.

"Electricity Laws" shall mean the Electricity Act, 2003 and the relevant rules, notifications,
and amendments issued there under and all other Laws in effect from time to time and
eb

applicable to the development, financing, construction, ownership, operation or maintenance


or regulation of electric generating companies and Utilities in India, the rules, regulations and
amendments issued by CERC/ MERC from time to time.
“Effective Date” shall mean the date of execution of Power Purchase Agreement (PPA)
W

by both the parties;


“Financial Closure” or “Project Financing Arrangements” means arrangement of necessary
funds by the Bidder / Solar Power Generator either by way of commitment of funds by the
Company from its internal resources and/or tie up of funds through a bank / financial
institution by way of a legally binding agreement for commitment of such finances.
"Financing Documents" mean the agreements and documents (including asset leasing
arrangements) entered/to be entered into between the bidder and the Financing Parties relating
to the financing of the Project.
“Financing Parties” means Parties financing the Project, pursuant to Financing
Documents.
“Group Company” of a Company means
(i) a Company which, directly or indirectly, holds 10% (ten percent) or more of the share
capital of the company, or

Page 8 of 122
Page 9 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

(ii) a company in which the company, directly or indirectly, holds 10% (ten percent) or
more of the share capital of such company, or
(iii) company in which the company, directly or indirectly, has the power to direct or cause
to be directed the management and policies of such company whether through the
ownership of securities or agreement or any other arrangement or otherwise, or
(iv) a company which, directly or indirectly, has the power to direct or cause to be
directed the management and policies of the Company whether through the ownership
of securities or agreement or any other arrangement or otherwise, or
(v) a company which is under common control with the company, and control
means ownership by one company of at least 10 % (Ten )of the share capital of
the other company or power to direct or cause to be directed the management and
policies of such company whether through the ownership of securities or agreement or
any other arrangement or otherwise.
Provided that a financial institution, scheduled bank, foreign institutional investor, nonbanking
financial company, and any mutual fund shall not be deemed to be Group Company, and its

y
shareholding and the power to direct or cause to be directed the management and policies of a

op
company shall not be considered for the purposes of this definition unless it is the Project
Company or a Member of the Consortium developing the Project.
“Group Business Entity” shall mean;
a) A Business Entity, which directly or indirectly holds not less than 26% of voting
C
securities in the Bidder; or
b) A Business Entity in which the Bidder directly or indirectly holds not less than 26% of
voting securities.
eb

“Interconnection Point”; shall mean the point(s) of connection(s) at which the project is
connected to the grid i.e. it shall be at 11 / 22 kV/33kV bus bar level of substation of MSEDCL.
“Lead Member of the Bidding Consortium” or “Lead Member”: There shall be only one
Lead Member, having shareholding more than 51% in the Bidding Consortium, which cannot
W

be changed till 1 year from the Commercial Operation Date (CoD) of the Project.
“Letter of Award” or “LOA” shall mean the letter issued by Maharashtra State Power
Generation Company Ltd. (MSPGCL) to the Selected Bidder for award of contract.
“Limited Liability Partnership” or “LLP” shall mean a Company governed by Limited
Liability Partnership Act 2008 or as amended.
“LLC” shall mean Limited Liability Company.
“Member in a Bidding Consortium” or “Member” shall mean each Company in a Bidding
Consortium. In case of a Technology Partner being a member in the Consortium, it has to be a
Company.
“MERC” shall mean Maharashtra Electricity Regulatory Commission.
“Metering Point”; Metering shall be at 11 / 22 kV level substation of
MSEDCL. “Month” shall mean calendar month.
“Net-Worth” means the Net-Worth as defined in Section 2 of the Companies Act
Page 9 of 122
Page 10 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

2013.
“Paid-up share capital” means the paid-up share capital as defined in Section 2 of
the Companies Act, 2013.
“Parent” means a company, which holds not less than 51% equity either directly or
indirectly in the Project Company or a Member in a Consortium developing the Project;
“Performance Bank Guarantee” shall mean the irrevocable unconditional bank
guarantee to be submitted by the successful bidder as per Section 3.9.
“PPA” shall mean the Power Purchase Agreement signed between the successful bidder
and
MSPGCL according to the terms and conditions of the standard PPA enclosed with this
RfP;
“Project” shall mean a Solar Photovoltaic Grid Interactive Power Station to be established by
the successful bidder comprising of number of units at single/multiple locations, and shall
include land, buildings, plant, machinery, ancillary equipment, material, switch-gear,
transformers, protection equipment and the like necessary to deliver the Electricity

y
generated by the Project to MSEDCL at the Delivery Point.

op
“Project Site” means any and all parcels of real property, rights-of-way, easements and
access roads, upon which the Project and its related infrastructure will be located.
“Project Capacity” means the AC capacity of the project at the generating terminal(s)
and to be contracted with MSPGCL for supply from the Solar Power Project.
C
“RfP Document” shall mean the bidding document issued by MSPGCL including
all attachments, clarifications and amendments thereof.
eb

“SCADA” means the Supervisory Control and Data Acquisition System (SCADA)
installed for recording and transferring the online data.
“SCOD” or “Scheduled Commercial Operation Date” shall mean the date as declared
by the Successful Bidder in the PPA which shall not exceed 13 (Thirteen) months from the
W

date of execution of PPA.


“SEA” means the State Energy Account issued by State Load Dispatch Centre,
and amendment thereto.
“Selected Bidder or Successful Bidder” shall mean the Bidder selected pursuant to this
RfP
to set up the Project and supply electrical output as per the terms of
PPA.
“SLDC” means the State Load Dispatch Center as notified by the State
Government.
“Solar PV Project” means the solar Photo Voltaic Power project that uses sunlight for
direct conversion into electricity through Photo Voltaic technology.
“STU or “State Transmission Utility” shall mean the State Transmission Utility notified
by respective State Government under Sub-section (1) of Section 39 of the Act.
“SNA” means State Nodal Agency.
“TOE” shall mean Tender Opening Event.
Page 10 of 122
Page 11 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

“Ultimate Parent” shall mean a Company, which owns not less than fifty-one percent (51%)
equity either directly or indirectly in the Parent and Affiliates.
“Unit” shall mean one set of Solar Photovoltaic Grid Interactive power plant and all
the auxiliary equipment and facilities, required to constitute a solar Project.
“Week” shall mean calendar week.
“Voltage of Delivery” means the voltage at which the Electricity generated by the Project
is required to be delivered at 11 / 22 kV/33kV level substation of MSEDCL.

y
op
C
eb
W

Page 11 of 122
Page 12 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

y
SECTION - I:
op
C
INSTRUCTIONS TO BIDDERS
eb
W

Page 12 of 122

Page 13 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

1.0 INVITATION TO BID

Bids are invited by Maharashtra State Power Generation Co. Ltd., 'Prakashgad' 3 floor, Bandra (East),
Mumbai 400051 through this Request for Proposal ("RFP" or "Bid proposal") Number CE/SPGD-P/
PH-IV/ 750MW /Green-shoe / AG/ PV- 47 Competitive Bidding for selection of solar power developer
for development of 750MWAC cumulative capacity grid interactive solar PV power plant to cater the AG
feeder load of various substations in Maharashtra with additional capacity of 250MWAC under Green-
shoe option.
1.1 BACKGROUND

Govt. of Maharashtra has announced "Renewable Energy Policy -2015". Under this policy
7500 MW capacity Solar Power Projects will be developed in Maharashtra, out of which
2500 MW capacity solar power projects will be developed by Mahagenco in next five years.

Also the Government of Maharashtra vide GR dated 17.03.2018 has appointed


MAHAGENCO as a implementing agency for “Chief Minister Solar Agriculture Feeder
Scheme” accordingly, Mahagenco has planned to install 750MWAC with Green shoe option
of additional 250 MW grid interactive PV solar power plants at various places in Maharashtra

y
including 25 years operation and maintenance of the same on PPP basis.

a. Land

op
The bidder shall identify 100% land required for the project within the periphery of 3
KM from the substation where the power will be evacuated at the time of submission of
bid in Format 6.1. Howevere the bidder shall be allowed to change the location of the
C
project within the same Taluka only once till the time of achievement of Financial
Closure i.e. Withine 7 month from the date of signing of PPA .In no circumstances shall
the Tariff offered by the bidders in its financial bid be changed due to change in location.
eb

b. Power Transmission and Evacuation

SPD will construct requisite infrastructure for transmission of power from each Solar
Project to the nearest substation (within 3 KM) including the ABT meters and required
Transmission Bay at both the ends (power plant switch yard & substation). All approvals
W

permits and clearances required for setting up of the project (including connectivity) and
those required from State Government and local bodies shall be in the scope of the bidder

c. Power Off-take

Power/energy generated from the Units will be purchased by Mahagenco, in accordance


with the provisions of Power Purchase Agreement.

1.2 Total Capacity Offered:


a) Total Capacity:
Selection of Grid-connected Solar PV Projects for total capacity of 750MW will be
carried out through e-bidding.

b) Capacity Allocation Under Green-shoe Option


The modality for allocation of additional 250MW capacity under Green-shoe
Option shall be as under:-
i. An additional 250MW capacity through Green-shoe option may be
offered to the Participating Bidders, who are willing to execute PPAs
Page 13 of 122

Page 14 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

with MSPGCL at the lowest tariff (L1 rate) discovered under


Competitive Bidding Process (followed by e-reverse auction) to the
extent of their respective quoted capacity.

ii. The bidders willing to execute PPA with MSPGCL at the L1 rate
shall have to give their confirmation within a period of 10 days from
the price bid opening / conclusion of reverse auction.

iii. The balance unallocated capacity shall be allotted to the remaining


unsuccessful Bidders in their order of ranking in e-reverse auction followed by
their ranking in the initial price bids.

1.3 Capacity of the Project:

A Bidder may submit Bids for developing the Project(s) under solar PV technology
(Solar PV ground mount Project) as per the criteria below:

i. The individual project capacity to be developed shall be the maximum


AG load connected to the substation as per enclosed list of the

y
substation in ANNEXURE-20., However, minimum project capacity
should not be less than 2MW.

1.4
ii.
op
There shall not be any maximum limit for cumulative project
c a p a c i t y bidder can quote for entire 750MW.
Project Locations:
C
a. The bidder should select the project location in the 3KM periphery from the
substation of enclosed ANNEXURE-20.
b. The Successful bidders shall develop ground mounted solar PV power
eb

projects.
c. The Successful bidder shall have to ensure the connectivity permission from the
MSEDCL.

2. BRIEF DESCRIPTION OF BIDDING PROCESS: (Only Through E- Tendering Mode)


W

Bidder shall bear all costs for preparation and submission of his tender. Employer will not be
responsible for or pay for any expenses or losses, which might be incurred or suffered by any Bidder
in connection with submission of tender. A prospective Bidder requiring any clarifications on the
Tender documents may request online to Chief Engineer (SPGD-P), Email id:
dycespgd@mahagenco.in
On the date and time specified in the tender notice, following procedure will be adopted for opening
of the Tender. Bidder is also requested to follow the online E-tendering procedure and contact details
for the vendors MAHAGENCO.

Page 14 of 122

Page 15 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

3. VENDOR REGISTRATION

FEE, TENDER FEE AND CONTENTS OF BIDDING DOCUMENTS:

3.1 Each bidder shall register itself at the website address https://sets.mahagenco.in on online
payment of the vendor registration fees Rs. 5000/- + Service tax as applicable before the last
date for registration mentioned in the notification of invitation of bids ("NIT"). Vendor
registration fee is non-refundable.

The Bidder should note that they should obtain the valid digital signature in the company
name as per the requirement mentioned on https://sets.mahagenco.in in the FAQ section.
3.2 Bidder is required to pay online non-refundable Tender fee of Rs. 1000/- + GST as applicable
on or before the last date of payment of tender fees. Overseas bidders shall submit vendor
registration fee and tender fee through international debit/credit card.
3.3 The services required, bidding procedures and contract terms are prescribed in the Bid
Specification. The bid specification includes the following sections and Annexure which
shall collectively with the invitation for bids, and any amendments and modifications to the
bid specifications notified by the Mahagenco be referred to as the "Bid Specification"

y
CE/SPGD-P/ PH-IV/ 750MW /Green-shoe / AG/ PV-47
Instructions to bidder

Technical specification
General Terms & Conditions
op
Section - I

Section - II
Section - III
C
Special Terms & Conditions Section - IV

Annexure Annexure 1 to 20
eb

3.4 The bidder shall carefully examine the Bid Specification and fully inform and satisfy itself
as to all the conditions and matters which may in any way affect to work or cost thereof.
Failure to furnish all information required by the Bid Specification or to submit a bid not
substantially responsive to the Bid Specification in every respect will be at bidder's risk and
W

may result in the rejection of the bid. A bidder if, find any discrepancies or omissions in
the Bid Specifications or have any queries with respect to any provision of the Bid
Specifications, he shall at once notify to the Mahagenco at below mentioned address:
Chief Engineer (Solar Projects) Maharashtra State Power
Generation Co. Ltd., Prakashgad, 3rd floor, Plot No. G-
9,Bandra (East), Mumbai - 400051
Phone: : 022-26474211/2131 Extn. 2315/2448/3534
Fax: 022- 26476518, Mobile No. 08879770699, 8408889754
email: dycespgd@mahagenco.in

Page 15 of 122

Page 16 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

4. CLARIFICATION OF BID SPECIFICATION:

Any prospective bidder (subject to having paid the vendor registration and tender fees) who requires
any clarification in respect of the Bid Specification may notify the Mahagenco in writing or by fax
enclosing therewith copy of successful online payment transaction against tender fee at the
Mahagenco's contact details given above 1 (one) day prior to the dead line for the pre-bid meeting.
The clarifications received after pre-bid meeting shall not be entertained. The Mahagenco's response
(including an explanation of the query but without identifying the source of enquiry) shall be
published by way of revision of the Bid Specification on website https://sets.mahagenco.in. The
bidders in their own interest may inform the Mahagenco in written about the payment of tender fee by
them and their detailed correspondence address with name of contact person, telephone/ fax nos., e-
mail address etc. so that such clarifications can be sent to them by fax/e-mail as may be possible.
However, Mahagenco's responsibility is restricted to only publishing such clarifications on above
mentioned website.

5. REVISION OF BID SPECIFICATION:

At any time prior to the deadline for submission of bids, the Mahagenco may, for any reason, whether
at its own initiative revise the Bid Specification. Every time the Bid Specification is revised, the
revisions/amendments/revised Bid Specifications shall be published on website

y
https://sets.mahagenco.in (the revision No. of the Bid Specification shall be accordingly enhanced).
Such revisions shall be binding on all the prospective bidders irrespective of whether they have paid
the tender fees prior to the revision or not.

op
In order to give prospective bidders reasonable time to take the revisions into account for preparing
their Bids, the Mahagenco may, at its discretion, extend the deadline for the submission of bids. The
Mahagencos decision about the extension of deadline of submission shall be final and binding on the
C
bidders and no correspondence shall be entertained in this regard.

6. PREPARATION OF BID:
eb

6.1 Preparation of Bid


a. The bid prepared by the bidder, as well as all correspondence and documents relating to the
bid exchanged by the bidder with the Mahagenco shall be written in English. Supporting
documents and printed literature furnished by the bidder may be in any other language,
W

provided they are accompanied by the accurate translation in English duly certified by an
official translator engaged by a court in the jurisdiction of the bidder and notarized. For the
purposes of interpretation and evaluation of the bid, the translation in English shall govern
and be binding on the bidder.
b. Bidder shall take into account any corrigendum published on the tender document before
submitting their bids.
c. Please go through the tender advertisement and the tender document carefully to understand
the documents required to be submitted as part of the bid. Please note the number of covers in
which the bid documents have to be submitted, the number of documents - including the
names and content of each of the document that need to be submitted. Any deviations from
these may lead to rejection of the bid.
6.2 Bidder, in advance, shall get ready the bid documents to be submitted as indicated in the tender
document / schedule and generally, they can be in PDF / XLS / RAR / DWF/JPG formats. Bid
documents may be scanned with 100 dpi with black and white option which helps in reducing size
of the scanned document.

Page 16 of 122

Page 17 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

6.3 To avoid the time and effort required in uploading the same set of standard documents which are
required to be submitted as a part of every bid, a provision of uploading such standard documents
(e.g. PAN card copy, annual Reports, auditor certificates etc.) has been provided to the bidders.
Bidders can use "the Space" or "Other Important Documents'' area available to them to upload such
documents. Each document to be uploaded shall be in 1MB maximum.

Documents comprising the Bid:

Following documents shall constitute the documents comprising the Bid.

a) The Bid, the price Bid and the Physical Support Documents;
b) Latest revision of Bid Specification published by the Purchaser & responses to the
pre-bid queries.
c) Undertakings and Documentary evidence in accordance with Qualifying Requirement
set out in Clause 11 of section-I & the relevant Annexure- establishing that the bidder
is eligible to Bid.
d) Bid security (EMD) furnished in accordance with Clause 8.0 Section –I
e) The documents submitted under the Annexures of RFP.

y
6.4 Bid Form and Bid Schedules:

op
The bidder shall complete the Bid Form and the appropriate price schedule furnished in the Bid
Specification. Bids shall be fully in accordance with the requirements of this document and the
Technical Specifications attached thereto. Copies of appropriate specimen Annexures/ forms
C
furnished with the Bid Specification shall be used for quoting bid prices
6.5 Only a bidder, who has paid the vendor registration and tender fees as stipulated in Clause
3.0 above, will be eligible to participate in the bidding. Bids received from those bidders,
who have not made payment of vendor registration and tender fees, will not be accepted. If the
eb

bidder is a consortium, the consortium may tender its Bid if the online payment is made against
vendor registration and tender fees by the lead member.
6.6 Multiple Bids by the same person (individually or as a part of a consortium) are not allowed for the
same item. Any person that controls (directly or indirectly) a bidder or a member of the bidding
W

consortium, any other persons which are controlled (directly or indirectly) by the aforementioned
person, or any person that is controlled (directly or indirectly) by such bidder or member of
bidding consortium, shall not bid on its own or as a member of a consortium for the same item for
which the bidder or the bidding consortium has submitted a bid.
6.7 For the purposes of this clause the term 'person' means any individual, company, corporation,
partnership (whether limited or unlimited), proprietorship, trust or other body (whether
incorporated or not), Hindu undivided family, union or association and in case of a trust shall
include the trustee or the trustees for the time being. For the purposes of this clause the term
'control' as applied to any person, means the possession, directly or indirectly, of the power to
direct or cause the direction of the management or policies of that person whether through
ownership of voting securities, by contract, or otherwise.

Page 17 of 122

Page 18 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

7. PRICE BID /BID PARAMETER


a) Mahagenco has fixed the Ceiling Tariff Rs. 3.25 per unit the bidders shall have to quote
tariff rate less than or equal to the ceiling Tariff in their Financial proposal. Financial
bids of Techno commercially qualified bidders will be opened on-line in as per e-tendering
procedure. Bids of each bidder will be evaluated on the basis of the tariff quoted by the
bidder.
b) Price bid shall be submitted on line only. Physical submission of price bid will not be
accepted and such bids will be liable for rejection.

c) Price Bids with tariff quoted above the Ceiling Tariff shall be disqualified and shall not
be allowed to participate in reverse bidding auction.

8. BID SECURITY (EMD)


8.1 Each Bidder shall be required to submit Bid Security/ Earnest Money Deposit (EMD) of Rs.
8,00,000/- (Rs. Eight Lakh only) /MW in the form of bank guarantee as per Annexure 11, issued
by any branch of Bank mentioned in list attached. In the case of a Consortium, the Lead Member
shall furnish the Bid Security as stipulated in the RFP, on behalf of the Consortium Members as

y
per the Consortium Agreement. The Bid Security shall be valid for a period of 180 days (6 months)
from the date of submission of the Bid (online) in addition to the validity the claim period for Bank

op
Guarantee should be six(06) month beyond the validity period. It is to be noted that the Bid
Security to be provided must be issued from the list of Banks on non-judicial stamp paper of worth
Rs. 500/- as per the formatted provided in the Annexure -17 payable at Mumbai only. The Bid
Security must be payable in currency of India.
C
8.2 Scanned copy of the Bid security (As annexure 11 shall be uploaded/submitted on-line on the
website http://sets.mahagenco.in.
8.3 No interest will be paid on bid security irrespective of mode of submission.
eb

8.4 Existing permanent bank guarantee if any submitted by any bidder with the Mahagenco shall not be
considered for exemption from the payment of bid security (EMD) against this bidding or Security -
cum -Performance Guarantee to be provided as per the terms of this RFP.
8.5 Any bid not accompanied by Bid security (EMD) or having submitted shorter amount than specified
W

under Clause 8.0 above or the bank guarantee taken from the bank which is not listed in the
Annexure No.18, such bids shall be liable to disqualified.
8.6 The Bid submitted by a bidder shall be treated invalid and the Bid security shall be forfeited:

a) If the bidder withdraws/ modify his bid within the bid validity specified in the Bid
Specification.
OR
b) The successful bidder fails to submit performance guarantee and/ or to execute contract
agreement within the prescribed period in accordance with the instructions to the bidder.
OR

c) If the Bidder does not accept the designed CUF of 19% for evaluation of the bid
OR
d) If the bidder being the successful bidder fails to furnish the acceptance of Letter of Award,
within the specified time limit.
Page 18 of 122

Page 19 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

OR
e) If the bidder gives any wrong / false information /documents in the bid for making the bid
qualified (eligible).
OR
f) If the successful bidder fails to sign the PPA within the period of days from the date of issue
of LoA.
OR
g) In case, MAHAGENCO offers to execute the PPA with the selected bidder and if the
selected bidder does not submit the requisite document.
OR
h) If after date of issue of LOA ,it is found that the documents furnished by the bidder during
RFP are misleading or misrepresented in any way and that relevant facts have been
suppressed.
OR

y
i) If the bidder fails to furnish required Performance Bank Guarantee.

a. Acceptance of LOA by the bidder and


op
j) The EMD of the successful bidder shall be returned after

b. The submission of bank guarantee towards contract performance security by the bidder and
C
on acceptance of the same by the MAHAGENCO.
k) Unsuccessful bidder's EMD will be discharged/returned as promptly as possible.
8.7 In the exceptional circumstances, prior to expiry of the original validity period of the bank
eb

guarantee furnished as Bid Security, MAHAGENCO may request the Bidders to extend the period
of validity for an additional period. In such case the bidders shall provide the extended bid securities
no later than ten (10) days prior to the expiry of the Bid Security. MAHAGENCO reserves the right
to reject the Bid submitted by any Bidder who fails to extend the validity of the Bid Security in line
with the provisions of this clause.
W

8.8 EMD of the successful bidder will be released when the bidder has signed the Contract Agreement
pursuant to Instruction to Bidders and has furnished the required Contract Performance Guarantee
pursuant.
8.9 VALIDITY OF BIDS:
Offers/bids shall be valid for a period of at least 180 days from the date of opening of techno-
commercial Bid. Bids with shorter validity shall be liable for rejection at the discretion of the
Mahagenco.
Extension of validity of proposal:

If it becomes necessary, MAHAGENCO may request the parties, in writing, to extend validity of
proposals. The parties shall have the right to refuse such extension without forfeiting their proposal
security. In case a party extends the validity then it shall also extend the validity of its Proposal
Security for corresponding period.

9. SIGNING OF BIDS:

Page 19 of 122

Page 20 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

9.1 Bid shall be submitted along with the tender documents and duly filled in with all sections
/Annexure/Appendixes/ schedules etc. the online offer shall be signed with valid digital signature
of the bidder/ lead member as per this clause. Physical supporting documents shall be signed by
the authorized person of the bidder/ lead member as per Format of Authorization.

9.2 The foreign bidders shall indicate in his bid , the name of Indian firm, if any, who will be acting as
his representative in India for the purpose of liaison of contract and receiving of payments and
will have to submit the form of authorization for Indian representative as per the Format of
Authorization. Such authorized Indian firm will have to submit the form of Authorized Indian
representative as per Annexure - 6 duly singed by a person authorized by the bidder.
Appointment of such Indian representative shall be subject to acceptance by the Mahagenco.

10. SUBMISSION OF BIDS:

10.1 Each bidder shall carefully examine the Bid Specification and shall independently fully inform
and satisfy itself as to all the conditions and matters which may, in any way affect the work
specified in the Bid Specifications or costs thereof. Failure to furnish all information required by
the Bid Specifications or to submit a Bid not substantially responsive to the Bid Specification in
every respect will be at the bidder's risk and may result in the rejection of the Bid.

y
10.2 Each Indian as well as overseas bidder shall obtain Digital Signature Certificate (meant for e-
tendering) from the list of Licensed Certifying Authorities approved by the controller of
Certifying Authorities provided on the website https://sets.mahagenco.in. The bidder in whose

as the same is not transferable.


op
name the Digital Signature Certificate / Registration is obtained can only fill up the tender online

10.3 Each bidder shall register itself at the website address https://sets.mahagenco.in on payment of the
vendor registration fees as per Clause 3.0 of Section –I to the Mahagenco before the last date for
C
registration mentioned in the notification of invitation of bids ("NIT").

10.4 Each bidder shall arrange to pay the vendor registration and tender fee as per Clause 3.0 to the
Mahagenco by the last date for payment of tender fee indicated in NIT.
eb

10.5 Each bidder shall use the user ID and password, to login to the system and view the Bid
Specification. Each bidder is required to go through (on-line) the Bid Specifications thoroughly
before bidding.
W

10.6 Bidders shall then fill the details required for the Bid and price Bid within the timelines indicated
in NIT for submission of the Bid. Subsequent to making the Bid, the bidder shall provide the
Mahagenco with physical copies of the required documents that have been uploaded in scanned
form in the form named as "Physical Support Documents" in accordance with NIT.

10.7 It is mandatory for the bidder to submit the Bids through e-tendering platform and the bidders are
required to provide the "Physical Support Documents" duly signed and sealed, within the
timelines specified.

10.8 The bidder shall send the "Physical Support Documents" in an envelope superscripted to the
address given in Clause 3.4:-"Physical Support Documents"
SPECIFICATION No: CE/SPGD-P/ PH-IV/ 750MW /Green-shoe / AG/ PV-47

Name of the bidder

10.9 Each Bidder shall submit their price Bid within the time-period indicated in NIT on the e-
tendering platform.

Page 20 of 122

Page 21 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

10.10 Any discrepancy between the data/ details/ documents of the Bids submitted by the bidder in the
on-line Bid and the Physical Support Documents shall not be allowed and any such discrepancy
shall make the Bid submitted by the bidder liable to be rejected. No further communication in the
matter shall be entertained by the Mahagenco.

10.11 It shall be noted that the price Bid can be made only through the e-tendering platform. No
physical price Bids shall be submitted. In case a bidder submits physical price Bids, such Bids
shall be summarily rejected.

10.12 It shall be noted that prices shall be filled with two decimal points only. If the prices are filled
with more than two decimal points, only first two decimal digits shall be considered.

10.13 Bidders are requested to fill up/submit the online Bid data in the formats / space provided in the
Bid Specification itself. The bidders shall take a print of the filled-up Bid (for the bidder's record)
before the submit key is pressed on-line. It may not be possible to take a print thereafter.

10.14 Bids are to be submitted online and physical support documents shall be submitted in sealed
condition only. As such, physical support documents sent by fax/telegram/ e-mail etc. or
submitted in open condition shall not be accepted

10.15 Timely submission of offer: It is advisable to submit the digitally signed offer sufficiently in

y
advance of due date & time so as avoid last minute trafficking at server. Offer received after the
due date and time of submission shall not be accepted. In case, the due date of opening of tender

10.16 Pre Tender Queries op


happens to be holiday, the offer shall be opened on the next working day at the same time.

The Bidder is requested to submit any question only online on Email id:
C
dycespgd@mahagenco.in, ------------------- at 15.00 Hr. Pre-bid meeting will be conducted.

10.17 Assistance to Bidders


eb

a) Any queries relating to the tender document and the terms and conditions contained therein
shall be addressed to the Tender Inviting Authority for a tender or the relevant contact person
indicated in the tender.

b) Conditional Tender will be rejected outright considering it as non-responsive offer and Tender
W

will be liable to be rejected outright if it is found that;


"The Bidder proposes any alternation in the assignment specified in the tender or in time
allowed for completing the assignments or indicate any other unacceptable condition".
c) After the public opening of Tenders information relating to the examination, clarification,
evaluation and comparisons of Tenders and recommendations concerning the award of
contract shall not be disclosed to Bidders or any other(s). Any efforts by the Bidder to
influence the Employer, in the process of examination, clarification, evaluation and
comparison of tenders and decisions concerning award of contract may result in the rejection
of the Bidder's tender.

d) To assist in the examination, evaluation and comparison of tenders, the employer may ask
Bidders, individually for clarifications of their tenders. The request for clarification and the
response shall be in writing or by Where there is discrepancy between amounts in figures and
words, the amount in words will govern.

e) Prior to the expiration of the prescribed period of tender validity or such extended period the
Employer will notify the successful Bidder, by cable or telex, fax confirming in writing by
Page 21 of 122

Page 22 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

registered letter that his tender has been accepted. The notification of award will constitute the
formation of the contract upon the furnishing by the successful Bidder of a performance
security.

f) All costs, charges and expenses including stamp duty in connection with contract as well as
preparations and completion of agreement shall be borne by the Bidders.

11. QUALIFICATION REQUIREMENTS


The Q.R. is divided in two parts viz. General Eligibility Criteria & Technical Eligibility Criteria with
general terms.

Short-listing of Bidders will be based on meeting the following criteria;

A. General Eligibility Criteria


i. Companies incorporated in India under the Companies Act 1956 or Companies
Act,2013 as applicable.
ii. Bidding Consortium with one of the Companies as Lead member. Consortium
shortlisted based on this RFP has to necessarily form a Project Company and get it

y
registered under the Companies Act, 2013, before signing of PPA, keeping the
original shareholding of the Bidding Consortium unchanged. In case applications for

iii. op
multiple Projects have been made by a Consortium, separate Project Companies can
be formed for each Project.
A foreign company can also participate on standalone basis or as a member of
consortium at the RFP stage. In case of foreign company participating on standalone
C
basis and its selection as successful bidder, it has to form an Indian Company
registered under the Companies Act, 2013 as its fully owned subsidiary Company
(i.e. 100% subsidiary) before signing of PPA.
iv. Limited Liability Companies (LLC) shall be eligible. Further, if such Limited
eb

L i a b i l i t y Companies are selected as successful B i d d e r s , they w i l l h a v e to


r e g i s t e r a s a Company under the Indian Companies Act, 1956 or Companies
Act, 2013, as applicable, before signing of PPA, keeping the original
shareholding of LLC unchanged. In such cases, it will also be mandatory on the part
W

of such Limited Labiality Companies to either demonstrate or infuse the capital in


form of his own equity in line with the requirement stipulated in Clause 11 (B)
given below. In case LLC fails to incorporate as an Indian company before
signing of PPA or unable to demonstrate/ infusion of capital in form of his own
equity in to the Company registered in India or not able to sign PPA with
Mahagenco, EMD of such Bidders shall be forfeited.
Note: Limited Liability Companies (LLC) shall be eligible only for those
LLCs which are formed by companies.
v. Limited Liability Partnership (LLPs) are not eligible for participation.
vi. A bidder which has been selected as successful Bidder based on this RFP can also
execute the Project through a Special Purpose Vehicle (SPV) i.e. a Project company
especially incorporated as a fully owned subsidiary Company (100% subsidiary) of
the successful bidder for setting up of the Project which has to be registered under
the Indian Companies Act, 2013, before signing of PPA.
vii. The successful bidder, if being a single company, shall ensure that its shareholding in
Page 22 of 122

Page 23 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

the SPV/project company executing the PPA shall not fall below 51% (fifty-one per
cent) at any time prior to 1 (one) year from the COD (as defined in Clause 15), except
with the prior approval of the MAHAGENCO. In the event the successful bidder is a
consortium, then the combined shareholding of the consortium members in the
SPV/project company executing the PPA, shall not fall below 51% at any time prior
to 1 (one) year from the COD, except with the prior approval of the MAHAGENCO.
However, in case the successful bidder shall be itself executing the PPA, then it shall
ensure that its promoters shall not cede control till 1 (one) year from the COD,
except with the prior approval of the MAHAGENCO. In this case it shall also be
essential that the successful bidder shall provide the information about its promoters
and their shareholding to the MAHAGENCO before signing of the PPA with
MAHAGENCO.

viii. Any change in the shareholding after the expiry of 1 (one) year from the COD can
be undertaken under intimation to MAHAGENCO.

B. Financial Requirements for Selected Project:


1. Net Worth:

y
i.

op
The Net-Worth of the Bidder for the financial year ended on 31.03.2017 shall
not be less than INR 0.85 Crores per MW (of the capacity quoted).
iii. Bidders shall have to furnish a Certificate from Chartered
Accountants, certifying the Networth per MW of quoted capacity
C
as on 31st March, 2017. For avoidance of doubt, “net worth” as per
Section 2 (57) of the Companies Act 2013 means the aggregate
value of the paid-up share capital and all reserves created out of the
profits and securities premium account, after deducting the
eb

aggregate value of the accumulated losses, deferred expenditure


and miscellaneous expenditure not written off, as per the
audited balance sheet, but does not include reserves created out of
revaluation of assets, write- back of depreciation and
W

amalgamation.

iii. Pursuant to evaluation of Net Worth Criteria as part of technical bid, if it is


found by MSPGCL that the Bidder is eligible for lesser quantum than the
quantum for which bid has been submitted, then the Bidder shall be qualified
for such lesser quantum, provided that such quantum is not less than minimum
bid capacity i.e. as specified in Clause 3.2.2.

2. Liquidity:
In order to ascertain that the Bidder has sufficient means to manage the fund
requirements for the Project, the Bidder shall be required to demonstrate at least one of
the following parameters:

i. A minimum annual turnover of Rs. 25 lakhs/MW of the quoted


capacity during the previous financial year 2016-17. It is hereby
Page 23 of 122

Page 24 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

clarified that “Other Income” as indicated in the annual accounts of


the Bidder shall not be considered for arriving at the annual turnover.

ii. Internal resource generation capability, in the form of Profit


Before Depreciation Interest and Taxes (PBDIT) for a minimum
amount of Rs. 10Lakhs/MW of the quoted capacity, as on the last
date of previous financial year, 2016-17.
iii. In-principle sanction letter from the lending institutions/banks of the
Bidder, committing a Line of Credit for a minimum amount of Rs.
12.5 Lakhs/MW of the quoted capacity, towards meeting the working
capital requirement of the project quoted under this RfS. Such letter
can also be obtained by the Affiliate(s) of the Bidder.

iv. The Bidder may seek qualification on the basis of financial


capability of its Affiliate(s) for the purpose of meeting the
qualification requirements as per Clause 3.6.1 & 3.6.2 above. In case

y
of the Bidder being a Bidding Consortium, any Member may seek
qualification on the basis of financial capability of its Affiliate(s). In

op
such cases, the Bidder shall be required to submit Board Resolutions
from the respective Affiliate(s), undertaking to contribute the required
equity funding and performance bank guarantees in case the
Bidder(s) fail to do so in accordance with the RfS. In case of non-
C
availability of the Board Resolution as required above, a letter from
the CEO/Managing Director of the respective Affiliate(s), undertaking
the above, shall be required to be submitted and the requisite Board
Resolution from the Affiliate(s) shall be required to be submitted prior
eb

to signing of PPA.
3. The bidder shall have to submit documentary evidence for the above along with
Certified copies of annual audited accounts of the last financial year i.e., 2015-16 or
2016-17 as may be applicable OR in case the Bidder is a newly formed Company, then
W

the certificate issued by a Chartered Accountant with certified copies of Balance sheet,
Profit & Loss account, Schedules and cash flow statement supported with bank
statement are required to be submitted at respective stages.

12. CONNECTIVITY WITH THE GRID


SPD will provide the evacuation arrangement from the solar power plant to the nearest substation.
O&M of this evacuation system for 25 years will be responsibility of the SPD.

A) The project should be designed for delivery of energy at 33/11 KV level substation of MSEDCL.

B) The responsibility of getting the grid connectivity with MSEDCL shall entirely be of the successful
bidder. The successful bidder shall submit documentary evidence for securing connectivity with grid
from MSEDCL within 7 month from the date of signing of PPA.

C) The transmission of power up to the of interconnection and energy accounting infrastructure shall be the
responsibility of the successful bidder at his own cost. The maintenance of the transmission/distribution
system up to the interconnection point shall be responsibility of the bidder.

Page 24 of 122

Page 25 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

D) The arrangement of connectivity can be made by the successful bidder through a dedicated line or
sharing of a line. The dedicated line may be constructed by the successful bidder or through any of
agency. The entire cost of transmission including cost of construction of line ,maintenance, losses etc.
from the project up to the delivery point will be borne by the successful bidder The arrangement of
connectivity can be made through sharing of a line ,however sharing of line shall be at the discretion of
the bidder provided there is a legally binding arrangement between the bidder and the other parties
sharing the same line for a period not less than 25 years and the bidder shall indemnify MSEDCL for
any loss arising out of failure of such shared line.

E) The successful bidder shall not be entitled to deemed generation in case of any delay in grant of
connectivity.

F) The successful bidder shall comply MERC regulations on forecasting, scheduling and deviation
settlement ,as applicable and are responsible for all liabilities related to connectivity.

13. SELECTION OF THE TECHNOLOGY


The Projects to be selected for capacity of 750MWAC , provide for deployment of Solar PV
Technology. However, the projects would be technology agnostic within the technology approved by

y
the MNRE i.e. Crystalline silicon or thin film or CPV, with or without trackers can be installed. Only
commercially established and operational technologies can be used, to minimize the technology risk

14. TRACK RECORD op


and to achieve the timely commissioning of the Projects.

The bidder shall have good track record and shall not have been blacklisted/banned for participation in
C
tenders issued by any entity, Government / Semi-Government organization in any country as on date of
submission of bid. The bidder shall submit an Affidavit to that effect. The bid will be rejected if such
affidavit is not furnished or the contract may be terminated if any information found incorrect at any
later stage.
eb

15. FINANCIAL CLOSURE OR PROJECT FINANCING ARRANGEMENTS

SPD should take all necessary actions in order to achieve financial closure of the project. Mahagenco
W

will not provide any VGF or financial assistance or loan for the project. SPD to ensure that the
financial closure will be carried out within 7 (Seven) months from the date of signing of PPA.
Accordingly the successful bidder shall furnish the following documents within 7 months from the date
of signing of PPA.
a) Submit power evacuation/connectivity agreement of successful bidder with MSEDCL.
b) Evidence of clear possession of required land along with the following documentary evidences.
i. Ownership right or lease hold right or right to use from state nodal agency for entire duration
of the project in the name of successful bidder and possession of 100% of the area required
for the project. The land used for the project on lease hold basis or right to use basis will be
accepted in case of both government land and private land. Where ,leasing of private land is
involved , the lease should allow transfer of land to the procurer, in case of default of the solar
power Generator.
ii. Sworn affidavit from the authorized person of the successful bidder listing the details of the
land and certifying total land required for the project under clear possession of the successful
bidder.
iii. Developer and or Transfer permission issued by state Nodal agency /MEDA.
Page 25 of 122

Page 26 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

iv. Copy of key plan drawing showing survey number, plot no. ,point of installation of solar
project with capacity.
If the project developer fails to tie-up financing arrangement for the project within 7 months as
prescribed above or if the project developer fails to report such tie-up then the MAHAGENCO shall
forfeit the performance bank Guarantee (PBG) unless the delay is on account of delay caused due to a
force Majeure. An extension for the attainment of the financial closure can however be considered by
the MAHAGENCO, on the sole request of the solar power Generator,upon submission of a fresh
Performance Bank Guarantee (PBG) with same conditions,value and validity as stated in section-3-1

16. RIGHT TO ACCEPT/ REJECT

MAHAGENCO reserves the right to accept any bid or reject any or all bids without assigning any
reasons thereof.

17. BID EVALUATION CRITERIA AND SELECTION PROCEDURE OF THE BIDDER


The bids of all bidders be evaluated in Three stages as under

i. Evaluation of Technical bids (Step-1)

y
At this stage, bids of each bidder will be evaluated on the basis of terms & conditions of RFP viz.

op
bid security (EMD), the correctness & validity of required undertaking/agreements/Board
resolutions/ annexure/ certificates/financial documents/ vendor credentials documents etc.
submitted by bidder under prescribed format according to the RFP.

Bidder whose bid found complete in all respect and in line with RFP terms & conditions will be
C
considered qualified bidder.

ii. Financial Bid Evaluation (Step-2)


eb

In this step evaluations shall be done based on the “Tariff” quoted by the bidders in the
Electronic Form of Financial Bid. After this step, the shortlisted bidders shall be invited for the
Reverse Auction.
i) Second Envelope (containing Tariff) of only those bidders shall be opened whose
W

technical bids are found to be qualified.


ii) The bidders including its Parent, Affiliate or Ultimate Parent or any Group Company
will have to submit bid (single application) quoting tariff per kWh for the project. Tariff can
be quoted up to two places of decimal only. If it is quoted with more than two digits after
decimal, it shall be ignored after first two decimal places. (For e.g. if the quoted tariff is
₹3.337, then it shall be considered as ₹3.33).

iii) In this step, evaluation will be carried out based on tariff quoted by the Bidders.
iv) On completion of Techno-commercial bid evaluation, if it is found that the total aggregate
capacity of the Solar Power Projects short-listed is lower than or equal to 500 MW, then
the procedure as elaborated in Section 4.3.2 shall be followed.

Note: On completion of Techno-commercial bid evaluation, if it is found that only one bidder
is eligible, opening of the financial bid of the bidder will be at the discretion of MSPGCL.

Page 26 of 122

Page 27 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

v) If the first-round tariff quoted is same for two or more bidders, then all the bidders with
same tariff shall be considered of equal rank/ standing in the order.
vi) All bidders with same tariff shall be eligible for reverse auction round (provided their
rank is equal to or less than “n” as mentioned in Section 4.3.2).
vii) Ranking of bidders after Financial Bid Evaluation: In case of financial bids received
from all bidders are in the form of tariff, ranking of bidders shall be done accordingly. For
example:

Bidder Submitted Financial bid Ranking

B8 Rs. 2.30 (Tariff in Rs./ kWh) L1


B5 Rs. 2.70 (Tariff in Rs./ kWh) L2
B1 Rs. 2.80 (Tariff in Rs./ kWh) L3
B4 Rs. 2.80 (Tariff in Rs./ kWh) L3
B2 Rs. 3.00 (Tariff in Rs./ kWh) L4
B3 Rs. 3.30 (Tariff in Rs./ kWh) L5

y
B7 Rs. 3.50 (Tariff in Rs./ kWh) L6
B6
B10
B9
B11
Rs.
Rs.
Rs.
Rs.
3.60
3.90
4.00
4.00
op
(Tariff in Rs./
(Tariff in Rs./
(Tariff in Rs./
(Tariff in Rs./
kWh)
kWh)
kWh)
kWh)
L7
L8
L9
L9
C
iii. Reverse Auction (Step-3)
Following procedure will be followed for the reverse bidding/ auction
eb

The Eligible Bidders shall participate in the Reverse Auction Process, in accordance with reverse
auction process, for determination of the Selected Bidder(s).
i. Intimation of Date and Time of Reverse Auction
W

MAHAGENCO shall, at least 4 (four) calendar days prior to the date of conducting
the Reverse Auction Process, inform all the Eligible Bidders through e-mail
regarding the date and time of the Reverse Auction Process and notifying them of
being eligible to participate in the Reverse Auction Process.
Once the e-Reverse Auction window of the E-bidding portal is configured, Eligible
Bidders can log on to the E-bidding Portal and view salient aspects of the Reverse
Auction window on the E-bidding portal (e.g. Best Quote, minimum bid decrement
value). Further, each Eligible Bidder would be able to see number of Units for which
that Eligible Bidder is qualified.
MAHAGENCO will also send a separate e-mail to all the Eligible Bidders notifying
the start time of the Reverse Auction Process, along with the number of Units for
which such Eligible Bidder is qualified. Eligible Bidders will be able to login into
the E-bidding Portal 15 (fifteen) minutes before the scheduled commencement time
of the Reverse Auction Process.
ii. REVERSE AUCTION / BIDDING PROCEDURE

Page 27 of 122

Page 28 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Process
a) In reverse bidding(auction) process, the bidder has to quote lower tariff rate
in the decrement of Rs.0.01/-(one paisa) & value will be rounded / truncated
up to 2 decimal digits. The reverse bidding (auction) will be started from the
lowest price quoted by the bidder.
b) After opening of price bids and depending upon the comparative statements,
bidders will be eligible for participating in reverse bidding process. In reverse
bidding (auction) process, the bidder has to quote on the base value declared
by Mahagenco in the decrement of step of Rs. 0.01/- (One paisa) and value
will be rounded/ truncated up to 2 decimal digits. The modalities of Reverse
Bidding will be followed.
Detailed Procedure of Reverse Bidding is enclosed as Annexure No.19

The reverse auction shall be conducted on https://sets.mahagenco.in. Reverse Auction shall be


carried out as specified in “Bid Information Sheet” of this RfP.
Total eligible bidders for reverse auction shall be decided as mentioned below:

y
Assuming
T = Total number of techno-commercially qualified bidders, and

op
ST= Capacity of the total number of techno-commercially qualified bidders
SK = Cumulative capacity till the ‘k’th serial number bidder (not the ‘k’th rank bidder)
after ranking is done in ascending order from L1 onwards
C
SM = Total capacity of techno-commercially qualified bidders after ranking is done in
ascending order from L1 onwards) such that (SM-1 < SE MW and SM ≥ SE
SE = Eligible Capacity for Award
eb

SE (i) In case ST <500 MW; SE = 0.8 X ST,


=(Eligible
capacity for (ii) In case ST ≥ 500 MW; SE = 0.8 X ST, subject to
W

award) maximum eligible capacity being 500 MW.

T, if T=m or m+1 Where m =Total number of techno-


commercially qualified bidders (after
m+(T-m)/2, if ranking is done in ascending order
Sm≥ SE and from L1 onwards) such that
n={
(Sm-1 < SE MW and Sm ≥ SE) and
m+(T-m+1)/2, if
1≤m≤T
Sm ≥ SE and
Total eligible bidders for e-Reverse Auction = Bidders from Sr. No. 1 to Sr. No. n.
For e.g. (Shortlisting of bidders for reverse auction):

Total bid capacity of techno-commercially shortlisted bidders = ST=770 MW Eligible


capacity for award = SE = 500 MW
SM = 550 MW

Page 28 of 122

Page 29 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Therefore, n = [7 + (11-7)/2] = 9 as per the above formula.

Sl. Techno
Capacity Shortlisted
commercially Rank T M SE N
No. (MW) Bidders
qualified Bidder

1 B8 L1 55 11 7 500 9* B8
2 B5 L2 45 MW B5
3 B1 L3 125 B1
4 B4 L3 75 B4
5 B2 L4 80 B2
6 B3 L5 95 B3
7 B7 L6 75 B7
8 B6 L7 60 B6

y
9 B10 L8 50 B10

10

11
B9

B11
L9

L10
55

55
op
C
* Though, n = 7 + (11-7)/2 = 9 as per the above formula.

Shortlisted bidders for Reverse Auction will be able to login into https://sets.mahagenco.in
eb

for reverse auction 15 minutes before the start time of reverse auction.
i) During 15 minutes prior to start of reverse auction process, the respective tariff along
with the total project capacity of the bidder shall be displayed on its window.
W

ii) The minimum decrement value for tariff shall be ₹ 0.01 per kWh. The bidder can
mention its revised tariff which has to be at least 01 (one) paisa less than its current tariff.

iii) Bidders can only quote any value lower than their previous quoted tariff taking into
consideration of the minimum decrement value mentioned in previous Section.
However, at any stage, increase in tariff will not be permissible. Bidders can
improve their ranking by quoting the tariff lower than their last quoted tariff.

iv) During Reverse Auction, the bidder shall not have the option of changing the total
project capacity while quoting tariff during reverse auction.
v) In the bidder’s bidding window, the following information can be viewed by the bidder:

1. Its tariff as their initial start price and there after last quoted tariff
along with project capacity for which the bidder is qualified;
2. The list of all the bidders with their following details:
Pseudo Identity, last quoted tariff and project capacity
Page 29 of 122

Page 30 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

vi) The initial auction period will be of 60 minutes (Sixty minutes) with a provision of auto
extension by ten minutes from the scheduled / extended closing time if any fresh bid
is received in last Ten minutes of auction period or extended auction period. If no
valid bid is received during last ten minutes of auction period or extended auction
period, then the reverse auction process will get closed.

iv. Selection of Successful Bidders


a) The bidders shall be selected in the ascending order with lowest quoted
tariff (being L1) till the capacity is exhausted. Some of the possible
scenarios including, but not limited to, are shown below:

Scenario – 1 Scenario – 2 Scenario – 3 Scenario – 4

Rs. 2.30 / kWh Rs. 2.30 / kWh Rs. 2.30 / kWh Rs. 2.25 / kWh

Rs. 2.50 / kWh Rs. 2.60 / kWh Rs. 2.70 / kWh Rs. 2.30 / kWh

y
Rs. 2.65 / kWh Rs. 2.70 / kWh Rs. 2.80 / kWh Rs. 2.60 / kWh

Rs. 2.70 / kWh

Rs. 2.80 / kWh


Rs. 2.80 / kWh

Rs. 2.80 / kWh


opRs. 2.80 / kWh

Rs. 2.90 / kWh


Rs. 2.70 / kWh

Rs. 2.80 / kWh


C
Rs. 3.00 / kWh Rs. 3.00 / kWh Rs. 3.00 / kWh Rs. 2.80 / kWh

Rs. 3.00 / kWh Rs. 3.20 / kWh Rs. 3.05 / kWh Rs. 3.30 / kWh
eb

b) The lowest quoting bidder will be allotted its qualified project capacity and
then, next higher bidder will be allotted its qualified project capacity and so on, till
the total capacity is exhausted.
W

c) In case of the last selected bidder, if the balance project capacity is less than the
total project capacity mentioned by the bidder, then the balance capacity shall be
awarded to the bidder till the total capacity is exhausted subject to a minimum
allocation of 2MW. The allocation of additional 250MW capacity through
Green-shoe option shall be as per Clause 3.2 of RFS (Note: It will be mandatory
for the last selected Bidder to accept the last Project capacity offered by
MSPGCL, which may be less than the capacity quoted by him). However, the
bidder who has submitted the bid for Project with more than one locations,
may intimate MSPGCL about its revised location details within two working
days after e-Reverse Auction event and the same shall be considered by
MSPGCL to allot the projects before issuance of LoA.

d) In case of tie, among two or more bidders (i.e. their last quoted tariff being
the same) they will be considered in the chronological order of their last bid
with preference to that bidder who has quoted his last bid earlier than others.
e) In the above case (as mentioned in previous Section), if the time of quote also
Page 30 of 122

Page 31 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

becomes exactly same among the bidders at a tie, then the ranking among these
bidders shall be done as follow:
Step – 1: Lowest rank will be given to the bidder who has quoted the
lowest in Financial Bid (Electronic Form) and so on. If there is also a
tie among any of these bidders, then the following step (Step 2) will be
followed.
Step – 2: Ranking will be done based on draw of lots.
f) At the end of selection process, Letter of Award (LOA) will be issued to all
the Successful Bidders. In case of Consortium being selected as Successful
Bidder, the LOA shall be issued to the Lead Member of the Consortium.
In all cases, MSPGCL’s decision regarding selection of bidder through
Reverse Auction or otherwise based on tariff or annulment of tender process shall
be final and binding on all participating bidders.
Also, MSPGCL shall reserve the right to short close the capacity lower
than 1000MW (750MW + 250MW under Green-shoe option) at its discretion, if
the prices are abruptly high.

y
4.4.3 In case of the last selected bidder, if the balance project capacity is less than
the total project capacity mentioned by the bidder, then the balance capacity shall

op
be awarded to the bidder till the total capacity is exhausted subject to a
minimum allocation of 25 MW. The allocation of additional 500 MW
capacity through Greenshoe option shall be as per Clause 3.2 of RFS (Note: It
will be mandatory for the last selected Bidder to accept the last Project capacity
C
offered by MSPGCL, which may be less than the capacity quoted by him).
However, the bidder who has submitted the bid for Project with more than
one locations, may intimate MSPGCL about its revised location details within
two working days after e-Reverse Auction event and the same shall be
eb

considered by MSPGCL to allot the projects before issuance of LoA.


4.4.4 In case of tie, among two or more bidders (i.e. their last quoted tariff being
the same) they will be considered in the chronological order of their last bid
with preference to that bidder who has quoted his last bid earlier than others.
W

4.4.5 In the above case (as mentioned in previous Section), if the time of quote
also becomes exactly same among the bidders at a tie, then the ranking among
these bidders shall be done as follow:
Step – 1: Lowest rank will be given to the bidder who has quoted the lowest
in Financial Bid (Electronic Form) and so on. If there is also a tie among any
of these bidders, then the following step (Step 2) will be followed.
Step – 2: Ranking will be done based on draw of lots.
4.4.6 At the end of selection process, Letter of Award (LOA) will be issued to all
the Successful Bidders. In case of Consortium being selected as Successful
Bidder, the LOA shall be issued to the Lead Member of the Consortium.
In all cases, MSPGL’s decision regarding selection of bidder through
Reverse Auction or otherwise based on tariff or annulment of tender process shall
be final and binding on all participating bidders.
Also, MSPGCL shall reserve the right to short close the capacity lower
than
Page 31 of 122

Page 32 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

1000 MW (500 MW + 500 MW under Greenshoe option) at its discretion, if


the prices are abruptly high.

y
op
C
eb
W

Page 32 of 122

Page 33 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

SECTION II:

TECHNICAL SPECIFICATION FOR COMPETITIVE BIDDING FOR


SELECTION OF SOLAR POWER DEVELOPER FOR DEVELOPMENT OF
750MWAC CUMULATIVE CAPACITY GRID INTERACTIVE SOLAR PV
POWER PLANT TO CATER THE AG FEEDER LOAD OF VARIOUS
SUBSTATIONS IN MAHARASHTRA WITH ADDITIONAL CAPACITY OF

y
250MWAC UNDER GREEN-SHOE OPTION.

op
C
eb
W

1. GENERAL SCOPE OF WORK


1.1 Objective

Page 33 of 122

Page 34 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

The main objective of this project to design, engineering, manufacture, supply, erection, testing and
commissioning of 750MW AC cumulative capacity grid interactive solar PV power plants at various
places to cater the AG feeder load of various substations at various places in Maharashtra under
‘Chief Minister Solar AG Feeder Scheme’.

1.2 Mahagenco Scope of work:

Mahagenco will sign the PPA for 25 years with the SPD at the tariff rate discovered through
the reverse bidding and PSA with MSEDCL.
1.4 SPD Scope or work:

1. Financial Closure of the project.


2. Signing of PPA with MSPGCL.
3. The bidder shall identify 100% land required for the project within the periphery of 3 KM from
the substation where the power is evacuated at the time of submission of bid in Format 6.1.

y
4. Operation and Maintenance of Plant for 25 years.
5. Construction of the semi grouting type approach road to the site and semi grouting type
Periphery Road along with Drainage system.
6. Construction of fencing to the land plot.
7. Construction of Bore wells at the site.
op
C
8. Arrangement of topographical, Geological, soil test & water test report.
9. Design, engineering, manufacture, supply, erection, testing and commissioning of alloted
capacity grid interactive solar PV power plant at various places to cater the AG feeder load
eb

of various substations at various places in Maharashtra on PPP basis.

10. SPD will construct & erect complete evacuation line along with & ABT meters from the
switchyard of solar power project to the nearest MSEDCL/MSETCL substation. Energy
meter (ABT) will be located at MSEDCL Substation.
W

12. Construction of bays and installation of all necessary associated equipment and protection
and metering system at interconnection point at MSEDCL/MSETCL substation.
13. SPD will carry the O&M of the evacuation line and associated equipment, viz. Breakers,
Isolators, Bays, CT, PT, ABT meter, Protection & metering etc. for 25 years

14. All approvals permits and clearances required for setting up of the project (including connectivity)
and those required from State Government and local bodies shall be in the scope of the bidder .

1.5 MEDA Scope of Work:


SPD will register the Solar Project with MEDA. However, MEDA will register the project as per the
provisions under ‘Chief Minister Solar AG feeder scheme’

2. TECHNICAL SPECIFICATION
All components of the PV plant shall be in accordance with technical specifications given in relevant
IS/IEC Standards. The design and commissioning also shall be as per latest IEC/IS standards. The

Page 34 of 122

Page 35 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

following are some of the technical measures required to ensure quality of the major components used
in grid connected solar power Projects.
2.1 PV Module Qualification
The PV modules used in the grid connected solar power Projects must qualify to the latest edition of any
of the following IEC PV module qualification test or equivalent BIS standards.
Crystalline Silicon Solar Cell Modules IEC 61215
Thin Film Modules IEC 61646
Concentrator PV modules IEC 62108
In addition, PV modules must qualify to IEC 61730 for safety qualification testing @1000 V DC or
higher. For the PV modules to be used in a highly corrosive atmosphere throughout their lifetime, they
must qualify to IEC 61701.
2.2 Power Conditioners/ Inverters
The Power Conditioners/Inverters of the SPV power plants must conform to the latest edition of IEC/
equivalent BIS Standards as specified below:

y
Efficiency Measurements IEC 61683
Environmental Testing IEC 60068-2/ IEC 62093
Electromagnetic Compatibility (EMC)
Electrical Safety

Protection against Islanding of Grid


op
IEC 61000-6-2, IEC 61000-6-4
IEC 62103/ 62109-1&2
IEEE1547/IEC 62116/ UL1741 or equivalent
EN/BIS Standards
C
As per the latest CERC Guidelines/ Order/
LVRT Compliance Regulations
eb

Relevant CERC Regulations (including LVRT


Grid Connectivity compliance) and Grid Code as amended and revised
from time to time.
Rated capacity Nominal/Rated output power of the inverter (if
W

different power ratings are mentioned at different


temperatures, then power rating at 500 C shall be
considered) in kW will be considered as inverter
rated capacity.

2.3 Cables and connectors:


All cables and connectors for used for installation of solar field must be of solar grade which can
withstand harsh environment conditions for 25 years and voltages as per latest IEC standards. (Note: IEC
Standard for DC cables for PV systems is under development. It is recommended that in the interim, the
Cables of 600-1800 Volts DC for outdoor installations should comply with the EN50618/ TUV 2pfg
1169/08/07 or equivalent IS for service life expectancy of 25 years).
2.4 Other Sub-systems/Components
Other subsystems/components used in the SPV power plants (Cables, Connectors, Junction Boxes, Surge
Protection Devices, etc.) must also conform to the relevant international/national Standards for Electrical
Safety besides that for Quality required for ensuring Expected Service Life and Weather Resistance.
2.5 Authorized Test Centers
Page 35 of 122

Page 36 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

The PV modules / Power Conditioners deployed in the power plants must have valid test certificates for
their qualification as per above specified IEC/ BIS Standards by one of the NABL Accredited Test
Centers in India. In case of module types/ equipment for which such Test facilities may not exist in India
at present, test certificates from reputed ILAC Member body accredited Labs abroad will be acceptable.
2.6 Warranty
i. PV modules used in grid connected solar power plants must be warranted for peak output
wattage, which should not be less than 90% at the end of 10 years and 80% at the end of 25
years.
ii. The modules shall be warranted for at least 10 years for failures due to material defects and
workmanship.
iii. The mechanical structures, electrical works and overall workmanship of the grid solar power
plants must be warranted for a minimum of 5 years.
iv. The Inverters/PCUs installed in the solar power plant must have a warranty for 5 years.
2.7 Identification and Traceability

y
Each PV module used in any solar power Project must use a RF identification tag. The following
information must be mentioned in the RFID used on each module (This can be inside or outside the

i. Name of the manufacturer of PV Module


ii. Name of the Manufacturer of Solar cells op
laminate, but must be able to withstand harsh environmental conditions):
C
iii. Month and year of the manufacture (separately for solar cells and module)
iv. Country of origin (separately for solar cells and module)
v. I-V curve for the module at Standard Test Condition (1000 W/m2, AM 1.5, 250C)
eb

vi. Wattage, Im, Vm and FF for the module


vii. Unique Serial No. and Model No. of the module
viii. Date and year of obtaining IEC PV module qualification certificate
W

ix. Name of the test lab issuing IEC certificate


x. Other relevant information on traceability of solar cells and module as per ISO 9000

Site owners would be required to maintain accessibility to the list of Module IDs along with the above
parametric data for each module.
2.8 Performance Monitoring
As part of the performance monitoring, the following shall be carried out:
a. The SPD shall maintain the list of Module IDs along with performance characteristic data for each
module. This data shall be submitted to Mahagenco.
b. The SPDs must install necessary equipment to continuously measure solar radiation on module plane,
ambient temperature, wind speed and other weather parameters and simultaneously measure the
generation of DC power as well as AC power generated from the plant. They will be required to
submit this data to Mahagenco on line and/or through a report on regular basis every month for the
entire duration of PPA.

Page 36 of 122

Page 37 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

c. The SPDs shall provide access to Mahagenco or their authorized representatives for installing any
additional monitoring equipment to facilitate on-line transfer of data.
d. All data shall be made available as mentioned above for the entire duration of the PPA.
e. Fibre Optic Ethernet Ring network (Managed type Ethernet switches in each Control Room) should
be provided between MCR & Inverter Control Rooms.
f. Web-based monitoring should be available, which should not be machine dependent. The web- based
monitoring should provide the same screens as available in the plant. Also it should be possible to
download reports from a remote web-client in PDF or Excel format.
g. The SPD shall follow the forecasting and scheduling process as per the regulations in this regard by
the CERC/MERC as per the Indian Electricity Grid Code (IEGC) and requirement of SLDC by
establishing the required SCADA system & communication facility from project to SLDC. SPD shall
be responsible for the O&M of SCADA & communication system thereof for entire contract period
at its own cost.
Bidder shall ensure that the facility at all times
a) Have SCADA installation/ any other continuous communication facility for
transferring the data of Solar Energy generated from the Facility‟s switchyard /
MSEDCL Substation to the State Grid‟s Sub-Station / Control room;

y
b) Have installed Special Energy Meter (SEM) with telecommunication facility with

/ regulations as may be applicable.


op
availability based tariff (ABT) feature as per relevant CEA specifications

c) Moreover, it shall be mandatory to provide real time visibility of electricity


generation to MSLDC at Airoli, Navi Mumbai, Maharashtra or MSEDCL through
C
RTU-DC, V-SAT or any other standard protocol decided by MSEDCL.

2.9 Safe Disposal of Solar PV Modules:


eb

The SPD will ensure that all Solar PV modules from their plant after their ‘end of life’ (when they
become defective/ non-operational/ non-repairable) are disposed in accordance with the “e-waste
(Management and Handling) Rules, 2011” notified by the Government and as revised and amended from
time to time.
W

Page 37 of 122

Page 38 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

SECTION III:

GENERAL TERMS & CONDITIONS

y
op
C
eb
W

Page 38 of 122

Page 39 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

1. PERFORMANCE SECURITY

Bidders selected by Mahagenco based on this RFP shall submit Performance Security in the form of
Bank Guarantee for a value @ Rs 20 Lakh / MW for each awarded project within 21 days of issuance
of LoA or 2 days prior to signing of PPA of that individual Solar power Project. It may be noted that
successful Bidders shall submit the Performance Guarantee on the non-judicial stamp paper of worth
Rs.500/- as per the format prescribed in the Annexure - 15 for a value @ Rs. 20 Lakh/MW with a
validity period of 24 months which includes 12 months of operation of plant beyond accepted
scheduled or re-scheduled commissioning date, whichever is later in addition to this the Bank
Guarantee should have 06 (six month) claim period beyond the validity date. On receipt and after
successful verification of the total Performance Bank Guarantees for allotted capacity projects in the
acceptable form, the BG submitted towards EMD shall be returned by Mahagenco to the successful
Bidder. The Performance Security in the form of Bank Guarantee would be encashed proportionally @
Rs.20 Lakh/MW for the project not commissioned within accepted schedule period or re-scheduled
period.

2. STATUTORY RESPONSIBILITY

 The SPD shall comply with all applicable laws or ordinances, codes, approved standards, rules,

y
and regulations and shall procure all necessary Municipal, Panchayat and Government permits,
licenses at its own cost. Also, fees, royalties, charges etc. shall be borne by the SPD at his own


cost.

op
The SPD shall leave the MAHAGENCO and the CE (SPGD-P) harmless as a result of any
infractions thereof. If required, the SPD shall renew the above permits & licenses in case such
situation warrants.
C
3. INSOLVENCY AND BREACH OF CONTRACT

The MAHAGENCO may at any time by notice in writing summarily terminate the Contract without
eb

compensation to the SPD in any of the following events:


a. If the SPD being an individual or if a firm, any partner thereof shall at any time, be adjudged
insolvent or shall have a receiving order or order from administration of his estate made against
him or shall take any proceeding for composition under any Insolvency Act for the time being in
W

force or make any conveyance or assignment with his creditors or suspend payment or if the firm
be dissolved under Partnership Act, or
b. If the SPD being a Company is wound up voluntarily or by the order of a court or a Receiver,
Liquidator or manager on behalf of the Debenture holder is appointed or circumstances have arisen
which entitle the Court or debenture holder to appoint a Receiver, Liquidator or Manager, or
c. If the SPD commits any breach of the contract not herein specifically provided for, provided
always that such determination shall not prejudice any right of action or remedy which shall have
accrued or shall accrue thereafter to the MAHAGENCO and provided also that the SPD shall be
liable to pay to the MAHAGENCO. The SPD shall under no circumstances be entitled to pay again
or repurchase, Or
d. If the SPD found utilizing the land leased to him for any other purpose/commercial activities that
are not associated with solar power project.

Page 39 of 122

Page 40 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

4. TIME OF COMPLETION & DELAY


The project shall be commissioned within 13 months from the date of execution of the PPA of the date
of handing over the site of solar project (for e.g. if the site is handed over on is 07.10.2017, then
scheduled commissioning date shall be 07.01.2019) in this regard, a duly constituted committee will
physically inspect and certify successful commissioning of the project.

Sr. No. Stage Reference


From D
1 Date of Execution of the PPA Zero Date (D)
2 Financial closure D+210
3 Achievement of Commercial Operation Date with entire contracted D+395
capacity.

In case of failure to achieve these milestones, MAHAGENCO shall have rights to encash the

y
Performance Bank Guarantee and in the event that the SPD is not able to commission the project beyond
3 months of Schedule Date of COD then Mahagenco can also cancel the PPA.

5. TERMINATION FOR DEFAULT

op
i. The MAHAGENCO may, without prejudice to any other remedy for breach of contract, by written
notice of default sent to the SPD, terminate the contract in whole or part:
C
ii. SPD fails to achieve financial closure in stipulated time OR fails to infuse the require equity amount
as stipulated as per the financial requirement clause under Section-I, Qualifying Requirement clause
no.11, B, OR at any stage if it is found that the documents furnished by us are false / misleading or
misrepresented in any way, then the LoA issued shall be terminated and the entire EMD and
eb

Performance Security shall be forfeited.

iii. If the SPD fails to deliver or execute any or all of its contractual obligations as stipulated in the RFP
& Contract Agreement within the time period(s) under the contract or any extension thereof granted
by the MAHAGENCO pursuant to the clause for Delay in Execution or Failure to Supply or/If the
W

SPD fails to perform any other obligations(s) under the contract.


iv. In the event the MAHAGENCO terminates the contract in whole or part the PBG submitted by the
SPD will forfeited.

6. BREACH OF THE CONTRACT


In case of non-performance in any form or change of the covenant and conditions of the Contract by
the SPD, MAHAGENCO shall have the power to cancel the order or a portion thereof and if so
purchase or authorize purchase of the plant/equipment not so delivered or order plant/equipment of
similar description (opinion of the MAHAGENCO shall be final) at the risk and cost of the SPD.

7. FORCE MAJEURE
i. In the event of either party being rendered unable by Force Majeure to perform any obligation
required to be performed by them under this agreement, relative obligation of the party affected by
such Force Majeure shall be treated as suspended during which the Force Majeure clause last.

Page 40 of 122

Page 41 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ii. The term "Force Majeure" shall have herein mean riots (other than among the SPD's employee),
Civil commotion, War (whether declared or not), invasion, act of foreign enemies hostilities, civil
war, rebellion, revolution, insurrection, military coup, damage from aircraft, nuclear fission,
embargoes, quarantines, acts of god such as earthquake (above 7.0 magnitude on Richter scales),
lightning, unprecedented floods, fires not caused by SPDs negligence and other causes which the
SPD has no control and accepted as such by the CE(SPGD-P) whose decision shall be final and
binding. Normal rainy season and monsoons are not Force Majeure.
iii. Upon occurrence of such causes and upon its termination, the party alleging that it has been
rendered unable as aforesaid thereby shall notify the other party in writing by registered notice
within 24 (twenty-four) hours of the alleged beginning and ending thereof giving full particulars
and satisfactory evidence in support of its claim.
iv. Time for performance of the relative obligation suspended by the force majeure shall stand
extended by the period for which such clause lasts.
v. If works are suspended by Force Majeure conditions lasting for more than two months, the
MAHAGENCO shall have the option of canceling this contract in whole or part thereof, at its
discretion.

y
vi. The SPD shall not claim any compensation for 'Force Majeure conditions' and shall take
appropriate steps to insure men and materials utilized by him under the contract well in advance

8. PROGRESS REPORT OF WORK

op
The SPD shall submit monthly progress report on execution of works conforming to bar chart,
network like PERT. In case of any slippage(s) or delay in execution of work reasons for such delay
C
along with details of hindrances will be submitted by the SPD along with modified Bar Chart
mentioning the action plan being taken to keep the due date of completion of project unchanged. If
required, SPD shall use additional manpower to keep the due date of completion of project
unchanged.
eb

9. STATUTORY ACTS, RULES AND STANDARDS


The work shall be executed in conformity with the relevant standard of Bureau of Indian Standards (or
equivalent International Standard), Indian Electricity Rules, 1956 (as amended up to date), Indian
Electricity Act, BARC/DAE rules, Explosive Act 1948, Petroleum Act 1934, National Building Code
W

and relevant Rules in vogue at the time of execution including operation & maintenance period. All
the fees/cost regarding renewals of all required statutory certificates shall be borne by SPD during
contract period Also, all the taxes, royalties, fees applicable as per government rules shall be borne by
SPD.

10. SAFETY MEASURES


The SPD shall have to provide necessary and adequate safety measures including personal protective
equipment and precautions to avoid any accident, which may cause damage to any equipment/material
or injury to workmen. MAHAGENCO shall not be responsible for any such accidents.

11. HAZARDOUS MATERIAL


Any hazardous material used during construction or used as part of the plant has to be taken back by
the supplier for recycling or dumping purpose after its operating / working life, so that it may not
affect the environment or any living being. SPD shall comply with MPCB regulation.

Page 41 of 122

Page 42 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

12. STOPPAGE OF WORK


MAHAGENCO shall not be responsible and not liable to pay any compensation due to stoppage of
work as a reaction from local public due to any undue action on the part of the SPD causing
annoyance to local people.

13. GOVERNING LANGUAGE


The contract shall be written in English Language. All correspondence and documents pertaining to
the contract, which are exchanged by the MAHAGENCO& SPD, shall be written in English.

14. ARBITRATION
a) Except where otherwise provided, if at any time, any question, dispute or difference, whatever
shall arise between the SPD and the MAHAGENCO upon or in relation to or in connection
with this contract either of the parties may give to the other notice in writing of the existence
of such a question, on rejection of the matter, the dispute or difference shall be referred to the
sole arbitrator jointly appointed by MAHAGENCO and the SPD at the time of dispute after
ascertaining the terms of reference mutually.

y
b) The Arbitrator will preferably be a member of Arbitration Council and arbitration proceedings
will take place as per provisions of Arbitration and Conciliation Act, 1996 or any statutory

c) op
modifications or re-enactment thereof, and the rules made there under and for the time being
in force shall apply.

The SPD will ensure that the work under this contract shall continue during arbitration
proceedings and dispute and no payments due from or payment by the MAHAGENCO shall
C
be withheld on account of such proceedings except to the extent which may be in dispute.

15. COURT OF COMPETENT JURISDICTION


The Bombay High Court will only have jurisdiction in this case.
eb

16. LAW & PROCEDURE


a) The law which is to apply to the contract and under which the contract is to be construed shall
be Indian Law
W

b) The Law governing the procedure and administration of any arbitration instituted under the
Clause for Arbitration shall be the Indian Law.

17. CONSTRUCTION OF CONTRACT


The contract shall in all respect be construed and operated, as a contract as defined in the Indian
Contracts Act, 1872, and all the payments there under shall be made in Indian Rupees unless
otherwise specified.

18. NOTICES

a) For all purpose of the contract, including arbitration there under, the address of the SPD
mentioned in the tender shall be the address to which all communications addressed to the SPD
shall be sent, unless the SPD has notified a change by a separate letter containing no other
communication and sent by registered post with acknowledgement due to the Project Manager.
The SPD shall be solely responsible for the consequence of an omission to notify change of
address in the manner aforesaid.

Page 42 of 122

Page 43 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

b) Any communication or notice on behalf of the MAHAGENCO in relation to the contract


agreement may be issued to the SPD by Project Manager and all such communication and notice
may be served on the SPD either by registered post or under certificate of posting or by ordinary
post or by hand delivery at the option of the officer.
c) Instructions or notices to the SPD and notices from the SPD to the MAHAGENCO recorded in a
minute signed by the authorized representatives of both MAHAGENCO& SPD. Such notice or
instruction shall be valid notice of instruction for the purpose of contract.

19. Ambiguities resolution:

In case any term or condition in this RFP is found ambiguous & un clear or the RFP is silent on some
terms/conditions which required to incorporated in post tender period such terms or condition shall be
applicable as per the prevailing MNRE/SECI guidelines with mutual consents.

y
op
C
eb
W

Page 43 of 122

Page 44 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

y
SECTION- IV:

SPECIAL TERMS AND CONDITIONS:


op
C
eb
W

Page 44 of 122

Page 45 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

1. GENERATION BY SPD, SHORTFALL/EXCESS IN GENERATION POWER


a) Criteria for generation :-The power producer will declare the CUF of their project at the time
of PPA and will be allowed to revise the same once within first year of COD. The Declared
CUF shall in no case be less than 19% & more than 22% over a year. They shall maintain
generation so as to achieve CUF in the range of +10% of their declared value during PPA
duration. The lower limit will ,however, be relaxed by MAHAGENCO to the extent of grid
non-availability for evacuation which is beyond the control of the Developer.

b) In case the project generates and supplies energy less than the energy corresponding to the
contracted CUF, the SPD will be liable to pay to the Mahagenco, penalty for the shortfall in
availability below contracted CUF level.
c) The amount of such penalty shall be 25% (twenty-five per cent) of the cost of this shortfall in
energy terms, calculated at PPA tariff. However this penalty shall not be applicable in event of
force majeure identified under PPA with successful bidder affecting supply of solar power by
seller/power producer.

y
d) In case the availability is more than the maximum CUF specified, the SPD will be free to sell it
to any other entity provided first right of refusal will vest with the Mahagenco. In case the
Mahagenco purchases the excess generation, the same may be done at 75% (seventy-five per
cent) of the PPA tariff.

op
e) Repowering: The Solar Power Generators will be free to re-power their plants from time to
time during the PPA duration. However, the Procurer will be obliged to buy power only within
the range of CUF (or CEQ, as relevant), specified in the PPA. Any excess generation will be
C
dealt as specified in above clause (d).

2. Synchronizing and commissioning

a) Synchronizing and commissioning of individual project


eb

i. The SPD shall give MAHAGENCO at least thirty (30) days advanced preliminary written notice
and at least fifteen (15) days advanced final written notice, of the date on which it intends to
synchronize the individual Solar Power Plant to the Grid System. For eg. SPD shall give
W

Mahagenco at least thirty (30) days advanced preliminary written notice that it intends to
synchronize 6.00 MW Solar Power Plant at Kathpal, Taluka = Sangola to the Grid System.
ii. Subject to clause no. 2 of Section -IV the individual Solar Power project may be synchronized by
the SPD to the Grid System when it meets all the connection conditions prescribed in applicable
Grid Code then in effect and otherwise meets all other Indian legal requirements for
synchronization to the Grid System.
iii. All the necessary permissions from Electrical Inspector, MEDA, MSETCL, MSEDCL, SLDC
etc., as may be required, shall be taken up by the SPD for the purpose of interconnection of the
individual solar power plant with the grid. Grid connectivity related permits and approvals
required to connect the plant with the proposed substation will be taken by SPD.
iv. The synchronization equipment shall be installed by the SPD at the respective Solar Power Plant
at its own cost. The SPD shall synchronize the Solar Power Plant with the Grid System only after
the approval of synchronization scheme is granted by MAHAGENCO/ the head of the concerned
sub-station/Grid System and checking/verification is made by MAHAGENCO/ the concerned
authorities of the Grid System.

Page 45 of 122

Page 46 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

v. The SPD shall immediately after synchronization/tripping of generator, inform MAHAGENCO/


the sub-station of the Grid System to which the individual Solar Power Plant is electrically
connected in accordance with applicable Grid Code.
b) Trial Run

Trial operation shall commence immediately after the synchronization of the individual Solar Power
Project with the grid before commissioning. During the trial operation and testing, the Solar Power
Plant shall perform trouble free operation cumulative minimum 72 hours during which functionality
of all plant components shall be demonstrated and the system shall be in Generating mode.
c) Pre-Commissioning Tests
The following tests and activities shall be completed by the SPD before the declaration of COD of the
solar power plant:

i. Relay testing
ii. Transformer testing
iii. Line charging

y
iv. Transformer charging

vi Trial Run
op
v. Electrical safety & earthing

There shall be no obligation for Mahagenco to take delivery of solar energy prior to commercial
operation date, except that mahagenco shall take all energy produced during testing of the facility,
C
without payment of any charges

d) Commissioning
eb

On successful completion of trial run and pre-commissioning tests of individual project, the Solar
Power Plant shall be commissioned in accordance with the provisions of this Contract, applicable
rules and regulations, grid code and recommendations of MSETCL/MSEDCL.
3. Commercial Operation Date of the Solar Power Plant
W

(i) Once the commissioning of the individual Solar Power Project is finished satisfactorily in
accordance with the agreed schedule, MAHAGENCO and the SPD will draw up the Commercial
Operation Date of the that particular Solar Power Plant, whose date will determine, amongst other
issues, the beginning of the Guarantee Period for defects.
(ii) The only circumstances or causes for delay of the Commercial Operation Date of the Solar Power
Plant are those specified in this Contract, and only in the case that they are not attributed to the
SPD. Under no circumstances will the exercise by MAHAGENCO of any of the rights established
in the Contract give rise to an extension of the period for the Commercial Operation of the Solar
Power Plant, unless this possibility is considered in this Contract. Similarly, failure to comply by
the SPD of any of the periods set out in the Execution Plan will not in itself give the SPD the right
to request an extension of the term set for the Commercial Operation of the Solar Power Plant.
(iii) Any reference to the Commercial Operation in this Contract will refer to the Commercial
Operation of the Solar Power Plant unless it is indicated to the contrary.

Page 46 of 122

Page 47 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

4. Conditions regarding Commercial Operation

(i) The Commercial Operation of the particular Solar Power Project out of total cumulative capacity of
750MW will occur after to be in line with above clause 2. c) & d) above and entire capacity it is
connected to the corresponding electricity grid and working properly.
(ii) Before the individual Solar Power Project is connected to the grid, the SPD shall inform, at least
thirty (30) Days before the anticipated date in writing to MAHAGENCO, that the
certain amount of contracted capacity Solar Power Plant based on the capacity is ready for the
Commercial Operation, as long as the following conditions are fulfilled:
a) The SPD has finished the construction, supply, erection, installation & interconnections of the
all equipments for that individual solar plant viz. MMS, PV Modules, Inverters, all electrical
installations along with transformers of Solar Power Plant in accordance with this Contract,
and it is free of defects;
b) All the permits, licenses and authorizations for running and maintaining the individual Solar
Power Plant are in order according to the regulations in force.

6. POWER PURCHASE AGREEMENT (PPA)

y
Mahagenco shall enter into Power purchase agreement (PPA) with Bidders selected based on this RfP.

op
A copy of standard Power Purchase Agreement to be executed between Mahagenco and the selected
SPD will be made available on http://sets.mahagenco.in. The PPA shall be signed within 01 month
from the date of issue of Letter of Award (LoA) (for e.g. If the LOA is dated 07-10-2017, then the last
date of signing of PPA shall be 07-11-2017). PPA will be executed between Mahagenco and selected
bidder for each Project separately with the L1 bidder tariff rate discovered through reveres bidding
C
process. The PPAs shall be valid for a period of 25 years as per provisions of PPA.

Before signing of PPA with the selected Bidders, Mahagenco will verify the documents furnished by
eb

the Bidders at the time of submission of response to RFP including the shareholding of the Project
Company along with a copy of complete documentary evidence supported with the original
documents. Bidders will be required to furnish the documentary evidence for meeting the RFP
Qualification Requirement and financial requirements mentioned at Clause 11 A and Clause 11 B
W

respectively. Mahagenco at this stage may also ask the Bidders to furnish the audited balance sheet of
the previous month-end along with complete Bank Statement starting from day 1 of submission of
response to RFP till date along with a copy of the documents submitted.
At the time of signing of PPA. If at this stage it is found that the documents furnished by the Bidders
are false / misleading or misrepresented in any way, then the LoA issued shall be terminated and the
entire EMD and Performance Security shall be forfeited.

7. Change in law:

a) In the event a Change in Law results in any adverse financial loss/ gain to the Solar Power Generator
then, in order to ensure that the Solar Power Generator is placed in the same financial position as it
would have been had it not been for the occurrence of the Change in Law, the Solar Power Generator/
Procurer shall be entitled to compensation by the other party, as the case may be, subject to the
condition that the quantum and mechanism of compensation payment shall be determined and shall be
effective from such date as may be decided by the Appropriate Commission.
b) In these Guidelines, the term Change in Law shall refer to the occurrence of any of the following
events after the last date of the bid submission, including
Page 47 of 122

Page 48 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

(i) the enactment of any new law; or


(ii) an amendment, modification or repeal of an existing law; or
(iii) the requirement to obtain a new consent, permit or license; or
(iv) any modification to the prevailing conditions prescribed for obtaining an consent, permit or
license, not owing to any default of the Solar Power Generator;
(v) any change in the rates of any Taxes which have a direct effect on the Project. However,
Change in Law shall not include any change in taxes on corporate income or any change in
any withholding tax on income or dividends.

y
op
C
eb
W

Page 48 of 122

Page 49 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

SECTION – V:

y
ANNEXURES
op
C
SECTION V: ANNEXURES FOR BID SUBMISSION

The following formats are required to be submitted as part of the Bid. These formats are designed to
eb

demonstrate the SPD's compliance with the Qualification Requirements set forth in Clause 12 of Section I and
other Bid submission requirements specified in the RFP.
W

Page 49 of 122

Page 50 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure - 1
Formats for Eligibility of Offer

(Non-Financial Bid) (The format shall be on the Letter Head of the Bidding Company/ Lead Member of the
Bidding Consortium)
No ........................
To,
The Chief Engineer (SPGD-P.),
Maharashtra State Power Generation Company Ltd.,
"Prakashgad", 3rd Floor, Bandra (East)
Mumbai - 400 051

y
Sub: Offer in response to Notice Inviting Tender No. dated for selection of solar power developer for
development of 750MWAC cumulative capacity grid interactive solar PV power plant to cater the AG

option
Dear Sir, op
feeder load of various substations in Maharashtra with additional capacity of 250MWAC under Green-shoe
C
We, the undersigned [insert name of the 'Bidder'] having read, examined and understood in detail the RFP
and Contract for development of 750MWAC cumulative capacity grid interactive solar PV power plant to
cater the AG feeder load of various substations in Maharashtra with additional capacity of 250MWAC under
eb

Green-shoe option.
We hereby submit our Bid comprising of Financial Bid and Non-Financial Bid. We confirm that neither we nor
any of our Parent Company/ Affiliate/ Ultimate Parent Company has submitted Bid other than this Bid directly
or indirectly in response to the aforesaid RFP.We are submitting application for the development of following
W

solar power projects.

Sr. Location of project (Village ,Taluka ,Districts) Sub-station Details Proposed Capacity in
No MW

Total Capacity

Page 50 of 122

Page 51 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

We give our unconditional acceptance to the RFP, dated XXXXXX and Contract attached thereto, issued by
MAHAGENCO, as amended. In token of our acceptance to the Contract, the same have been initialed by us and
enclosed to the Bid. We shall ensure that SPD shall execute such Contract as per the provisions of the RFP and
provisions of such Contract shall be binding on us.

(Please insert, in Case of Consortium): We are having consortium agreement with


M/s __________________________ (legal name and country of incorporation to be given) who will be jointly
and severally bound with us and be responsible to you for successful performance of the contract. Towards this
we have submitted a deed of joint undertaking. Further, we have also enclosed a copy of the association
agreement (between the Bidder & the consortium associate).

Bid Security
We have enclosed a Bid Security of Rs. _______________ (Insert Amount), in the form of bank guarantee
no. ____________ (Insert number of the bank guarantee) dated ___________ [Insert date of bank

y
guarantee] from ______________________ (Insert name of bank providing Bid Security) and valid up
to _________ . The offered quantum of power by us is MW (Insert total capacity offered)

op
We have submitted our Price Bid strictly on line only, without any deviations, conditions and without
mentioning any assumptions or notes for the Price Bid in the said format.
C
Acceptance
We hereby unconditionally and irrevocably agree and accept that the decision made by MAHAGENCO in
respect of any matter regarding or arising out of the RFP shall be binding on us. We hereby expressly waive any
eb

and all claims in respect of Bid process. We confirm that there are no litigations or disputes against us, which
materially affect our ability to fulfill our obligations with regard to execution of Contract.
CODES AND STANDARDS:
We confirm that all the materials/equipment supplied by us under this bid shall be according to the various
W

codes, standards, acts, laws, rules, etc. as specified in your bid specification and documents.

APPRAISAL OF SITE CONDITION:


We confirm that our representative has visited the project site and we are fully familiar with site conditions.

Familiarity with Relevant Indian Laws & Regulations

We confirm that we have studied the provisions of the relevant Indian laws and regulations as required to enable
us to submit this Bid and execute the Contract, in the event of our selection as Successful Bidder. We further
undertake and agree that all such factors as mentioned in RFP have been fully examined and considered while
submitting the Bid.

Page 51 of 122

Page 52 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Contact Person

Details of the contact person are furnished as under:

Name: Designation: Company : Address : Phone Nos. :

Fax Nos. : E-mail address:

We are enclosing herewith the Bid Security& Non-Financial Bid (Envelope I) and Financial Bid (Envelope II)
containing duly signed formats, each one duly closed separately, in one (1) original + two (2) copies (duly
attested) as desired by you in the RFP for your consideration.

It is confirmed that our Bid is consistent with all the requirements of submission as stated in the RFP and

y
subsequent communications from MAHAGENCO.

op
The information submitted in our Bid is complete, strictly as per the requirements stipulated in the RFP and is
correct to the best of our knowledge and understanding. We would be solely responsible for any errors or
omissions in our Bid.
C
We confirm that all the terms and conditions of our Bid are valid for acceptance for a period of one hundred and
twenty (180) days from the Bid Deadline.
eb

We confirm that no order / ruling has been passed by an Appropriate Commission or a competent court against
us or any of our Affiliates in the preceding one (1) year from the Bid Deadline for breach of any contract related
to design and/or engineering and/or manufacture and/or supply and/or erection and/or testing and/or
commissioning and/or operation & maintenance having duration of contract in excess of one (1) year and that
the Bid Security submitted by us or any of our Affiliates has not been forfeited, either partly or wholly, in any
W

bid process related to Contract involving design and/or engineering and/or manufacture and/or supply and/or
erection and/or testing and/or commissioning and/or operation & maintenance in the preceding one (1) year
from the Bid Deadline to any company/utility in India as per the provisions of clause “Qualifying
Requirement.”

We also declare that our company/all members of the consortium has/have not been included in the list of
sanctions of the Indian Government nor in any other list of sanctions and affirm that our company/all members
of the consortium will immediately inform MAHAGENCO if this situation occur at a later stage.

Thanking you,

We remain,

Page 52 of 122

Page 53 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Yours faithfully,
Name, Designation and Signature of Authorized Person in whose name Power of Attorney / Board Resolution
as per is issued.
Date
Place
Seal of Company

y
op
C
eb
W

Page 53 of 122

Page 54 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure - 2
Format for Power of Attorney
(Non-Financial Bid)
POWER OF ATTORNEY

(To be on non-judicial stamp paper of appropriate value as per Stamp Act relevant to place of execution.
Foreign companies submitting Bids are required to follow the applicable law in their country)

Power of Attorney to be provided by the Bidding Company/ Lead Member in favor of its representative as
evidence of authorized signatory's authority.

Know all men by these presents, We ............................................................................. (name and address of

y
the registered office of the Bidding Company or Lead Member of the Bidding Consortium, as applicable) do

op
hereby constitute, appoint and authorize
Mr./Ms .............................................................................. (name and residential address) who is
presently employed with us and holding the position of ........................................................... as our true and
C
lawful attorney, to do in our name and on our behalf, all such acts, deeds and things necessary in connection
with or incidental to submission of our Bid for development of 750MWAC cumulative capacity grid interactive
solar PV power plant to cater the AG feeder load of various substations in Maharashtra with additional
capacity of 250MWAC under Green-shoe option
eb

Maharashtra in the country of India in response to the RFP dated XXXXXX issued by Maharashtra State
Power Generation Company Limited ("MAHAGENCO" or "MSPGCL"), including signing and submission of
the Bid and all other documents related to the Bid, including but not limited to undertakings, letters,
certificates, acceptances, clarifications, guarantees or any other document which MAHAGENCO may require
W

us to submit. The aforesaid Attorney is further authorized for making representations to MAHAGENCO, and
providing information / responses to MAHAGENCO, representing us in all matters before MAHAGENCO,
and generally dealing with MAHAGENCO in all matters in connection with our Bid till the completion of the
Bidding Process as per the terms of the RFP.

We hereby agree to ratify all acts, deeds and things done by our said attorney pursuant to this Power of
Attorney and that all acts, deeds and things done by our aforesaid attorney shall be binding on us and shall
always be deemed to have been done by us.
All the terms used herein but not defined shall have the meaning ascribed to such terms under the RFP.

Signed by the within named

........................................... [Insert the name of the executant company]

Page 54 of 122

Page 55 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

through the hand of

Mr .................................................................
duly authorized by the Board to issue such Power of Attorney

Dated this ....................................... day of ..............

Signature of Attorney

(Name, designation and address of the Attorney)

Attested

y
(Signature of the executant)
(Name, designation and address of the executant)
op
C
Signature and stamp of Notary of the place of execution
eb

Common seal of........................... has been affixed in my/our presence pursuant to Board of Director's

Resolution dated .........


W

WITNESS

1 .....................................................................................

(Signature)

Name ........................................................

Designation ...........................................

2.
Page 55 of 122

Page 56 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

(Signature)

Name ........................................................

Designation ...........................................

Notes:

The mode of execution of the power of attorney shall be in accordance with the procedure, if any, laid down
by the applicable law and the charter documents of the executant(s) and the same shall be under common seal
of the executant affixed in accordance with the applicable procedure. Further, the person whose signatures are
to be provided on the power of attorney shall be duly authorized by the executant(s) in this regard.

y
The person authorized under this Power of Attorney shall be a person holding the post of Manager or above
designation in the company.

of equivalent position.
op
In case of the Bidding Company/Lead Member being a foreign company, the same shall be signed by a person

In the event, power of attorney has been executed outside India, the same needs to be duly notarized by a
notary public of the jurisdiction where it is executed.
C
eb

Also, wherever required, the executant(s) shall submit for verification the extract of the charter documents and
documents such as a Board resolution / power of attorney, in favor of the person executing this power of
attorney for delegation of power hereunder on behalf of the executant(s).
W

Page 56 of 122

Page 57 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure – 3

Format for Consortium Agreement

(Non-Financial Bid) (To be on non-judicial stamp paper of appropriate value as per Stamp Act relevant to
place of execution, duly signed on each page. Foreign entities submitting Bid are required to follow the
applicable law in their country)

FORM OF CONSORTIUM AGREEMENT BETWEEN


M/S.........................................,
M/S..................................... AND M/S...................................
FOR (……………………………)
AS PER CLAUSE No.12.3 of the RfP

y
op
THIS Consortium Agreement (hereinafter referred to as “Agreement”) executed on this....................... day of
..................Two thousand.................. between M/s......................................................................... a company
incorporated under the laws of ...................................... and having its Registered Office at ................................
(hereinafter called the "Party 1”, which expression shall include its successors, executors and permitted
C
assigns), M/s ...................................................... a company incorporated under the laws of
...................................... and having its Registered Office at ................................ (hereinafter called the "Party
2”, which expression shall include its successors, executors and permitted assigns) and
M/s....................................................... a Company incorporated under the laws of
eb

......................................................... and having its Registered Office at ............................................................


(hereinafter called the "Party 3", which expression shall include its successors, executors and permitted
assigns) (The Bidding Consortium shall list the name, address of its registered office and other details of all the
Consortium Members) for the purpose of submitting the Bid in response to the RFP and in the event of
selection as Successful Bidder to comply with the requirements as specified in the RFP and ensure execution
W

of the RFP Documents as may be required to be entered into with Maharashtra State Power Generation
Company Limited (MAHAGENCO).

Party 1, Party 2, and Party 3 are hereinafter collectively referred to as the “Parties” and individually as a
“Party”.

WHEREAS Maharashtra State Power Generation Company Limited “MAHAGENCO” desires to enter into a
Contract for development of 750MWAC cumulative capacity grid interactive solar PV power plant to cater the
AG feeder load of various substations in Maharashtra with additional capacity of 250MWAC under Green-shoe
option.

WHEREAS, Maharashtra State Power Generation Company Limited “MAHAGENCO” had invited Bids, vide
RFP dated issued to……………. [Insert the name of purchaser of RFP]

AND WHEREAS Clause Qualifying Requirement of the RFP stipulates that the Bidders qualifying on the
strength of a Bidding Consortium shall submit a legally enforceable Consortium Agreement in a format
specified in the RFP, whereby the Consortium Members undertake to be liable for their respective equity
investment commitment for the formation of a Project Company and undertake to submit the Contract
Performance Guarantee as required as per the provisions of the RFP, as specified herein.

Page 57of 194


Page 58 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

NOW THEREFORE, THIS INDENTURE WITNESSTH AS UNDER:

In consideration of the above premises and agreement all the parties in this Consortium do hereby mutually
agree as follows:

In consideration of the selection of the Consortium as the Successful Bidder by MAHAGENCO, we the
Members of the Consortium and Parties to the Consortium Agreement do hereby unequivocally agree that
M/s........................................................... (Insert name of the Lead Member), shall act as the Lead Member as
defined in the RFP for self and agent for and on behalf of ………. (the names of all the other Members of the
Consortium to be filled in here).

The Lead Member is hereby authorized by the Members of Consortium and Parties to the Consortium
Agreement to bind the Consortium and receive instructions for and on behalf of all Members.

The Lead Member shall be liable and responsible for ensuring the individual and collective commitment of
each of the Members of the Consortium in discharging all their respective equity obligations. Each Consortium
Member further undertakes to be individually liable for the performance of its part of the obligations without in
any way limiting the scope of collective liability envisaged in this Agreement.

(Insert as applicable) The Consortium shall be responsible to incorporate a Project Company as a legal entity

y
as per the provisions of the RFP, within fifteen (15) days of issue of LOA provided such a Project Company
has not been incorporated by the Bidder prior to the submission of the Bid.

OR
op
The Consortium has incorporated a Project Company by the name ………..(Insert name of the Project
Company) to undertake the responsibilities and obligations for supply of power as per the provisions of the
C
RFP Documents.

The percentage of equity holding of each Member of the Consortium in the Project Company shall be/is as
follows:
eb

Percentage of equity holding in the Project


Name
Company

Party 1 ….
W

…. ….
Party n ….

Total 100%

[Note: The percentage equity holding for any Consortium Member cannot be zero in the above table. Lead
Member’s percentage equity holding cannot be less than 51% from the Effective Date up to a period of two (2)
years after Scheduled COD or Revised Scheduled COD, as the case may be and the Technical Member’s
percentage equity holding cannot be less than 26% from the Effective Date up to a period of three (3) years
after Scheduled COD or Revised Scheduled COD, as the case may be.]

In case of any breach of any of the equity investment commitment as specified in clause (Insolvency &
Breach of Contract) of section III above by any of the Consortium Members for the formation of the Project
Company, the Lead Member shall be liable to meet the equity obligation.

Except as specified in the Agreement, it is agreed that sharing of responsibilities as aforesaid and equity
investment obligations thereto shall not in any way be a limitation of responsibility of the Lead Member under
Page 58of 194
Page 59 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

these presents.

It is further specifically agreed that the financial liability for equity contribution of Lead Member shall, not be
limited in any way so as to restrict or limit its liabilities. The Lead Member shall be liable irrespective of their
scope of work or financial commitments.

This Consortium Agreement shall be construed and interpreted in accordance with the Laws of India and
courts at Mumbai (Maharashtra) alone shall have the exclusive jurisdiction in all matters relating thereto and
arising there under.

It is hereby agreed that the Lead Member shall furnish the Bid Security, as stipulated in the RFP, on behalf of
the Consortium.

It is hereby agreed that in case of selection of Bidding Consortium as the Successful Bidder, the Parties to this
Consortium Agreement do hereby agree that they shall furnish the Contract Performance Guarantee on behalf
of the SPD in favour of MAHAGENCO, as stipulated in the RFP and Contract. The Lead Member shall be
responsible for ensuring the submission of the CPG on behalf of all the Consortium Members.

It is further expressly agreed that the Consortium Agreement shall be irrevocable and, for the Successful
Bidder, shall remain valid over the term of the Contract, unless expressly agreed to the contrary by

y
MAHAGENCO.

op
The Lead Member is authorized and shall be fully responsible for the accuracy and veracity of the
representations and information submitted by the Consortium Members respectively from time to time in
response to the RFP for the purposes of the Bid.

It is expressly understood and agreed between the Members that the responsibilities and obligations of each of
C
the Members shall be as delineated as annexed hereto as Annexure-I forming integral part of this Agreement. It
is further agreed by the Members that the above sharing of responsibilities and obligations shall not in any way
be a limitation of joint and several responsibilities and liabilities of the Members, with regards to all matters
relating to the supply of power envisaged in the RFP Documents.
eb

It is clearly agreed that the Lead Member shall ensure performance under the agreements and if one or more
Consortium Members fail to perform its /their respective obligations under the agreement(s), the same shall be
deemed to be a default by all the Consortium Members.
W

It is hereby expressly agreed between the Parties to this Consortium Agreement that neither Party shall assign
or delegate its rights, duties or obligations under this Agreement except with prior written consent of
MAHAGENCO.

This Consortium Agreement

has been duly executed and delivered on behalf of each Party hereto and constitutes the legal, valid, binding
and enforceable obligation of each such Party,

sets forth the entire understanding of the Parties hereto with respect to the subject matter hereof;

may not be amended or modified except in writing signed by each of the Parties and with prior written consent
of MAHAGENCO:

IN WITNESS WHEREOF, the Parties to the Consortium Agreement have, through their authorized
representatives, executed these presents and affixed common seals of their respective companies on the Day,
Month and Year first mentioned above.

Common Seal of ................ For and on behalf of

Page 59of 194


Page 60 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM
has been affixed in my/our Consortium Member (party 2)
presence pursuant to the M/s………………………….
Board of Director’s resolution
dated ......................

……………………………….. ………………………………………
(Signature) (Signature of authorized
representative)
Name: …………………........... Name: ………………………..
Designation:………………….. Designation: ……………………..
Place: …………………….
Date: …………………………

y
Witness :
1. …………………………………….

(Signature)

Name ……………………………….
op
C
Designation...........…………………..
eb

2. …………………………………….

(Signature)

Name ……………………………….
W

Designation...........…………………..

Common Seal of ................ For and on behalf of


has been affixed in my/our Consortium Member (Party 3)
presence pursuant to the M/s………………………….
Board of Director’s
resolution dated ......................

………………………………. …………………………………….
(Signature) (Signature of authorized
representative)

Page 60of 194


Page 61 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Name: Name:
Designation: Designation:
Place:
Date:
WITNESS 1
1. …………………………………….
(Signature)
Name ……………………………….
Designation...........…………………..

2. …………………………………….
(Signature)

y
Name ……………………………….
Designation...........…………………..

Attested: op
C
…………………………….
(Signature)
eb

(Notary Public)
Place: ………………………….
Date: …………………………….
W

Note: Each Consortium Member has to provide Power of Attorney for authorization to authorized signatory
and certified true copy of the Board Resolution for issue of Power of Attorney clearly specifying the name of
attorney as well as the executant, affixation of common seal and names of persons attesting the common seal.

Page 61of 194


Page 62 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure – 4
Format for Letter of Consent from Consortium Members

(Non-Financial Bid) (On the letter head of each Member of the Consortium including Lead Member)

Date: _____________________
From: _____________________
_____________________
____________________
Tel.#:
Fax#:

y
E-mail address #:

To,
The Chief Engineer (SPGD- P),
op
C
Maharashtra State Power Generation Company Ltd.,
“Prakashgad”, 3rd Floor, Bandra (East)
eb

Mumbai - 400 051

Sub: Offer in response to Notice Inviting Tender No.___________ dated __________ for selection of solar
power developer for development of 750MWAC cumulative capacity grid interactive solar PV power plant
W

to cater the AG feeder load of various substations in Maharashtra with additional capacity of 250MWAC
under Green-shoe option
We, the undersigned Member of ……… (Insert name of the Bidding Consortium) have read, examined and
understood the RFP and Contract for the selection of Bidder(s) as prospective SPD for development of
750MWAC cumulative capacity grid interactive solar PV power plant to cater the AG feeder load of various
substations in Maharashtra with additional capacity of 250MWAC under Green-shoe option.

We hereby confirm our concurrence with the RFP including in particular the Consortium Agreement and the
Bid submitted by ……. (Insert name of the Lead Member) in response to the RFP. We confirm that the Bid has
been reviewed and each element of the Bid is agreed to including but not limited to the investment
commitment in the Project Company.

The details of contact person are furnished as under:

Name : ……………………………
Designation : ……………………………..

Page 62of 194


Page 63 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Name of the Company : ………………………………..


Address : ……………………………………
Phone Nos. : ………………………………
Fax Nos. : ………………………………….
E-mail address : …………………………………..

Dated the ……. day of ……. of 20…

Thanking you,
Yours faithfully,

………………………………..

y
(Signature, Name, Designation of Authorized Signatory of Consortium Member and Company's Seal)

Business Address:

Name and address of authorized signatory.


op
C
Note:
eb

Each Consortium Member has to provide Power of Attorney for authorization to authorized signatory and
certified true copy of the Board Resolution for issue of Power of Attorney clearly specifying the name of
attorney as well as the executant, affixation of common seal and names of persons attesting the common seal.
The letter of consent provided by Consortium Member(s) will be additionally signed by authorized signatory
W

of the Lead Member.

Page 63of 194


Page 64 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure – 5
Format for Bidder’s Composition and Ownership Structure

(Non-Financial Bid) Description of Bidder


Name of the Bidding Company / Joint Venture
Company
Name of the Lead Consortium Member

In case of Bidding Consortium


Sl..No. Name of the Member Role in the Bidding
Company Consortium
1

y
2
3

op
Type of Technology to be used in the bidding: ………………………………
C
Capacity Offered: ………………………….

(Please provide the following information for Bidder. If the Bidder is a Consortium, please provide this
eb

information for each Member including Lead Member)

Corporate Details:
W

Please provide the following information for the Bidder.

Company’s Name, Address, Nationality and Director’s details:


Name: __________________________________
Registered/Principal Address: _____________________
__________________________________
__________________________________
Website Address: _________________________________
Corporate Identification Number, if any: __________________
Country of Origin: __________________________________
Address for Correspondence: ……………………………
……………………………
……………………………

Page 64of 194


Page 65 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Year of Incorporation: _____________________


Company's Business Activities:

Name of the authorized representative:


Telephone Number: _________________________________
Email Address: _________________________________
Telefax Number: _________________________________
Status as a Bidder:
Bidding Company
Lead Member of the Bidding Consortium
Member of the Bidding Consortium
Note: (tick the applicable serial number)

y
Company's Local Address in India (if incorporated outside India):
__________________________________
__________________________________
__________________________________
Please provide the following documents:
op
C
Copy of the Memorandum and Articles of Association and certificate of incorporation or other equivalent
organizational document (as applicable in the case of a foreign company), including their amendments,
certified by the company secretary of the Bidding Company / each Member of the Consortium (as Attachment)
eb

Authority letter in favour of Maharashtra State Power Generation Company Limited from the Bidding
Company/each Member of the Consortium (as specified in Format ) authorizing Authorized Representative to
seek reference from their respective bankers, lenders, financing institutions and any other person as given
below in the Format for Authorization of the RFP.
W

(Insert this point in case of Bidder being a Bidding Company) Whether the Bidder wishes to form a Project
Company for execution of the contract …………… (Yes/No)

(Insert this point in case of Bidder being a Bidding Company) Whether the Bidder has already formed a
Project Company:……………………(Yes/No)

If Yes, the details of the Project Company as follows:


Name of the Project Company …………………..
Name of the Equity Holder ……………………
Type and No. of Shares owned ……………………
% of equity holding …………………….
Extent of voting control(%) ……………………..
Date of incorporation ……………………

Page 65of 194


Page 66 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM
Details of Ownership Structure:
Details of persons owning 10% or more of the total paid up equity of the Bidding Company / each Member of
the Consortium.
Name of the Bidding Company/ Member of the Consortium …………….
Status of equity as on ………………………
Name of Equity Holder Type and Number of % of Equity Holding Extent of Voting Control
shares owned (%)

1.
2.

3.

Notes:
Status of equity holding shall be provided not earlier than 30 (thirty) days prior to Bid Deadline.

y
The above table is to be filled in separately for each Consortium Member if applicable.

op
Documents submitted in support of establishing the relationship with the Parent Company / Affiliate with the
Bidding Company or with the Member of the Bidding Consortium (including Lead Member) in terms of the
provisions of Qualifying Requirements of this RFP:
C
1. ………………………
2. ……………………….
3. ………………………..
eb

4. …………………………
W

For and on behalf of Bidding Company/ Member of the Consortium


M/s………………………………………………….
……………………………………………
(Signature of authorized representative)
Name:…………………………….
Designation:…………………………….
Stamp:…………………………….
Date:…………………….
Place: ……………………………….

Note:

Page 66of 194


Page 67 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Each Consortium Member has to provide Power of Attorney as per format given for authorization to
authorized signatory and certified true copy of the Board Resolution for issue of Power of Attorney clearly
specifying the name of attorney as well as the executant, affixation of common seal and names of persons
attesting the common seal.
The letter of consent provided by Consortium Member(s) will be additionally signed by authorized signatory
of the Lead Member.

y
op
C
eb
W

Page 67of 194


Page 68 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure – 6
FORMAT FOR AUTHORISATION

(On Non – judicial stamp paper duly attested by Notary Public)

(In case of Bidding Consortium to be given separately by each Member)

The undersigned hereby authorize(s) and request(s) all our Bankers, a list of which is attached herewith as
Annexure 2 hereto, including its subsidiaries and branches, any person, firm, corporation or authority to
furnish pertinent information deemed necessary and requested by Maharashtra State Power Generation
Company Limited to verify the authenticity of the documents / information submitted by us for meeting the
Qualification Requirements in respect of our Bid for selection of solar power developer for development of
750MWAC cumulative capacity grid interactive solar PV power plant to cater the AG feeder load of various
substations in Maharashtra with additional capacity of 250MWAC under Green-shoe option

y
For and on behalf of M/s……………. (Insert Name of Bidding Company or Member of the Consortium)

………………………………………..
op
Signature and Name of the authorized representative of the Company
C
Company rubber stamp/seal
eb

…………………………………
(Signature of Notary Public)
W

(Name and Address of the Attorney)


Place:…………
Date:………….
(This Annexure- is integral part of this format)

Note:

Each Consortium Member has to provide Power of Attorney for authorization to authorized signatory and
certified true copy of the Board Resolution for issue of Power of Attorney clearly specifying the name of
attorney as well as the executant, affixation of common seal and names of persons attesting the common seal.

The letter of consent provided by Consortium Member(s) will be additionally signed by authorized signatory
of the Lead Member.

Page 68of 194


Page 69 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure – 7
FORMAT FOR QUALIFICATION REQUIREMENT

(Non-Financial Bid)
(This format shall be on the Letter Head of the Bidding Company/ Lead Member of the Bidding Consortium)

To,
The Chief Engineer(SPGD-P),
Maharashtra State Power Generation Company Ltd.,
“Prakashgad”, 3rd Floor, Bandra (East)

y
Mumbai - 400 051

Dear Sir,
op
C
Sub: Bid for selection of solar power developer for development of 750MWAC cumulative capacity grid
interactive solar PV power plant to cater the AG feeder load of various substations in Maharashtra with
additional capacity of 250MWAC under Green-shoe option
eb

We hereby submit following details/documents in support of meeting the Qualification Requirements of this
RFP. The details are summarized in the format attached:

We the undersigned Bidder, having read and examined in details the Technical Specification for selection of
W

solar power developer for development of 750MW AC cumulative capacity grid interactive solar PV power
plant to cater the AG feeder load of various substations in Maharashtra with additional capacity of 250MWAC
under Green-shoe option. Technical Specification for Array Yard, Power Control Unit, Switchyard for Control
Room and Main Control Room, Comprehensive Operation and Maintenance, Quality Assurance, Quality
Control Inspection and Testing and General Condition and are hereby submitting our offer to execute the
contract as per specification as set forth in your RFP Documents. In this connection, we enclose a technical
report (As per Annexure attached to this format) for your kind perusal.

Yours faithfully

(Signature and stamp (on each page) of Managing Director /Chief Executive Officer /Manager [refer Notes
1and 2 below] of Bidding Company/ Member of Consortium)
Name:
Date:
Place:
Please also affix common seal of Bidding Company/ Member in a Bidding Consortium
Page 69of 194
Page 70 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Common Seal of ................has been affixed in my/our presence pursuant to the Board of Director’s
resolution dated ......................

………………………………………….
(Signature)
Name:
Designation:

WITNESS:

1. ……………………………………………….
(Signature)

y
Name ………………………………….
Designation...........…………………..

Date:
op
C
2. ……………………………………………….
eb

(Signature)

Name ………………………………….
W

Designation...........…………………..
Date:

Notes:
Managing Director/ Chief Executive Officer, being a full time director on the Board of the Bidding Company/
Member in case of a Consortium.

In case of Manager, the Company shall confirm through a copy of Board Resolution attested by Company
Secretary that the concerned person is appointed as Manager as appointed under Section 269 of the Companies
Act, for the purpose in question. The Company Secretary shall also certify that the Company does not have a
Managing Director or Chief Executive Officer. In case of the Bidding Company/Member being a foreign
company, the same shall be signed by a person of equivalent position.

Page 70of 194


Page 71 of 122
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure – 8
FORMAT OF UNDERTAKING

(Non-Financial Bid) Bidder’s undertaking


[On the Letter Head of the Bidding Company/Lead Member of Bidding Consortium]
To,

The Chief Engineer (SPGD-P),


Maharashtra State Power Generation Company Ltd.,
“Prakashgad”, 3rd Floor, Bandra (East)
Mumbai - 400 051

y
Dear Sir,

op
Sub: Bidders’ Undertakings for selection of solar power developer for development of 750MWAC
cumulative capacity grid interactive solar PV power plant to cater the AG feeder load of various
substations in Maharashtra with additional capacity of 250MWAC under Green-shoe option.
C
“We have carefully read and examined in detail the RFP, including in particular, regarding
submission of an undertaking, as per the prescribed Format.

We give our unconditional acceptance to the RFP and Contract issued by MAHAGENCO as a part of
eb

the RFP, and as amended. We shall ensure that the SPD shall execute such RFP Documents as per the
provisions of the RFP.

We have submitted our Financial Bid(s) strictly online only, without any deviations, conditions and
without mentioning any assumptions or notes for the Financial Bid in the said format.
W

We have submitted the Bid on the terms and conditions contained in the RFP.

Our Bid (including Financial Bid) is valid up to the period required under this RFP.

Our Bid (including Financial Bid) has been duly signed by authorized signatory and closed in the
manner and to the extent indicated in the RFP and the Power of Attorney/ Board Resolution in
requisite format as per RFP has been enclosed in original with this undertaking.

(Insert in case of incorporation of Project Company by the Bidding Company/Bidding Consortium)


We undertake that if we are selected as the Successful Bidder we shall transfer all Consents,
Clearances and Permits in the name of the Project Company within the period specified in the
Contract, if such Consents, Clearances and Permits have been obtained in the name of a company
other than the Project Company prior to the submission of our Bid.

(Insert in case of incorporation of Project Company by the Bidding Company/Bidding Consortium)


We have also noted the amount of the equity investment required to be made in the Project Company

Page 71 of 122

Page 72 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

by “us” (in case of Bidding Company)/ “each Member of Consortium” (in case of Bidding
Consortium) to be incorporated to undertake the obligations under the Contract for selection of solar
power developer for development of 750MWAC cumulative capacity grid interactive solar PV power
plant to cater the AG feeder load of various substations in Maharashtra with additional capacity of
250MWAC under Green-shoe option.

(Insert in case of incorporation of Project Company by Bidding Consortium, repeat this para for each
member of consortium) In view of the above, we hereby undertake to you and confirm that in the
event of failure of ………………….( Insert name of Member of the Consortium) to invest in full or in
part, in the equity share capital of the Project Company as specified in the Bid, we shall invest the said
amount not invested by ……………………. (Insert name of Member of the Consortium).]”).

(Insert in case of incorporation of Project Company by the Bidding Company/Bidding Consortium) In


view of the above, we hereby undertake to you and confirm that we will invest in the equity share
capital of the Project Company as specified in the Bid.

(Insert in case of incorporation of Project Company by Bidding Consortium) In view of the above, we

y
hereby undertake to you and confirm that we will invest in the equity share capital of the Project
Company as specified in the Bid and Consortium Agreement.

op
We have assumed that if we are selected as the Successful Bidder, the provisions of the Consortium
Agreement submitted along with the Bid, to the extent and only in relation to equity lock in and our
liability thereof shall get modified to give effect to the provisions of the RFP and Contract.
C
(Applicable only in case of a Bidding Consortium)

We confirm that our Bid meets the following conditions:


eb

The Scheduled COD is not later than the date specified in the RFP, subject to the provisions of the
Contract.
Financial Bid(s) is/are in the prescribed Format, and is submitted duly signed by the authorized
W

signatory
Financial Bid(s) is/are unconditional

We confirm that we comply with all the technical specifications and terms and conditions included in
the RFP and RFP Documents.

We have neither made any statement nor provided any information in this Bid, which to the best of
our knowledge is materially inaccurate or misleading. Further, all the confirmations, declarations and
representations made in our Bid are true and accurate. In case this is found to be incorrect after our
selection as Successful Bidder, we agree that the same would be treated as a Solar Power Company’s
event of default under Contract, and consequent provisions of Contract shall apply.

We have also noted the amount of the Contract Performance Guarantee required to be submitted as
per the RFP by the us for selection of solar power developer for development of 750MW AC
Page 72 of 122
Page 73 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

cumulative capacity grid interactive solar PV power plant to cater the AG feeder load of various
substations in Maharashtra with additional capacity of 250MWAC under Green-shoe option in the
event of it being selected as the Successful Bidder”.

We have attached hereto certified true copy of the Board Resolution whereby the Board of Directors
of our Company has approved issue of this Undertaking by the Company.

All the terms used herein but not defined, shall have the meaning as ascribed to the said terms under
the RFP.

In view of the above, we hereby undertake to you and confirm that we will submit the Contract
Performance Guarantee in full at any stage, as specified in the RFP.

(Note: Insert the following para in case of the Bidding Company/ Lead Member of Consortium is
same as Financially Evaluated Entity/Technically Evaluated Entity)

y
op
We confirm that we are using our own technical and/or financial (Select technical for technically
evaluated entity/ financial for financially evaluated entity/ or both) capability for meeting the
Qualification Requirements as specified in Clause 11.0 of the RFP…………………………………..
Signature and name of authorized signatory in whose name Power of Attorney/ Board Resolution as
C
per Q.R. is issued.
Original Power of Attorney/ Board Resolution as per RFP is enclosed.
Rubber stamp of the Bidder to be affixed.
eb
W

Page 73 of 122

Page 74 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure – 9

UNDERTAKING FROM THE FINANCIALLY EVALUATED ENTITY AND/ OR


ENTITY OR ITS PARENT COMPANY/ ULTIMATE PARENT COMPANY (ON THE
LETTER HEAD OF THE FINANCIALLY EVALUATED ENTITY OR ITS PARENT
COMPANY/ ULTIMATE PARENT COMPANY)

Name:
Full Address:
Telephone No.:
E-mail address:
Fax / No.:

y
op
To,
The Chief Engineer (SPGD-P),
Maharashtra State Power Generation Company Ltd.,
C
“Prakashgad”, 3rd Floor, Bandra (East)
Mumbai - 400 051
eb

Dear Sir,

We refer to the Request for Proposal dated XXXXXX issued by you for selection of solar power
W

developer for development of 750MWAC cumulative capacity grid interactive solar PV power plant to
cater the AG feeder load of various substations in Maharashtra with additional capacity of 250MW AC
under Green-shoe option.

“We have carefully read and examined in detail the RFP, including in particular, Q.R. of the RFP,
regarding submission of an undertaking, as per the prescribed Format.

We have attached hereto certified true copy of the Board Resolution whereby the Board of Directors
of our Company has approved issue of this Undertaking by the Company.

All the terms used herein but not defined, shall have the meaning as ascribed to the said terms under
the RFP.

(Note: Insert the following para in case of the Bidding Company/ Lead Member of Consortium is not
same as Financially Evaluated Entity/Technically Evaluated Entity)

Page 74 of 122
Page 75 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

We have also noted the amount of the Contract Performance Guarantee required to be submitted as
per Clause of the RFP by the ……………………………….. (Insert the name of the Bidding
Company) for selection of solar power developer for development of 750MWAC cumulative capacity
grid interactive solar PV power plant to cater the AG feeder load of various substations in
Maharashtra with additional capacity of 250MWAC under Green-shoe option”.

In view of the above, we hereby undertake to you and confirm that in the event of failure of
……………………. (Insert name of the Bidding Company) to submit the Contract Performance
Guarantee in full or in part at any stage, as specified in the RFP, we shall submit the Contract
Performance Guarantee for the amount not submitted by ……………………. (Insert name of the
Bidding Company]”.))

We confirm that M/s. ………. (Insert name of Bidding Company) has been authorized by us to use
our technical/financial (Select technical for technically evaluated entity/ financial for financially
evaluated entity) capability for meeting the Qualification Requirements as specified in the RFP
referred to above.

[Note: Insert the following para in case of a Bidding Consortium OR a Bidding Company opting to
invest through a Project Company]

y
We have also noted the amount of the equity investment required to be made in the Project Company

op
by the ………………………………... (Insert the name of the Bidding Company/Consortium
Member) to be incorporated to undertake the obligations under the Contract for selection of solar
power developer for development of 750MWAC cumulative capacity grid interactive solar PV power
plant to cater the AG feeder load of various substations in Maharashtra with additional capacity of
250MWAC under Green-shoe option.
C
In view of the above, we hereby undertake to you and confirm that in the event of failure of
……………………. (Insert name of the Bidding Company/Member of the Consortium) to invest in
full or in part, in the equity share capital of the Project Company as specified in the Bid, we shall
eb

invest the said amount not invested by ……………………. (Insert name of the Bidding
Company/Member of the Consortium).]”).
W

……………………………………..

Signature and name of authorized signatory in whose name Power of Attorney/ Board Resolution is
issued

Rubber stamp of the Bidder to be affixed.

WITNESS

1. ……………………………………………….
(Signature)
Name ………………………………….
Page 75 of 122

Page 76 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Designation...........…………………..

2. ……………………………………………….
(Signature)
Name ………………………………….
Designation...........…………………..

Note:
Each entity (Parent/Affiliate/Consortium Member) has to provide Power of Attorney for authorization
to authorized signatory and certified true copy of the Board Resolution for issue of Power of Attorney
clearly specifying the name of attorney as well as the executant, affixation of common seal and names
of persons attesting the common seal.
The letter of consent provided by Consortium Member(s) will be additionally signed by authorized

y
signatory of the Lead Member.

op
C
eb
W

Page 76 of 122
Page 77 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure – 10
FORMAT FOR BOARD RESOLUTION
(Non-Financial Bid)

Not required as Incorporation Certificate of Companies will be attached

(Format for the Board resolution to be passed by each Financially Evaluated Entity and Technically
Evaluated Entity/ its Parent Company /Ultimate Parent Company)

The Board, after discussion, at the duly convened Meeting on ………… (Insert date), with the
consent of all the Directors present and in compliance of the provisions of the Companies Act, 1956,
passed the following Resolution:

RESOLVED THAT pursuant to the provisions of the Companies Act, 1956 and compliance thereof
and as permitted under the Memorandum and Articles of Association of the company, approval of the
Board be and is hereby accorded for issuing an Undertaking to MAHAGENCO, in the format
specified in the RFP, draft of which is attached hereto and initialled by the Chairman whereby the

y
company undertakes to provide the ________ percent (___ %) [Insert 100% in case of Bidding
Company and percent of equity investment in the Project Company in case of Member of

op
Consortium] of the Contract Performance Guarantee, as per the terms and conditions of the RFP,
representing the total amount of Contract Performance Guarantee required to be provided by the
________ (Insert the name of the Bidding Company / Consortium Member), in case of failure of the
________ (Insert the name of the Bidding Company / Consortium Member) to provide such Contract
Performance Guarantee.
C
[Note: Insert the following para in case of a Bidding Company opting to invest through a Project
Company or a Consortium]
eb

FURTHER RESOLVED THAT pursuant to the provisions of the Companies Act, 1956 and
compliance thereof and as permitted under the Memorandum and Articles of Association of the
company, approval of the Board be and is hereby accorded for issuing an undertaking to
MAHAGENCO whereby the company undertakes to invest equity in the Project Company to the
extent of _____ percent (__ %), as per the terms and conditions of the RFP, representing the amount
W

of equity required to be provided by _______ (Insert the name of the Bidding Company / Consortium
Member), in case of failure of ________ (Insert the name of the Bidding Company / Consortium
Member) to invest such equity.

FURTHER RESOLVED THAT Mr. /Ms. ___________, be and is hereby authorized to take all the
steps required to be taken by the Company for submission of Bid, including in particular, signing the
Bid, making changes thereto and submitting amended Bid, all the documents related to the Bid,
certified copy of this Board resolution or letter or undertakings etc., required to be submitted to
MAHAGENCO as part of the Bid or such other documents as may be necessary in this regard.

[Note: In the event the Bidder is a Bidding Consortium, the following Board resolution no. 4 also
needs to be passed by the Lead Member and Technical Member of the Bidding Consortium]

FURTHER RESOLVED THAT approval of the Board be and is hereby accorded to contribute such
additional amount over and above the percentage limit (specified for the Lead Member in the
Consortium Agreement) to the extent becoming necessary towards the total equity share in the Project
Company, obligatory on the part of the Consortium pursuant to the terms and conditions contained in
Page 77 of 122

Page 78 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

the Consortium Agreement dated ________ executed by the Consortium as per the provisions of the
RFP.

[Note: The following resolution no. 5 is to be provided by the Bidding Company /Lead Member and
Technical Member of the Consortium only]

FURTHER RESOLVED THAT Mr. /Ms. ___________, be and is hereby authorized to take all the
steps required to be taken by the Company for submission of Bid, including in particular, signing the
Bid, making changes thereto and submitting amended Bid, all the documents related to the Bid,
certified copy of this Board resolution or letter or undertakings etc., required to be submitted to
MAHAGENCO as part of the Bid or such other documents as may be necessary in this regard.

Certified True Copy

Signature and stamp of Company Secretary / Managing Director of Financially Evaluated Entity/
Technically Evaluated Entity/ its Parent Company /Ultimate Parent Company

Notes:

This certified true copy shall be submitted on the letterhead of the Company, signed by the Company

y
Secretary / Managing Director of the Financially Evaluated Entity/ its Parent Company /Ultimate
Parent Company.

resolution.
op
The contents of the format may be suitably re-worded indicating the identity of the entity passing the

In case of the Board resolution being provided by a company incorporated in India, the Board
C
resolution needs to be notarized by a notified notary. In the event the Board resolution is from a
company incorporated outside India, the same needs to be duly notarized in its jurisdiction.

The paragraphs related to issue of Power of Attorney clearly mentioning the name of Attorney and
Executant shall also be inserted as applicable by the Bidder. Also, the paragraphs related to affixation
eb

of Common Seal of the company along with the attestation of the same by the desired persons as per
the Memorandum and Articles of Association of the company for the purpose of this bid clearly
mentioning the name of these desired persons shall also be inserted as applicable by the Bidder.
W

This format may be modified only to the limited extent required to comply with the local regulations
and laws applicable to a foreign entity submitting this resolution. For example, reference to
Companies Act 1956 may be suitably modified to refer to the law applicable to the entity submitting
the resolution. However, in such case, the foreign entity shall submit an unqualified opinion issued by
the legal counsel of such foreign entity, stating that the Board resolutions are in compliance with the
applicable laws of the respective jurisdictions of the issuing company and the authorizations granted
therein are true and valid.

Page 78 of 122
Page 79 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure – 11

BID SECURITY AGAINST BID

FORMAT OF THE UNCONDITIONAL AND IRREVOCABLE BANK


GUARANTEE FOR BID SECURITY
(To be on non-judicial stamp paper of value Rs 500/- (Rs. Five Hundred only) as per Stamp Act
relevant to place of execution. Foreign entities submitting Bids are required to follow the applicable
law in their country.)

In consideration of the (Insert name of the Bidder) submitting the Bid inter alia for selection of solar
power developer for development of 750MWAC cumulative capacity grid interactive solar PV power
plant to cater the AG feeder load of various substations in Maharashtra with additional capacity of
250MWAC under Green-shoe option in response to the RFP dated XXXXXX issued by Maharashtra
State Power Generation Company Limited(hereinafter referred to as MAHAGENCO) and such

y
MAHAGENCO agreeing to consider the Bid of [Insert the name of the Bidder] as per the terms

of the RFP, the (Insert name and address of the bank issuing the Bid Security, and

op
address of the head office) (here in after referred to as “Guarantor Bank”) hereby agrees
unequivocally, irrevocably and unconditionally to pay to MAHAGENCO at Mumbai
(Maharashtra)forthwith on demand in writing from MAHAGENCO or any representative authorized
C
by it in this behalf an amount not exceeding Rupees (Rs ) only [Insert amount not less than Rs three
crores],

on behalf of M/s. .[Insert name of the Bidder].


eb

This guarantee shall be valid and binding on the Guarantor Bank up to and including XXXXX (Date
of validity of Bid Security in accordance with Clause of this RFP) and shall not be terminable by
notice or any change in the constitution of the Guarantor Bank or by any other reasons whatsoever
and our liability hereunder shall not be impaired or discharged by any extension of time or variations
W

or alternations made, given, or agreed with or without our knowledge or consent, by or between
concerned parties.

Our liability under this Guarantee is restricted to Rupees . (Rs ) only.

Our Guarantee shall remain in force until XXXXX or its authorized representative shall be entitled to
invoke this Guarantee until XXXXX.

The Guarantor Bank hereby expressly agrees that it shall not require any proof in addition to the
written demand from MAHAGENCO or its authorized representative, made in any format, raised at
the above mentioned address of the Guarantor Bank, in order to make the said payment to
MAHAGENCO or its authorized representative.

The Guarantor Bank shall make payment hereunder on first demand without restriction or conditions
and notwithstanding any objection, disputes, or disparities raised by the Bidder or any other person.
The Guarantor Bank shall not require MAHAGENCO or its authorized representative to justify the
invocation of this BANK GUARANTEE, nor shall the Guarantor Bank have any recourse against
MAHAGENCO or its authorized representative in respect of any payment made hereunder.
Page 79 of 122

Page 80 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

This BANK GUARANTEE shall be interpreted in accordance with the laws of India and the courts at
Mumbai (Maharashtra) shall have exclusive jurisdiction. This BANK GUARANTEE is payable in
currency of India and payable at Mumbai.

The Guarantor Bank represents that this BANK GUARANTEE has been established in such form and

with such content that it is fully enforceable in accordance with its terms as against the Guarantor
Bank in the manner provided herein .

This BANK GUARANTEE shall not be affected in any manner by reason of merger, amalgamation,
restructuring, liquidation, winding up, dissolution or any other change in the constitution of the
Guarantor Bank.

This BANK GUARANTEE shall be a primary obligation of the Guarantor Bank and accordingly,
MAHAGENCO or its authorized representative shall not be obliged before enforcing this BANK
GUARANTEE to take any action in any court or arbitral proceedings against the Bidder, to make any
claim against or any demand on the Bidder or to give any notice to the Bidder to enforce any security
held by MAHAGENCO or its authorized representative or to exercise, levy or enforce any distress,
diligence or other process against the Bidder.

y
The Guarantor Bank acknowledges that this BANK GUARANTEE is not personal to MAHAGENCO
and may be assigned, in whole or in part, (whether absolutely or by way of security) by

Documents if required under pre-intimation to the Bank Concern.

op
MAHAGENCO to any entity to whom it is entitled to assign its rights and obligations under the RFP

The Guarantor Bank hereby agrees and acknowledges that MAHAGENCO shall have a right to
invoke this Bank Guarantee either in part or in full, as it may deem fit.
C
Notwithstanding anything contained hereinabove, our liability under this Guarantee is restricted to Rs
(Rs only) and it shall remain in force until XXXXX, with an additional claim period of thirty (30)
days thereafter. We are liable to pay the guaranteed amount or any part thereof under this BANK
eb

GUARANTEE only if MAHAGENCO or its authorized representative serves upon us a written claim
or demand.

In witness whereof the Bank, through its authorized officer, has set its hand and stamp on this
. day of at
W

Witness:
Signature
Signature
Name and address. Name:
1 ....................................................... Designation with Bank Stamp
Signature
Name and address

Attorney as per power of attorney No. ...........................


For:
................................................................. [Insert Name of the Bank]
Banker’s Stamp and Full Address:
Page 80 of 122
Page 81 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Dated this .......................... day of ................... 20.....


Note: The Stamp Paper shall be in the name of the Executing Bank.
Dated this day of 20.....

Note: The Stamp Paper shall be in the name of the Executing Bank.

y
op
C
eb
W

Page 81 of 122

Page 82 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure – 12
(Non-Financial Bid) FORMAT FOR DISCLOSURE
(ON THE LETTER HEAD OF BIDDING COMPANY / EACH MEMBER IN A
BIDDING CONSORTIUM)
Disclosure
To:
The Chief Engineer (SPGD-P.),
Maharashtra State Power Generation Company Ltd.,
“Prakashgad”, 3rd Floor, Bandra (East)
Mumbai - 400 051

Sub: Bidders’ Disclosure for selection of solar power developer for development of 750MWAC
cumulative capacity grid interactive solar PV power plant to cater the AG feeder load of various
substations in Maharashtra with additional capacity of 250MWAC under Green-shoe option in

y
response to the RFP dated XXXXXXX

Sl. No. Name of the Company


op
We hereby declare that the following companies with which we have direct or indirect relationship are
also separately participating in this Bidding Process as per following details
Relationship
C
eb

Further we confirm that we don’t have any Conflict of Interest with any other Bidder participating in
this bid process.
W

……………………….

Signature of Authorized Signatory

Notes:

In case there is no such company please fill in the column “Name of the Company” as Nil and under
column of Relationship as “Not Applicable”.

Each entity has to provide Power of Attorney for authorization to authorized signatory and certified
true copy of the Board Resolution for issue of Power of Attorney clearly specifying the name of
attorney as well as the executant, affixation of common seal and names of persons attesting the
common seal.

The letter of consent provided by Consortium Member(s) will be additionally signed by authorized
signatory of the Lead Member.

Page 82 of 122
Page 83 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure – 13
FORMAT FOR CERTIFICATION OF RELATIONSHIP

(Non-Financial Bid) (Relationship of Parent Company or Affiliate with the Bidding Company or with
the Member of the Bidding Consortium, including the Lead Member.)

To,
The Dy. Chief Engineer (SPGD-P ),
Maharashtra State Power Generation Company Ltd.,
“Prakashgad”, 3rd Floor, Bandra (East)

y
Mumbai - 400 051

Dear Sir,
op
C
Sub: Bid for selection of solar power developer for development of 750MWAC cumulative capacity
grid interactive solar PV power plant to cater the AG feeder load of various substations in
Maharashtra with additional capacity of 250MWAC under Green-shoe option in response to the RFP
eb

We hereby certify that M/s…………….., M/s……………. ,M/s ………… are the Affiliate(s) / Parent
Company of the Bidding Company/Member of the Bidding Consortium as per the definition of
Affiliate/Parent Company as provided in this RFP and based on details of equity holding as on seven
(7) days prior to the Bid Deadline.
W

The details of equity holding of the Bidding Company/Member of the Consortium in the
Affiliate/Parent Company or vice versa as on seven (7) days prior to the Bid Deadline are given as
below:
Name of Bidding Name of the Affiliate Name of the Parent Name of the company having
Company / Member of the Bidding Company of the common control on the
of Bidding Company / Member Bidding Company / Affiliate and the Bidding
Consortium of the Bidding Member of Bidding Company / Member of
Consortium* Consortium Bidding Consortium

Page 83 of 122

Page 84 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

* Bidding Company / Member of Bidding Consortium to hold at least twenty six percent (26%) in
such Affiliate as on seven (7) days prior to Bid Deadline
…………….
(Insert Name and Signature of Statutory Auditor of the Bidder or practicing Company Secretary)

y
op
C
eb
W

Page 84 of 122
Page 85 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure – 14
FORMAT OF CHECKLIST FOR SUBMISSION OF BID

(Non-Financial Bid)

Submission of Bid requirements Response


(Yes/No)
Covering Letter as per Format

Original Power of Attorney as per Format

y
Consortium Agreement as per Format (if Bid is submitted by a Bidding Consortium)

op
Letter of consent from Consortium Members as per Format (if Bid is submitted by a
Bidding Consortium)
C
Bidder’s composition and ownership structure as per Format
eb

Details of meeting Qualification Requirement. as per Format

Documentary evidence for meeting the Qualification Requirement as per Format


W

Bidder’s Undertaking as per Format

Undertaking from the Financially Evaluated Entity or its Parent Company/ Ultimate
Parent Company as per Format

Applicable Board Resolutions as per Format

Bid Security as per Format

Disclosure as per Format

Page 85 of 122

Page 86 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Certificate of relationship of Parent Company or Affiliate with the Bidding Company or


with the Member of the Bidding Consortium, including the Lead Member as per Format;

Checklist of submission of Bid as per this Format

Last 3 financial years’ unconsolidated/consolidated audited annual accounts of the


Bidder/ each Member (or Financially Evaluated Entity, if different from the Bidder/ each
Member) duly certified by the Statutory Auditor.

Authority letter in favour of Maharashtra State Power Generation Company Limited


“MAHAGENCO” from the Bidder MAHAGENCO to seek reference from their
respective bankers & others.

y
Submission of Technical documents and certificates as given in the table below

op
Initialling of all pages of Bid by authorized signatory.
C
Copy of this RFP and RFP Documents duly initiated by authorized signatory.
eb

Signature of authorized signatory in whose name Power of Attorney as per RFP is issued:
Name and designation of authorized signatory: ………………..
W

Place: ………………..
Date: …………………

Page 86 of 122
Page 87 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure – 15
PROFORMA FOR CONTRACT PERFORMANCE SECURITY

(To be submitted by Bidder on a Non-Judicial Stamp Paper of value Rs. 500/-)

Bank Guarantee No .................... & Date .......... . Issue date:


(For Rs .................... ) Expiry date:
Claim period:
Name & Address of the Bank.

To,

Maharashtra State Power Generation Co.


Ltd., „Prakashgad , 3rd floor, Bandra

y
(East), MUMBAI -400 051

op
Whereas M/s. .........................................(Hereinafter called the SPDs) have entered into a contract
with the Maharashtra State Power Generation Co. Ltd. (hereinafter called the MAHAGENCO),
vide Letter of Award No. .................................................Dated ............ of the MAH AGENCO, for the supply
C
and installation of equipment for the order value of Rs. ............................... or equivalent foreign
currency.

1 And whereas under the terms of the said Letter of Award, the SPD is to furnish MAHAGENCO
eb

with a Bank Guarantee for an amount of ............. of the value of contract due performance of the
Contract and fulfilment of the terms thereof, we ............................................. (Name of the Bank)
............................ (Hereinafter referred to as the B ank) do hereb y undertake to pay to the
W

MAHAGENCO an amount not exceeding Rs ............................... against any loss or damage caused to
or suffered or would be caused to or suffered by the MAHAGENCO by reason of any breach by
the said SPD (s) of any of the terms or conditions contained in the said contract.

2 W e ........ (Name of the Bank) ................ do hereby undertake to pay the amounts due and payable
under this Guarantee without any demur, merely on a demand from the MAHAGENCO
stating that the amount claimed is due by way of loss or damage caused to or would be
caused to or suffered b y the MAH AGENCO by reason of any breach by the same SP D(s)
of any of the terms or conditions contained in the said contract or by reason of th e
SPD's failure to perform the said contract. Any such demand made on the Bank shall be
conclusive as regards the amount due and payable by the Bank under this guarantee.
However, our liability under this g u a r a n t e e s h a l l b e r e s t r i ct e d t o a n a m o u n t n o t
e x c e e d i n g R s o n l y.

Page 87 of 122

Page 88 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

3 We ............................................................................................................................ ( N a m e o f t h e
Bank)
.................................................................................................................................. furth er agree that
the Guarantee herein contained shall remain in full force and effect during the period that would be
taken for the performance of the said We have submitted our Price Bid strictly on line only,
without any deviations, conditions and without mentioning any assumptions or notes for the Price
Bid in the said format.

4 We ................................... .(Name of the Bank) ...........................further agree with the MAHAGENCO


that the MAHAGENCO shall have the fullest liberty, without our consent and without affecting in
any manner our obligations hereunder, to vary any of the terms and conditions of the said
contract or to extend time of performance by the said contractor(s) from time to time or to
postpone for any time or from time to time any of the powers exercisable by the MAHAGENCO
against the said contractor(s) and to forebear or enforce any of the terms and conditions relating to
the said contract and we shall not be relived from our liability by reasons of any such variation or
extension being granted to the said contractor(s) or for any forbearance ,act or omission on the part
of the MAHAGENCO or any indulgence by the MAHAGENCO to the said contractor(s) or by any
such matter of thing whatsoever which under the law relating to sureties would but for this provision

y
have effect of so relieving us.

Not withstanding any thing contained above -

op
i) Our liabilities under this guarantee shall not exceed Rs ..................
C
ii) This Bank Guarantee valid up to ................... Further, claim period upto six month
We are liable to pay the guaranteed amount or any part thereof under this bank guarantee only
and only if you (MAHAGENCO) serve upon us a written claim or demand on or before...........
eb

In witness whereof We ___________________________ Bank Limited have executed this on this the
________________ day of __________________
W

Signature:
For
Witness

Page 88 of 122
Page 89 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure -16
UNDERTAKING OF FINANCIAL REQUIREMENT

(Non-Financial Bid) Bidder’s Undertaking


[On the Letter Head of the Bidding Company/Lead Member of Bidding Consortium]

To,

The Chief Engineer (SPGD-P),


Maharashtra State Power Generation Company Ltd.,

y
“Prakashgad”, 3rd Floor, Bandra (East)
Mumbai - 400 051

Dear Sir, op
C
Sub: Bidders’ Undertaking for financial requirement for selection of solar power developer for
development of 750MW AC cumulative capacity grid interactive solar PV power plant to cater
the AG feeder load of various substations in Maharashtra with additional capacity of 250MWAC
eb

under Green-shoe option in response to the RFP.

“We have carefully read and examined in detail the RFP, including in particular, regarding
submission of an undertaking, as per the prescribed Format.
W

We give our unconditional acceptance to the RFP and Contract issued by MAHAGENCO as a part of
the RFP, and as amended. We shall ensure that the SPD shall execute such RFP Documents as per the
provisions of the RFP.

We confirm that we are using our own technical and/or financial (Select technical for technically
evaluated entity/ financial for financially evaluated entity/ or both) capability for meeting the
Qualification Requirements as specified in Clause 11.0 of the RFP.

(Insert in case of incorporation of Project Company by the Bidding Company/Bidding Consortium)


We have also noted the amount of the equity investment required to be made in the Project Company
by “us” (in case of Bidding Company)/ “each Member of Consortium” (in case of Bidding
Consortium) to be incorporated to undertake the obligations under the Contract for selection of solar
power developer for development of 750MWAC cumulative capacity grid interactive solar PV power
plant to cater the AG feeder load of various substations in Maharashtra with additional capacity of
250MWAC under Green-shoe option.

Page 89 of 122

Page 90 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

(Insert in case of incorporation of Project Company by the Bidding Company/Bidding Consortium)


We undertake that if we are selected as the Successful Bidder we shall infuse an Equity amount of at
least Rs. 60Lacs/MW for each project in the following manner:

ii) @ 50% at the time of Financial Closure and

iii) the balance prior to declaration of COD for the project.

We undertake that Documentary evidence for the above shall be provided to Mahagenco along with
Certified copies of annual audited accounts of the last financial year as may be applicable OR in case
the Bidder is a newly formed Company, then the certificate issued by a Chartered Accountant with
certified copies of Balance sheet, Profit & Loss account, Schedules and cash flow statement
supported with bank statement are required shall be submitted at respective stages.

(Insert in case of incorporation of Project Company by the Bidding Company/Bidding Consortium)


We have also noted that if we fails to achieve financial closure in stipulated time OR fails to infuse

y
the required equity amount at the time of financial closure & prior to declaration of COD for the
project OR at any stage it is found that the documents furnished by us are false / misleading or

op
misrepresented in any way, then the LoA issued shall be terminated and the entire EMD and
Performance Security shall be forfeited.
C
……………………………………..
Signature and name of authorized signatory in whose name Power of Attorney/ Board Resolution as
eb

per Q.R. is issued

Original Power of Attorney/ Board Resolution as per RFP is enclosed.


W

Rubber stamp of the Bidder to be affixed.

Page 90 of 122
Page 91 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure -17
LIST OF BANKERS

For and on behalf of M/s……………. (Insert Name of Bidding Company or Member of the
Consortium)

………………………………………..
Signature and Name of the authorized representative of the Company

Company rubber stamp/seal

y
…………………………………
(Signature of Notary Public)
op
C
(Name and Address of the Attorney)
Place:…………
eb

Date:………….
(This Annexure is integral part of format for authorization)
W

Note:

Each Consortium Member has to provide Power of Attorney for authorization to authorized signatory
and certified true copy of the Board Resolution for issue of Power of Attorney clearly specifying the
name of attorney as well as the executant, affixation of common seal and names of persons attesting
the common seal.

The letter of consent provided by Consortium Member(s) will be additionally signed by authorized
signatory of the Lead Member.

Page 91 of 122

Page 92 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

List of Banks
1. SCHEDULED COMMERCIAL BANKS 2.OTHER PUBLIC SECTOR BANKS

SBI AND ASSOCIATES IDBI Bank Ltd.


1. State Bank of India 3.FOREIGN BANKS
2. State Bank of Bikaner & Jaipur 1. Bank of America NA

3. State Bank of Hyderabad 2. Bank of Tokyo Mitsubishi UFJ Ltd.

4. State Bank of Indore 3. BNP Paribas


5. State Bank of Mysore 4. Calyon Bank
6. State Bank of Patiala 5. Citi Bank N.A.
7. State Bank of Travancore 6. Deutsche Bank A.G

7. The HongKong and Shanghai


NATIONALISED BANKS Banking Corpn.Ltd.

y
1. Allahaba dBank 8. Standard Chartered Bank
2. Andhra Bank
3. Bank of India
4. Bank of Maharashtra
5. Canara Bank
op 9. Societe Generale
10. Barclays Bank
11. Royal Bank of Scotland
12. Bank of Nova Scotia
C
13. Development Bank of Singapore
6. Central Bank ofIndia
(DBS,BankLtd.)
eb

14. Crédit Agricole Corporate and


7. Corporation Bank Investment Bank

8. DenaBank 4. SCHEDULED PRIVATEBANKS


W

9.IndianBank 1. Federal Bank Ltd.

10.Indian Overseas Bank 2.INGVysyaBankLtd.


11. Oriental Bank of Commerce 3. Axis Bank Ltd.

12. Punjab National Bank 4.ICICIBankLtd.

13. Punjab &Sind Bank 5. HDFC Bank Ltd.

14. Syndicate Bank 6. Yes Bank Ltd.


15. Union Bank of India 7. Kotak Mahindra Bank

16. United Bank of India 8.IndusInd Bank Ltd.

17. UCO Bank 9. KarurVysya Bank

18. Vijaya Bank

Page 92 of 122
Page 93 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

19. Bank of Baroda

Annexure -18

FORMAT FOR FINANCIAL PROPOSAL

To be submitted online on SETS Portal

To,
The Chief Engineer (SPGD-P),
Maharashtra State Power Generation Company Ltd.,
“Prakashgad”, 3rd Floor, Bandra (East)
Mumbai - 400 051

y
Dear Sir,

op
With reference to your RFP dated [_________], we, having read and examined in detail the Bid
Documents and understood their contents, hereby submit our Financial Proposal. The Financial
Proposal is unconditional and unqualified and valid for 120 (one hundred and twenty) days from the
C
Proposal Due Date.

Tariff
eb

Cumulative capacity quoted Tariff per KwH


W

Page 93 of 122

Page 94 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure -19
REVERSE AUCTION / BIDDING PROCEDURE
1. For the Reverse Auction / Bidding, technically and commercially acceptable bidders only
shall be eligible to participate.
2. Bidders shall ensure online submission of their ‘Bid Price’ within the reverse auction period.

3. MAHAGENCO will provide all necessary training and assistance before commencement of
reverse auction. MAHAGENCO in case so required, shall arrange to demonstrate/ train the bidder
or bidder’s nominated person(s), without any cost to bidders. MAHAGENCO shall also explain the
bidders, all the rules related to the Reverse Auction/ Business Rules Document to be adopted along
with Reverse Auction manual.

4. Business rules for Reverse Auction / Bidding like event date, time, bid decrement, Extension etc.
shall be as per the business rules, enumerated in the biding Documents, for compliance. The date

y
will be communicated later.

op
5. Bidders have to accept ‘Terms & Condition’ and the ‘Business rules of Reverse Auction’ before
start of Reverse auction / bidding. Without this, the bidder will not be Eligible to submit bid in the
Reverse auction / bidding
6. Bidder may take help of the excel sheet and keep it ready for keying in their Bid Price during the
C
Reverse auction / bidding.
7. Reverse auction / bidding will be conducted on scheduled date & time, which shall be intimated
to the eligible bidders in advance.
eb

8. After conclusion of the Reverse auction / bidding event, the lowest bidder has to e-mail from its
registered e-mail id, the itemized breakup of the final prices quoted during the online Reverse
auction / bidding duly signed by the authorized person, in the prescribed Price Schedule format
including that of line items, if required, within two (2) hours of Auction end time without fail.
W

9. Bidders should acquaint themselves of the ‘Business Rules of Reverse Auction’, which will be
enclosed separately in the bidding documents.
10. If the Bidder or any of his representatives are found to be involved in Price manipulation/ cartel
formation of any kind, directly o or indirectly by communicating with other bidders, action shall
be initiated by MAHAGENCO.
11. The Bidder shall not divulge either his Bids or any other exclusive details of MAHAGENCO to
any other party.
12. Period of validity of Prices received through Reverse Auction shall be same as that of the period
of validity of bids offered.

Page 94 of 122
Page 95 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Bidders should also note that:


a. Bidders may note that, although extension time is ‘X’ minutes, there is a time lag
between the actual placing the bid on the local computer of the bidder and the
refreshing of the data on to the server for the visibility to the Owner. Considering the
processing time for data exchange and the possible network congestion, bidders must
avoid the last minute hosting of the Price Bid.
b. Participating bidder will agree to non-disclosure of trade information regarding the
purchase, identity of MAHAGENCO, bid process, bid technology, bid documentation
and bid details.
c. Bidder is advised to understand Proxy Bidding process as a protection against
technical failure.
d. It is brought to the attention of the bidders that the bid event will lead to the final
price only
e. Technical and other non-commercial queries (not impacting price) can only be routed

y
to the, MAHAGENCO contact personnel indicated in the bidding documents.

op
13. Order finalization and post order activities such as BG submission towards SD & Coal Cost
Deposit, signing of contract, transportation etc would be transacted directly between successful
bidder and MAHAGENCO.
C
14. Order shall be placed outside the e-portal & further processing of the contract shall also be outside
the system.
eb

15. In case of any problem faced by the bidder during Reverse Auction and for all Bidding process
related queries, bidders are advised to contact the persons indicated for “Contact Us” link provided
on the log-on page of, MAHAGENCO e-tender portal.

16. Bidders are advised to go through the User Manual which will be provided to those qualified for
W

Reverse Auction. Visit the auction page and login successfully well in advance to identify /rectify
the problems to avoid last minute hitches.

17. MAHAGENCO will not be responsible for any PC configuration/Java related issues,
software/hardware related issues, telephone line glitches and breakdown / slow speed in internet
connection of PC at Bidder’s end.

18. Bidders may note that it may not be possible to extend any help, during Reverse Auction, over
phone or in person in relation to rectification of PC / Internet / Java related issues and Bidder may
lose the chance of participation in the auction.

For access to the Auction site, the following URL is to be used: https://sets.mahagenco.in

 Login ID and Password: Use your personal Login ID and Password to participate in the online
event.
 To participate in the Auctioning event, you shall need a security key which shall be sent to
Page 95 of 122

Page 96 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

you over mail to the email address mentioned during vendor registration. You may also find
this key in the inbox folder inside the login.
 You will need to enter this event key for joining the auction event.
 On the left hand side pane of the login window, expand the ‘Event’ folder.
 Under that, click on ‘Auction Opening’.
 You will now see the auction event on the right hand side.
 Select the auction event and click on ‘Join’ button.
 You will then be asked to enter the security key. Maximize the window using the maximize
button.
 Then enter the security key and click on ‘Submit’ button
 You shall then join the auctioning event.
 The start price for the selected item will be displayed. This means you have to submit a price
which is less than that appearing against the item.
 To enter a quote, click on the bid button.
 Then enter the price in the box. Then click on OK button next to the bid to submit the quote.
 Once you submit the quote, the quoted price shall be displayed next to the item.
 After you click on ‘OK’, your quote will be submitted and cannot be deleted.
 For submitting first quote for an item, you shall be allowed to enter a price which is lower
than the start price given in the ‘Details’ tab.

y
 Thereafter, the quoted value shall be displayed in the ‘Quoted price’ column.
 You can view quotes submitted by other bidders for each item. You may choose to outbid


op
them by submitting a price lower than the price quoted by other bidders.
At any instant, we can see the time remaining for each item in the auction. The timer
continuously indicates the time remaining for each item within which you can submit your
quote for those items
C
 You can submit your quotes till there is time remaining for that item. Once the time is up, the
status changes to ‘CLOSED’. Thereafter, you cannot submit your quotes.
 You can then click on ‘Close’ button and close the window.
 No queries shall be entertained while Reverse Auction is in progress
eb

BUSINESS RULES OF REVERSE AUCTION:


W

1. Schedule for Reverse Auction: The Reverse Auction (RA) Schedule will be intimated to the
bidders who are technically and commercially qualified and are eligible for Reverse Auction
/Bidding after opening of Price Bid as per terms and conditions of the tender.

2. Auction extension time : If a valid bid is placed within 5 minutes of End Time of the RA, then
Reverse Auction duration shall get automatically extended for another 5 minutes from the
existing end time. It may be noted that the auto-extension will take place only if a valid bid
comes in those last 5 minutes. If a bid does not get accepted as the lowest bid, the auto
extension will not take place even if that bid might have come in the last 5 minutes. The
above process will continue till no bid is received in last 5 minutes which shall mark the
completion of Reverse Auction. However, bidders are advised not to wait till the last moment
to enter their bid to avoid complications related to internet connectivity, their network
problems, system crash down, power failure etc.

3. Bid price: The Bidder has to quote the price excluding all taxes and duties in Indian Rupees.
Page 96 of 122
Page 97 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

The auction will be conducted on Indian Rupees (INR) only.

4. Post auction procedure: Mahagenco will proceed with the Lowest Bid received or estimated
rate in the Reverse Auction / Bidding for further processing and award considerations.

5. Procedure of Reverse Auctioning/ Bidding

(i) All bidders are to submit their Price Bid including Price Schedule along with submission of
Techno- Commercial bid as per schedule mentioned in Price Bid.

(ii)Online Reverse Auction: The ‘Opening Price’ i.e. start price for RA will be as decided by
Mahagenco in Rupees.

(iii) Bid Decrement shall be step of Rs.0.01/kWh value will be rounded / truncated up to 2
decimal digits of L1 bid price.

(iv) Bidders, by offering a price equal to or lower than the “Next Valid Bid, can become “L1”

y
Bidder and this continues as an iterative process.

further processing.
op
(v) After completion of the online Reverse Auction, the Closing Price (CP) shall be available for

(vi) If no bid is received in the auction system/ website within the specified time duration of the
C
online RA, then Mahagenco will scrap the online Reverse Auction process and proceed with
the Bid Price received through e-tendering for further processing.
eb

(vii) Only those bidders who have submitted the “Price Bid alongwith Price Schedule’ within the
scheduled time and who are considered technically and commercially responsive, shall be
eligible to participate in RA process.

(viii) Online Reverse Auction shall be conducted by Mahagenco on pre-specified date and time,
W

while the bidders shall be quoting from their own offices/ place of their choice.

(ix) Internet connectivity shall have to be ensured by bidders themselves. During the RA, if a
bidder is not able to bid and requests for extension of time by e-mail/fax, then time extension
of additional 15 minutes may be given by Mahagenco provided such requests come at least 5
minutes before auction end time and no bid is received by Mahagenco till that time.
However, in order to ward-off such contingent situation, bidders are requested to make all
the necessary arrangements /alternatives whatever required so that they are able to
circumvent such situation and still be able to participate in the Reverse Auction successfully.
Failure of power or loss of connectivity at the premises of bidders during the Reverse
Auction cannot be the cause for not participating in the Reverse Auction. Mahagenco shall
not be responsible for such eventualities.

(x) Proxy bids:Proxy bidding feature is a pro-bidder feature to safeguard the bidder’s interest of
any internet failure or to avoid last minute rush. The proxy bidding feature allows bidders to
place an automated bid in the system directly in an auction and bid without having to enter a
Page 97 of 122

Page 98 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

new amount each time a competing bidder submits a new offer. The bid amount that a bidder
enters is the minimum bid price in INR that the bidder is willing to offer. Here the software
bids on behalf of the bidder who has quoted the lowest “Minimum Bid Price”, the price
which is one decrement less than the next bidder’s bid price. This obviates the need for the
bidder participating in the bidding process until the minimum bid amount is decrement ally
reached by other bidders. When any bidder quotes a price lower than the existing lowest bid
amount, the bidder (who had earlier submitted the lowest bid) has an option to once again
start participating in the bidding process by quoting a price equal or lower than the next valid
bid price. However, it may please be noted that if the current bid matches the minimum bid
of the lowest bidder submitted earlier, the bid submitted by the lowest bidder will be
recognized as the L1 at that instant. During the course of bidding, the bidder cannot delete or
increase such amount but can always reduce the same depending upon the amount quoted by
other bidders. Proxy bids are fed into the system directly by the respective bidders. As such
this information is privy only to the respective bidder (s).

(xi) Bidders are advised to get fully trained and clear all their doubts such as refreshing of Screen,
quantity being auctioned, tender value being auctioned, auction rules etc. Separate Date for
demonstration will be conveyed separately.

y
(xii) The price break-up for loading and transportation charges in terms of percentage uploaded at
the time of submission of online Price bid on SeTs will be considered final and same will be

op
considered applicable to the rates quoted at the time of Reverse Bidding / Auction. Bidder
shall not be allowed or permitted to increase the item rate of any item earlier quoted in the
Price Schedule submitted along with Price Bid.

(xiii) Bidders shall be assigned a Unique User Name & Password by MSPGCL. Bidders are
C
advised to change the Password after the receipt of initial. Password from MSPGCL to
ensure confidentiality. All bids made from the Login ID given to the bidders will be deemed
to have been made by the bidder’s / bidders’ company.
eb

(xiv) Bidders shall be able to view the following on their screen along with the necessary fields
during Online Reverse Auction:
a. Start Price
W

b. Decrement value
c. Masked bidder (Bidders name & code will not be displayed)
d. Current bid of the bidder (Unit Rate)
e. Minimum Bid placed by the bidder (Unit Rate)
f. Best Bid in the Auction (Current L1 Price)

(xv) Upon receipt of the system report after completion of the Online Reverse Auction, L1 will be
considered for further processing. MSPGCL’s decision on award of contract shall be final
and binding on all the Bidders.

(xvi) MSPGCL reserves the right to cancel/reschedule/extend the Reverse Auction process /
tender at any time, before ordering, without assigning any reason.

Page 98 of 122
Page 99 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

(xvii) MSPGCL shall not have any liability to bidders for any interruption or delay in access to
the site irrespective of the cause. In such cases, the decision of MSPGCL shall be binding
on the bidders.

(xviii) Other terms and conditions shall be as per bidder’s techno-commercial offers and as per
MSPGCL’s bidding documents and other correspondences, if any, till date.

(xix) Bidders are required to submit their acceptance to the stipulated terms and conditions before
participating in the Reverse Auction.

y
op
C
eb
W

Page 99 of 122

Page 100 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure – 20
Tentative List of Substations
Maharashtra State Power Generation Company Ltd.
Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
AKOLA AKOLA AKOLA RURAL AKOLA (R) 33 KV WANI 11 KV
1 ZONE CIRCLE DIVISION SUB-DN RAMBHAPUR KANSHIVANI,AG 4338.736 4.34
AKOLA AKOLA AKOLA RURAL AKOLA (R)
2 ZONE CIRCLE DIVISION SUB-DN 33 kV VIZORA 11 kv katkeda ag 3436.076 3.44
AKOLA AKOLA AKOLA RURAL BALAPUR 33 KV BALAPUR
3 ZONE CIRCLE DIVISION SUB-DN S/S 11 KV PARAS 1935.124 1.94
BARSHI
AKOLA AKOLA AKOLA RURAL TAKLI SUB- 33 KV BARSHI 11 KV KANHERI

y
4 ZONE CIRCLE DIVISION DN TAKLI S/S AG 2341.694 2.34
BARSHI
AKOLA AKOLA AKOLA RURAL TAKLI SUB-

op
5 ZONE CIRCLE DIVISION DN 33 KV DHABA 11 KV DHABA AG 1791.892 1.79
11 KV
AKOLA AKOLA AKOLA RURAL MURTIZAPU 33/11 KV Sonori KURANKHED AG
6 ZONE CIRCLE DIVISION R SUB-DN S/S FEEDER 1865 1.87
AKOLA AKOLA AKOLA RURAL MURTIZAPU 11 KV KURUM AG
7 ZONE CIRCLE DIVISION R SUB-DN 33KV S/S MANA FEEDER 1855.302 1.86
AKOLA AKOLA AKOT AKOT SUB 11 KV
C
8 ZONE CIRCLE DIVISION DN 132 KV AKOT S/S POPATKHED 1946.314 1.95
AKOLA AKOLA AKOT AKOT SUB 33KV
9 ZONE CIRCLE DIVISION DN LAKHAMAPUR 11 KV MOHADA 1943.33 1.94
AKOLA BULDHAN BULDHANA BULDANA 33/11 KV 11KV DONGAR
10 ZONE A CIRCLE DIVISION SUB-DN D'SHEWALI SHEOLI AG 2020.168 2.02
eb

AKOLA BULDHAN BULDHANA BULDANA 33/11 KV 11KV KINHOLA


11 ZONE A CIRCLE DIVISION SUB-DN D'SHEWALI AG 2333.488 2.33
AKOLA BULDHAN BULDHANA BULDANA 33/11 KV 11KV SHELSUR
12 ZONE A CIRCLE DIVISION SUB-DN D'SHEWALI AG 2136.544 2.14
AKOLA BULDHAN BULDHANA BULDANA
13 ZONE A CIRCLE DIVISION SUB-DN Bhadola Bhadola Ag 2217.112 2.22
33/11 KV
W

AKOLA BULDHAN BULDHANA CHANDHAI 11 KV BHOKER


14 ZONE A CIRCLE DIVISION CHIKHLI (BHOKER) AG 2055.976 2.06
AKOLA BULDHAN BULDHANA 33/11 KV 11 KV RAIPUR
15 ZONE A CIRCLE DIVISION CHIKHLI CHIKHLI AG 2026.136 2.03
AKOLA BULDHAN BULDHANA 33/11 KV 11 KV SHELSOOR
16 ZONE A CIRCLE DIVISION CHIKHLI CHIKHLI AG 2508.798 2.51
AKOLA BULDHAN BULDHANA 33/11 KV 11 KV AMDAPUR
17 ZONE A CIRCLE DIVISION CHIKHLI AMDAPUR AG 2994.444 2.99
AKOLA BULDHAN BULDHANA 33/11 KV
18 ZONE A CIRCLE DIVISION CHIKHLI AMDAPUR 11 KV UNDRI AG 3417.426 3.42
AKOLA BULDHAN BULDHANA 33/11 KV MERA 11 KV ANTRI KH.
19 ZONE A CIRCLE DIVISION CHIKHLI KH AG 2770.644 2.77
AKOLA BULDHAN BULDHANA D'RAJA SUB- 11 KV
20 ZONE A CIRCLE DIVISION DN 33 KV D MAHI TAKARKHED 1917.22 1.92
AKOLA BULDHAN BULDHANA D'RAJA SUB- 11 KV DIGRAS
21 ZONE A CIRCLE DIVISION DN 33 KV D MAHI AG 2361.836 2.36
AKOLA BULDHAN BULDHANA D'RAJA SUB-
22 ZONE A CIRCLE DIVISION DN 33 KV D MAHI 11 KV DMAHI 2044.786 2.04
AKOLA BULDHAN BULDHANA D'RAJA SUB-
23 ZONE A CIRCLE DIVISION DN 33 KV Giroli 11 KV GIROLI AG 2429.722 2.43
AKOLA BULDHAN BULDHANA D'RAJA SUB-
24 ZONE A CIRCLE DIVISION DN 33 KV Giroli 11 KV SRAJA AG 3092.17 3.09
AKOLA BULDHAN BULDHANA D'RAJA SUB-
25 ZONE A CIRCLE DIVISION DN 33 KV Giroli 11 kv JUMDA AG 2600.556 2.60

Page 100 of 122


Page 101 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW

AKOLA BULDHAN BULDHANA


26 ZONE A CIRCLE DIVISION DHAD S/DN. 33KV S/S DHAD 11KV KARDI 2188.018 2.19
AKOLA BULDHAN BULDHANA 33KV S/S
27 ZONE A CIRCLE DIVISION DHAD S/DN. RAYPUR 11KV RAIPUR 1823.97 1.82
AKOLA BULDHAN BULDHANA SHINDKHED 132KV S/S
28 ZONE A CIRCLE DIVISION S/DN. DUSARBID 11KV RAHERI AG 2079.848 2.08
33 /11 KV
AKOLA BULDHAN BULDHANA SHINDKHED MALKAPUR 11 KV WAGHALA
29 ZONE A CIRCLE DIVISION S/DN. PANGRA AG 2546.098 2.55
AKOLA BULDHAN BULDHANA SHINDKHED 11KV BAMKHED
30 ZONE A CIRCLE DIVISION S/DN. 33KV S. RAJA S/S AG 2059.706 2.06
AKOLA BULDHAN BULDHANA SHINDKHED 11KV SAWKHED
31 ZONE A CIRCLE DIVISION S/DN. 33KV S. RAJA S/S AG 3028.76 3.03
11KV
AKOLA BULDHAN BULDHANA SHINDKHED 33KV SAKHARKHERDA
32 ZONE A CIRCLE DIVISION S/DN. SAKHARKHERDA AG 2686.346 2.69
KHAMGAON 33 KV 11 KV
AKOLA BULDHAN CONSTRUCTIO KHAMGAON( PIMPALGAON BHALEGAON

y
33 ZONE A CIRCLE N DIV R) S/DN RAJA FEEDER 3644.21 3.64
KHAMGAON 33 KV 11 KV
AKOLA BULDHAN CONSTRUCTIO KHAMGAON( PIMPALGAON TANDULWADI
34

35
ZONE

AKOLA
ZONE

AKOLA
A CIRCLE

BULDHAN
A CIRCLE

BULDHAN
N DIV
KHAMGAON
CONSTRUCTIO
N DIV
KHAMGAON
CONSTRUCTIO
R) S/DN

KHAMGAON(
R) S/DN

KHAMGAON(
op RAJA
33 KV
PIMPALGAON
RAJA

33 kv Sajanpuri
FEEDER

WASADI AG
FEEDER

11 kv Shirasgaon
2475.228

2866.878
2.48

2.87
C
36 ZONE A CIRCLE N DIV R) S/DN s/s Deshmukh Ag 1868.73 1.87
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO KHAMGAON( 33/11 KV 11 KV JALAMB
37 ZONE A CIRCLE N DIV R) S/DN MATARGAON FEEDER 2572.208 2.57
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO KHAMGAON( 33/11 KV 11 KV
eb

38 ZONE A CIRCLE N DIV R) S/DN MATARGAON MATARGAON AG 1926.918 1.93


KHAMGAON
AKOLA BULDHAN CONSTRUCTIO KHAMGAON( 11 KV BORI
39 ZONE A CIRCLE N DIV R) S/DN 33/11KV ATALI ADGAON 3286.13 3.29
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO KHAMGAON( 33/11KV 11KV GERU
W

40 ZONE A CIRCLE N DIV R) S/DN HIWARKHED SS MATARGAON AG 1779.21 1.78


KHAMGAON
AKOLA BULDHAN CONSTRUCTIO LONAR 11KV Shara AG
41 ZONE A CIRCLE N DIV S/DN. 33 KV LONAR Feeder 3194.372 3.19
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO LONAR 33 KV PIMPRI 11 KV ANJANI
42 ZONE A CIRCLE N DIV S/DN. KHANDARE FEEDER 2278.284 2.28
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO LONAR 33 KV PIMPRI 11 KV MALKAPUR
43 ZONE A CIRCLE N DIV S/DN. KHANDARE PANGRA FEEDER 1732.212 1.73
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO LONAR 33/11 KV 11 KV Chincholi
44 ZONE A CIRCLE N DIV S/DN. SULTANPUR SS AG FEEDER 1927.664 1.93
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO LONAR 33/11 KV 11 KV WENI
45 ZONE A CIRCLE N DIV S/DN. SULTANPUR SS FEEDER 2058.214 2.06
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO LONAR 11 kv Wadhav AG
46 ZONE A CIRCLE N DIV S/DN. 33/11KV HIRDAV Feeder 1734.45 1.73
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO 132/33/11 KV 11 KV
47 ZONE A CIRCLE N DIV MEHEKAR MEHKAR BHALEGAON AG 2406.596 2.41
AKOLA BULDHAN KHAMGAON 33/11 KV 11 KV NAGZARI
48 ZONE A CIRCLE CONSTRUCTIO MEHEKAR DEULGAON MALI AG 2074.626 2.07

Page 101 of 122

Page 102 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
N DIV
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO 33/11 KV 11 KV
49 ZONE A CIRCLE N DIV MEHEKAR DONGAON PANGARKHED AG 2555.05 2.56
KHAMGAON 11 KV
AKOLA BULDHAN CONSTRUCTIO 33/11 KV DEULGAON
50 ZONE A CIRCLE N DIV MEHEKAR JANEFAL SAKARSHA AG 2836.292 2.84
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO 33/11 KV 11 KV HIWARA
51 ZONE A CIRCLE N DIV MEHEKAR JANEFAL KD. AG 3991.846 3.99
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO 33/11 KV 11 KV NAIGAON
52 ZONE A CIRCLE N DIV MEHEKAR JANEFAL DATTAPUR AG 3019.808 3.02
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO 33/11 KV 11 KV ANDHURD
53 ZONE A CIRCLE N DIV MEHEKAR LONIGAWALI AG 3003.396 3.00
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO 33/11 KV 11 KV BHIWAPUR
54 ZONE A CIRCLE N DIV MEHEKAR LONIGAWALI AG 2347.662 2.35

y
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO 11 KV
55 ZONE A CIRCLE N DIV MEHEKAR 33/11KV ATALI LAKHANWADA 2258.142 2.26

56

57
AKOLA
ZONE

AKOLA
ZONE
BULDHAN
A CIRCLE

BULDHAN
A CIRCLE
KHAMGAON
CONSTRUCTIO
N DIV
KHAMGAON
CONSTRUCTIO
N DIV
MEHEKAR

MEHEKAR
op 33KV HIVARA
ASHRAM

33KV HIVARA
ASHRAM
11 KV LAWALA
AG

11KV Deulgaon
Mali AG
2643.078

2760.946
2.64

2.76
C
KHAMGAON
AKOLA BULDHAN CONSTRUCTIO SANGRAMPU 33/11 KV
58 ZONE A CIRCLE N DIV R S/DN. PATURDA S/STN 11 KV KODRI AG 2223.826 2.22
KHAMGAON 33/11 KV
AKOLA BULDHAN CONSTRUCTIO SANGRAMPU WARWAT BAKAL 11kv
59 ZONE A CIRCLE N DIV R S/DN. S/STN kAKANWADA AG 2256.65 2.26
eb

KHAMGAON 33/11 KV
AKOLA BULDHAN CONSTRUCTIO SANGRAMPU WARWAT BAKAL
60 ZONE A CIRCLE N DIV R S/DN. S/STN 11kv wankhed ag 2033.596 2.03
KHAMGAON 33/11 KV
AKOLA BULDHAN CONSTRUCTIO SHEGAON SHEGAON R & M 11 KV ALASNA
61 ZONE A CIRCLE N DIV S/DN. S/Stn AG 2125.354 2.13
W

KHAMGAON 33/11 KV
AKOLA BULDHAN CONSTRUCTIO SHEGAON SHEGAON 11KV Nagzari AG
62 ZONE A CIRCLE N DIV S/DN. ANAND-SAGAR S FEEDER 3094.408 3.09
JALGAON
AKOLA BULDHAN MALKAPUR JALMOD 33 KV ASLGAON 11 KV DHANORA
63 ZONE A CIRCLE DIVISION SDIV S/S AG 1746.386 1.75
JALGAON
AKOLA BULDHAN MALKAPUR JALMOD 33 KV JALGAON 11 KV UMAPUR
64 ZONE A CIRCLE DIVISION SDIV JAMOD S/S AG FEEDER 2132.068 2.13
AKOLA BULDHAN MALKAPUR MALKAPUR 132 KV 11 KV
65 ZONE A CIRCLE DIVISION S/DN. MALKAPUR S/S DEODHABA AG 2754.232 2.75
AKOLA BULDHAN MALKAPUR MALKAPUR 132 KV
66 ZONE A CIRCLE DIVISION S/DN. MALKAPUR S/S 11KV ZODGA AG 2039.564 2.04
AKOLA BULDHAN MALKAPUR MALKAPUR 33 KV 11 KV NERVAL
67 ZONE A CIRCLE DIVISION S/DN. DASARKHED S/S AG 2023.898 2.02
AKOLA BULDHAN MALKAPUR MALKAPUR 33 KV 11 KV RAMTHAM
68 ZONE A CIRCLE DIVISION S/DN. DASARKHED S/S AG 2009.724 2.01
33 KV SUB 11 KV
AKOLA BULDHAN MALKAPUR MOTALA S. STATION NALGANAGA AG
69 ZONE A CIRCLE DIVISION DN. MOTALA FEEDER 2127.592 2.13
33 KV
AKOLA BULDHAN MALKAPUR MOTALA S. SUBSTATION 11 KV S.BAZAR
70 ZONE A CIRCLE DIVISION DN. SAWARGAON AG FEEDER 1988.836 1.99
AKOLA BULDHAN MALKAPUR NANDURA 33 kv Chandur 11 kv Chandur
71 ZONE A CIRCLE DIVISION S/DN. s/s Ag 1736.688 1.74
Page 102 of 122
Page 103 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
AKOLA BULDHAN MALKAPUR NANDURA 33 kv Mahalungi
72 ZONE A CIRCLE DIVISION S/DN. s/s 11 kv Tarwadi Ag 1833.668 1.83
AKOLA BULDHAN MALKAPUR NANDURA 33 kv Nimgaon 11 kv Nimgaon
73 ZONE A CIRCLE DIVISION S/DN. s/s Ag 2148.48 2.15
AKOLA WASHIM WASHIM 33 KV DHANORA 11 KV DHANORA
74 ZONE CIRCLE DIVISION KARANJA SUB STATION AG FEEDER 1914.236 1.91
33 KV 11 KV KHERDA
AKOLA WASHIM WASHIM KARMARGAON BHULODA
75 ZONE CIRCLE DIVISION KARANJA SUB STATION FEEDER 1733.704 1.73
33 KV UMBARDA
AKOLA WASHIM WASHIM BAZAR SUB 11 KV UMBARDA
76 ZONE CIRCLE DIVISION KARANJA STAT AG FEEDER 3089.186 3.09
132 KV
AKOLA WASHIM WASHIM MALEGAON MALEGAON SUB-
77 ZONE CIRCLE DIVISION S DN. STATION chandas AG 2958.636 2.96
AKOLA WASHIM WASHIM MALEGAON
78 ZONE CIRCLE DIVISION S DN. 33 KV AMANI amani ag 2466.276 2.47
AKOLA WASHIM WASHIM MALEGAON 11 KV RIDHORA
79 ZONE CIRCLE DIVISION S DN. 33 KV MEDSHI AG FEEDER 2549.828 2.55

y
AKOLA WASHIM WASHIM MALEGAON
80 ZONE CIRCLE DIVISION S DN. SHIRPUR dudhala ag 2437.928 2.44
33 KV

op
AKOLA WASHIM WASHIM MANGRULPE MAGALURPIR
81 ZONE CIRCLE DIVISION ER SUB STATION manora 3365.206 3.37
33/11 KV
AKOLA WASHIM WASHIM MANGRULPE SHIVANI ROAD Poghat -ag
82 ZONE CIRCLE DIVISION ER SUB STAT feeder 1827.7 1.83
AKOLA WASHIM WASHIM RISOD 11 KV
83 ZONE CIRCLE DIVISION S/DN. 33 KV KENWAD JAIYKHEDA AG 1968.694 1.97
C
AKOLA WASHIM WASHIM RISOD 33 KV 11 kv
84 ZONE CIRCLE DIVISION S/DN. MANGULZANAK mangulzanak 2221.588 2.22
AKOLA WASHIM WASHIM RISOD 11 KV AASEGAON
85 ZONE CIRCLE DIVISION S/DN. 33 KV RITHAD AGP FEEDER 2593.842 2.59
11 KV
eb

AKOLA WASHIM WASHIM RISOD SAWARGAON


86 ZONE CIRCLE DIVISION S/DN. 33 KV RITHAD AGP FEEDER 3299.558 3.30
AKOLA WASHIM WASHIM RISOD 11 KV SIRSALA
87 ZONE CIRCLE DIVISION S/DN. 33 KV RITHAD AGP FEEDER 2910.146 2.91
33 KV MIDC
AKOLA WASHIM WASHIM WASHIM SUB- 11 KV KALAMBA
88 ZONE CIRCLE DIVISION WASHIM STATION AG FEEDER 2977.286 2.98
W

AKOLA WASHIM WASHIM 33 KV CIVIL LINE 11 KV CHIKHALI


89 ZONE CIRCLE DIVISION WASHIM SUBSTATION AG 3484.566 3.48
AKOLA WASHIM WASHIM KALAMBA
90 ZONE CIRCLE DIVISION WASHIM SUBSTATION KAJALAMBA 2146.242 2.15
218.25

AMARAVA AMARAVA ACHALPUR ACHALPUR


1 TI ZONE TI CIRCLE DIVISION CAMP S/DN. 33 KV KHARPI 11 KV Salepur Ag 2520.734 2.52
AMARAVA AMARAVA ACHALPUR ACHALPUR
2 TI ZONE TI CIRCLE DIVISION CAMP S/DN. 33 kv shirajgaon 11 KV Pala AG 1799.352 1.80
33/11 KV
AMARAVA AMARAVA ACHALPUR ACHALPUR SARFAPUR 11 KV DEURWAD
3 TI ZONE TI CIRCLE DIVISION CAMP S/DN. SUBSTATION AG FEEDER 1743.402 1.74
33/11 KV
AMARAVA AMARAVA ACHALPUR ACHALPUR SARFAPUR 11KV RATANPUR
4 TI ZONE TI CIRCLE DIVISION CAMP S/DN. SUBSTATION AG FEEDER 1758.322 1.76
ACHALPUR
AMARAVA AMARAVA ACHALPUR CITY SUB- 132 KV
5 TI ZONE TI CIRCLE DIVISION DN ACHALPUR 11 KV Chamak 3262.258 3.26
ACHALPUR
AMARAVA AMARAVA ACHALPUR CITY SUB- 11 KV Asegaon
6 TI ZONE TI CIRCLE DIVISION DN 33KV ASEGAON Ag 2538.638 2.54

Page 103 of 122

Page 104 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
ACHALPUR
AMARAVA AMARAVA ACHALPUR CITY SUB-
7 TI ZONE TI CIRCLE DIVISION DN 33KV RASEGAON 11 KV Rasegaon 1929.156 1.93
AMARAVA AMARAVA ACHALPUR ANJANGAON 132 KV 11 KV NIMBHARI
8 TI ZONE TI CIRCLE DIVISION SUB-DN ANJANGAON [AG] 1752.354 1.75
AMARAVA AMARAVA ACHALPUR ANJANGAON 33 KV 11 KV NIMKHED
9 TI ZONE TI CIRCLE DIVISION SUB-DN BHANDARAJ [AG] 1763.544 1.76
AMARAVA AMARAVA ACHALPUR ANJANGAON 33 KV 11 KV SATEGAON
10 TI ZONE TI CIRCLE DIVISION SUB-DN BHANDARAJ [AG] 2064.182 2.06
AMARAVA AMARAVA ACHALPUR DARYAPUR 11 KV Khallar AG
11 TI ZONE TI CIRCLE DIVISION SUB-DN 33 KV ASADPUR FEEDER 2129.084 2.13
AMARAVATI 33 KV
AMARAVA AMARAVA CONSTRUCTIO AMRAVATI NANDGAONPETH 11 KV BORGAON
12 TI ZONE TI CIRCLE N DN (R) SUB-DN S/S. AG 3119.026 3.12
AMARAVATI 33 KV
AMARAVA AMARAVA CONSTRUCTIO AMRAVATI NANDGAONPETH 11 KV KATHORA
13 TI ZONE TI CIRCLE N DN (R) SUB-DN S/S. AG FEEDER 1885.142 1.89
AMARAVATI
AMARAVA AMARAVA CONSTRUCTIO AMRAVATI 33 KV SHIRALA DEVARA DEVARI
14

y
TI ZONE TI CIRCLE N DN (R) SUB-DN SUB - STATION AG 3146.628 3.15
AMARAVATI
AMARAVA AMARAVA CONSTRUCTIO AMRAVATI 11 KV YAWALI

op
15 TI ZONE TI CIRCLE N DN (R) SUB-DN 33KV S/S MAHULI AG FEEDER 4799.018 4.80
AMARAVATI 33 KV
AMARAVA AMARAVA CONSTRUCTIO BADNERA ANJANGAON
16 TI ZONE TI CIRCLE N DN SUB-DN. BARI S/S 11 KV Nirsana AG 2446.134 2.45
AMARAVATI
AMARAVA AMARAVA CONSTRUCTIO BADNERA 33 KV LONI 11 KV FULAMALA
17 TI ZONE TI CIRCLE N DN SUB-DN. S/STN AG 2423.008 2.42
C
AMARAVATI CHANDUR
AMARAVA AMARAVA CONSTRUCTIO RLY SUB- 11 KV KAWATHA
18 TI ZONE TI CIRCLE N DN DN. 33 KV MALKHED AG FEEDER 2396.152 2.40
AMARAVATI CHANDUR 11 KV
AMARAVA AMARAVA CONSTRUCTIO RLY SUB- 33KV GHUIKHED RAJURA(AG)
eb

19 TI ZONE TI CIRCLE N DN DN. SUBSTATION FEEDER 2461.054 2.46


AMARAVATI
AMARAVA AMARAVA CONSTRUCTIO DHAMANGA 33 KV MANGRUL 11 KV KHANAPUR
20 TI ZONE TI CIRCLE N DN ON SUB-DN. SUB STN AG 2440.912 2.44
AMARAVATI 33/11 s/s
AMARAVA AMARAVA CONSTRUCTIO NANDGAON MANGRUL
21 TI ZONE TI CIRCLE N DN KH SUB-DN CHAWHALA Veni Ganeshpur 1729.228 1.73
W

AMARAVATI
AMARAVA AMARAVA CONSTRUCTIO TIWASA 33 KV KURHA 11 KV
22 TI ZONE TI CIRCLE N DN SUB-DN. SUB-STATION KAUDNYAPUR AG 2743.042 2.74
AMARAVATI
AMARAVA AMARAVA CONSTRUCTIO TIWASA 33 KV MOZARI MALEGAON
23 TI ZONE TI CIRCLE N DN SUB-DN. SUB-STATION DHOTRA 1705.356 1.71
AMARAVA AMARAVA MURSHI CHANDUR 132KV CHANDUR 11KV GHATLADKI
24 TI ZONE TI CIRCLE DIVSION BAZAR BZR -132KV- 2608.016 2.61
AMARAVA AMARAVA MURSHI CHANDUR 132KV CHANDUR TALWEL AG
25 TI ZONE TI CIRCLE DIVSION BAZAR BZR SEPERATION 2495.37 2.50
AMARAVA AMARAVA MURSHI MORSHI I 11 KV NASITPUR
26 TI ZONE TI CIRCLE DIVSION S/DN 132KV MORSHI AG 2345.424 2.35
AMARAVA AMARAVA MURSHI MORSHI I 11KV MORSHI
27 TI ZONE TI CIRCLE DIVSION S/DN 132KV MORSHI RURAL 3348.794 3.35
AMARAVA AMARAVA MURSHI MORSHI I
28 TI ZONE TI CIRCLE DIVSION S/DN 33KV ASTEGAON 11KV Ambada AG 2548.336 2.55
AMARAVA AMARAVA MURSHI MORSHI I 11KV Khanapur
29 TI ZONE TI CIRCLE DIVSION S/DN 33KV ASTEGAON AG 1897.824 1.90
AMARAVA AMARAVA MURSHI MORSHI I 11KV TARODA
30 TI ZONE TI CIRCLE DIVSION S/DN 33KV ASTEGAON (KHED) AG 1790.4 1.79
AMARAVA AMARAVA MURSHI MORSHI I 33KV 11KV DAPORI
31 TI ZONE TI CIRCLE DIVSION S/DN HIWARKHED AG 2372.28 2.37
AMARAVA AMARAVA MURSHI MORSHI I 33KV 11KV
32 TI ZONE TI CIRCLE DIVSION S/DN HIWARKHED HIWARKHED AG 2545.352 2.55

Page 104 of 122


Page 105 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
11KV
AMARAVA AMARAVA MURSHI MORSHI II DHAMANGAON
33 TI ZONE TI CIRCLE DIVSION S/DN. 33KV LEHEGAON AG 2511.782 2.51
11KV
AMARAVA AMARAVA MURSHI MORSHI II NERPINGALAI
34 TI ZONE TI CIRCLE DIVSION S/DN. 33KV LEHEGAON AG 2299.918 2.30
AMARAVA AMARAVA MURSHI MORSHI II 11KV
35 TI ZONE TI CIRCLE DIVSION S/DN. 33KV LEHEGAON SAWARKHED AG 2536.4 2.54
AMARAVA AMARAVA MURSHI MORSHI II 11KV SHIRKHED
36 TI ZONE TI CIRCLE DIVSION S/DN. 33KV LEHEGAON AG 1869.476 1.87
SHENDURGA
AMARAVA AMARAVA MURSHI NAGHAT
37 TI ZONE TI CIRCLE DIVSION S/DN 132KV WARUD 11KV PUSALA AG 3182.436 3.18
SHENDURGA
AMARAVA AMARAVA MURSHI NAGHAT 11KV
38 TI ZONE TI CIRCLE DIVSION S/DN 132KV WARUD TIOSAGHAT AG 2704.996 2.70
SHENDURGA 11 KV
AMARAVA AMARAVA MURSHI NAGHAT 33 TEMBHURKHEDA
39 TI ZONE TI CIRCLE DIVSION S/DN TEMBHURKHEDA AG 2072.388 2.07

y
SHENDURGA
AMARAVA AMARAVA MURSHI NAGHAT 11KV SATNOOR
40 TI ZONE TI CIRCLE DIVSION S/DN 33KV SHE'GHAT AG 2173.844 2.17

op
AMARAVA AMARAVA MURSHI
41 TI ZONE TI CIRCLE DIVSION WARUD (I) 132KV WARUD 11 KV MILL AG 2920.59 2.92
AMARAVA AMARAVA MURSHI 33KV CHANDAS
42 TI ZONE TI CIRCLE DIVSION WARUD (I) WATHODA Dhaga Ag 2584.89 2.58
AMARAVA AMARAVA MURSHI 33KV CHANDAS
43 TI ZONE TI CIRCLE DIVSION WARUD (I) WATHODA Shekapur Ag 1717.292 1.72
AMARAVA AMARAVA MURSHI 33KV RAJURA
C
44 TI ZONE TI CIRCLE DIVSION WARUD (I) BZR 11KV PAWANI AG 1991.82 1.99
AMARAVA AMARAVA MURSHI WARUD II
45 TI ZONE TI CIRCLE DIVSION S/DN 33 KV LONI 11 KV SAWANGA 2856.434 2.86
AMARAVA AMARAVA MURSHI WARUD II
46 TI ZONE TI CIRCLE DIVSION S/DN 33 KV LONI 11 KV SHINGORI 4027.654 4.03
eb

AMARAVA AMARAVA MURSHI WARUD II BENODA 11 KV BARGAON


47 TI ZONE TI CIRCLE DIVSION S/DN SUBSTATION Ag 2913.13 2.91
AMARAVA AMARAVA MURSHI WARUD II BENODA 11 KV ISSAMBRI
48 TI ZONE TI CIRCLE DIVSION S/DN SUBSTATION Ag 1820.986 1.82
AMARAVA AMARAVA MURSHI WARUD II BENODA
49 TI ZONE TI CIRCLE DIVSION S/DN SUBSTATION PALSONA AG 1721.022 1.72
AMARAVA YAVATMA PANDHARKAW GHANTAJI 11 KV Pandhurna
W

50 TI ZONE L CIRCLE ADA DN. S/DN. 33 KV KUMBHARI Ag 1806.066 1.81


AMARAVA YAVATMA PANDHARKAW GHANTAJI
51 TI ZONE L CIRCLE ADA DN. S/DN. 33 KV MOHADA 11 KV Runza Ag 2344.678 2.34
AMARAVA YAVATMA PANDHARKAW GHANTAJI 33 KV NEW 11 KV Sakhara
52 TI ZONE L CIRCLE ADA DN. S/DN. GHATANJI Ag (Ght) 2790.786 2.79
AMARAVA YAVATMA PANDHARKAW GHANTAJI
53 TI ZONE L CIRCLE ADA DN. S/DN. 33 KV PARAWA 11 KV Jamb Ag 1935.124 1.94
AMARAVA YAVATMA PANDHARKAW GHANTAJI
54 TI ZONE L CIRCLE ADA DN. S/DN. 33 KV PARAWA 11 KV Parawa Ag 2755.724 2.76
AMARAVA YAVATMA PANDHARKAW
55 TI ZONE L CIRCLE ADA DN. WANI S DIV 33 KV RAJUR 11 KV Rajur Ag 2217.858 2.22
ZARI-
AMARAVA YAVATMA PANDHARKAW JAMANI 11 KV Susari P
56 TI ZONE L CIRCLE ADA DN. S/DN. 33 KV GHONSA Ag 1721.022 1.72
AMARAVA YAVATMA PUSAD DHARWAH 33KV DARWHA 11 KV PWW AG
57 TI ZONE L CIRCLE DIVSION S/DN. S/S fdr 2117.148 2.12
AMARAVA YAVATMA PUSAD DHARWAH 33KV DARWHA 11kv Saikheda
58 TI ZONE L CIRCLE DIVSION S/DN. S/S AG FDR 2331.996 2.33
AMARAVA YAVATMA PUSAD DHARWAH
59 TI ZONE L CIRCLE DIVSION S/DN. 33KV MANKINHI 11KV MANKINHI 2285.744 2.29
AMARAVA YAVATMA PUSAD MAHAGAON 11 KV Kali
60 TI ZONE L CIRCLE DIVSION S/DN. 33 KV GUNJ (GUNJ) 1811.288 1.81
61 AMARAVA YAVATMA PUSAD MAHAGAON 33 KV GUNJ 11 kv Dhanoda 1926.918 1.93
Page 105 of 122

Page 106 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
TI ZONE L CIRCLE DIVSION S/DN.
AMARAVA YAVATMA YAVATMAL
62 TI ZONE L CIRCLE DIVSION NER S/DN. 33KV LADKHED 11kv Ladkhed 3296.574 3.30
AMARAVA YAVATMA YAVATMAL YAVATMAL 11kv TALEGAON
63 TI ZONE L CIRCLE DIVSION (R) SUB-DN. 33KV JODMOHA AG 2564.748 2.56
AMARAVA YAVATMA YAVATMAL YAVATMAL
64 TI ZONE L CIRCLE DIVSION (R) SUB-DN. 33KV KOLAMBI 11KV Akola AG 2950.43 2.95
153.27

AURANGA AURANGA

y
BAD BAD AURANGABAD PAITHAN
1 ZONE CIRCLE RURAL I DIVN. (R) S/D 33 KV S/S BIDKIN NILAJGAON Ag 2104.466 2.10
AURANGA AURANGA 11 KV

3
BAD
ZONE
AURANGA
BAD
ZONE
AURANGA
BAD
CIRCLE
AURANGA
BAD
CIRCLE
AURANGA
AURANGABAD
RURAL I DIVN.

AURANGABAD
RURAL I DIVN.
PAITHAN
(R) S/D

PAITHAN
(R) S/D
op LOHAGAON
33KV

PAITHAN 132 KV
DHAKEPHAL
FEEDER

BALANAGAR
1715.8

2310.362
1.72

2.31
C
BAD BAD AURANGABAD PAITHAN
4 ZONE CIRCLE RURAL I DIVN. (R) S/D PAITHAN 132 KV KAUTGAON 2954.16 2.95
AURANGA AURANGA
BAD BAD AURANGABAD PAITHAN
5 ZONE CIRCLE RURAL I DIVN. (R) S/D PAITHAN 132 KV RAHATGAON 1853.064 1.85
AURANGA AURANGA
eb

BAD BAD AURANGABAD PAITHAN PAITHAN SUB


6 ZONE CIRCLE RURAL I DIVN. (R) S/D STN 11kV Telwadi 2308.124 2.31
AURANGA AURANGA
BAD BAD AURANGABAD PAITHAN VIHAMANDAVA
7 ZONE CIRCLE RURAL I DIVN. (R) S/D 33 KV Navgaon AG 2017.93 2.02
AURANGA AURANGA
W

BAD BAD AURANGABAD KHULATABA 11 KV


8 ZONE CIRCLE RURAL II DIVN. D (R) S/D 33/11KV ELLORA KHULTABAD II 1715.054 1.72
AURANGA AURANGA
BAD BAD KANNAD KANNAD (R) 11 KV WADNER
9 ZONE CIRCLE DIVISION S/DN 33kv wadner s/s AG 2340.948 2.34
AURANGA AURANGA
BAD BAD KANNAD 33 KV 11 KV
10 ZONE CIRCLE DIVISION PISHOR SDN NACHANWEL NACHANWEL 1831.43 1.83
AURANGA AURANGA
BAD BAD KANNAD 11 KV
11 ZONE CIRCLE DIVISION PISHOR SDN 33 KV Pishor S/S NADARPUR AG 4138.062 4.14
AURANGA AURANGA
BAD BAD KANNAD 11kv KOLAMBI
12 ZONE CIRCLE DIVISION PISHOR SDN 33 KV Pishor S/S AG WITH SDT 2115.656 2.12
AURANGA
BAD JALNA JALNA AMBAD (R)
13 ZONE CIRCLE DIVISION II S/DN CHINCHKHED CHINCHKHED AG 1850.08 1.85
AURANGA
BAD JALNA JALNA AMBAD (R)
14 ZONE CIRCLE DIVISION II S/DN WADIGODRI SHAHAPUR AG 2255.158 2.26
AURANGA
BAD JALNA JALNA GHANSAWA KUMBHAR 11KV MURTI-AG
15 ZONE CIRCLE DIVISION II NGI S/DN. PIMPALGAON FDR 2455.086 2.46
16 AURANGA JALNA JALNA GHANSAWA TIRTHPURI 11KV KANDARI 2306.632 2.31

Page 106 of 122


Page 107 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
BAD CIRCLE DIVISION II NGI S/DN. AG
ZONE
36.27

BARAMAT BARAMAT BARAMATI BARAMATI 132/22KV


1 I ZONE I CIRCLE DIVISION (R) Baramati SS 22 KV SAWAL AG 2649.046 2.65
BARAMAT BARAMAT BARAMATI BARAMATI 132/22KV 22 KV
2 I ZONE I CIRCLE DIVISION (U) Baramati SS ANJANGAON AG 5149.638 5.15
BARAMAT BARAMAT BARAMATI 132/33/11 KV
3 I ZONE I CIRCLE DIVISION INDAPUR S/STN.INDAPUR kandalga on 2951.176 2.95
BARAMAT BARAMAT BARAMATI 33/11 KV
4 I ZONE I CIRCLE DIVISION INDAPUR BIJEWADI Bijewadi 1719.53 1.72
BARAMAT BARAMAT BARAMATI 33/11KV
5 I ZONE I CIRCLE DIVISION INDAPUR BAWADA Ganeshwadi 2561.018 2.56
BARAMAT BARAMAT BARAMATI 33/11KV
6 I ZONE I CIRCLE DIVISION INDAPUR BHATNIMGAON Babhulgaon 1906.03 1.91
BARAMAT BARAMAT BARAMATI 33/11KV Bhatnimgaon

y
7 I ZONE I CIRCLE DIVISION INDAPUR BHATNIMGAON GFSS 2092.53 2.09
BARAMAT BARAMAT BARAMATI Switching Station
8 I ZONE I CIRCLE DIVISION INDAPUR Indapur Kalthan Ag 2168.622 2.17

10
BARAMAT
I ZONE

BARAMAT
I ZONE
BARAMAT
I CIRCLE

BARAMAT
I CIRCLE
BARAMATI
DIVISION

BARAMATI
DIVISION
WALCHAND
NAGAR SUB-
DN
WALCHAND
NAGAR SUB-
DN
op 33/22 KV
BHIGWAN S/STN.

33/22 KV
BHIGWAN S/STN.
22 KV
KUMBHARGAON
AG

22KV BHIGWAN
AG
1747.132

3616.608
1.75

3.62
C
WALCHAND
BARAMAT BARAMAT BARAMATI NAGAR SUB- 33/22 KV 22KV KHANOTA
11 I ZONE I CIRCLE DIVISION DN BHIGWAN S/STN. BHIGWAN 2985.492 2.99
BARAMAT BARAMAT DOUND
12 I ZONE I CIRCLE DIVISION DOUND 132KV DAUND 22 KV KEDGAON 5275.712 5.28
BARAMAT BARAMAT DOUND 22 KV
eb

13 I ZONE I CIRCLE DIVISION DOUND 132KV DAUND KURKUMBH 2415.548 2.42


BARAMAT BARAMAT DOUND 33 /11 KV 11 KV Pedgaon
14 I ZONE I CIRCLE DIVISION DOUND DEULGAON AG 2048.516 2.05
BARAMAT BARAMAT DOUND Aalegaon 22 Kv Boribel
15 I ZONE I CIRCLE DIVISION DOUND Substation Feeder AG 4254.438 4.25
BARAMAT BARAMAT DOUND KEDGAON 33/11 KV RAHU 11 KV RAHU AG
W

16 I ZONE I CIRCLE DIVISION S/DN. S/STN FEEDER 1788.908 1.79


BARAMAT BARAMAT DOUND KEDGAON YAwat Sub- 22 Kv Rahu
17 I ZONE I CIRCLE DIVISION S/DN. station Feeder 9516.722 9.52
BARAMAT BARAMAT DOUND KEDGAON YAwat Sub- 22 Kv Supa
18 I ZONE I CIRCLE DIVISION S/DN. station Feeder 1735.196 1.74
BARAMAT BARAMAT DOUND KEDGAON YAwat Sub- 22 Kv Yawat
19 I ZONE I CIRCLE DIVISION S/DN. station Feeder 8144.082 8.14
BARAMAT BARAMAT DOUND KEDGAON YAwat Sub- 22 kv Bhuleshwar
20 I ZONE I CIRCLE DIVISION S/DN. station feeder 5114.576 5.11
132/33/22 KV
BARAMAT BARAMAT DOUND SHIKRAPUR SANASWADI
21 I ZONE I CIRCLE DIVISION S/DN. S/STN TALEGAON 6350.698 6.35
BARAMAT BARAMAT DOUND SHIKRAPUR 220 KV
22 I ZONE I CIRCLE DIVISION S/DN. RANJANGAON IBP Shikrapur 4461.08 4.46
BARAMAT BARAMAT DOUND SHIKRAPUR 220 KV
23 I ZONE I CIRCLE DIVISION S/DN. RANJANGAON Mahaganpati 4917.632 4.92
BARAMAT BARAMAT DOUND SHIKRAPUR 220 KV
24 I ZONE I CIRCLE DIVISION S/DN. RANJANGAON Varude Ganegaon 3125.74 3.13
33/22 kV
BARAMAT BARAMAT DOUND SHIKRAPUR PIMPALE JAGTAP
25 I ZONE I CIRCLE DIVISION S/DN. Sub St 22 KV Shikrapur 1753.1 1.75
BARAMAT BARAMAT DOUND 132/33/22 KV
26 I ZONE I CIRCLE DIVISION SHIRUR SHIRUR KARDA 2856.434 2.86

Page 107 of 122

Page 108 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
BARAMAT BARAMAT DOUND 132/33/22 KV
27 I ZONE I CIRCLE DIVISION SHIRUR SHIRUR MALLIKARJUN 4301.436 4.30
BARAMAT BARAMAT DOUND 132KV/33KV/22K
28 I ZONE I CIRCLE DIVISION SHIRUR V KURALI KURULI 2743.788 2.74
BARAMAT BARAMAT DOUND 132KV/33KV/22K
29 I ZONE I CIRCLE DIVISION SHIRUR V KURALI NAGARGAON 2945.954 2.95
BARAMAT BARAMAT DOUND 132KV/33KV/22K
30 I ZONE I CIRCLE DIVISION SHIRUR V KURALI URJA 3612.132 3.61
BARAMAT BARAMAT DOUND 132KV/33KV/22K
31 I ZONE I CIRCLE DIVISION SHIRUR V KURALI WADGAON 2922.828 2.92
11
BARAMAT BARAMAT DOUND 33/11 Ganegaon SANGAMESHWAR
32 I ZONE I CIRCLE DIVISION SHIRUR Dumala AG 2057.468 2.06
BARAMAT BARAMAT DOUND 33/11 kv 11 kv Shirasgaon
33 I ZONE I CIRCLE DIVISION SHIRUR Shirasgaon Kata Kata 1880.666 1.88
BARAMAT BARAMAT DOUND 33/22/11 KV 22 KV Alegaon
34 I ZONE I CIRCLE DIVISION SHIRUR NHAVARA AG feeder 3145.882 3.15
BARAMAT BARAMAT DOUND 33/22/11 KV
35 I ZONE I CIRCLE DIVISION SHIRUR NHAVARA Nimbone 3231.672 3.23

y
BARAMAT BARAMAT DOUND 33KV/22KV
36 I ZONE I CIRCLE DIVISION SHIRUR MALTHAN 22 kv Amdabad 2199.954 2.20
BARAMAT BARAMAT DOUND 33KV/22KV

op
37 I ZONE I CIRCLE DIVISION SHIRUR MALTHAN Kavathe 2087.308 2.09
BARAMAT BARAMAT SASWAD 22 KV HIRDOSHI
38 I ZONE I CIRCLE DIVISION BHOR 132 KV BHATGAR AG 1737.434 1.74
BARAMAT BARAMAT SASWAD
39 I ZONE I CIRCLE DIVISION BHOR 132 KV BHATGAR 22 KV VELHA AG 7092.222 7.09
BARAMAT BARAMAT SASWAD 33/22 KV NIRA 22KV NIRA (U)
40 I ZONE I CIRCLE DIVISION NIRA SUBSTATION AG 1886.634 1.89
C
33KV/22KV
BARAMAT BARAMAT SASWAD JEJURI 22 KV
41 I ZONE I CIRCLE DIVISION NIRA SUBSTATION KOLVIHIRE AG 3393.554 3.39
33KV/22KV
BARAMAT BARAMAT SASWAD JEJURI
eb

42 I ZONE I CIRCLE DIVISION NIRA SUBSTATION 22KV WALHA AG 4006.766 4.01


BARAMAT BARAMAT SASWAD 22 KV SASWAD
43 I ZONE I CIRCLE DIVISION SASWAD 33 KV SASWAD AG 4482.714 4.48
BARAMAT BARAMAT SASWAD
44 I ZONE I CIRCLE DIVISION SASWAD 33 KV SASWAD 22 KV DIWA AG 2277.538 2.28
BARAMAT BARAMAT SASWAD 22 KV KHALAD
45 I ZONE I CIRCLE DIVISION SASWAD 33 KV SASWAD AG 5897.13 5.90
W

BARAMAT BARAMAT SASWAD 22 KV


46 I ZONE I CIRCLE DIVISION SASWAD 33 KV SASWAD PURANDAR AG 3277.924 3.28
BARAMAT BARAMAT SASWAD 22 KV SHIVARI
47 I ZONE I CIRCLE DIVISION SASWAD 33 KV SASWAD AG 3462.186 3.46
BARAMAT SATARA KARAD KARAD -I
48 I ZONE CIRCLE DIVISION S/DN 33/11 KV KALE KODOLI AG 2425.246 2.43
BARAMAT SATARA KARAD KARAD -I
49 I ZONE CIRCLE DIVISION S/DN 33/11 KV WING 11 KV Wing AG 2496.862 2.50
BARAMAT SATARA KARAD KARAD -I
50 I ZONE CIRCLE DIVISION S/DN KOLEWADI TALMAVALE AG 3924.706 3.92
BARAMAT SATARA KARAD KARAD 33/11 KV
51 I ZONE CIRCLE DIVISION URBAN Oglewadi SS PARLE AG 3110.82 3.11
BARAMAT SATARA KARAD KARAD 33/11 KV
52 I ZONE CIRCLE DIVISION URBAN Oglewadi SS Surli Ag 3877.708 3.88
BARAMAT SATARA KARAD KARAD-II
53 I ZONE CIRCLE DIVISION S/DN. 110 KV Rethare RETHARE AG 2680.378 2.68
BARAMAT SATARA KARAD KARAD-II
54 I ZONE CIRCLE DIVISION S/DN. 110 KV Rethare SHENOLI AG 2099.99 2.10
BARAMAT SATARA KARAD KARAD-II 11KV Tembhu
55 I ZONE CIRCLE DIVISION S/DN. Switching Station KARVE Ag 1916.474 1.92
BARAMAT SATARA KARAD KARAD-II
56 I ZONE CIRCLE DIVISION S/DN. MUNDHE Supane AG 2559.526 2.56
BARAMAT SATARA KARAD KARAD-II
57 I ZONE CIRCLE DIVISION S/DN. TALBID 11 KV Talbid Ag 2030.612 2.03
Page 108 of 122
Page 109 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
BARAMAT SATARA KARAD KARAD-II
58 I ZONE CIRCLE DIVISION S/DN. TALBID VAHAGAON AG 2911.638 2.91
BARAMAT SATARA KARAD MALHAR
59 I ZONE CIRCLE DIVISION PETH S/DN MALHARPETH MUNDHA 2150.718 2.15
BARAMAT SATARA KARAD PATAN
60 I ZONE CIRCLE DIVISION S/DN. PATAN LIS 2604.286 2.60
BARAMAT SATARA KARAD UMBRAJ 11kv VADGAON
61 I ZONE CIRCLE DIVISION S/DN. 33/11 Pal AG 2350.646 2.35
BARAMAT SATARA KARAD UMBRAJ 11kv SHIRGAON
62 I ZONE CIRCLE DIVISION S/DN. 33/11 Pal AG 2773.628 2.77
BARAMAT SATARA KARAD UMBRAJ
63 I ZONE CIRCLE DIVISION S/DN. 33/11 kv urul Mazgaon Ag 2135.798 2.14
BARAMAT SATARA KARAD UMBRAJ
64 I ZONE CIRCLE DIVISION S/DN. MASUR Helgaon Ag 2602.048 2.60
BARAMAT SATARA KARAD UMBRAJ
65 I ZONE CIRCLE DIVISION S/DN. MASUR KONEGAON 2287.236 2.29
BARAMAT SATARA KARAD UMBRAJ
66 I ZONE CIRCLE DIVISION S/DN. MASUR kharade ag 2205.922 2.21
BARAMAT SATARA KARAD UMBRAJ

y
67 I ZONE CIRCLE DIVISION S/DN. Shahapur Riswad Ag 3489.788 3.49
BARAMAT SATARA KARAD UMBRAJ
68 I ZONE CIRCLE DIVISION S/DN. Shahapur Shahapur Ag 1732.212 1.73

69

70

71
BARAMAT
I ZONE
BARAMAT
I ZONE
BARAMAT
I ZONE
SATARA
CIRCLE
SATARA
CIRCLE
SATARA
CIRCLE
KARAD
DIVISION
KARAD
DIVISION
KARAD
DIVISION
UMBRAJ
S/DN.
UMBRAJ
S/DN.
UMBRAJ
S/DN.
op TARALE

TARALE

UMBRAJ
BAMBAWADE AG

TARALE -AG-

VARADE
2031.358

2017.93

1938.108
2.03

2.02

1.94
C
BARAMAT SATARA PHALTAN KHANDALA 33/22 KV
72 I ZONE CIRCLE DIVISION S/DN. MHAVASHI 22 KV AHIRE AG 2592.35 2.59
BARAMAT SATARA PHALTAN KHANDALA
73 I ZONE CIRCLE DIVISION S/DN. SHIRWAL 22KV BHADE AG 3761.332 3.76
BARAMAT SATARA PHALTAN KHANDALA
74 I ZONE CIRCLE DIVISION S/DN. SHIRWAL KHANDALA 5997.84 6.00
eb

22 KV MIDC
BARAMAT SATARA PHALTAN SWITCHING 22 KV ANDHURI
75 I ZONE CIRCLE DIVISION LONAND STATION AG 5669.6 5.67
BARAMAT SATARA PHALTAN 220/132 KV 22 KV TAMBAVE
76 I ZONE CIRCLE DIVISION LONAND LONAND AG 4972.09 4.97
BARAMAT SATARA PHALTAN 220/132 KV 22KV 10211.24
77 I ZONE CIRCLE DIVISION LONAND LONAND TARADGAON AG 8 10.21
W

BARAMAT SATARA PHALTAN


78 I ZONE CIRCLE DIVISION PHALTAN 132 KV PHALTAN 22KV Barad ag 4734.116 4.73
BARAMAT SATARA PHALTAN
79 I ZONE CIRCLE DIVISION PHALTAN 33/22 KV Rajale JANAI AG 1779.21 1.78
BARAMAT SATARA PHALTAN
80 I ZONE CIRCLE DIVISION PHALTAN 33/22 KV Rajale SATE PHATTA AG 1994.058 1.99
BARAMAT SATARA PHALTAN 22 KV Dudhebavi
81 I ZONE CIRCLE DIVISION PHALTAN 33/22 KV Saskal AG 2095.514 2.10
BARAMAT SATARA PHALTAN
82 I ZONE CIRCLE DIVISION PHALTAN 33/22 KV Saskal 22 KV Wadale AG 2878.068 2.88
BARAMAT SATARA PHALTAN
83 I ZONE CIRCLE DIVISION PHALTAN 33/22 KV Saskal 22 Kv Giravi Ag 2549.828 2.55
BARAMAT SATARA PHALTAN 22 Kv Vinchurni
84 I ZONE CIRCLE DIVISION PHALTAN 33/22 KV Saskal Ag 1907.522 1.91
BARAMAT SATARA PHALTAN 22 KV Nimblak
85 I ZONE CIRCLE DIVISION PHALTAN 33/22 kv BARAD AG 2231.286 2.23
BARAMAT SATARA PHALTAN
86 I ZONE CIRCLE DIVISION PHALTAN 33/22 kv BARAD 22KV Barad ag 2332.742 2.33
BARAMAT SATARA PHALTAN
87 I ZONE CIRCLE DIVISION PHALTAN 33/22 kv BARAD ANDHRUD AG 3339.842 3.34
BARAMAT SATARA PHALTAN
88 I ZONE CIRCLE DIVISION PHALTAN 33/22 kv BARAD MUNJAWADI AG 4076.144 4.08
89 BARAMAT SATARA PHALTAN PHALTAN BEDAKEWASTI 22 KV Sarade AG 1773.988 1.77
Page 109 of 122

Page 110 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
I ZONE CIRCLE DIVISION
BARAMAT SATARA PHALTAN
90 I ZONE CIRCLE DIVISION PHALTAN BEDAKEWASTI ASU AG 2546.844 2.55
BARAMAT SATARA PHALTAN
91 I ZONE CIRCLE DIVISION PHALTAN BEDAKEWASTI GOKHALI AG 2135.798 2.14
BARAMAT SATARA PHALTAN NIMBHORE AG
92 I ZONE CIRCLE DIVISION PHALTAN SURAWADI FEEDER 3273.448 3.27
BARAMAT SATARA PHALTAN SAKHARWADI
93 I ZONE CIRCLE DIVISION PHALTAN SURAWADI AG 2491.64 2.49
BARAMAT SATARA PHALTAN WATHAR -
94 I ZONE CIRCLE DIVISION PHALTAN SURAWADI NIMBLAK- AG 3046.664 3.05
BARAMAT SATARA PHALTAN
95 I ZONE CIRCLE DIVISION PHALTAN WAKHARI Wathar- N Ag 2279.03 2.28
BARAMAT SATARA PHALTAN PHALTAN 33/22 KV 22 KV
96 I ZONE CIRCLE DIVISION (U) SOMANTHALI KAMBALESHWAR 3132.454 3.13
BARAMAT SATARA PHALTAN PHALTAN 33/22 KV
97 I ZONE CIRCLE DIVISION (U) SOMANTHALI 22 KV SANGAVI 3156.326 3.16
BARAMAT SATARA PHALTAN PHALTAN 33/22 KV 22 KV
98 I ZONE CIRCLE DIVISION (U) SOMANTHALI SASTEWADI 3730 3.73

y
BARAMAT SATARA PHALTAN PHALTAN 33/22 KV 22 KV
99 I ZONE CIRCLE DIVISION (U) SOMANTHALI SOMANTHALI AG 2306.632 2.31
BARAMAT SATARA SATARA 110 KV SATARA-
100

101
I ZONE

BARAMAT
I ZONE

BARAMAT
CIRCLE

SATARA
CIRCLE

SATARA
DIVISION

SATARA
DIVISION

SATARA
KOREGAON

KOREGAON
op ROAD
33/11KV
WADACHIWADI
S/STN
33/11KV
WADACHIWADI
KOREGAON
11 KV
CHIMANGAON
AG

11KV
2773.628

2082.832
2.77

2.08
C
102 I ZONE CIRCLE DIVISION KOREGAON S/STN Shendurjane AG 2792.278 2.79
BARAMAT SATARA SATARA EKAMBE -
103 I ZONE CIRCLE DIVISION KOREGAON KORAGAON SANGVI- AG 2282.76 2.28
BARAMAT SATARA SATARA
104 I ZONE CIRCLE DIVISION KOREGAON KORAGAON KATHAPUR AG 3191.388 3.19
BARAMAT SATARA SATARA RAHIMATPU 11KV Dhamner
eb

105 I ZONE CIRCLE DIVISION R S/DN. RAHIMATPUR Ag 1850.826 1.85


BARAMAT SATARA SATARA RAHIMATPU
106 I ZONE CIRCLE DIVISION R S/DN. RAHIMATPUR PIMPARI 3006.38 3.01
BARAMAT SATARA SATARA RAHIMATPU
107 I ZONE CIRCLE DIVISION R S/DN. RAHIMATPUR SAP 3160.056 3.16
BARAMAT SATARA SATARA RAHIMATPU
W

108 I ZONE CIRCLE DIVISION R S/DN. RAHIMATPUR SASURVE 3870.994 3.87


BARAMAT SATARA SATARA 11 KV ANGAPUR
109 I ZONE CIRCLE DIVISION SATARA ANGAPUR AG 2219.35 2.22
BARAMAT SATARA SATARA
110 I ZONE CIRCLE DIVISION SATARA BHATMARALI 11 kv PADALI AG 2443.896 2.44
BARAMAT SATARA SATARA 11 KV DEGAON
111 I ZONE CIRCLE DIVISION SATARA NIGADI AG 3001.158 3.00
BARAMAT SATARA SATARA
112 I ZONE CIRCLE DIVISION SATARA PARALI PARALI AG 2531.924 2.53
BARAMAT SATARA SATARA 11 KV SHENDRE-
113 I ZONE CIRCLE DIVISION SATARA SHENDRE VECHALE AG 3157.072 3.16
BARAMAT SATARA SATARA
114 I ZONE CIRCLE DIVISION SATARA VENEGAON KOPARDE 2125.354 2.13
BARAMAT SATARA SATARA
115 I ZONE CIRCLE DIVISION SATARA VENEGAON NANDGAON 2294.696 2.29
BARAMAT SATARA SATARA 22 KV
116 I ZONE CIRCLE DIVISION SATARA WADHE RAMNAGAR AG 2517.004 2.52
22KV BHUINJ
BARAMAT SATARA SATARA 110 KV SATARA- i.e. 22KV DEUR
117 I ZONE CIRCLE DIVISION WATHAR ROAD AG 8403.69 8.40
BARAMAT SATARA SATARA 110 KV SATARA- WATHAR i.e.
118 I ZONE CIRCLE DIVISION WATHAR ROAD 22KV KINHAI AG. 7049.7 7.05
BARAMAT SATARA SATARA 22 KV Nandwal
119 I ZONE CIRCLE DIVISION WATHAR PIMPODA AG Feeder 2528.194 2.53

Page 110 of 122


Page 111 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
BARAMAT SATARA SATARA 22 KV WATHAR
120 I ZONE CIRCLE DIVISION WATHAR PIMPODA AG 2725.884 2.73
BARAMAT SATARA SATARA
121 I ZONE CIRCLE DIVISION WATHAR PIMPODA PIMPODE Ag 2398.39 2.40
BARAMAT SATARA VADUJ 33/11 KV Gopuj 11 KV Karkhana
122 I ZONE CIRCLE DIVISION AUNDH SubStation AG 1892.602 1.89
BARAMAT SATARA VADUJ 33/11 KV Gopuj
123 I ZONE CIRCLE DIVISION AUNDH SubStation 11 KV Yeliv AG 2853.45 2.85
BARAMAT SATARA VADUJ 33/22 KV 22 KV Pusesavali
124 I ZONE CIRCLE DIVISION AUNDH Pusesavali AG 2087.308 2.09
BARAMAT SATARA VADUJ 33/22 KV
125 I ZONE CIRCLE DIVISION AUNDH Pusesavali 22 KV R Kurle AG 2680.378 2.68
BARAMAT SATARA VADUJ 33/22 KV 22 KV Vadgaon
126 I ZONE CIRCLE DIVISION AUNDH Pusesavali AG 4009.004 4.01
BARAMAT SATARA VADUJ 33/22/11 KV
127 I ZONE CIRCLE DIVISION AUNDH Bhosare BHOSARE AG 2149.972 2.15
BARAMAT SATARA VADUJ 33/22/11 KV
128 I ZONE CIRCLE DIVISION AUNDH Bhosare KHATAV AG 5425.658 5.43
BARAMAT SATARA VADUJ 132/33/22 KV 22 KV BIDAL AG

y
129 I ZONE CIRCLE DIVISION DAHIWADI DAHIWADI (DAHIWADI) 5733.01 5.73
BARAMAT SATARA VADUJ 132/33/22 KV 22 KV DEVAPUR
130 I ZONE CIRCLE DIVISION DAHIWADI DAHIWADI AG 3841.154 3.84

131

132

133
BARAMAT
I ZONE
BARAMAT
I ZONE
BARAMAT
I ZONE
SATARA
CIRCLE
SATARA
CIRCLE
SATARA
CIRCLE
VADUJ
DIVISION
VADUJ
DIVISION
VADUJ
DIVISION
DAHIWADI

DAHIWADI

DAHIWADI
op 132/33/22 KV
DAHIWADI
33/11 KV
MHASWAD
33/11 KV
MHASWAD
22 KV
SHINGANAPUR
AG (DAHIWADI
11 KV DEVAPUR
AG
11 KV DHULDEV
AG
3932.912

2111.926

2477.466
3.93

2.11

2.48
C
BARAMAT SATARA VADUJ 33/11 KV 11 KV
134 I ZONE CIRCLE DIVISION DAHIWADI SHENAWADI SHENAWADI AG 2110.434 2.11
BARAMAT SATARA VADUJ 33/11 KV 11 KV VAR-
135 I ZONE CIRCLE DIVISION DAHIWADI SHENAWADI MALAWADI AG 1710.578 1.71
BARAMAT SATARA VADUJ
eb

136 I ZONE CIRCLE DIVISION DAHIWADI 33/11 KV VADJAL 11 KV DIWAD AG 1721.022 1.72
BARAMAT SATARA VADUJ 11 KV
137 I ZONE CIRCLE DIVISION DAHIWADI 33/11 KV VADJAL KUKUDWAD AG 1889.618 1.89
BARAMAT SATARA VADUJ 33/22 KV 22 KV PARKANDI
138 I ZONE CIRCLE DIVISION DAHIWADI ANDHALI AG 4385.734 4.39
BARAMAT SATARA VADUJ 33/22 KV 22 KV TONDALE
139 I ZONE CIRCLE DIVISION DAHIWADI ANDHALI AG 1818.748 1.82
W

BARAMAT SATARA VADUJ 33/22 KV


140 I ZONE CIRCLE DIVISION DAHIWADI SHINGANAPUR 22 KV MARDI AG 3398.776 3.40
22 KV
BARAMAT SATARA VADUJ 33/22 KV SHINGANAPUR
141 I ZONE CIRCLE DIVISION DAHIWADI SHINGANAPUR AG (SHINGNA 2775.12 2.78
33/22 KV
BARAMAT SATARA VADUJ KHATAV Shindewadi (
142 I ZONE CIRCLE DIVISION S/DN. Katgun ) 22 KV DARUJ AG 2415.548 2.42
33/22 KV
BARAMAT SATARA VADUJ KHATAV Shindewadi (
143 I ZONE CIRCLE DIVISION S/DN. Katgun ) 22 KV Nidhal AG 2217.858 2.22
BARAMAT SATARA VADUJ KHATAV 11 KV LALGUN
144 I ZONE CIRCLE DIVISION S/DN. BUDH AG 1788.908 1.79
BARAMAT SATARA VADUJ KHATAV
145 I ZONE CIRCLE DIVISION S/DN. BUDH 11 kv Mol Ag 2408.088 2.41
BARAMAT SATARA VADUJ KHATAV 22 KV KATEWADI
146 I ZONE CIRCLE DIVISION S/DN. BUDH AG 2338.71 2.34
BARAMAT SATARA VADUJ KATARKHATAV
147 I ZONE CIRCLE DIVISION VADUJ 110 KV MAYANI AG 2051.5 2.05
BARAMAT SATARA VADUJ
148 I ZONE CIRCLE DIVISION VADUJ 110 KV MAYANI PUSESAVALI AG 2237.254 2.24
BARAMAT SATARA VADUJ 33/22 KV
149 I ZONE CIRCLE DIVISION VADUJ VIKHALE GHARUDI AG 1929.902 1.93

Page 111 of 122

Page 112 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
BARAMAT SATARA VADUJ 33/22 KV
150 I ZONE CIRCLE DIVISION VADUJ VIKHALE KANERWADI AG 3122.01 3.12
BARAMAT SATARA VADUJ 11 KV BANPURI
151 I ZONE CIRCLE DIVISION VADUJ KATARKHATAV AG 2652.776 2.65
BARAMAT SATARA VADUJ 22 KV Bombale
152 I ZONE CIRCLE DIVISION VADUJ KATARKHATAV AG 4996.708 5.00
BARAMAT SATARA VADUJ 11 KV Goregaon
153 I ZONE CIRCLE DIVISION VADUJ NIMSOD (N) AG 1834.414 1.83
BARAMAT SATARA VADUJ
154 I ZONE CIRCLE DIVISION VADUJ NIMSOD MHASURNE AG 2757.962 2.76
BARAMAT SATARA VADUJ
155 I ZONE CIRCLE DIVISION VADUJ NIMSOD NIMSOD AG 2156.686 2.16
BARAMAT SATARA VADUJ 11KV KUMTHE
156 I ZONE CIRCLE DIVISION VADUJ VADUJ AG 3645.702 3.65
BARAMAT SATARA VADUJ
157 I ZONE CIRCLE DIVISION VADUJ VADUJ VADUJ AG 2274.554 2.27
BARAMAT SATARA ANEWADI
158 I ZONE CIRCLE WAI DIVISION MEDHA SONGAON AGRICULTURE 2540.876 2.54
BARAMAT SATARA KUDAL

y
159 I ZONE CIRCLE WAI DIVISION MEDHA SONGAON AGRICULTURE 2954.16 2.95
BARAMAT SATARA 132/33/22 KV 22 KV BAVDHAN
160 I ZONE CIRCLE WAI DIVISION WAI WAI S/STN AG 6837.836 6.84

161

162

163
BARAMAT
I ZONE
BARAMAT
I ZONE
BARAMAT
I ZONE
SATARA
CIRCLE
SATARA
CIRCLE
SATARA
CIRCLE
WAI DIVISION

WAI DIVISION

WAI DIVISION
WAI

WAI

WAI
op 132/33/22 KV
WAI S/STN
33/22 KV JAMB
S/STN
33/22 KV JAMB
S/STN
22 KV KENJAL AG
22 KV KHADAKI
AG

BHUINJ AG
6752.046

3040.696

3695.684
6.75

3.04

3.70
C
BARAMAT SATARA 33/22 KV JAMB
164 I ZONE CIRCLE WAI DIVISION WAI S/STN JAMB AG 2241.73 2.24
BARAMAT SATARA 33/22 KV VELE
165 I ZONE CIRCLE WAI DIVISION WAI S/STN NEW KENJAL AG 2358.852 2.36
BARAMAT SATARA 33/22 KV VELE
166 I ZONE CIRCLE WAI DIVISION WAI S/STN SURUR AG 2454.34 2.45
eb

11 KV
BARAMAT SATARA 33/22/11 KV WAI MANDHARDEV
167 I ZONE CIRCLE WAI DIVISION WAI MIDC S/STN AG 1726.244 1.73
BARAMAT SATARA 33/22/11 KV WAI 22 KV PASARNI
168 I ZONE CIRCLE WAI DIVISION WAI MIDC S/STN AG 4908.68 4.91
BARAMAT SOLAPUR AKLUJ O AND AKLUJ I 220/132/33/11
169 I ZONE CIRCLE M DIVISION SUB-DN. KV MALINAGAR SANGAM 1712.816 1.71
W

BARAMAT SOLAPUR AKLUJ O AND AKLUJ I 33/11 KV


170 I ZONE CIRCLE M DIVISION SUB-DN. LAWANG S/STN 11 KV WAGHOLI 1773.242 1.77
BARAMAT SOLAPUR AKLUJ O AND MALSHIRAS 33/11kv
171 I ZONE CIRCLE M DIVISION S/DN. MALSHIRAS S/Stn 11KV Medad AG 2140.274 2.14
33KV
BARAMAT SOLAPUR AKLUJ O AND MALSHIRAS KACHREWADI DESHMUKH
172 I ZONE CIRCLE M DIVISION S/DN. S/STN PATTA 1940.346 1.94
BARAMAT SOLAPUR AKLUJ O AND 33/11 KV
173 I ZONE CIRCLE M DIVISION NATEPUTE DHARMPURI 11KV KOTHALE 1740.418 1.74
33/11 KV
BARAMAT SOLAPUR AKLUJ O AND NATEPUTE SUB- 11KV LONAND
174 I ZONE CIRCLE M DIVISION NATEPUTE STATION AG 2525.21 2.53
33/11KV
BARAMAT SOLAPUR AKLUJ O AND FONDSHIRAS 11KV
175 I ZONE CIRCLE M DIVISION NATEPUTE S/STN TAMSHIDWADI 1793.384 1.79
BARAMAT SOLAPUR BARSI BARSHI (R) 33/11 KV
176 I ZONE CIRCLE DIVISION S/DN. PANGARI S/S BARSHI FEEDER 2061.944 2.06
BARAMAT SOLAPUR BARSI BARSHI (R) 33/11 KV UPALE JAMGAON
177 I ZONE CIRCLE DIVISION S/DN. (D) FEEDER 2208.16 2.21
33/11 KV
BARAMAT SOLAPUR BARSI JEUR SUB- SUBSTATION 11 KV KUGAON
178 I ZONE CIRCLE DIVISION DIVISION CHIKHALTHA AG 1813.526 1.81
BARAMAT SOLAPUR BARSI JEUR SUB- 33/11 KV 11 KV
179 I ZONE CIRCLE DIVISION DIVISION SUBSTATION DAHIGAON- 2097.752 2.10
Page 112 of 122
Page 113 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
JEUR (SO J SHETFAL AG
33/11 KV
BARAMAT SOLAPUR BARSI JEUR SUB- SUBSTATION 11 KV
180 I ZONE CIRCLE DIVISION DIVISION WANGI NO-1 NAGANATH AG 3164.532 3.16
BARAMAT SOLAPUR BARSI KURDUWADI MAHISGAON MAHISGAON AG
181 I ZONE CIRCLE DIVISION S/DN. S/STN SEPERATED 1944.822 1.94
33/11KV
BARAMAT SOLAPUR BARSI TERMBHURN PIMPLNEAR
182 I ZONE CIRCLE DIVISION I S/DN. SUBSTATION NIMGAON (T) 4385.734 4.39
33/11KV
BARAMAT SOLAPUR BARSI TERMBHURN PIMPLNEAR
183 I ZONE CIRCLE DIVISION I S/DN. SUBSTATION SAPATANE 3841.154 3.84
BARAMAT SOLAPUR BARSI TERMBHURN
184 I ZONE CIRCLE DIVISION I S/DN. ADHEGAON TAKALI FEEDER 1865.746 1.87
BARAMAT SOLAPUR BARSI TERMBHURN
185 I ZONE CIRCLE DIVISION I S/DN. BEMBALE Ghoti AG 5788.214 5.79
BARAMAT SOLAPUR BARSI TERMBHURN
186 I ZONE CIRCLE DIVISION I S/DN. TEMBHURNI MALEGAO AG 1938.854 1.94
BARAMAT SOLAPUR BARSI TERMBHURN

y
187 I ZONE CIRCLE DIVISION I S/DN. TEMBHURNI UJANI 3664.352 3.66
33/11 KV 11KV
BARAMAT SOLAPUR PANDHARPUR MANGALVED ANDHALGAON ANDHALGAON
188

189

190
I ZONE
BARAMAT
I ZONE
BARAMAT
I ZONE
BARAMAT
CIRCLE
SOLAPUR
CIRCLE
SOLAPUR
CIRCLE
SOLAPUR
DIVISION
PANDHARPUR
DIVISION
PANDHARPUR
DIVISION
PANDHARPUR
HA
MANGALVED
HA
MANGALVED
HA
MANGALVED
op SUBSTATION
33/11KV
Bramhapuri S/S
33/11KV
MARAPUR
33/11KV
FEEDER
11 Kv Machnur
new

11KV GHARNIKI
2455.832

2781.834

2061.198
2.46

2.78

2.06
C
191 I ZONE CIRCLE DIVISION HA MARAPUR 11KV MARAPUR 2862.402 2.86
BARAMAT SOLAPUR PANDHARPUR MANGALVED 33KV BATHAN 11KV UCHETHAN
192 I ZONE CIRCLE DIVISION HA S/S FEEDER 2681.124 2.68
BARAMAT SOLAPUR PANDHARPUR PANDHARPU 110/11 KV 11 KV
193 I ZONE CIRCLE DIVISION R R-I S/DN PANDHARPUR CHANDRABHAG 2176.828 2.18
BARAMAT SOLAPUR PANDHARPUR PANDHARPU 110/11 KV
eb

194 I ZONE CIRCLE DIVISION R R-I S/DN PANDHARPUR 11 KV TUNGAT 1706.102 1.71
BARAMAT SOLAPUR PANDHARPUR PANDHARPU 110/11 KV
195 I ZONE CIRCLE DIVISION R R-I S/DN PANDHARPUR 11KV GADEGAON 2340.202 2.34
BARAMAT SOLAPUR PANDHARPUR PANDHARPU 33/11 KV
196 I ZONE CIRCLE DIVISION R R-II S/DN KARKAMB 11 KV SANGAVI 2543.86 2.54
BARAMAT SOLAPUR PANDHARPUR PANDHARPU 33/11 KV
W

197 I ZONE CIRCLE DIVISION R R-II S/DN KARKAMB 11 KV UMBARE 3806.838 3.81
BARAMAT SOLAPUR PANDHARPUR PANDHARPU 11 KV
198 I ZONE CIRCLE DIVISION R R-II S/DN 33/11 KV UMBRE KANHAPURI 1741.91 1.74
BARAMAT SOLAPUR PANDHARPUR 33/11 KV MAHUD 11 KV Itaki
199 I ZONE CIRCLE DIVISION SANGOLA S/STN. feeder 2170.114 2.17
SOLAPUR
BARAMAT SOLAPUR RURAL AKKALKOT 132KV/33/11KV 11 KV WATER
200 I ZONE CIRCLE DIVISION S/DN. AKKALKOT S/S WORKS AG 2045.532 2.05
SOLAPUR
BARAMAT SOLAPUR RURAL AKKALKOT 33/ 11 KV 11 KV
201 I ZONE CIRCLE DIVISION S/DN. HANNUR S/S BOREGAON AG 1823.97 1.82
SOLAPUR
BARAMAT SOLAPUR RURAL AKKALKOT 33/ 11 KV 11 KV CHUNGI
202 I ZONE CIRCLE DIVISION S/DN. HANNUR S/S AG 1835.16 1.84
SOLAPUR 33/11 KV
BARAMAT SOLAPUR RURAL AKKALKOT MAINDARGI 11 KV BOROTI
203 I ZONE CIRCLE DIVISION S/DN. S/STN AG 1797.114 1.80
SOLAPUR 33/11 KV
BARAMAT SOLAPUR RURAL AKKALKOT TADWAL 11 KV KHANAPUR
204 I ZONE CIRCLE DIVISION S/DN. SUBSTATION AG 1758.322 1.76
SOLAPUR 33/11 KV
BARAMAT SOLAPUR RURAL AKKALKOT TADWAL 11 KV MANGRUL
205 I ZONE CIRCLE DIVISION S/DN. SUBSTATION AG 2092.53 2.09

Page 113 of 122

Page 114 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
SOLAPUR 33/11 KV
BARAMAT SOLAPUR RURAL AKKALKOT TADWAL 11 KV
206 I ZONE CIRCLE DIVISION S/DN. SUBSTATION MHAISALGI AG 2434.198 2.43
SOLAPUR 33/11 KV
BARAMAT SOLAPUR RURAL AKKALKOT TADWAL 11 KV TADWAL
207 I ZONE CIRCLE DIVISION S/DN. SUBSTATION AG 1985.852 1.99
SOLAPUR
BARAMAT SOLAPUR RURAL MOHOL 110/33/11 KV
208 I ZONE CIRCLE DIVISION S/DN. PULUJ 11 KV KAMATI 1850.826 1.85
SOLAPUR
BARAMAT SOLAPUR RURAL MOHOL 33/11 KV 11 KV
209 I ZONE CIRCLE DIVISION S/DN. BEGAMPUR ARDHANARI AG 2290.966 2.29
SOLAPUR
BARAMAT SOLAPUR RURAL MOHOL 33/11 KV 11 KV
210 I ZONE CIRCLE DIVISION S/DN. BEGAMPUR BEGAMPUR AG 4109.714 4.11
SOLAPUR
BARAMAT SOLAPUR RURAL MOHOL 11 KV SHINGOLI
211 I ZONE CIRCLE DIVISION S/DN. 33/11 KV KAMTI AG 1809.05 1.81
SOLAPUR
BARAMAT SOLAPUR RURAL MOHOL 11 KV WATWATE

y
212 I ZONE CIRCLE DIVISION S/DN. 33/11 KV KAMTI AG 3203.324 3.20
SOLAPUR

op
BARAMAT SOLAPUR RURAL MOHOL 11 KV OLD
213 I ZONE CIRCLE DIVISION S/DN. 33/11 KV KURUL KURUL AG 1926.918 1.93
SOLAPUR
BARAMAT SOLAPUR RURAL MOHOL
214 I ZONE CIRCLE DIVISION S/DN. 33/11 KV MOHOL 11 KV ANAGAR. 2114.164 2.11
SOLAPUR
BARAMAT SOLAPUR RURAL MOHOL
C
215 I ZONE CIRCLE DIVISION S/DN. 33/11 KV MOHOL 11 KV WADWAL 2106.704 2.11
SOLAPUR
BARAMAT SOLAPUR RURAL SOLAPUR R- 132/33/11 KV 11KV DEGAON-
216 I ZONE CIRCLE DIVISION I S/DN. DEGAON AG- 3527.088 3.53
SOLAPUR
BARAMAT SOLAPUR RURAL SOLAPUR R- 132/33/11 KV 11KV NEHRU
eb

217 I ZONE CIRCLE DIVISION I S/DN. DEGAON NAGAR Ag. 1957.504 1.96
SOLAPUR
BARAMAT SOLAPUR RURAL SOLAPUR R- 33/11 KV 11 KV DONGAON
218 I ZONE CIRCLE DIVISION I S/DN. DONGAON AG 2497.608 2.50
SOLAPUR
BARAMAT SOLAPUR RURAL SOLAPUR R- 33/11 KV 11 KV KAWATHE
W

219 I ZONE CIRCLE DIVISION I S/DN. DONGAON AG 1850.826 1.85


SOLAPUR
BARAMAT SOLAPUR RURAL SOLAPUR R- 33/11 KV
220 I ZONE CIRCLE DIVISION I S/DN. DONGAON 11 KV NANDUR 2502.084 2.50
SOLAPUR
BARAMAT SOLAPUR RURAL SOLAPUR R- 33/11 KV MIDC
221 I ZONE CIRCLE DIVISION I S/DN. C. KATI - 1 11KV AG FEEDER 2678.886 2.68
SOLAPUR
BARAMAT SOLAPUR RURAL SOLAPUR R- 33/11 KV 11 KV KALMAN
222 I ZONE CIRCLE DIVISION I S/DN. WADALA Ag. 2925.812 2.93
SOLAPUR
BARAMAT SOLAPUR RURAL SOLAPUR R- 33/11 KV 11 KV PADASALI
223 I ZONE CIRCLE DIVISION I S/DN. WADALA Ag. 1735.942 1.74
SOLAPUR
BARAMAT SOLAPUR RURAL SOLAPUR R- 33/11 KV 11KV
224 I ZONE CIRCLE DIVISION I S/DN. WADALA ShelgaonAG 2215.62 2.22
657.85

CHANDR CHANDRA 33 KV
APUR PUR BALLARSHAH RAJURA VIHIRGAON
1 ZONE CIRCLE DIVISION S/DN. SUBSTATION CHANAKA AG 2096.26 2.10
CHANDR GADCHIR BRAMHAPURI BRAMHAPUR 33 KV B' PURI 11 Kv
2 APUR OLI DIVISION I S/DN. (KHED) Pimpalgaon AG 1747.878 1.75

Page 114 of 122


Page 115 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
ZONE CIRCLE SUBSTATIO

3.84

GONDIA BHANDAR BHANDARA BHANDARA 220 KV 11 KV Sunflag


1 ZONE A CIRCLE DIVSION S/DN. BHANDARA S/S Feeder 1957.504 1.96
GONDIA BHANDAR BHANDARA BHANDARA 11 KV Salebardi
2 ZONE A CIRCLE DIVSION S/DN. 33KV KARDHA (AGP) 1851.572 1.85
GONDIA BHANDAR BHANDARA MOHADI
3 ZONE A CIRCLE DIVSION S/DN. 33 KV Kardi Kardi AG 2276.046 2.28
GONDIA BHANDAR BHANDARA PAONI 33/11 kv ASGAON 11 KV KONDHA
4 ZONE A CIRCLE DIVSION S/DN. S/ST AG FEEDER 2169.368 2.17
GONDIA BHANDAR BHANDARA PAONI 33/11 kv ASGAON 11 KV MANGLI
5 ZONE A CIRCLE DIVSION S/DN. S/ST FEEDER 2312.6 2.31
GONDIA BHANDAR BHANDARA TUMSAR 132 KV MADGI
6 ZONE A CIRCLE DIVSION S/DN S/S 11kV BETALA Ag 1718.784 1.72
GONDIA BHANDAR BHANDARA TUMSAR

y
7 ZONE A CIRCLE DIVSION S/DN 33 KV TUMSAR 11kv Sihora AGP 1805.32 1.81
GONDIA BHANDAR SAKOLI O&M LAKHANDUR 33 KV VIRLEE 11 KV GOURALA
8 ZONE A CIRCLE DIVISION S/DN. SUB STATION AG FEEDER 1826.954 1.83

9
GONDIA
ZONE
BHANDAR
A CIRCLE
SAKOLI O&M
DIVISION
LAKHANDUR
S/DN.

op 33 KV VIRLEE
SUB STATION
11 KV VIRLEE AG
FEEDER 1952.282 1.95
17.87
C
JALGAON DHULE DHULE RURAL 33/11 KV 11 KV DUSANE
1 ZONE CIRCLE DIVISION SAKRI S/DN JAITANE AG 1762.798 1.76
JALGAON DHULE DHULE URBAN 33/11 KV SUB 11KV CHANDGAD
2 ZONE CIRCLE DIVISION NARDANA NARDANA AG 2120.878 2.12
JALGAON DHULE DHULE URBAN 33/11 KV SUB 11 KV
eb

3 ZONE CIRCLE DIVISION NARDANA SUKWAD TAWKHEDA AG 2256.65 2.26


JALGAON DHULE DONDAICHA SHINDKHED 33/11
4 ZONE CIRCLE DIVISION A CHIMTHANE CHIMTHANE 2118.64 2.12
JALGAON DHULE DONDAICHA SHINDKHED 33/11 KV
5 ZONE CIRCLE DIVISION A BAMHANE BAMHANE 2197.716 2.20
JALGAON DHULE DONDAICHA SHINDKHED 33/11 KV
6 ZONE CIRCLE DIVISION A SHINDKHEDA AKKADASE 2549.082 2.55
W

JALGAON DHULE DONDAICHA SHINDKHED 33/11 KV


7 ZONE CIRCLE DIVISION A SHINDKHEDA CHIMTHANE 1724.752 1.72
33/11KV
JALGAON DHULE DONDAICHA SHINDKHED LANGHANE SUB 11KV KALGAON
8 ZONE CIRCLE DIVISION A STATION AG 1712.07 1.71
JALGAON JALGAON BHUSAWAL BHUSAWAL 33/11 KV
9 ZONE CIRCLE UCR DIVISION (E&M) CHORWAD 11 KV Kurha Ag 1758.322 1.76
JALGAON JALGAON BHUSAWAL BHUSAWAL 33/11 KV 11 KV Sunasgaon
10 ZONE CIRCLE UCR DIVISION (E&M) CHORWAD Ag 3542.754 3.54
JALGAON JALGAON BHUSAWAL BHUSAWAL 33/11 KV
11 ZONE CIRCLE UCR DIVISION (E&M) VELHALE 11 KV Shindi Ag 1936.616 1.94
JALGAON JALGAON BHUSAWAL BHUSAWAL 33/11 KV 11 KV Velhale -
12 ZONE CIRCLE UCR DIVISION (E&M) VELHALE AG - 2919.844 2.92
JALGAON JALGAON BHUSAWAL 33/11 KV 11 KV
13 ZONE CIRCLE UCR DIVISION JAMNER JAMNER Kekatnimbhora 2829.578 2.83
JALGAON JALGAON BHUSAWAL 33/11 KV
14 ZONE CIRCLE UCR DIVISION JAMNER JAMNER 11 KV Shahapur 1964.218 1.96
JALGAON JALGAON BHUSAWAL 11 KV
15 ZONE CIRCLE UCR DIVISION PAHUR 132 KV PAHUR Gondegaon 3376.396 3.38
JALGAON JALGAON DHARANGAON 33/11 KV 11 KV Bohare-
16 ZONE CIRCLE DIVISION AMALNER-II KALAMSARE Pure AG- 1735.942 1.74
JALGAON JALGAON DHARANGAON 33/11KV 11KV AMALGAON
17 ZONE CIRCLE DIVISION AMALNER-II GANDHALI PURE AG 2578.922 2.58

Page 115 of 122

Page 116 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
SUBSTATION
JALGAON JALGAON DHARANGAON CHOPDA-II
18 ZONE CIRCLE DIVISION S/DN 132 KV CHOPDA 11 KV Akulkheda 1985.852 1.99
JALGAON JALGAON DHARANGAON CHOPDA-II 11 KV Ganpur
19 ZONE CIRCLE DIVISION S/DN 33/11 KV HATED Agr 1790.4 1.79
JALGAON JALGAON DHARANGAON CHOPDA-II
20 ZONE CIRCLE DIVISION S/DN 33/11 KV LASUR 11 KV Lasur Agr 2014.946 2.01
JALGAON JALGAON DHARANGAON ERANDOL 33/11KV UTRAN 11 KV BAMHNE
21 ZONE CIRCLE DIVISION S/DIVN. SUBSTATION AGR 1762.798 1.76
JALGAON
JALGAON JALGAON URBAN 33/11 KV 11 KV Kanalda
22 ZONE CIRCLE DIVISION JALGAON-R VIDGAON AG 1700.134 1.70
JALGAON JALGAON MUKTAINAGAR 33/11 KV 11 KV Engaon -
23 ZONE CIRCLE DIVISION BODWAD ENGAON Pure Ag.- 2410.326 2.41
JALGAON JALGAON MUKTAINAGAR VARANGAON 132 KV
24 ZONE CIRCLE DIVISION S/DN VARANGAON 11 KV Hatnoor 2570.716 2.57
JALGAON JALGAON PACHORA 33/11 KV 11 KV KURHAD
25 ZONE CIRCLE DIVISION PACHORA-I KURHAD AG 2747.518 2.75
33/11 KV

y
JALGAON JALGAON PACHORA PIMPALGAON 11 KV
26 ZONE CIRCLE DIVISION PACHORA-I HARESHWAR PIMPALGAON AG 2105.958 2.11
33/11 KV

27

28
JALGAON
ZONE

JALGAON
ZONE
JALGAON
JALGAON
CIRCLE

JALGAON
CIRCLE
JALGAON
PACHORA
DIVISION

PACHORA
DIVISION
PACHORA
PACHORA-I

PACHORA-II
op PIMPALGAON
HARESHWAR
132/11 KV
PACHORA
SUBSTATION
33 KV
11 KV VARSADE
AG

11 KV SAMNER
AG FEEDER
11 KV KARMAD
1897.824

2293.204
1.90

2.29
C
29 ZONE CIRCLE DIVISION PAROLA TAMASWADI AG FEEDER 1759.814 1.76
JALGAON JALGAON PACHORA 33 KV 11 KV MUNDANE
30 ZONE CIRCLE DIVISION PAROLA TAMASWADI Ag FDR 2017.93 2.02
JALGAON JALGAON SAVADA RAVER
31 ZONE CIRCLE DIVISION S/DIVISION. 33/11 KV NIMBOL 11 KV SANGAVA 2003.01 2.00
JALGAON JALGAON SAVADA SAVADA SUB
eb

32 ZONE CIRCLE DIVISION DIVISION. 132 KV SAVADA 11 kv LIS 1932.886 1.93


11 KV
JALGAON JALGAON SAVADA DONGARADE
33 ZONE CIRCLE DIVISION YAWAL I 132 KV YAWAL AGR 2258.142 2.26
JALGAON JALGAON SAVADA YAWAL II 11 KV NIMGAON
34 ZONE CIRCLE DIVISION SUBDN. 132 KV YAWAL AG 2418.532 2.42
W

JALGAON JALGAON SAVADA YAWAL II


35 ZONE CIRCLE DIVISION SUBDN. 132 KV YAWAL 11 KV SAKLI AG 2091.784 2.09
JALGAON JALGAON SAVADA YAWAL II
36 ZONE CIRCLE DIVISION SUBDN. 132 KV YAWAL 11 KV VADRI AG 1835.16 1.84
NANDURB NANDURBAR
JALGAON AR (O&M) NANDURBAR
37 ZONE CIRCLE DIVISION -R2 KHONDAMALI KOPARLI 2646.062 2.65
NANDURB
JALGAON AR SHAHADA
38 ZONE CIRCLE DIVISION SHAHADA-I 132KV SHAHADA 11KV ANARAD 2286.49 2.29
83.61

KOLHAPU KOLHAPU GADHINGLAJ 11 KV KUDNOOR


1 R ZONE R CIRCLE DIVISION CHANDGAD 33/11 KOWAD AG 2024.644 2.02
KOLHAPU KOLHAPU GADHINGLAJ
2 R ZONE R CIRCLE DIVISION CHANDGAD 33/11 KOWAD 11 KV Kagani Ag 4522.998 4.52
KOLHAPU KOLHAPU GADHINGLAJ
3 R ZONE R CIRCLE DIVISION CHANDGAD 33/11 KV ADKUR 11 KV BONJURDI 1897.824 1.90
KOLHAPU KOLHAPU GADHINGLAJ 33/11 KV 11 KV Shivanage
4 R ZONE R CIRCLE DIVISION CHANDGAD HALKARNI Ag 3292.098 3.29
KOLHAPU KOLHAPU GADHINGLAJ GADHINGLA 33/11 KV
5 R ZONE R CIRCLE DIVISION J GADHINGLAJ 11 KV Nool Ag 1995.55 2.00
Page 116 of 122
Page 117 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
KOLHAPU KOLHAPU GADHINGLAJ GADHINGLA 33/11 KV
6 R ZONE R CIRCLE DIVISION J GADHINGLAJ 11 KV Uttur Ag 4679.658 4.68
KOLHAPU KOLHAPU GADHINGLAJ GADHINGLA 33/11 KV 11 Kv Karambali
7 R ZONE R CIRCLE DIVISION J KAULAGE Ag 3693.446 3.69
KOLHAPU KOLHAPU GADHINGLAJ GADHINGLA 33/11KV
8 R ZONE R CIRCLE DIVISION J Bhadgaon s/stn 11 KV JARALI AG 3062.33 3.06
KOLHAPU KOLHAPU GADHINGLAJ 33/11 KV 11 KV Halkarni
9 R ZONE R CIRCLE DIVISION NESARI HALKARNI Ag 2731.852 2.73
KOLHAPU KOLHAPU GADHINGLAJ 33/11 KV
10 R ZONE R CIRCLE DIVISION NESARI HALKARNI 11 KV Hiduggi Ag 3862.042 3.86
KOLHAPU KOLHAPU GADHINGLAJ 33/11 KV 11 KV nagnoor
11 R ZONE R CIRCLE DIVISION NESARI HALKARNI Ag 1799.352 1.80
KOLHAPU KOLHAPU GADHINGLAJ 11 KV Talewadi
12 R ZONE R CIRCLE DIVISION NESARI 33/11 KV NESARI Ag 3350.286 3.35
KOLHAPU KOLHAPU JAYASINGPUR HATKANANG 33/11 KV
13 R ZONE R CIRCLE DIVISION ALE CHOKAK S/STN 11Kv Halondi Ag 2436.436 2.44
33/11 KV
KOLHAPU KOLHAPU JAYASINGPUR HATKANANG KUMBHOJ S/STN 11 KV
14 R ZONE R CIRCLE DIVISION ALE (HTK) Hingangaon Ag 1706.102 1.71

y
KOLHAPU KOLHAPU JAYASINGPUR
15 R ZONE R CIRCLE DIVISION JAYSINGPUR 33/11 KV Kothali 11KV LIS 2243.968 2.24
KOLHAPU KOLHAPU JAYASINGPUR

op
16 R ZONE R CIRCLE DIVISION VADGAON 33/11KV SHIYE 11KV TOP II AG 2413.31 2.41
KOLHAPU KOLHAPU KOLHAPUR 33/11 KV S/ST 11 kV
17 R ZONE R CIRCLE RURAL II DIV. HUPARI PATTANKODOLI SANGWADE AG 2434.944 2.43
KOLHAPU KOLHAPU KOLHAPUR 33/11KV
18 R ZONE R CIRCLE RURAL II DIV. KAGAL SIDHNERLI 11KV Shendur Ag 3652.416 3.65
11 KV
KOLHAPU KOLHAPU KOLHAPUR 33/11 KV HAMIDWADA AG
C
19 R ZONE R CIRCLE RURAL II DIV. MURGUD SONAGE S/S FEEDER 3944.848 3.94
KOLHAPU KOLHAPU KOLHAPUR 33/11 Kv 11 KV LINGNOOR
20 R ZONE R CIRCLE RURAL II DIV. MURGUD KAPASHI AG 2697.536 2.70
KOLHAPU KOLHAPU KOLHAPUR RADHANAGA 33/11 KV 11 KV SOLANKUR
21 R ZONE R CIRCLE RURAL II DIV. RI SOLANKUR S/S AG 3636.75 3.64
eb

KOLHAPU KOLHAPU KOLHAPUR RADHANAGA 33/11 KV TARALE 11KV TARALE AG


22 R ZONE R CIRCLE RURAL II DIV. RI SUB STSTION (TARLE) 3605.418 3.61
KOLHAPU KOLHAPU KOLHAPUR RADHANAGA 33/11KV WALWA 11 KV
23 R ZONE R CIRCLE RURAL II DIV. RI S/S ARJUNWADA AG 4619.232 4.62
KOLHAPU KOLHAPU KOLHAPUR RADHANAGA 33/11KV WALWA 11KV
24 R ZONE R CIRCLE RURAL II DIV. RI S/S SHELEWADI AG 4417.812 4.42
KOLHAPU SANGLI ISLAMPUR 33/11 KV WALWA 11 KV
W

25 R ZONE CIRCLE DIVISION ASTHA S/S Padawalwadi Ag 2768.406 2.77


KOLHAPU SANGLI ISLAMPUR
26 R ZONE CIRCLE DIVISION ASTHA 33/11KV ASHTA 11 Kv Ashta Ag 2135.052 2.14
KOLHAPU SANGLI ISLAMPUR 33/11KV 11KV SHIGAON
27 R ZONE CIRCLE DIVISION ASTHA Falkewadi RIVER AG 2154.448 2.15
KOLHAPU SANGLI ISLAMPUR ISLAMPUR 11 KV KHUBI AG
28 R ZONE CIRCLE DIVISION (I) 110 KV Rethare FEEDER 2142.512 2.14
KOLHAPU SANGLI ISLAMPUR ISLAMPUR 110/33/11 KV 11 KV BORGON
29 R ZONE CIRCLE DIVISION (I) BORGAON AG FEEDER 3123.502 3.12
KOLHAPU SANGLI ISLAMPUR ISLAMPUR 110/33/11 KV 11 KV KHED AG
30 R ZONE CIRCLE DIVISION (I) BORGAON FEEDER 2392.422 2.39
KOLHAPU SANGLI ISLAMPUR ISLAMPUR 110/33/11 KV 11 KV WALWA
31 R ZONE CIRCLE DIVISION (I) BORGAON FEEDER 2410.326 2.41
KOLHAPU SANGLI ISLAMPUR ISLAMPUR 33/11 KV 11 KV KAMERI
32 R ZONE CIRCLE DIVISION (I) YEDENIPANI STN AG FEEDER 3082.472 3.08
KOLHAPU SANGLI ISLAMPUR ISLAMPUR 33/11 KV 11 KV Tambave
33 R ZONE CIRCLE DIVISION (II) KASEGAON Ag 2748.264 2.75
KOLHAPU SANGLI ISLAMPUR ISLAMPUR 11 KV Aitwade Kh
34 R ZONE CIRCLE DIVISION (II) 33/11 KV KURLAP Ag 1887.38 1.89
KOLHAPU SANGLI ISLAMPUR ISLAMPUR
35 R ZONE CIRCLE DIVISION (II) 33/11 KV KURLAP 11 KV WASHI AG 2875.83 2.88
KOLHAPU SANGLI ISLAMPUR ISLAMPUR
36 R ZONE CIRCLE DIVISION (II) 33/11 KV KURLAP 11 KV YELUR AG 1848.588 1.85

Page 117 of 122

Page 118 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
KOLHAPU SANGLI ISLAMPUR ISLAMPUR 33/11 KV 11 KV Devarde
37 R ZONE CIRCLE DIVISION (II) Karanjawade S/S AG 2490.894 2.49
KOLHAPU SANGLI ISLAMPUR ISLAMPUR 33/11 KV
38 R ZONE CIRCLE DIVISION (II) YEDENIPANI STN 11 KV ITKARE AG 2408.834 2.41
KOLHAPU SANGLI ISLAMPUR ISLAMPUR 33/11KV
39 R ZONE CIRCLE DIVISION (II) ISLAMPUR 11 KV Peth Ag 3145.882 3.15
KOLHAPU SANGLI ISLAMPUR 33/11 KV
40 R ZONE CIRCLE DIVISION SHIRALA SHIRALA 11 KV BIUR AG 3196.61 3.20
KOLHAPU SANGLI ISLAMPUR 33/11 MIDC 11 KV KARMALA
41 R ZONE CIRCLE DIVISION SHIRALA SHIRALA AG 2249.936 2.25
KOLHAPU SANGLI ISLAMPUR 33/11 MIDC 11 KV
42 R ZONE CIRCLE DIVISION SHIRALA SHIRALA PADALIWADI AG 2346.17 2.35
33/11KV
KOLHAPU SANGLI ISLAMPUR CHIKHALI SUB
43 R ZONE CIRCLE DIVISION SHIRALA STATION 11 KV KANDE AG 1791.892 1.79
KOLHAPU SANGLI KAVATHEMAHA 110/33/11 KV 11 KV MALLAL
44 R ZONE CIRCLE NKAL DIVISION JATH JAT AG 2322.298 2.32
KOLHAPU SANGLI KAVATHEMAHA 110/33/11 KV 11 KV Rampur
45 R ZONE CIRCLE NKAL DIVISION JATH JAT AG 2680.378 2.68

y
KOLHAPU SANGLI KAVATHEMAHA 33/11 KV BILLUR
46 R ZONE CIRCLE NKAL DIVISION JATH S/STN 11 KV Billur AG 1982.122 1.98
KOLHAPU SANGLI KAVATHEMAHA 33/11 KV 11 KV ANKALE

op
47 R ZONE CIRCLE NKAL DIVISION JATH DAFALAPUR DORLI AG 1875.444 1.88
KOLHAPU SANGLI KAVATHEMAHA 33/11 KV
48 R ZONE CIRCLE NKAL DIVISION JATH Dhawadwadi 11 KV Hivare AG 1820.24 1.82
11 KV
KOLHAPU SANGLI KAVATHEMAHA 33/11 KV Rawalgundwadi
49 R ZONE CIRCLE NKAL DIVISION JATH PACHAPUR AG 1944.076 1.94
KOLHAPU SANGLI KAVATHEMAHA 33/11 KV 11 KV SHEGAON
C
50 R ZONE CIRCLE NKAL DIVISION JATH SHEGAON AG 3228.688 3.23
11 KV
KOLHAPU SANGLI KAVATHEMAHA 33/11 KV SHINGANHALI
51 R ZONE CIRCLE NKAL DIVISION JATH SHEGAON AG 1780.702 1.78
KOLHAPU SANGLI KAVATHEMAHA 33/11 KV
eb

52 R ZONE CIRCLE NKAL DIVISION JATH UMRANI 11 KV Umrani AG 1792.638 1.79


KOLHAPU SANGLI KAVATHEMAHA 33/11 KV 11KV
53 R ZONE CIRCLE NKAL DIVISION JATH WALEKHINDI WALEKHINDI AG 2226.81 2.23
KOLHAPU SANGLI KAVATHEMAHA 11 KV JIRGYAL
54 R ZONE CIRCLE NKAL DIVISION JATH 33/11KV JIRGYAL AG 1841.128 1.84
KOLHAPU SANGLI KAVATHEMAHA K.MAHANKA 33/11 KV 11 KV BANEWADI
55 R ZONE CIRCLE NKAL DIVISION L Haroli(Deshing) AG 1886.634 1.89
W

KOLHAPU SANGLI KAVATHEMAHA K.MAHANKA 33/11 KV


56 R ZONE CIRCLE NKAL DIVISION L RANJANI 11KV Kokle Ag 2548.336 2.55
KOLHAPU SANGLI KAVATHEMAHA K.MAHANKA
57 R ZONE CIRCLE NKAL DIVISION L 33/11 kv kAROLI 11 KV Kuktoli Ag 2402.12 2.40
KOLHAPU SANGLI KAVATHEMAHA K.MAHANKA
58 R ZONE CIRCLE NKAL DIVISION L 33/11KV Borgaon 11KV Borgaon Ag 3888.898 3.89
KOLHAPU SANGLI KAVATHEMAHA K.MAHANKA 33/11KV
59 R ZONE CIRCLE NKAL DIVISION L DHALGAON 11KV Chorochi 2051.5 2.05
KOLHAPU SANGLI KAVATHEMAHA K.MAHANKA 33/11KV
60 R ZONE CIRCLE NKAL DIVISION L DHALGAON 11Kv Dudhebhavi 2762.438 2.76
KOLHAPU SANGLI KAVATHEMAHA K.MAHANKA 33/11KV 11 KV
61 R ZONE CIRCLE NKAL DIVISION L K.MAHANKAL HINGANGAON AG 2744.534 2.74
KOLHAPU SANGLI KAVATHEMAHA K.MAHANKA 33/11KV
62 R ZONE CIRCLE NKAL DIVISION L K.MAHANKAL 11KV KUCHI AG 2517.75 2.52
KOLHAPU SANGLI KAVATHEMAHA K.MAHANKA 33/11KV 11KV Langerpeth
63 R ZONE CIRCLE NKAL DIVISION L K.MAHANKAL Ag 2889.258 2.89
KOLHAPU SANGLI KAVATHEMAHA K.MAHANKA 33/11KV
64 R ZONE CIRCLE NKAL DIVISION L K.MAHANKAL 11KV Ranjani Ag 2337.218 2.34
KOLHAPU SANGLI KAVATHEMAHA K.MAHANKA 33/11KV 11KV S.Factory
65 R ZONE CIRCLE NKAL DIVISION L K.MAHANKAL Ag 1775.48 1.78
KOLHAPU SANGLI KAVATHEMAHA K.MAHANKA 33/11KV 11KV Shelkewadi
66 R ZONE CIRCLE NKAL DIVISION L KUNDLAPUR Ag 2949.684 2.95
KOLHAPU SANGLI KAVATHEMAHA MIRAJ 33/11 KV
67 R ZONE CIRCLE NKAL DIVISION RURAL-II BELANKI 11 KV Khatav 1916.474 1.92
Page 118 of 122
Page 119 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
S/DN.
MIRAJ
KOLHAPU SANGLI KAVATHEMAHA RURAL-II 33/11 KV 11 KV Lingnoor
68 R ZONE CIRCLE NKAL DIVISION S/DN. LINGNOOR Ag 2402.12 2.40
MIRAJ
KOLHAPU SANGLI KAVATHEMAHA RURAL-II 33/11 KV
69 R ZONE CIRCLE NKAL DIVISION S/DN. MALLEWADI 11 kv Erandoli 2946.7 2.95
MIRAJ
KOLHAPU SANGLI KAVATHEMAHA RURAL-II
70 R ZONE CIRCLE NKAL DIVISION S/DN. 33/11 kv Bedag 11 KV Bedag 1911.998 1.91
MIRAJ
KOLHAPU SANGLI KAVATHEMAHA RURAL-II
71 R ZONE CIRCLE NKAL DIVISION S/DN. 33/11 kv Bedag 11 KV rade ag 2483.434 2.48
KOLHAPU SANGLI KAVATHEMAHA SANKH 110/33/11 KV
72 R ZONE CIRCLE NKAL DIVISION S/DN. SANKH 11 KV SANKH AG 1823.224 1.82
KOLHAPU SANGLI KAVATHEMAHA SANKH 33/11 KV 11 KV
73 R ZONE CIRCLE NKAL DIVISION S/DN. DARIKONUR DARIBADCHI AG 2214.874 2.21
KOLHAPU SANGLI KAVATHEMAHA SANKH
74 R ZONE CIRCLE NKAL DIVISION S/DN. 33/11 KV SONYAL 11 KV UTAGI AG 2081.34 2.08

y
KOLHAPU SANGLI KAVATHEMAHA SANKH 11 KV SONALGI
75 R ZONE CIRCLE NKAL DIVISION S/DN. 33/11 KV UMADI AG 1771.004 1.77
KOLHAPU SANGLI SANGLI RURAL MIRAJ 33/11 KV 11 KV MHAISHAL
76

77

78
R ZONE
KOLHAPU
R ZONE
KOLHAPU
R ZONE
KOLHAPU
CIRCLE
SANGLI
CIRCLE
SANGLI
CIRCLE
SANGLI
DIVISION
SANGLI RURAL
DIVISION
SANGLI RURAL
DIVISION
SANGLI RURAL
RURAL
MIRAJ
RURAL
MIRAJ
RURAL
SAVLAJ
op MHAISHAL

33/11 KV SONI
33/11 KV Savali
Kanadwadi
33/11 KV ANJANI
AG
11KV Bhose AG
Spare

11 KV Savali Ag
11 kv Vadgaon
2201.446

2684.854

1883.65
2.20

2.68

1.88
C
79 R ZONE CIRCLE DIVISION S/DN. (NAGEWADI) Ag 1830.684 1.83
KOLHAPU SANGLI SANGLI RURAL SAVLAJ 11 KV Khujgaon
80 R ZONE CIRCLE DIVISION S/DN. 33/11 KV Koulage AG 3031.744 3.03
KOLHAPU SANGLI SANGLI RURAL SAVLAJ 33/11 KV 11 KV Manerajuri
81 R ZONE CIRCLE DIVISION S/DN. MANERAJURI Ag 2483.434 2.48
KOLHAPU SANGLI SANGLI RURAL SAVLAJ 33/11 KV Savlaj 11 KV
eb

82 R ZONE CIRCLE DIVISION S/DN. Substation Dongarsoni AG 2661.728 2.66


KOLHAPU SANGLI SANGLI RURAL SAVLAJ 33/11 KV 11 KV Biranwadi
83 R ZONE CIRCLE DIVISION S/DN. WAIFALE Ag 2022.406 2.02
KOLHAPU SANGLI SANGLI RURAL SAVLAJ 33/11 KV
84 R ZONE CIRCLE DIVISION S/DN. WAIFALE 11 KV Waifale Ag 2954.906 2.95
KOLHAPU SANGLI SANGLI RURAL TASGAON 110/33/11 KV 11 KV MATKUNKI
W

85 R ZONE CIRCLE DIVISION (I) TASGAON AG 3259.274 3.26


KOLHAPU SANGLI SANGLI RURAL TASGAON 33/11 KV 11 KV SHIRGAON
86 R ZONE CIRCLE DIVISION (I) BORGAON AG 2101.482 2.10
KOLHAPU SANGLI SANGLI RURAL TASGAON 33/11 KV 11kv VISAPUR
87 R ZONE CIRCLE DIVISION (I) BORGAON AG 2381.978 2.38
KOLHAPU SANGLI SANGLI RURAL TASGAON 33/11 KV 11 KV HATNUR
88 R ZONE CIRCLE DIVISION (I) HATNUR AG 3401.76 3.40
KOLHAPU SANGLI SANGLI RURAL TASGAON 33/11 KV
89 R ZONE CIRCLE DIVISION (I) KUMTHE 11 KV Kumthe Ag 3001.158 3.00
KOLHAPU SANGLI SANGLI RURAL TASGAON 33/11 KV
90 R ZONE CIRCLE DIVISION (I) KUMTHE 11 KV Nagaon Ag 1918.712 1.92
KOLHAPU SANGLI SANGLI RURAL TASGAON 11KV ARAWADE
91 R ZONE CIRCLE DIVISION (I) 33/11 KV Koulage AG 2712.456 2.71
KOLHAPU SANGLI SANGLI RURAL TASGAON 110/33/11 KV 11 KV ARWADE
92 R ZONE CIRCLE DIVISION (II) TASGAON AG 2464.038 2.46
KOLHAPU SANGLI SANGLI RURAL TASGAON 110/33/11 KV 11 KV DHAVLI
93 R ZONE CIRCLE DIVISION (II) TASGAON AG 2757.962 2.76
KOLHAPU SANGLI SANGLI RURAL TASGAON 110/33/11 KV 11 KV NIMANI
94 R ZONE CIRCLE DIVISION (II) TASGAON AG 1755.338 1.76
KOLHAPU SANGLI SANGLI RURAL TASGAON 33/11 KV 11 KV
95 R ZONE CIRCLE DIVISION (II) ANKALHKOP BHILAWADI AG 3409.22 3.41
KOLHAPU SANGLI SANGLI RURAL TASGAON 33/11 KV 11 KV
96 R ZONE CIRCLE DIVISION (II) ANKALHKOP NAGTHANE AG 3641.972 3.64

Page 119 of 122

Page 120 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
33/11 KV
KOLHAPU SANGLI SANGLI RURAL TASGAON Bhilwadi ( 11 KV MALWADI
97 R ZONE CIRCLE DIVISION (II) Malwadi ) AG 1968.694 1.97
KOLHAPU SANGLI SANGLI RURAL TASGAON 33/11 KV 11 KV NIMANI
98 R ZONE CIRCLE DIVISION (II) TURACHI AG 2261.126 2.26
KOLHAPU SANGLI SANGLI RURAL VISHRAMBA 33/11 KV 11 KV Kaleran (
99 R ZONE CIRCLE DIVISION G BUDHGAON Kavalpur ) AG 2621.444 2.62
KOLHAPU SANGLI SANGLI RURAL VISHRAMBA 33/11 KV 11 KV Kavalapur
100 R ZONE CIRCLE DIVISION G KUMTHE Ag 2243.222 2.24
KOLHAPU SANGLI ATPADI 33/11 KV
101 R ZONE CIRCLE VITA DIVISION S/DN. KARGANI 11 KV Banpuri AG 2774.374 2.77
KOLHAPU SANGLI ATPADI 33/11 KV
102 R ZONE CIRCLE VITA DIVISION S/DN. KARGANI 11 KV Hivtad AG 2394.66 2.39
KOLHAPU SANGLI ATPADI 33/11 KV
103 R ZONE CIRCLE VITA DIVISION S/DN. Pujarwadi 11 KV Kauthuly 2340.202 2.34
KOLHAPU SANGLI ATPADI 33/11 KV 11 KV
104 R ZONE CIRCLE VITA DIVISION S/DN. Pujarwadi Nimbawade 3480.836 3.48
33/11 KV SUB-
KOLHAPU SANGLI ATPADI STATION,

y
105 R ZONE CIRCLE VITA DIVISION S/DN. ATPADI 11 KV Atpadi AG 2049.262 2.05
33/11 KV SUB-
KOLHAPU SANGLI ATPADI STATION, 11 KV Madgule

op
106 R ZONE CIRCLE VITA DIVISION S/DN. ATPADI AG 5360.756 5.36
33/11 KV
KOLHAPU SANGLI ATPADI SUBSTATION, 11 KV Nelkaranji
107 R ZONE CIRCLE VITA DIVISION S/DN. KHARSUNDI AG 3209.292 3.21
33/11 KV
KOLHAPU SANGLI ATPADI SUBSTATION,
108 R ZONE CIRCLE VITA DIVISION S/DN. KHARSUNDI 11 KV Walvan AG 1850.826 1.85
C
33/11 KV
KOLHAPU SANGLI ATPADI SUBSTATION,
109 R ZONE CIRCLE VITA DIVISION S/DN. KHARSUNDI 11 KV Zare AG 2778.104 2.78
KOLHAPU SANGLI 33/11 KV Hiware 11 KV HIVARE
110 R ZONE CIRCLE VITA DIVISION KHANAPUR Substation AG 2850.466 2.85
eb

KOLHAPU SANGLI 33/11 KV 11 KV Balawadi


111 R ZONE CIRCLE VITA DIVISION KHANAPUR KHANAPUR Ag 2995.936 3.00
KOLHAPU SANGLI KIRLOSKAR 110/33/11 KV 11 KV
112 R ZONE CIRCLE VITA DIVISION WADI S/DN. KUNDAL S/ST DEORASHTRE 1766.528 1.77
KOLHAPU SANGLI KIRLOSKAR 110/33/11 KV
113 R ZONE CIRCLE VITA DIVISION WADI S/DN. KUNDAL S/ST 11 KV TAKARI 2319.314 2.32
KOLHAPU SANGLI KIRLOSKAR 33/11 KV K'WADI 11 KV
W

114 R ZONE CIRCLE VITA DIVISION WADI S/DN. S/S SAWANTPUR 2230.54 2.23
KOLHAPU SANGLI KIRLOSKAR 33/11 KV M 11KV MOHITE
115 R ZONE CIRCLE VITA DIVISION WADI S/DN. WADGAON VADGAON 2888.512 2.89
KOLHAPU SANGLI KIRLOSKAR 33/11 KV
116 R ZONE CIRCLE VITA DIVISION WADI S/DN. SANDAGEWADI 11 KV Andhali Ag 2825.848 2.83
KOLHAPU SANGLI KIRLOSKAR 33/11 KV 11KV
117 R ZONE CIRCLE VITA DIVISION WADI S/DN. SANDAGEWADI BAMBAWADE AG 1828.446 1.83
KOLHAPU SANGLI 33/11 KV 11 KV CHIKHALI
118 R ZONE CIRCLE VITA DIVISION VITA I S/DN. KADEPUR AG 1983.614 1.98
KOLHAPU SANGLI 33/11 KV
119 R ZONE CIRCLE VITA DIVISION VITA I S/DN. KADEPUR 11 KV Wangi 3219.736 3.22
KOLHAPU SANGLI 33/11 KV WANGI 11 KV YERALA
120 R ZONE CIRCLE VITA DIVISION VITA I S/DN. SUB-STATION AG 2401.374 2.40
KOLHAPU SANGLI BELAWADE
121 R ZONE CIRCLE VITA DIVISION VITA I S/DN. S/STN 11 KV Raigaon 2837.038 2.84
KOLHAPU SANGLI BELAWADE
122 R ZONE CIRCLE VITA DIVISION VITA I S/DN. S/STN 11 KV Tondoli 2828.832 2.83
KOLHAPU SANGLI VITA II 33/11 KV ALSAND 11 KV Umar
123 R ZONE CIRCLE VITA DIVISION S/DN. S/S Kanchan 2005.994 2.01
KOLHAPU SANGLI VITA II 33/11 KV KARVE 11 KV PARE
124 R ZONE CIRCLE VITA DIVISION S/DN. MIDC FEEDER 3617.354 3.62
KOLHAPU SANGLI VITA II 33/11 KV 11 kv Yetgaon
125 R ZONE CIRCLE VITA DIVISION S/DN. NAGEWADI S/S AG FEEDER 1972.424 1.97

Page 120 of 122


Page 121 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
KOLHAPU SANGLI VITA II 33/11 KV STN 11 KV
126 R ZONE CIRCLE VITA DIVISION S/DN. LENGRE VEJEGAON AG 3459.948 3.46
KOLHAPU SANGLI VITA II 33/11 KV STN 11 KV Lengare
127 R ZONE CIRCLE VITA DIVISION S/DN. LENGRE Ag 2314.838 2.31
331.96

LATUR 11 KV
ZONE, LATUR LATUR MURURD (R) KARKATTA-AG-
1 LATUR CIRCLE DIVISION S/DN 33/11 KV MURUD FEEDER 1906.776 1.91
1.91

NAGPUR
NAGPUR (R) NAGPUR I KUHI (R) 11 KV BHOJAPUR
1 ZONE CIRCLE DIVISION S/DN. 33 KV KUHI AG 1932.14 1.93
1.93

y
1

2
NANDED
ZONE
NANDED
ZONE
NANDED
HINGOLI
CIRCLE
HINGOLI
CIRCLE
HINGOLI
HINGOLI
DIVSION
HINGOLI
DIVSION
HINGOLI
HINGOLI (R)
S/DN
HINGOLI (R)
S/DN
HINGOLI (R)
op 33 KV
YASHWANT
NAGAR HINGOLI

33KV NARSI(N)
11 KV LOHGAON
AG

11KV GHOTA AG
1840.382

1744.148
1.84

1.74
C
3 ZONE CIRCLE DIVSION S/DN 33KV NARSI(N) 11KV PAHENI AG 1809.05 1.81
NANDED HINGOLI HINGOLI KALAMNURI 33/11 KV GAUL 11 KV SHIVANI
4 ZONE CIRCLE DIVSION (R) S/DN BAZAR AG 2427.484 2.43
NANDED HINGOLI HINGOLI KALAMNURI 33/11 KV SUKLI 11 KV
5 ZONE CIRCLE DIVSION (R) S/DN VEER DANDEGAON AG 1721.022 1.72
eb

SENGAON 33 KV
NANDED HINGOLI HINGOLI SUB- PANKANHERGAO 11 KV JAYPUR
6 ZONE CIRCLE DIVSION DIVISION N AG 1829.938 1.83
11.37
W

AHMEDNAGAR
NASIK A' NAGAR RURAL 33/11KV 11 KV
1 ZONE CIRCLE DIVISION SHEVGAON BALAMTAKELI BODHEGAON 1780.702 1.78
NASIK A' NAGAR KARJAT (R) BELWANDI 33/11KV
2 ZONE CIRCLE DIVISION S/DN. BELWANDI 11KV LONI I 1792.638 1.79
NASIK A' NAGAR KARJAT (R) BELWANDI 33/11KV
3 ZONE CIRCLE DIVISION S/DN. CHIMBHALE 11KV BORI 1714.308 1.71
NASIK A' NAGAR KARJAT (R) BELWANDI 33/11KV 11 KV
4 ZONE CIRCLE DIVISION S/DN. TANDALI D BHANGAON 1760.56 1.76
NASIK A' NAGAR KARJAT (R) BELWANDI 33/11KV
5 ZONE CIRCLE DIVISION S/DN. VISAPUR 11 KV NIMBHAVI 1783.686 1.78
NASIK A' NAGAR KARJAT (R) 132KV
6 ZONE CIRCLE DIVISION SHRIGONDA SHRIGONDA 11KV SHEDGAON 1877.682 1.88
NASIK A' NAGAR KARJAT (R) 33/11 KV
7 ZONE CIRCLE DIVISION SHRIGONDA ANGARE 11 KV ANGARE 1883.65 1.88
NASIK A' NAGAR KARJAT (R) 33/11 KV
8 ZONE CIRCLE DIVISION SHRIGONDA ANGARE 11 KV KAUTHA 2167.13 2.17
NASIK A' NAGAR KARJAT (R)
9 ZONE CIRCLE DIVISION SHRIGONDA 33/11KV KASHTI 11KV KAUTHA 1771.75 1.77
NASIK A' NAGAR SANGEMNER 11 KV VITHA
10 ZONE CIRCLE DIVISION RAJUR 33/11 KV RAJUR FEEDER 1914.236 1.91
NASIK NASIK (U) CHANDWAD PIMPALGAO 33/11 KV
11 ZONE CIRCLE DIVISION N BOPEGAON 11 KV RAJAPUR 2697.536 2.70
Page 121 of 122

Page 122 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Maharashtra State Power Generation Company Ltd.


Date: 23.03.2017
Load In Hp
SR. Subdivisio AG
Zone Circle Division Substation Feeder
No. n Load in Load in
KW MW
NASIK NASIK (U) CHANDWAD PIMPALGAO 33/11 KV 11 KV RANMALA
12 ZONE CIRCLE DIVISION N PIMPALGAON AG 2294.696 2.29
NASIK NASIK (U) CHANDWAD PIMPALGAO 33/11 KV
13 ZONE CIRCLE DIVISION N PIMPALGAON 11 KV WANI 1858.286 1.86
NASIK NASIK (U) NASIK RURAL DINDORI 11KV
14 ZONE CIRCLE DIVISION (R) SUBDN LAKHAMAPUR LAKHAMAPUR AG 2026.136 2.03
27.32

PUNE PUNE (R) MANCHAR O&M 33/11KV


1 ZONE CIRCLE DIVISION MANCHAR KATHAPUR 11KV KATHAPUR 2011.216 2.01
PUNE PUNE (R) MANCHAR O&M 33/11KV 11KV
2 ZONE CIRCLE DIVISION MANCHAR KATHAPUR LAKHANGAON 2369.296 2.37
4.38

Total MW 1549.85

y
op
C
eb
W

Page 122 of 122


Page 123 of 194
TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Responses to Pre -Bid Queries


Section & Page Description as per RFP Query/Clarification requested Mahagenco Reply
Sr.No
Clause no. no.
Section I The bidder shall identify 100% land required for Request you to remove the restriction of Land Revised Clause:-
Instructions to the project within the periphery of 3 KM from the being within the periphery of 3 KM from the The bidder shall identify 100% land required for the
1 Bidder 1.1 (a) 15 substation where the power will be evacuated at the substation as there might be issues of project in the jurisdiction of the proposed substation
time of submission of bid unavailability of land. where the power will be evacuated at the time of
submission of bid.
Section I The bidder shall identify 100% land required for The bidders shall be given the flexibility to bid This clause is revised as above
Instructions to the project within the periphery of 3 KM from the without deciding the sub station. After the LoA is
Bidder 1.1 (a) substation where the power will be evacuated at the issued, the bidder shall be given time to survey and
time of submission of bid assess the available capacities at the substations.

y
2 16
This would ensure that the prices of lands near
substations are not increased by the owners due to

op
sudden increase in demand.

Section IV; 1 The Declared CUF shall in no case be less than Please confirm if declared CUF is 22%, then Tender Condition Prevails
(a) 19% & more than 22% over a year. They shall generation up to 22% ± 10% will be purchased by
3 47 maintain generation so as to achieve CUF in the Mahagenco.
range of +10% of their declared value during PPA

C
duration.
Section I The individual project capacity to be developed If the maximum load at substation is less than the Revised Clause:-
Instructions to shall be the maximum AG load connected to the load mentioned in Annexure - 20, the successful The individual project capacity to be developed shall
Bidder; 1.3 (i) substation as per enclosed list of the bidder shall be allowed to reduce the allocated be tentative and maximum AG load connected to the
substation capacity. In such an event of short closing, the substation as per enclosed tentative list of the
4 16 eb successful bidder shall not be penalized in any way
substation however capacity shall be finalized as per
the actual load connected and permitted load
connectivity as per MSEDCL.
Section I However the bidder shall be allowed to change the Bidder should be allowed to change the location Clause Revised:-
Instructions to location of the project within the same Taluka only of project and substation irrespective of the However the bidder shall be allowed to change the
W
Bidder 1.1 (a) once Taluka, i.e. the location and substation can be location of the project within the jurisdiction of the
5 15
changed once till Financial Closure to be in any same substation only once.
Taluka. This will ensure more participation and
more competitive bidding

Page 124 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section & Page Description as per RFP Query/Clarification requested Mahagenco Reply
Sr.No
Clause no. no.
Section I An additional 250MW capacity through Green- a.) Please confirm that only Successful Bidders Revised Clause:
Instructions to shoe option may be offered to the Participating will be considered for the additional 250 MW An additional 250MW capacity through Green-shoe
Bidder 1.2 (b) Bidders, who are willing to execute PPAs with capacity, as only Successful Bidders will have the option may be offered to the Techno commercially
(i) MSPGCL at the lowest tariff (L1 rate) discovered capability of executing additional Capacity at a qualified Bidders, who are willing to execute PPAs
under Competitive Bidding Process (followed by e- Low tariff.
with MSPGCL at the lowest tariff (L1 rate)
reverse auction) to the extent of their respective
6 15 discovered under Competitive Bidding Process
quoted capacity b). Please clarify how the Selection of Bidders for
the allocation of the additional 250 MW of will be (followed by e-reverse auction) to the extent of their
done. respective quoted capacity
If more than one Bidders agree to accept the

y
additional 250 MW capacity, which Bidder will be
allocated the additional capacity?

op
Section IV In case the availability is more than the maximum a. Please confirm that 100% of the power Tender condition prevails
Special Terms CUF specified, the SPD will be free to sell it to generated by SPD, up to a declared CUF of 22%
and any other entity provided first right of refusal will ,will be purchased by Mahagenco.
Conditions; 1 vest with the Mahagenco. In case the Mahagenco
7 (d) 47 purchases the excess generation, the same may be b. Any generation above 22% should also be
done at 75% (seventy-five per cent) of the PPA purchased by Mahagenco, at reduced tariff.

C
tariff.

Section III; The project shall be commissioned within 13 As per the revised MNRE timelines, the project clause Revised:
Clause 4 months from the date of execution of the PPA. shall be commissioned within 21 months from the Capacity in MW -Commissioned
eb date of execution of PPA 1 0-250 MW - 15 month
8 42 2 250-500 MW - 18 month
3 500-750 MW - 21 month

Section 1 till the time of achievement of Financial Closure As per the revised MNRE timelines, the successful Clause Revised. Financial Closure:
W
Instructions to i.e. Within 7 month from the date of signing of bidder shall achieve financial closure within 12 Capacity in MW - Financial Closure
Bidder 1.1 (a) PPA months from the date of execution of PPA. 0-250 MW - 6 month
9 15 Request you to amend this clause of achievement 250-500 MW - 8 month
of Financial Closure i.e. Within 7 month from the
500-750 MW - 12 month
date of signing of PPA

Section IV Power Purchase Agreement: Mahagenco shall enter Please confirm all the necessary approvals for PPA will be signed after approval of PPA from
Special Terms into Power purchase agreement (PPA) with executing the PPA, including approvals and MERC.
10 and 49 Bidders selected based on this RfP. permits from State Regulatory Commission, shall
Conditions; be obtained prior to issuance of LoA
Clause 6

Page 125 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section & Page Description as per RFP Query/Clarification requested Mahagenco Reply
Sr.No
Clause no. no.
Section IV ; Change in law The Change in Law clause must be as per the The clause is amended and enclosed as an Annexure-
Clause 7 standard MNRE provisions. Please amend the A.
11 48 clause to include "change in rates of taxes, duties
and cess"

Section I ..the shortlisted bidders shall be invited for the Please allow all technically and financially Tender condition prevails
Instructions to Reverse Auction qualified bidders to participate in e-reverse auction
12 28
Bidder 17 (ii)

Section IV Mahagenco shall enter into Power purchase PPA shall be signed directly with MSEDCL since Tender condition prevails

y
Special Terms agreement (PPA) with Bidders selected based on the offtaker is MSEDCL
13 and 48 this RfP.
Conditions;

op
Clause 6
Section I The successful bidder shall submit documentary As per the standard MNRE guidelines, grid Tender condition prevails
Instructions to evidence for securing connectivity with grid from connectivity shall be obtained till the Financial
Bidder, 12 B MSEDCL within 7 month from the date of signing Closure i.e. within 12 months of execution of PPA.
of PPA. Request you to amend the timeline to 12 months.
14 26

C
Section III Bidders selected by Mahagenco based on this RFP The PBG submission must be only 2 days prior to Tender condition prevails
General shall submit Performance Security in the form of
eb signing of PPA.
Terms and Bank Guarantee for a value @ Rs 20 Lakh / MW
15 Conditions ; 41 for each awarded project within 21 days of
Clause 1 issuance of LoA or 2 days prior to signing of PPA
of that individual Solar power Project.

Section I The responsibility of getting the grid connectivity Required infrastructure and approvals for Tender condition prevails
W
Instructions to with MSEDCL shall entirely be of the successful connectivity shall be provided by MSEDCL. This
Bidder, 12 B bidder will reduce the probability of delays and the total
16 26
project cost to the bidder and result in lower tariffs

Section I If the successful bidder fails to sign the PPA within Please Confirm that the PBG will not be forfeited PBG shall not be forfeited if it is eshtablished on the
Instructions to the period of days from the date of issue of LoA. if delay is due to reasons not attributable to SPD. basis valid documentary evidence that delay is due to
Bidders ; 8.6 reasons not attributable to SPD
(f)
17 20

Page 126 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section & Page Description as per RFP Query/Clarification requested Mahagenco Reply
Sr.No
Clause no. no.
Annexure 16 We undertake that if we are selected as the As discussed in the pre bid meeting, please remove The caluse is removed from Annexure 16
Successful Bidder we shall infuse an Equity the clause from the Annexure.
amount of at least Rs. 60Lacs/MW for each project
18 92 in the following manner:
ii) @ 50% at the time of Financial Closure

Section I If the project developer fails to tie-up financing SPD shall not be penalized incase the delay is due clause revised:
Instructions to arrangement for the project within 7 months as to reasons not attributable to SPD. We request you If the project developer fails to tie-up financing
Bidder; prescribed above or if the project developer fails to to remove this clause of forfeiting the PGB arrangement for the project in in month as prescribed
Clause 15 report such tie-up then the MAHAGENCO shall below: Capacity in MW - Financial Closure

y
forfeit the performance bank Guarantee (PBG)
0-250 MW - 6 month
unless the delay is on account of delay caused due
250-500 MW - 8 month

op
to a force Majeure.
19 28 500-750 MW - 12 month
or if the project developer fails to report such tie-up
then the MAHAGENCO shall forfeit the performance
bank Guarantee (PBG) unless the delay is on account
of delay caused due to a force Majeure.

C
Section I The bidder shall identify 100% land required for Please clarify if the distance measure shall be by This clause is revised.
Instructions to the project within the periphery of 3 KM from the road route or arial route
20 15 eb
Bidder 1.1 (a) substation where the power will be evacuated at the
time of submission of bid
Section III SPD fails to achieve financial closure in stipulated SPD shall not be penalized incase the delay is due Tender condition prevails
General time OR fails to infuse the require equity amount as to reasons not attributable to SPD. We request you
21 Terms and 42 stipulated as per the financial requirement to remove this clause of forfeiting the PBG.
Conditions ;5
W
.(ii)
Section II SPD will register the Solar Project with MEDA. Please provide the timelines for MEDA Scope of MEDA registration is under bidder's scope.
Technical However, MEDA will register the project as per Work
22 36
Specification ; the provisions under ‘Chief Minister Solar AG
clause 1.5 feeder scheme’
Section III The project shall be commissioned within 13 Please clear the ambiguity in this clause and clause Revised:
General months from the date of execution of the PPA of confirm that the he project shall be commissioned Capacity in MW -Commissioned
Terms and the date of handing over the site of solar project within 13 months from the date of execution of the 1 0-250 MW - 15 month
Conditions ; PPA 2 250-500 MW - 18 month
23 41
clause 4
3 500-750 MW - 21 month

Page 127 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section & Page Description as per RFP Query/Clarification requested Mahagenco Reply
Sr.No
Clause no. no.
Section I Power/energy generated from the Units will be Please share PPA and other important documents draft PPA enclosed.
Instructions to purchased by Mahagenco, in accordance with the before bid submission date
24 15
Bidder 1.1 (c) provisions of Power Purchase Agreement.

Section I If the bidder being the successful bidder fails to Please specify the time limit for acceptance of 7 working days
Instructions to furnish the acceptance of Letter of Award, within LoA
25 21
Bidder 8.6 the specified time limit.
(d)
Section III The MAHAGENCO may at any time by notice in a.) Sufficient time shall be provided to resolve the Tender condition prevails
General writing summarily terminate the Contract without problem before the termination.
Terms and compensation to the SPD in any of the following

y
26 Conditions ; 40 events: b.) As this is a huge investment from the
3 developer's end he should be given minimum lock-

op
in period to recognize revenues. We request you to
specify the lock-in period
Section I On completion of Techno-commercial bid There is no mention of Section 4.3.2 in the RfS clause revised. Read 4.3.2 as section 1, clause 17. , iii
Instructions to evaluation, if it is found that the total aggregate
Bidder 17 capacity of the Solar Power Projects short-listed is
27 28
(iv) lower than or equal to 500 MW, then the procedure

C
as elaborated in Section 4.3.2 shall be followed.

Section I All approvals permits and clearances required for MAHAGENCO is a government entity, so it is Tender condition prevails
Instructions to setting up of the project (including connectivity) comparatively easier for Mahagenco to obtain
28 Bidder 1.1 (b) 15 and those required from State Government and
eb approvals, permits and clearances. Request you to
local bodies shall be in the scope of the bidder facilitate this process

Annexure 7 Managing Director/ Chief Executive Officer, being Request you to let this Annexure be Signed by Accepted.
a full time director on the Board of the Bidding Authorized Signatory as per the Board Resolution
29 71
Company/Member in case of a Consortium.
W
Annexure 2 The person authorized under this Power of We request you to remove the requirement of the Tender condition prevails
Attorney shall be a person holding the post of Authorized Person being a "Manager"
30 57
Manager or above designation in the company.

Page 128 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section & Page Description as per RFP Query/Clarification requested Mahagenco Reply
Sr.No
Clause no. no.
Section-I _ Each bidder shall register itself at the website We, IBC Solar Venture India B.V. is a company As per section 1, clause 11.Q.R. clause A, I The bidding
Vender address https://sets.mahagenco.in on online incorporated in Netherlands having business company i. Companies incorporated in India under the
Registration payment of the vendor registration fees Rs. 5000/- operations in India. While we try to register our Companies Act 1956 or Companies Act,2013 as applicable.
(Clause-3.1) + Service tax as applicable before the last company on https://sets.mahagenco.in it requires
date for registration mentioned in the notification
of invitation of bids ("NIT"). Vendor mandatory GST Number. Currently we do not
31 16 registration fee is non-refundable. have GST number in India. How can we register
The Bidder should note that they should obtain the for this tender without GST number?
valid digital signature in the company We have our office registered in Netherlands and
name as per the requirement mentioned on website is not allowing to register foreign

y
https://sets.mahagenco.in in the FAQ section. company.

op
Section-I _ Bidder is required to pay online non-refundable Can overseas bidder pay tender fees through its Registered vendor can purchase the tender.
Vender Tender fee of Rs. 1000/- + GST as applicable Indian group company account or through Indian
Registration on or before the last date of payment of tender fees. debit/credit card
32 (Clause-3.2) 16 Overseas bidders shall submit vendor
registration fee and tender fee through international

C
debit/credit card.

Section-I The bidder shall identify 100% land required for Requirement of Land within periphery of 3 KM clause revised.
_Land the project within the periphery of 3 from the substation at the time of bid submission
Requirement KM from the substation where the power will be should be withdrawn. Suitable land within 3 KM

33
(Clause-
1.1(a))

14
eb
evacuated at the time of submission of
bid in Format 6.1. Howevere the bidder shall be
allowed to change the location of the
periphery may not be available because of the
reason that within such periphery of Taluka,
urbanization gets developed or 3 KM area comes
project within the same Taluka only once till the under some municipality.
time of achievement of Financial
Closure i.e. Withine 7 month from the date of
W
signing of PPA .In no circumstances shall
the Tariff offered by the bidders in its financial bid
be changed due to change in location.

Page 129 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section & Page Description as per RFP Query/Clarification requested Mahagenco Reply
Sr.No
Clause no. no.
Section- SPD should take all necessary actions in order to Financial closure within 7 (Seven) months of Tender condition prevails
I_Financial achieve financial closure of the project. signing of PPA should be extended to 12 months
Closure(Claus Mahagenco will not provide any VGF or financial in line Amendment to the Guidelines for Tariff
e-15) assistance or loan for the project. SPD to ensure Based Competitive Bidding Process for
that the financial closure will be carried out within Procurement of Power from Grid Connected Solar
34 26
7 (Seven) months from the date of signing of PPA. PV Power Projects, Ministry of Power Resolution
Accordingly the successful bidder shall furnish the No. 23/27/2017-R&R dated June 14, 2018.
following documents within 7 months from the date
of signing of PPA.

y
Section- Commercial Operation Date of the Solar Power It is not clear when COD will be declared by Pl. read section IV, clause 4.
IV_COD Plant MAHAGENCO after successfully commissioning
35 47
(Clause 3) of the plant. It says, it will be decided mutually by

op
MAHAGENCO and SPD.
Additional Our Company Namrata Services is SSI registered Mahagenco does not have such provision.
Company hence as per GR EMD is waived for
36
SSI. Will we get exemption on these grounds for
this tender?
Additional Also can we get 15% advantage in price offered by Mahagenco does not have such provision.

C
37
us?
Section 1 “Scheduled Commercial Operation Date” shall Request you to kindly consider SCOD period as 18 Tender condition prevails
Definition - mean the date as declared months as there will simultaneous execution of
38 SCOD 11 by the Successful Bidder in the PPA which shall multiple projects at different location and
not exceed 13 (Thirteen) months from the
eb mobilisation at site will be difficult for SPD.
date of execution of PPA.
Section 1 -1.4 The bidder should select the project location in the Please consider land distance within 10 km from clause revised
Project 3KM periphery from the substation instead of 3 km
39 15
Location substation.

Section-IV 7 In the event a Change in Law results in any adverse Please include any change in the rate of clause revised
W
Change in law financial loss/ gain to the Solar Power Generator taxes,duties and cess which have s direct effect on
then, in order to ensure that the Solar Power the project.
Generator is placed in the same financial position
as it would have been had it not been for the
occurrence of the Change in Law, the Solar Power
40 48 Generator/Procurer shall be entitled to
compensation by the other party, as the case may
be, subject to the condition that the quantum and
mechanism of compensation payment shall be
determined and shall be
effective from such date as may be decided by the
Appropriate Commission.

Page 130 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section & Page Description as per RFP Query/Clarification requested Mahagenco Reply
Sr.No
Clause no. no.
Section-IV 1 Criteria for generation :-The power producer will Please allow SPD to declare upper CUF limit Tender condition prevails
Generation by declare the CUF of their project at the time Request you not to limit the upper value of CUF
41 46
SPD of PPA and will be allowed to revise the same once
within first year of COD
Additional Please share draft PPA terms and condition for the enclosed
42
Project
Section 1.1.a The bidder shall identify 100% land required for Periphery needs to be 5 Kms instead of 3 Kms clause revised
Land the project within the periphery of 3
KM from the substation where the power will be
evacuated at the time of submission of
bid in Format 6.1. Howevere the bidder shall be

y
allowed to change the location of the
43 14 project within the same Taluka only once till the

op
time of achievement of Financial
Closure i.e. Withine 7 month from the date of
signing of PPA .In no circumstances shall
the Tariff offered by the bidders in its financial bid
be changed due to change in location.

C
Section 1.4 a.The bidder should select the project location in a). Can Project locations be beyond Annexure 20 a) The attached list in annexure 20 is a tentative list.
Project the 3KM periphery from the for the proposed capacity of 750MWac as well as Bidder can propose sites identified by them subject to
Locations substation for green-shoe option of 250 MWac? the substation must have connected AG load of
b.The Successful bidders shall develop ground b). We understand there’s an agricultural load of 8- proposed capacity by bidder
44 14,15 mounted solar PV power 10 MWac at MSEDCL Substation Degaon, Taluka
eb b) You can propose subject to above condition.
projects. Sindhkhede, District Dhule. Can we propose an 8
c. The Successful bidder shall have to ensure the MWac capacity plant at the said place under this
connectivity permission from the tender?
MSEDCL.
Section 1 The Net-Worth of the Bidder for the financial year
a.) For the net worth criteria, it is suggested that Clause Revised:-
11.B.1. ended on 31.03.2017 shall not be less than INRthe new companies formed after 31st March 2017 The Net-Worth of the Bidder for the financial year
W
Financial 0.85 Crores per MW (of the capacity quoted). may show its net worth of the current financial ended on 31.03.2017 shall not be less than INR 0.52
Requirements year 2018-19 with a CA certificate for the net Crores per MW or equivalent to US $ (of the capacity
45 24
for Selected worth 2 85 lakhs a MW and a letter from the bank
quoted).
Project: Net about the line of credit at the rate of INR 12.5
Wor lacs/MW

Page 131 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section & Page Description as per RFP Query/Clarification requested Mahagenco Reply
Sr.No
Clause no. no.
ANNEXURE Format for Consortium Agreement a). In a consortium of 2 parties, can a lead member a) Lead member of the consortium should hold at least
S 3 – Format hold 99.99% of the equity and can the other 51% equity holding.
of Consortium consortium member hold just a nominal 00.01% of b) The revised condition in format
Agreement equity. b). Is the [Note: The percentage equity holding for any
percentage of equity holding of the technical
46 58 Consortium Member cannot be zero in the above
member of not lesser than 26% necessary? Since
table. Lead Member’s percentage equity holding
there appears to be no QR for technical member
cannot be less than 51% from the Effective Date up to
a period of one (1) years after Scheduled COD or
Revised Scheduled COD.]

y
Section - I , Invitation to Bid:The bidder shall identify 100% As, the 100% of land identification is in the hands clause revised
1.1 a15 land required for the project within the periphery of of SPD, there should not be any peripheral
3 KM from the substation where the power will be constraint (project distance from the

op
47 15 evacuated at the time of submission of bid. Substation), such as the project with in the
periphery of 3 KM from the Substation

Section - I 1.2 Capacity Allocation Under Green-shoe Option: The RfS document does not provide any clause is self explanatory
48 b 15 Allocation of additional 250MW capacity under details procedure of this additional 250

C
Green-shoe Option MW PPA
Section - II MAHAGENCO Scope of work: MAHAGENCO 1).       Kindly clarify, whether MAHAGENCO 1)Pl. refer section IV, clause no. 6
1.2 will sign the PPA for 25 years with the SPD at the will sign single PPA or multiple PPAs for 2) The Power sale agreement will be signed suitably.
tariff rate discovered the reverse bidding and PSA multiple locations. 3)Draft PPA is enclosed.
with MSEDCLthrough eb 2).   Power Sale Agreement should be signed  4)before signing PPA, the draft PSA will be shared
before to signing the PPA”. 3). We with successful bidder
will prefer project wise PPAs. Kindly share 5) refer above response 2).
49 35 the Draft PPA for review. 4. Provide the
Draft PSA for review. 5. Make clear
W
that “Power Sale Agreement should be signed
before to signing the PPA”.

Section -IV 6 PPA Kindly provide clarification, whether the bidding PPA shall be approved from MERC.
document including the PPA is approved by
50 48 appropriate, which is mandatory for purchase of
Power u/s 63 of Electricity Act 2003

Definitions Capacity Utilisation Factor (CUF) Kindly confirm the CUF computation will be on CUF computation will be on according to AC
according to AC capacity or DC Capacity.Also, capacity as per MERC norms.
51 8
please provide formula for CUF calculation.

Page 132 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section & Page Description as per RFP Query/Clarification requested Mahagenco Reply
Sr.No
Clause no. no.
1.1 a) Land The bidder shall identify 100% land required We request Mahagenco to remove the clause of clause revised
for the project within the periphery of 3 KM from “land required for the project within the periphery
the substation of 3 KM from the power will be
where the power will be evacuated at the time evacuated”substation where the
of submission of bid in Format 6.1. However the
bidder shall be allowed to change the location of
52 14 the project
within the same Taluka only once till the time
of achievement of Financial Closure i.e. Within 07
months from the date of signing of PPA.

y
op
1.1 a) Land The bidder shall identify 100% land required Referring to the recent amendments in Guidelines this clause is revised
for the project within the periphery of 3 KM from for Tariff Based Competitive Bidding Process for
the substation Procurement of Power from Grid Connected Solar
where the power will be evacuated at the time PV Power Projects published by MoP. We
of submission of bid in Format 6.1. However the Request Mahagenco to revise the period of land
14

C
53 bidder shall be allowed to change the location of identification from 07 months to 12 (Twelve )
the project months from the date of execution of PPA.
within the same Taluka only once till the time
of achievement of Financial Closure i.e. Within 07
months from the date of signing of PPA.

15.Financial
Closure
eb
SPD should take all necessary actions in order to a
chieve financial closure of the project. Mahagenco
will not provide any VGF or financial assistance
Referring to the recent amendments in Guidelines This clause is revised
for Tariff Based Competitive Bidding Process for
Procurement of months to 12 (Twelve)
or loan for the project. SPD to ensure that the monthsPower from Grid Connected Solar PV
54 26 financial closure will be carried out within 7 Power Projects published by MoP. We request
W
(Seven) months from the date of signing of PPA. Mahagenco to revise the period for Financial
Accordingly the successful bidder s hall furnish the Closure from 07 months to 12 (Twelve)
following documents within 7 months from the months.
date of signing of PPA.

SECTION SPD will register the Solar Project with MEDA. Referring to the OM no.283/65/2018-Grid Solar Tender condition prevails
II:1.5 MEDA However, MEDA will register the project as per published by MNRE. We request you to remove
55 scope of work 35 the provisions under ‘Chief Minister Solar AG the mandatory registration of project with MEDA
feeder scheme for implementation and commissioning of solar
project.

Page 133 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section & Page Description as per RFP Query/Clarification requested Mahagenco Reply
Sr.No
Clause no. no.
SECTION The project shall be commissioned within 13 Referring to the recent amendments in Guidelines This clause is revised
III:GENERA months from the date of execution of the PPA of for Tariff Based Competitive Bidding Process for
L TERMS the date of handing over a duly constituted Procurement of Power from Grid Connected Solar
&CONDITIO committee will physically inspect and certify PV Power Projects published by MoP. We request
NS 4. Time of successful commissioning of the project the site of Mahagenco to revise the time period for
56 Completion & 40 solar Project (for e.g. if the site is handed over on commissioning from 13
Delay is 07.10.2017, then scheduled commissioning date months to 21 (Twenty one) months from the date
shall be 07.01.2019) in this regard, a duly of execution of the PPA
constituted committee will physically inspect and
certify successful commissioning of the project .

y
1.1 b) Power SPD will construct requisite infrastructure for Can we use common switchyard location for yes. Subject to condition that proposed project capacity AG
Transmission transmission of power from each Solar Project to power evacuation of more than one projects? load connected to same substation

op
and the nearest substation (within 3 KM) including the
57 14
Evacuation ABT meters and required Transmission Bay at
both the ends (power plant switch yard &
substation).
1.4 Project The bidder should select the project location in the We request Mahagenco to accept alternative query is answered already above
58 location 15 3KM periphery from the substation of enclosed substations wherein load is available (AG Feeder)

C
ANNEXURE-20 but not mentioned in annexure 20.
Additional Start-up Power application Requesting Mahagenco to provide clear guidelines It is responsibility of SPD. Standard guidelines of MSEDCL
for start-up power approval. It will enable to shall be applied.
59
maintain the timelines of project commissioning.

60
Additional
eb
Applicability of Reactive Power(RKVAH) penalty We request MSEDCL not to levy the Reactive
similar to biomass projects Power penalty similar to biomass projects. But if
levied then it should be as per Wind projects
(Comm. Circular no. 196 dtd.29thApril,2013)
At present, reactive power penalty not applicable to solar
power

Section I, 8.0- Each Bidder shall be required to submit Bid Dear Sir, As we are planning to Bid for complete Tender Clause Revised:
W
Bid Security Security/ Earnest Money Deposit (EMD) of Rs.750MW request you to Please reduce the EMD to Each Bidder shall be required to submit Bid Security/
EMD 8,00,000/- (Rs. Eight Lakh only) /MW in the Rs. 2,00,000/- Per MW Earnest Money Deposit (EMD) of Rs. 5,00,000/- (Rs.
61 19 form of bank guarantee as per Annexure 11, Five Lakh only) /MW in the form of bank
issued by any branch of Bank mentioned in guarantee as per Annexure 11, issued by any
list attached branch of Bank mentioned in list attached

Page 134 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section & Page Description as per RFP Query/Clarification requested Mahagenco Reply
Sr.No
Clause no. no.
Section-I, 1.3 - The individual project capacity to be developed Dear Sir, Since the Minimum capacity for 750MW Tender conditions prevails
Capacity of shall be the maximum AG load connected to the is only 2MW. This is very capacity and will attract
the project substation as per enclosed list of the substation in smaller non serious players in the bidding with no
ANNEXURE-20., however, minimum Experience. Also with companies bidding with
project capacity should not be less than lower capacity will bid Higher Tariff rates as they
62 16 will not be also to achieve proper cost of EPC
2MW. required for Bulk Buying to do bigger projects.
Hence we request you to please make the
minimum bidding capacity of 50MW.

y
Section-I, The Net-Worth of the Bidder for the financial year Dear Sir, with the Net –requirement of 0.85 Cr per Clause Revised:-
11(B)- ended on 31.03.2017 shall not be less than INR MW no solar company in India is big enough to The Net-Worth of the Bidder for the financial year

op
Financial 0.85 Crores per MW (of the capacity quoted). Bid for the complete 750MW and companies ended on 31.03.2017 shall not be less than INR 0.52
Requirements bidding for the lower capacity will lead to getting Crores per MW or equivalent to US $ (of the capacity
for Selected higher Tariff Rates.
quoted).
Project: Hence we request you to Please change the
63 23 financial criteria to 0.26 Cr per MW which is 6%
of the project value.

C
Section-I, A minimum annual turnover of Rs. 25 lakhs/MW
eb A minimum annual turnover of Rs. 25 lakhs/MW or
11(B)- of the quoted capacity during the previous financial equivalent to US $ of the quoted capacity during the
Financial year 2016-17. previous financial year 2016-17.
Requirements
for Selected Internal resource generation capability, in the form Internal resource generation capability, in the form of Profit
Project:2 of Profit Before Depreciation Interest and Taxes Before Depreciation Interest and Taxes (PBDIT) for a
W
Liquidity: (PBDIT) for a minimum amount of Rs. minimum amount of Rs. 10Lakhs/MW or equivalent to US $
10Lakhs/MW of the quoted capacity, as on the last of the quoted capacity, as on the last date of previous
date of previous financial year, 2016-17 financial year, 2016-17
64 25

In-principle sanction letter from the lending In-principle sanction letter from the lending
institutions/banks of the Bidder, committing a Line institutions/banks of the Bidder, committing a Line of Credit
of Credit for a minimum amount of Rs. for a minimum amount of Rs.
12.5 Lakhs/MW of the quoted capacity, towards 12.5 Lakhs/MW or equivalent to US $ of the quoted
meeting the working capital requirement of the capacity, towards meeting the working capital requirement
project quoted under this RfS of the project quoted under this Rfp

Page 135 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section & Page Description as per RFP Query/Clarification requested Mahagenco Reply
Sr.No
Clause no. no.
Section-I, 11 - Technical criteria missing in the tender. Since the Setting of the solar power plants with Tender condition prevails
QUALIFICA Such High capacity, it is important for the
TION customer that the company has a good technical
REQUIREM experience in setting up the solar power plant in
ENTS the past to ensure timely and proper execution of
the projects.
Hence we request you to please add the technical
Qualification criteria in the tender for the bidders
to ensure that companies with experience bid for
the project.

y
The Minimum technical criteria:
65 24
1. The company should be in the solar business
since last 10 years

op
2. The company should have installed successfully
a single project of 10MW working satisfactorily
for 5 years
3. The company should have installed Successfully
a single project of 50MW working satisfactorily
for 3 years

C
Section - II, The bidder shall identify 100% land required for Dear Sir, it is very difficult to find the land within This clause is revised as above
1.4- SPD the project within the periphery of 3 KM from the
eb the range of 3KM from the substation mentioned
Scope or substation where the power is evacuated at the time in the tender, since the Meter will be installed in
work: of submission of bid in Format 6.1. the substation then MAHAGENCO should be able
to give free hand to the Bidders to choose the land
66 36 as per their convenience and calculate the
transmission losses on their OWN.
W
Hence we request you to please delete this clause

Page 136 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section & Page Description as per RFP Query/Clarification requested Mahagenco Reply
Sr.No
Clause no. no.
Section-I, 1.0 The bidder shall identify 100% land required for Dear Sir, Please let us know which are documents At bidding stage bidders needs provide the tentative location
(a) - the project within the periphery of 3KM from the that needs to be submitted for the land in the of the site & capacity in MW as per the name of the
Background/ substation where the power will be evacuated at the tender which are mandatory. Accordingly we can substations and the connected AG load to that substation by
Land time of submission of bid in Format 6.1. However bid for the capacity as per the availability of the referring the indicative substation list provided by
the bidder shall be allowed to change the location land. Mahagenco in RFP.
67 15 of the project within the same Taluka only once till In case the two or more bidders will quote same substation
the time of achievement of Financial Closure i.e. the preference shall be given to the lowest tariff quoted
Within 7 month from the date of signing of PPA .In bidder.
no circumstances shall the Tariff offered by the
bidders in its financial bid be changed due to

y
change in location.

Section-I, 6 - If the bidder is a consortium, the consortium may a) We propose to participate through consortium in a) Lead member of the consortium should hold at least 51%

op
Preparation tender its Bid if the online payment is made against which shareholding structure shall be equity holding.
Of Bid vendor registration and tender fees by the lead 99.99%(Foreign company) and 0.01% (Indian b) Any one member of consortium can purchase the tender
member Company). c) In case of consortium the bid shall be submitted in the of
b) The Indian company which shall have 0.01% consortium.
shareholding will buy the tender document by
68 18 registering itself on Mahagenco website.

C
Tender fees shall also be paid by this company
only.
c) Therefore,we request Mahagenco to allow to
buy , register and submit the bid by the Indian
eb Company (Non-lead member of the Consortium.

Section -I 8 Notwithstanding anything contained hereinabove, The Bid Security shall be valid for a period of 180 days with
Bid Security. our liability under this Guarantee is restricted to Rs an additional claim period of 180 days thereafter.
And (Rs only) and it shall remain in force until
ANNEXURE 19 & XXXXX, with an additional claim period of thirty
69 S -11 (30) days thereafter. We are liable to pay the
80
W
guaranteed amount or any part thereof under this
BANK GUARANTEE only if MAHAGENCO or
its authorized representative serves upon us a
written claim or demand.

Page 137 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section & Page Description as per RFP Query/Clarification requested Mahagenco Reply
Sr.No
Clause no. no.
Section -I 1.3 i) The individual project capacity to be developed Tender Clause Revised:
Capacity of shall be the maximum AG load connected to the i) The total quantum 750MW is divided in region wise
the Project substation as per enclosed list of the substation in and district wise in 15 block. Each block of 50Mw
ANNEXURE-20., However, minimum project capacity.
capacity should not be less than 2MW.
ii) In each block of 50MW capacity, the developer can
ii) There shall not be any maximum limit for
establish Solar Power Project from minimum 2MW to
cumulative project c a p a c i t y bidder can quote
for entire 750MW. maximum AG load connected to that particular
substation
iii) The bidder can quote for entire 15 Nos of block
(i.e.-Total capacity of 750MW).

y
iv) The tentative list of substation is attached in RFP
ANNEXURE-20. The individual project capacity

op
shall be developed as per maximum AG load
70 16 connected to the substation which is selected by the
bidder. However, Bidder should have to quote for
atleast one block of 50MW capacity from any region
given in ANNEXURE-21.

C
v) Selection of L1 bidder is Block wise.
vi) L1 will be decided for each block separately
vii) Reverse Auction for each 50MW block will be
carried out separately.
eb viii) The district wise distribution of MW capacity in
five regions of Maharashtra is enclosed at
ANNEXURE-21
W

Page 138 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Power Purchase Agreement

For

50MWAC Cumulative Capacity of Solar PV Power Projects

At

y
XXXXXXXX REGION - MAHARASHTRA

op
Between
C
MAHARASHTRA STATE POWER GENERATION COMPANY LIMITED,
eb

(MAHAGENCO/ PURCHASER)
W

And

XXXXXXXXX

(SELLER)

Page 139 of 194 1


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

TABLE OF CONTENTS

PAGE

ARTICLE 1 DEFINITIONS 07
Section 1.01 Definitions

ARTICLE 2 REGULATORY APPROVALS 13


Section 2.01 MERC Orders& other Regulations
Section 2.02 MERC and EA 2003

ARTICLE 3 CONDITIONS PRECEDENT 14

ARTICLE 4 OBLIGATIONS 15
Section 4.01 XXXXXXXXX‘s obligation
Section 4.02 MAHAGENCO’s obligations.
Section 4.03 Indemnification

y
ARTICLE 5 TERM& TERMINATION 17
Section 5.01
Section 5.02
Section 5.03
Section 5.04
Section 5.05:
Term
Option to Renew
Force Majeure Event Termination
Event of default termination
Termination procedure
op
C
Section 5.06: Survival

ARTICLE 6 FACILITY DESCRIPTION 19


Section 6.01 Summary Description
eb

Section 6.02 Location of the Facility


Section 6.03 General Design of the Facility

ARTICLE 7 FACILITY DEVELOPMENTS 20


Section 7.01 Facility Permits
W

ARTICLE 8 INERCONNECTION AND EVACUATION 21


Section 8.01 Interconnection
Section 8.02 Evacuation

ARTICLE 9 COMMERCIAL OPERATIONS 22


Section 9.01 Commercial Operations
Section 9.02 Notice of Commercial Operations

ARTICLE 10 SALE AND PURCHASE OF SOLAR ENERGY 24


Section 10.01 Sale and Purchase
Section 10.02 Title and Risk of Loss
Section 10.03 Deemed Generation

ARTICLE 11 OPERATIONS AND MAINTENANCE 27


Section 11.01 Facility Operations
Section 11.02 Outage and Performance Reporting
Section 11.03 Operating Records
Section 11.04 Access to Facility

Page 140 of 194 2


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section 11.05 Data to be provided to State Load Dispatch Centre.

ARTICLE 12 MEASURING AND METERING 29


Section 12.01 Metering Equipment
Section 12.02 Testing of the Metering Equipment
Section 12.03 Installation of Meters
Section 12.04 Charges and Penalties
Section 12.05 Joint Meter Readings

ARTICLE 13 BILLING AND ENERGY ACCOUNTING 31


Section 13.01 Monthly Energy Bills
Section 13.02 Payments
Section 13.03 Payment Securities Mechanism.
Section 13.04 Billing & Payment records
Section 13.05 Disputed bill
Section 13.06 Reconciliation of bills

ARTICLE 14 EVENTS OF DEFAULT AND REMEDIES 34


Section 14.01 XXXXXXXXX’s Event of Default
Section 14.02 Remedies for XXXXXXXXX’s Default
Section 14.03 MAGHAGENCO Events of Default

y
Section 14.04 Remedies for MAHAGENCO Default

ARTICLE 15
Section 15.01
Section 15.02
Limitation on Liability
Limitation on Damages op
LIMITATION OF LIABILITY AND DAMAGES 37
C
ARTICLE 16 REPRESENTATIONS, WARRANTIES AND COVENANTS 38
Section 16.01 XXXXXXXXX's Representations,
Warranties and Covenants
eb

ARTICLE 17 FORCE MAJEURE 40

ARTICLE 18 GOVERNING LAW, DISPUTE RESOLUTION AND CONSENT TO


JURISDICTION 41
Section 18.01 Governing Law.
W

Section 18.02 Dispute Resolution

ARTICLE 19 CDM AND SUBSIDY 42


Section 19.01 CDM

ARTICLE 20 NOTICES 43
Section 20.01 Notices in Writing

ARTICLE 21 MISCELLANEOUS 44
Section 21.01 Amendments and Exhibits
Section 21.02 Disclaimer
Section 21.03 Entire Agreements.
Section 21.04 Waiver
Section 21.05 Captions; Construction.
Section 21.06 Assignment
Section 21.07 No Agency.
Section 21.08 Cooperation.
Section 21.09 Further Assurances
Section 21.10 Counterparts
Section 21.11 Severability.

Page 141 of 194 3


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section 21.12 Change in Law


Section 21.13 Relief for Change in Law
Section 21.14 Third party beneficiaries
Section 21.15 Confidentiality
Section 21.16 Language
Section 21.17 Approval of MERC

EXHIBITS:

EXHIBIT A: FACILITY DESCRIPTION.

y
op
C
eb
W

Page 142 of 194 4


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

y
op
C
eb

Power Purchase Agreement for Solar Energy


W

THIS POWER PURCHASE AGREEMENT FOR SOLAR ENERGY is made on this ___day of
_________, 2018 at Mumbai;

BETWEEN

XXXXXXXXX Address: 3rd Floor, Asset 301-304, & 307, Worldmark, 3 Aerocity New Delhi, Pin -
110037;a Limited Company duly incorporated under the Companies Act, 1956 with its registered
Office at Mumbai, hereinafter referred to as the "XXXXXXXXX/SELLER" [which expression shall
unless repugnant to the context or meaning thereof include its successor and assigns]

AND

Maharashtra State Power Generation Company Limited (MAHAGENCO), a Public


LimitedCompany registered under the Companies Act 1956, having its Registered Office at
Prakashgad, Plot G 9, Prof. Anant Kanekar Marg, Bandra (East), Mumbai 400 051, hereinafter
referred to as the " MAHAGENCO/ PURCHASER” (which expression shall unless repugnant to
the context or meaning thereof include its successor and assigns)

Page 143 of 194 5


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

WHEREAS,

MAHAGENCO had issued RFP in which XXXXXXXXX had submitted its bid and was successful
in getting awarded 50MWAC Cumulative Capacity of Solar PV Power Projects at
WESTERNREGION - MAHARASHTRA

AND WHEREAS,

XXXXXXXXX pursuant to the RFP desires to develop, design, construct, own and operate a Solar
Generating Facility (PV Technology) with an Installed Capacity of 50MWAC Cumulative Capacity
of Solar PV Power Projects at WESTERNREGION - MAHARASHTRA hereinafter referred to as

y
the “Facility”.

op
AND WHEREAS,

The XXXXXXXXX desires to interconnect the Facility with the State Grid as advised by the
C
MAHAGENCO and sell and deliver to MAHAGENCO at the Interconnection point, 100 % of the
Solar Energy produced by the Facility from the date of commissioning of the Solar Project.

AND WHEREAS,
eb

XXXXXXXXX SHALL BE CALLED AS SELLER


W

NOW THEREFORE in consideration of the mutual covenants herein contained, the parties agree
to the following:

Page 144 of 194 6


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE-1

DEFINITIONS

Section 1.01: Definitions:

In this Agreement, the following words and expressions shall have the respective meanings
set forth herein:

“Act” means the Electricity Act 2003 as in force from time to time

“Agreement” means this Power Purchase Agreement executed between


XXXXXXXXX, and MAHAGENCO (MAHAGENCO) including
the Exhibits attached hereto.

“Affected Party” means the XXXXXXXXX (SELLER) or MAHAGENCO


(PURCHASER) whose performance has been affected by
an event of Force Majeure. An event of Force Majeure
affecting the CTU/STU or any other agent of MAHAGENCO
or XXXXXXXXX, which has affected the transmission line

y
beyond the delivery/metering point, shall be deemed to be
an event of Force Majeure affecting XXXXXXXXX,

“Auxiliary Energy
Consumption
MAHAGENCO

op
means the electrical energy consumed by XXXXXXXXX to
meet its own energy requirement as recorded in the energy
meter at the Metering Point.
C
“Capacity Utilisation means the percentage of energy generated and measured
Factor (CUF %)” at the Metering Point installed in Switch yard in power plant
divided by the installed capacity multiplied by the number of
eb

hours (8760 Hours) in a calendar year.

“Check Meter” means the meter, connected to the core of the Current
Transformers (CTs) and Potential Transformers (PTs) to
which the Main meter is connected and shall be used for
W

energy accounting and billing in case of failure of the Main


Meter.

“COD Notice” means the meaning set forth in Section 9.02

“Commercial means the date, on which XXXXXXXXX makes declaration


Operation Date (COD)” as set forth in the Section 9.01

“Commissioning” A solar PV Project will be considered commissioned if all


equipment as per rated project capacity has been installed
and energy has flown into the Grid.

“Conditions means the meaning set forth in Article 3.


Precedent”

“Detailed Project Detailed Project Report (DPR), of a Solar Energy project


Report DPR” will consist of the micro citing drawing, broad technical
specifications of the solar technology employed, plan for
interconnection arrangement(s) with the State Grid,
prognosis analysis (energy generation per year), details of

Page 145 of 194 7


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

project cost, financing plan and financial cash flow of the


project.

“Due date of Payment” shall mean in relation to any invoice the day falling after the due
date (as described hereunder) upon which such invoice is
submitted If such day is not a business day, the immediately
succeeding business day will be considered as due date for
payment.

a. The payment from Mahagenco to XXXXXXXXX: Due date


of Payment shall mean in relation to any invoice the day
falling 60 Days after the date upon which such invoice is
submitted.

“Effective Date” Shall mean the agreement to be effective from the date of
signing. However, for project completion, effective date will be
counted from Notice to Proceed (NTP) i.e. the date of handing
over of land.

“Emergency” means any abnormal occurrence in the interconnection or

y
system condition that requires automatic or manual action
to prevent or limit loss of the State Grid Electrical load or

(ii)
op
generation supply could;

(i) adversely affect the reliability of the system or


generation supply,
adversely affect the reliability of any interconnected
C
system or
(iii) Otherwise result in significant disruption of service
to consumers or pose a threat to public safety or
property.
eb

“Event of Default” Means the meaning set forth in Section 14.

“Extra High Voltage means EHV transmission lines with voltage rating of 66 Kilo-
(EHV)” Volts (KV) and above.
W

“Facility” or “Project” Means XXXXXXXXX’s electricity generating facility as


identified and described in Article 6 and Exhibit A to this
Agreement, the purpose for which is to produce electricity
and deliver such electricity to the Point of Delivery within the
power plant. The facility includes without limitation,
XXXXXXXXX’s solar technologies, together with all
associated equipment, control systems, safety devices,
property, interconnection facilities, buildings if any, inverter
transformers, output breakers, electric lines within the PV
Plant (if any), and any other facilities necessary to connect
to the Point of Delivery except the scope spelt out in, Clause
1.3 & 1.4 of Section –II in RFP 61485 (Amendment - 11)

“Financial Year” means the year commencing from 1st April of the year to
31st March of the next year.

"Force Majeure Event" means any act or event that delays or prevents a Party from
timely performing obligations under this Agreement or from
complying with conditions required under this Agreement if

Page 146 of 194 8


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

such act or event is reasonably unforeseeable, beyond the


reasonable control of and without the fault or negligence of
the Party relying thereon as justification for such delay, non-
performance or non-compliance, including without limitation
an act of God or the elements, extreme or severe weather
conditions like heavy rain, explosion, fire, epidemic,
landslide, mudslide, sabotage, lightning, earthquake, flood
or similar cataclysmic event, transportation delays,
unavailability of materials, an act of public enemy, war,
blockade, civil insurrection, riot, civil disturbance, strike or
other labour difficulty/caused at site or suffered by third
parties beyond the reasonable control of such Party or its
Affiliates (whether such cause is similar or dissimilar to the
foregoing) or any restraint or restriction imposed by law or
by rule, regulation or other acts of governmental authorities,
whether central, state or local, provided that for Solar
Energy generation, XXXXXXXXX's failure to obtain any of
the Permits shall not be a Force Majeure Event.

“Forced Outage” means any condition of the facility that requires immediate
disconnection of the Facility, or some part thereof, from

y
service and/or the period of interruption or reduction or
shutdown of the Facility attributed to unforeseen conditions

“GOI”

“GOM”
op
other than planned or scheduled outages

means Government of India.

means Government of Maharashtra.


C
“HT Consumers” mean all Consumers who obtain three phase supply at a
high voltage as specified in the “Conditions of Supply” of
MSEDCL
eb

"Interconnection Point/ means point of interface of solar power plant facility with
Point of Delivery" distribution system at which the Solar Energy is delivered to
the MSEDCL’s System at the plant boundary and such
interface point shall be the line isolator on the outgoing
W

feeder on HV side of the pooling sub-station/sub-station


within the premises of the solar power plant facility in the
switchyard of solar power plant.

“KWh” Means kilowatt-hour, a unit of energy equal to one kilowatt


of power supplied or taken from an electric circuit for one
hour.

‘Main Meters” means the meters installed at the Metering Point within
Solar PV plant boundary to primarily measure the Solar
Energy for purposes of accounting and/or billing. The main
meter shall be ABT type meter.

“MERC” means the Maharashtra Electricity Regulatory Commission.

“MSEDCL’s System” means MSEDCL’s electricity supply distribution system as


modified and expanded from time to time for giving supply to
consumers in the state of Maharashtra and to
interconnected states.

Page 147 of 194 9


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

“MSETCL” means the Maharashtra State Electricity Transmission Co.


Ltd., a “Company” formed and registered under the
Companies Act, 1956 to undertake transmission in
accordance with the scheme under part XII (Reorganization
of Board) of Electricity Act, 2003, formerly Maharashtra
State Electricity Board constituted under the erstwhile
Electricity (Supply) Act 1948.

“MSETCL’s System” means MSETCL’s electricity EHV transmission system as


modified and expanded from time to time for giving supply to
consumers in the state of Maharashtra and to
interconnected states.

“Metering Point” is the physical point at which the meters are installed on the
State Grid to measure the Solar Energy sold to
MAHAGENCO at the Interconnection Point. The meter shall
be installed in nearest MSEDCLsubstation
“MWh” means megawatt-hour, i.e. a unit of energy equal to one
thousand kWh.
“MUS” means a unit of energy, equal to one million kWh.

y
“Non-firm power” ‘Non-firm power’ means the power generated from

“Operating Records”
op
renewable sources, the hourly variation of which is
dependent upon nature’s phenomenon like sun, cloud, wind,
etc., that cannot be accurately predicted.
means all the agreements / records associated with the
C
Facility, operating logs, and blueprints for construction,
operating manuals, all warranties on equipment and all
documents whether in printed or electronic format, that
XXXXXXXXX uses or maintains for the operation and
maintenance of the Facility.
eb

“Permit” means a written consent (Permission) obtained by


XXXXXXXXX from Mahagenco / MSEDCL for carrying out
any maintenance work in the Facility which requires a shut
down.
W

“Renewable Energy” means the grid quality electricity generated from renewable
energy sources.

means the power plants other than the conventional power


“Renewable Energy plants generating grid quality electricity from renewable
Power Plants” energy sources.

“Renewable Purchase is framework provided as per MERC( RPO/REC


Obligation (RPO)” Regulations),2010

“Scheduled Outage” means planned shutdown or outage / reduction of the


Facility’s generation that both (i) has been coordinated in
advance with Mahagenco/MSEDCL, with mutually agreed
start date and duration and (ii) is required for inspection or
preventive or corrective maintenance.
“RFP” Means the “Request for Proposal”, the bidding document
published vide the tender number of 61485 along with its all
addendums, corrigendum and responses to the bidders

Page 148 of 194 10


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

queries published during Competitive Bidding for selection of


Solar Power Developer (SPD) for design, engineering,
manufacture, supply, erection, testing and commissioning of
50MWAC Cumulative Capacity Crystalline Solar PV
Technology Grid Interactive Solar PV Power Plant at
WESTERNREGION - MAHARASHTRA on Build Own
&Operate (BOO) basis. (with Reverse Bidding)
“Site” means the immovable property on which the Facility will be
constructed and located as more specifically described in
Article 6 and Exhibit A to this Agreement.
“Standard Utility means the practices, methods and acts (including but not
Practices” limited to the practices, methods and acts engaged in or
approved by a significant portion of the electric power
generation industry, MERC and/or any other Governmental
agency) that, at a particular time, in the exercise of
reasonable judgment in light of the facts known or that
should reasonably have been known at the time a decision
was made, would have been expected to accomplish the
desired result in a manner consistent with law, regulation,
permits, codes, standards, equipment manufacturer's

y
recommendations, reliability, safety, environmental
protection, economy and expedition. With respect to the

(i)
op
Facility, Standard Utility Practices includes, but is not limited
to, taking reasonable steps to ensure that:

Equipment, materials, resources and supplies,


including spare parts inventories, are available to
C
meet the Facility's needs;
(ii) Sufficient operating personnel are available at all
times and are adequately experienced and trained
and licensed as necessary to
eb

(A) operate the Facility properly and efficiently, and


in coordination with MAHAGENCO & MSEDCL,
and
(B) respond in an appropriately timely manner to
reasonably foreseeable Emergency conditions
W

whether caused by events, circumstances or


conditions on or off the Site;
(iii) Preventive, routine and non-routine maintenance
and repairs are performed on a basis that ensures
reliable, long-term and safe operation, and are
performed by knowledgeable, trained and
experienced personnel utilizing proper equipment
and tools;
(iv) Appropriate monitoring and testing are performed to
ensure equipment is functioning as designed;
(v) Equipment is not operated in a reckless manner, in
violation of manufacturer's guidelines or in a manner
unsafe to workers, the general public or the
interconnected system or contrary to environmental
laws, permits or regulations or without regard to
defined limitations such as flood conditions, safety
inspection requirements, operating voltage, current,
volt-ampere reactive (VAR) loading, frequency,
rotational speed, polarity, synchronization and/or

Page 149 of 194 11


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

control system limits; and


(vi) Equipment and components meet or exceed the
standard of durability that is generally used for
electric generation operations in the region and will
function properly over the full range of ambient
temperature and weather conditions reasonably
expected to occur at the Site and under both normal
and Emergency conditions.

“State Agency” Maharashtra Energy Development Agency or any other


Agency designated by MERC

“State Grid System” means the State Grid Electricity Supply, Distribution and
Transmission System, as modified and expanded from time
to time, for delivery of electricity to the MSEDCL’s
consumers in the State of Maharashtra and to
interconnected states.

“Solar Energy” or means energy radiation of sun which is converted into


“Solar Power” Electrical Energy with the help of solar technology

y
“Solar Electric means the net electric energy generated exclusively by the
Energy” Facility (which is electric energy derived from a technology

“Solar Technology”
op
that exclusively relies on a solar energy source) and
delivered and metered to the Point of Delivery by the Meters
installed by MSEDCL pursuant to Section 12.01

the accessories including Photovoltaic Panel, concentric


C
collector and other accessories used to convert solar
radiation in to electrical energy

“Tariff Period” means the 25 years’ period from the COD of the solar
eb

Project.

“Term” means the period of time during which this Agreement shall
remain in full force and effect, as set forth in Section 5.01.
W

“Test Energy” means the energy, which is produced by the Facility and
delivered to the MAHAGENCO at the Point of Delivery at the
time of testing of the Facility prior to Commercial Operations.

“Unit” Unit means 50MWAC Cumulative Capacity of Solar PV


Power Projects.

Page 150 of 194 12


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 2

REGULATORY APPROVAL

Section 2.01: MERC Orders and Other Regulations:

The sale of Solar Energy under this Agreement shall be governed by the terms and conditions
of the RFP No. 61485 & Maharashtra Electricity Regulatory Commission (Terms and
Conditions for Determination of RE Tariff) Regulations, 2015 & Maharashtra Electricity
Regulatory Commission (Renewable Purchase Obligation, Its Compliance and
Implementation of REC Framework) Regulations, 2015.

Section 2.02: Electricity Act 2003 and Grid Regulations

y
This Agreement is subject to any further orders passed by MERC and shall be subject to all
necessary sanctions/permissions/approvals as may be required to be obtained from the

op
MERC or any other Governmental Authority. XXXXXXXXX shall follow the grid discipline and
Grid Connectivity Rules and Regulations as well as technical standards for Grid Connectivity,
as may be set out by the MERC SOP Regulations, 2005, State Grid code 2006,CEA
Technical Standard for Grid connectivity Regulations’ 2007or any other Competent Authority
as per the provisions of the Electricity Act 2003.
C
Section 2.03: GOM’s GR dtd. 14.06.2017 and its Amendment G.R. dted.17.03.2018

As per GOM’s G.R. Dtd. 14.06.2017, this project is under “Chief Minister Solar Agriculture
Feeder Scheme”. Hence, a committee comprising of designated representatives of
eb

Mahagenco, MSEDCL and MEDA are empowered to make suitable changes in the
amendments made in the policy as per GOM’s G.R. dtd. 14.06.2017, at later stage, in view of
difficulties faced while implementing the project without making any change to the tariff and
tenure that has been agreed and signed off by and between Mahagenco and XXXXXXXXX
W

Page 151 of 194 13


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 3

CONDITIONS PRECEDENT

The obligations under this Agreement are subject to the satisfaction in full of the following
conditions precedent:

[a] XXXXXXX shall get all the approvals and permission required for the project from the
various departments like MEDA, MSEDCL or any other state or central government
agencies. XXXXXXXX shall obtain all such licenses/ sanctions/ approvals/
clearances from Governmental Agencies, inter-alia, including but not limited to the
following

(i) All approvals and clearances from the Maharashtra Energy Development Agency
(MEDA), Government of Maharashtra,

All the applicable land related permits & Clearance including but not limited to
permission to set up the Facility on the Site

y
Approval for Permission and Evacuation including approval of the single line

(ii)
op
diagram of proposed connectivity with MSEDCL’s System and Protection logic

Any other statutory permission, not listed above but required for completion
installation & connection of the power plant
C
\

The Permissions should be submitted & obtained preferably within one month after
execution of this Agreement however, in any case before Commissioning of the
eb

Project without having any impact on completion schedule.

[b] XXXXXXXXX shall ensure that the design and construction of the Facility shall be in
line with technical specification of RFP.
W

[c] XXXXXXXXX shall submit declaration whether they wants to avail accelerated
depreciation benefit or not, before commercial operation date. (COD)

Page 152 of 194 14


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 4

OBLIGATIONS

Section 4.01XXXXXXXXX’s Obligations:

XXXXXXXXX shall obtain all related statutory approvals, clearances and permits necessary for
the Project

i. XXXXXXXXX shall Design, Engineering, Manufacture, Supply, Erection, Testing


and Commissioning of 50MWAC Cumulative Capacity of Solar PV Power Projects
at XXXXXREGION - MAHARASHTRA. The Facility installation should be in line
with RFP

ii. XXXXXXXXX shall make available to Mahagenco confirmatory letters regarding


financial closure from the banks /financial institutions/ internal equity commitments
preferably within 12 months from the date of execution of PPA,

y
iii. XXXXXXXXX shall also comply with the provisions of IEGC/State Grid Code
prevailing ABT order issued by CERC, and other technical operational and safety

op
criteria as per the terms and conditions mentioned in the RFP

iv. It is the responsibility of XXXXXXXXX to obtain and maintain necessary policies of


insurance during the Term of this Agreement consistent with Standard Utility
Practice.
C
v. To give the advance notice to the Mahagenco of anticipated date and duration of
planned shutdown to enable MSEDCL to plan maintenance work of transmission
line /evacuation facilities.
eb

vi. XXXXXXXXX shall complete the Project within 18 (Eighteen) Months from handing
over of the Land.
W

In the event of delay in handing over of the land and or handing over of the
approvals by Mahagenco, Commissioning Date shall be extended day for day
basis.
vii. In the event if the COD is delayed beyond 18 Months from the NTP for the
reasons not attributable to XXXXXXXXX, a cooling period of 18 Months will start &
after that the procedure of encashment as provided in the RFP would be taken by
Mahagenco by providing prior notice of 30 days. Extensions of Time: In the event
that the Seller is prevented from performing its obligations under Section 4.01 by
the Commercial Operations Date due to:

a. Any MAHAGENCO Event of Default; or


b. Force Majeure Events affecting MSEDCL and/or MAHAGENCO; or
c. Force Majeure Events affecting the Seller;

The Commercial Operations Date shall be deferred for reasonable period but not
less than ‘day for day’ basis, to permit the Seller or MAHAGENCO through the
use of due diligence, to overcome the effects of the Force Majeure Events

Page 153 of 194 15


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

affecting the Seller or MAHAGENCO, or till such time such Event of Default is
rectified by MAHAGENCO and no penalty shall be levied on XXXXXXXXX either
in the form of BG encashment or reduction of Tariff

Section 4.02 Role of MAHAGENCO’s as per RFP:

1. Mahagenco shall off-take and purchase the electricity generated by XXXXXXXXX.

2. Mahagenco agrees to make the payment to XXXXXXXXX as per the Tariff Rate
mentioned in Article 10 of this Agreement directly to XXXXXXXXX as per the terms and
conditions of this Agreement.

3. Purchaser to open the Letter of Credit valid for one year within 30 days of the COD
ensuring that payment for first month generation is paid directly by RTGS or demand draft
directly to XXXXXXXXX based on joint meter Reading

4. Land for the Facility shall be provided by MAHAGENCO as per clause 1.3 of Section – II
of RFP 61485 through a separate agreement, signed between the MAHAGENCO and the
Seller for the PPA Tenure of 25 Years from the date of COD

y
5. The MAHAGENCO shall be responsible for completion of their scope of work as per

6. op
clause 1.3 & 1.4 of Section – II of RFP 61485. (with Amendment-11)

MAHAGENCO shall ensure that during the Term of this Agreement the rights of
MAHAGENCO on the Site shall continue to subsist without any encumbrance whatsoever
C
and shall keep the Lease valid through-out the Term of this Agreement.

7. Providing unfettered access to the Seller, its affiliates contractors and employees to the
Site for installation, operation and maintenance of the Facility during the Term of the
eb

Agreement;

Section 4.03 Indemnification:


W

If the synchronisation of the Project is delayed due to non-availability of interconnection


facility, the Seller shall be indemnified by Mahagenco as per clause 10.3 of this
Agreement.

Page 154 of 194 16


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 5

TERM& TERMINATION
Section 5.01: Term:
This Agreement shall come into effect from the Effective Date and shall be valid for a term of
25 (Twenty Five) years from the date of COD. The obligations to purchase and sell the Solar
Electric Energy will remain on the Parties of this Agreement for the duration of 25 (Twenty
Five) years unless renewed or extended under section 5.02

Section 5.02: Option to Renew:

Prior to the expiration of the Term, this Agreement may be renewed or extended for further
period only by mutual written agreement of the Parties hereto, on terms and conditions
mutually agreeable to the Parties and subject to the Orders/guidelines of the MERC.

Section 5.03:Force Majeure Event Termination

y
In the event that any delay or failure of performance caused by a Force Majeure Event,
continues for an uninterrupted period of three hundred sixty-five (365) days from its occurrence

op
or inception, the Party not claiming such Force Majeure Event may, at any time following the
end of such three hundred sixty-five (365) days period, terminate this Agreement upon written
notice to the affected Party, without further obligation by either Party except as to damages,
costs and balances incurred prior to the date of such termination.
C
Section 5.04: Event of Default Termination

Upon the occurrence and continuation of Event of Default by any Party as specified in Article
14 then Other Party may terminate this Agreement by giving prior written notice of 30 (Thirty)
eb

days.

Section 5.05:Termination Procedure


W

5.05.1 In the event of operation of Article 5.03,5.04the affected Party shall have the right to
deliver to the defaulting Party a Preliminary Termination Notice, which shall specify in
reasonable detail the circumstances giving rise to the issue of such notice.

5.05.2 Following the issue of Preliminary Termination Notice the Parties shall wait for
consultation as to what steps shall be taken to remedy the situation having regard to
all the circumstances for consultation period of thirty (30) days or such longer period
as the Parties may agree.

5.05.3 Any time after a period of thirty (30) days following the expiry of the Consultation
Period and unless the Parties shall have otherwise agreed to the contrary or the Party
may terminate this Agreement by delivering a Final Termination Notice, whereupon
this Agreement shall terminate on the date of such notice.

5.05.4 Till service of final notice of termination, the Parties shall, save as otherwise provided
in this Agreement, continue to perform their respective obligations under this
Agreement.

Page 155 of 194 17


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

5.05.5 Upon serving final termination notice XXXXXXXXX may within 90(Ninety) days
remove the Facility from the Site in case the Solar Energy is not sold to any third
party.

Section 6.07: Survival

This LoA is subjected to approval of AG solar feeder Scheme by MERC and terms & conditions
therein and the terms and conditions, if any laid by MEDA in their approval regarding IC
registration.

The expiry or termination of this Agreement shall not affect accrued rights and obligations of
the Parties under this Agreement, nor shall it affect any continuing obligations for which this
Agreement provides, either expressly or by necessary implication, the survival of, post its
expiry or termination.

y
op
C
eb
W

Page 156 of 194 18


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 6

FACILITY DESCRIPTION

Section 6.01 Summary Description:

XXXXXXXXX shall construct, own, operate and maintain the Facility, consisting of Solar PV
panel and associated equipment as per the RFP having a maximum installed capacity as
indicated in the “Exhibit A” to this Agreement which includes a complete written description of
the Facility, including identification of the solar technology and other equipment and
components that make up the Facility

Section 6.02: Location of the Facility:

The Facility shall be located on the Site and shall be identified as 50MWAC Cumulative

y
Capacity of Solar PV Power Projects at XXXXXREGION - MAHARASHTRA

op
A scaled map that identifies the Site, the location of the Facility at the Site, the location of the
Point of Delivery and the location of the ancillary facilities and the interconnection facilities is
included in “Exhibit A” to this Agreement. The Site is leased out for a period of 25 (Twenty
Five) years from the date of COD and this shall form an integral part of this Agreement.
C
Section 6.03: General Design of the Facility:

XXXXXXXXX shall design, construct, operate and maintain the Facility according to the
permissions/sanctions mentioned in Article 3 (b) and in accordance with the RFP, Standard
Utility Practices, the relevant technical standards in terms of the Electricity Act 2003 if
eb

designed to use Solar PV.XXXXXXXXX shall ensure that the Facility at all times:

[a] Have necessary protective equipment and interlocking facilities, which shall be so
coordinated that any malfunctioning or abnormality in XXXXXXXXX ’s Facility shall not
adversely affect the State Grid System and in the event of such malfunctioning or
W

abnormality XXXXXXXXX’s circuit breaker shall trip first to protect the equipment;

Page 157 of 194 19


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 7

FACILITY DEVELOPMENT

XXXXXXXX shall be responsible for obtaining all licences, Permit& approvals required for the
construction and commercial operation of the Facility.

In accordance with Article 3, the satisfaction of the foregoing obligation on the part of
XXXXXXXXX will be a condition precedent to Commercial Operations and any obligation of
MAHAGENCO under Article 4.

y
op
C
eb
W

Page 158 of 194 20


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 8

INTERCONNECTION AND EVACUATION

Section 8.01: Interconnection:


XXXXXXXX shall obtain permission from MSEDCL to interconnect and operate Facility

Section 8.02: Evacuation:

XXXXXXXX shall ensure the evacuation infrastructure upto the Inter-connection point as per
Clause 1.3 & 1.4 of Section – II of RFP 61485.

y
op
C
eb
W

Page 159 of 194 21


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 9

COMMERCIAL OPERATIONS

Section 9.01: Commercial Operations:

[a] Commercial Operations Date: XXXXXXXXX shall notify and achieve Commercial
Operations Date within 18 Months from the date of NTP, subject to the conditions as
mentioned in Article 4 and shall be fully capable of reliably producing the Solar Energy
to be provided under this Agreement and delivering such Solar Energy to MAHAGENCO
at the Interconnection Point.

[b] Pre Commercial Operations: in case of plant facility is ready to inject the power before
COD but unable to export due to non-readiness of interconnection facility with bay
extension, XXXXXXXXX shall be compensated according to Deemed generation Clause
mentioned in Article 10.03. There shall be no obligation for Mahagenco to take delivery

y
of solar energy prior to commercial operation date, except that Mahagenco shall take all
energy produced during testing of the facility, without payment of any charges.

Section 9.02: Notice of Commercial Operations:


Section 9.02.01
op
C
XXXXXXXXX shall specify in a written notice (“COD Notice”) to MAHAGENCO not later than
14 days that :

(i) the Facility is constructed in accordance with this Agreement and is ready to
eb

deliver Solar Energy in accordance with the terms hereof;

(ii) all permissions and approvals required for the Facility has been obtained by
XXXXXXXXX
W

(iii) all Interconnection Facilities are available to receive Solar Energy from the
Facility including metering arrangement, transmission line, bay extension at grid
sub-station and it’s corresponding approval

Section 9.02.02

Such notice shall take effect and the Commercial Operations Date will be achieved following
MAHAGENCO’s declaration that all of the conditions set forth in this Section and Article 3
have been satisfied or waived off by MAHAGENCO.

(a) XXXXXXXXX has to complete the testing of the Facility in accordance with the
manufacturer’s recommendations successfully. XXXXXXXXX has to submit the
required testing reports, Certificates from the Electrical Inspector (GOM),
certificates from MEDA to the MSEDCL’s officer as may be designated

(b) XXXXXXXXX has delivered to the Mahagenco a list of the Facility’s equipment,
showing the make, model, serial number and certified the installed capacity of
the Facility;

Page 160 of 194 22


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

(c) The Facility has achieved initial synchronization with the MSEDCL’s / State Grid
System and has demonstrated the reliability of its communications systems and
communications with the MSEDCL.

(d) XXXXXXXXX has operated the Facility without experiencing any abnormal or
unsafe operating conditions on any interconnected system;

y
op
C
eb
W

Page 161 of 194 23


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 10

SALE AND PURCHASE OF SOLAR ENERGY

Section 10.01 Sale and Purchase:


[a] At COD,XXXXXXXXX will sell and deliver and the MAHAGENCO will purchase and accept
all of the Solar Energy of the Facility at the Point of Delivery, subject to the terms and
conditions of this Agreement. MAHAGENCO will payXXXXXXXXX for the Solar Energy as
metered at the Point of Delivery at the “all-in” fixed tariff.

[b] The tariff for Facility shall be strictly as per the lowest tariff quoted byXXXXXXXXX during
the reverse bidding of tender No.61485 as under.

Particulars
Tariff Levelised Tariff
Period

(Rs/kWh)
Solar PV 25 3.18

y
[c]
op
Tariff is fixed and non-negotiable &will be applicable for entire period of the Agreement
i.e. 25 years from COD

The purchase of Solar Energy Units by MAHAGENCO from XXXXXXXXX under


thisAgreement shall be in the nature of firm purchase. There shall be no restriction on
C
the supply of Solar Energy Units by XXXXXXXXX to MAHAGENCO, except for force
majeure conditions and dispatch instructions issued by SLDC from time to time.
Further, XXXXXXXXX must follow grid discipline.
.
eb

[d] XXXXXXXXX shall design the Facility considering 19% yearly CUF for each individual
solar project. The 19% yearly CUF will be considered contracted CUF for first year and
thereafter, if the yearly CUF falls below threshold value of 19% of degraded capacity of
the Solar project (by considering the 0.77% per year linear degradation of PV modules),
SPD should take necessary measures to augment the plant and see that the CUF of
W

19% and above is maintained. In the event of CUF falling below 25% than the
Contracted CUF, consecutively for more than 3 years, Mahagenco shall terminate PPA
on account of lower generation.

In case the project generates and supplies energy less than the energy corresponding to
the
contracted CUF, the SPD will be liable to pay to the Mahagenco, penalty for the shortfall in
availability below contracted CUF level.

The amount of such penalty shall be 25% (twenty-five per cent) of the cost of this shortfall in
energy terms, calculated at PPA tariff.

In case the availability is more than the maximum CUF specified, the SPD will be free to sell
it to any other entity provided first right of refusal will vest with the Mahagenco. In case the
Mahagenco purchases the excess generation, the same may be done at 75% (seventy-five
per cent) of the PPA tariff.

Repowering: The Solar Power Generators will be free to re-power their plants from time to

Page 162 of 194 24


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

time during the PPA duration. However, the Procurer will be obliged to buy power only
within
the range of CUF (or CEQ, as relevant), specified in the PPA. Any excess generation will be
dealt as specified in above clause.

[e] The formula for purchasing Solar Energy and/or the quantum energy sold to the
MAHAGENCO shall be:

(ES) = EG - EAux .

Where:

ES = Net Energy Supplied by the Seller.


EG = Energy Generated and delivered to the State Grid System measured at the
Point of Delivery.
Eaux = Auxiliary Energy if Consumed by the Seller from own solar project.
Section 10.02 Title and Risk of Loss:
(i) As between the Parties, XXXXXXXXX shall have control on the Solar Energy and the
Test Energy output from the Facility up to the Interconnection Point at Metering point

y
(ii) Title and risk of loss related to the Solar Energy and Test Energy shall transfer from
XXXXXXXXX to MAHAGENCO at the Interconnection Point.

Section 10.03 Deemed Generation


op
Mahagenco may be constrained not to schedule power on account of unavailability of the
C
Transmission Infrastructure / Grid availability or in the eventuality of Forced Outage (Back
down).

10.3.1. Deemed Generation on account of Power evacuation / Grid Unavailability:


eb

a) After the scheduled commissioning date, if the plant is ready but the necessary power
evacuation/ transmission infrastructure is not ready, for reasons not attributable to the
Solar Power developer, leading to off take constraint, the provision for generation
compensation is as follows:
W

Transmission Constraint Provision for generation Compensation


If the plant is ready but the The normative CUF of 19% (nineteen per cent) or
necessary power committed CUF, Whichever is lower, and in cases where
evacuation / transmission the contract is in energy terms, proportionate value of
infrastructure is not ready, CEQ (Contracted Energy Quantity), for the period of grid
leading to off take constraint unavailability, shall be taken for the purpose of calculation
of generation loss. Corresponding to this generation loss,
the excess generation by the SPD in the succeeding 3
(three) Contract Years, shall be procured by the Procurer
at the PPA tariff so as to offset this loss.

If the transmission delay is directly attributable to the


organization building the transmission network and some
penalty is imposed on him, then a part of that penalty
may be utilized for compensating the Generation loss.

Page 163 of 194 25


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

However, it is clarified that if the plant is ready before COD, but Mahagenco is constrained
because of inadequate/ incomplete power evacuation infrastructure, no compensation shall
be permissible.

b) During the operation of the plant, there can be some periods where the plant can generate
power but due to temporary transmission unavailability the power is not evacuated, for
reasons not attributable to the Solar Power Developer. In such cases the generation
compensation shall be addressed by the Mahagenco in following manner:

Duration of Grid Provision for generation Compensation


unavailability
Grid unavailability in a Generation Loss = [(Average Generation per hour during
contract year as defined in the contract year) × (number of hours of grid
the PPA: (only period from unavailability during the contract year)]
8 am to 6 pm to be
counted): Where, Average Generation per hour during the contract
year (kWh) =Total generation in the contract year (kWh) ÷
Total hours of generation in the contract year

The excess generation by XXXXXXXXX equals to this


generation loss shall be procured by the MAHAGENCO

y
at the PPA tariff so as to offset this loss in the succeeding
3 (three) Contract years.

op
C
Provided that as an alternative to the mechanism provided above in Clause 10.3.1, the Procurer
may choose to provide Generation Compensation, in terms of PPA tariff, for the Generation loss
as defined in Clause 10.3.1, and for Grid unavailability beyond 50 hours in a Contract Year as
defined in the PPA.
eb

10.3.2) Due to Forced Outage (Back down)

The Solar Power Generator and the Procurer shall follow the forecasting and scheduling process
W

as per the regulations in this regard by the Appropriate Commission. The Government of India, as
per Clause 5.2(u) of the Indian Electricity Grid Code (IEGC), encourages a status of “must-run” to
solar power projects. Accordingly, no solar power plant, duly commissioned, should be directed to
back down by a Discom/ Load Dispatch Centre (LDC). In case such eventuality of Back down
arises, except for the cases where the Back down is on account of events like consideration of
grid security or safety of any equipment or personnel or other such conditions, the Solar Power
Generator shall be eligible for a Minimum Generation Compensation, from the Procurer, in the
manner detailed below.

Duration of Back down Provision for generation Compensation


Hours of Back down(“Forced Minimum Generation Compensation = 50% of [(Average
Outage”) during a monthly Generation per hour during the month) × (number of back
billing cycle. down hours during the month) × PPA Tariff]

Where, Average Generation per hour during the month (kWh)


=Total generation in the month (kWh) ÷ Total hours of generation
in the month

Page 164 of 194 26


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

The Generation Compensation is to be paid as part of the energy bill for the successive month

y
op
C
eb
W

Page 165 of 194 27


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 11

OPERATION AND MAINTENANCE


Section 11.01 Facility Operation:

[a] XXXXXXXXX covenants to operate the Facility as an integrated part of the System / grid.

[b] XXXXXXXXX covenants to operate and maintain the Facility in safe and reliable
operating condition and in compliance with Standard Utility Practices and within the
specified voltage and frequency ranges. XXXXXXXXX shall provide suitable automatic
disconnection arrangement for the Facility, in case the ranges of electrical
characteristics go outside the limits specified, due to the Grid/System constraints or due
to any other reason. MAHAGENCO shall not be responsible for any damages to
XXXXXXXXX’s equipment due to variation in voltage and frequency in Grid/ System and
MAHAGENCO shall not be liable to compensate XXXXXXXXX for any damages suffered
there from as XXXXXXXXX is responsible for installation of necessary protection system
to safeguard XXXXXXXXX s facility and isolation of MSEDCL Evacuation infrastructure
thereof

y
[c] XXXXXXXXX will devise and implement a plan of inspection, maintenance and repair of
the Facility and the components thereof in order to maintain such equipment in a safe

[d] op
and reliable operating condition and in accordance with Standard Utility Practices, and
shall keep records with respect to such inspections, maintenance and repairs.

During the period of generation, XXXXXXXXX shall liaison and co-ordinate with the
Officer of the MAHAGENCO& MSEDCL as may be designated.
C
[e] During the Term of this Agreement XXXXXXXXX shall arrange for testing of the
protection system at least once in a twelve month.
eb

Section 11.02 Outage and Performance Reporting:

[a] XXXXXXXXX shall comply with all outage-reporting requirements of MAHAGENCO &
MSEDCL
W

[b] When Forced Outages occur, XXXXXXXXX shall notify the MAHAGENCO of the
existence, nature and expected duration of the Forced Outage as soon as practicable
after the Forced Outage occurs. XXXXXXXXX shall immediately inform Mahagenco of
changes in the expected duration of the Forced Outage unless relieved of this obligation
by MAHAGENCO & MSEDCL for the duration of each Forced Outage. For such forced
outage, Deemed generation clause will be applicable.

Section 11.03 Operating Records:

XXXXXXXXX shall maintain Operating Records at the Facility that contain an accurate and up
to date operating log, in electronic format, records of production, changes in operating status,
Scheduled Outages and Forced Outages and hourly average solar radiation during the Term
of this Agreement, including such records as may be required by MERC. MAHAGENCO may
examine the Operating Records and data kept by XXXXXXXXX at any time during the period
the records are required to be maintained, upon request and during normal business hours.

Section 11.04 Access to Facility:

Page 166 of 194 28


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

XXXXXXXXX shall ensure that appropriate Officers of MAHAGENCO& their informed


representatives shall at all reasonable times, including weekends and nights have access to
the Facility to read meters and perform all inspections, maintenance, service and operational
reviews as may be appropriate to facilitate the performance of this Agreement.

Section 11.05 Data to be provided to State Load Dispatch Centre:

XXXXXXXXX shall provide the data of Generation, the Generation Forecast etc. to the state
Load Dispatch Centre. The data visibility system should be installed & in operation during the
PPA period by XXXXX (as per MERC norms)

y
op
C
eb
W

Page 167 of 194 29


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 12

MEASURING AND METERING

Section12.01 Metering Equipment:

[a] The ABT metering equipment(at Delivery point & at Grid System) which will be installed
by XXXXXXX, consisting of Main and Check Meters with separate CT and PT shall be
identical in make, technical standards and of 0.2s accuracy class and calibration and
comply with the requirements of Electricity Rules. The meters installed at the Metering
Point shall have four quadrants, three phases, four wires and provision for on line
reading and time slots as required by Mahagenco , MSEDCL& SLDC.

[b] Metering arrangements shall be made by XXXXXXX keeping in view


guidelines/regulations notified by MERC, if any. Meters shall comply with the
requirements of CEA regulation on ‘Installation and Operation of meters’.

[c] XXXXXXXXX shall be responsible to operate the Facility as envisaged under the

y
Agreement and to provide appropriate facility instrumentation and metering
arrangement to enable monitoring of Generation.

[a]
op
Section 12.02 Testing of the Metering Equipment:

The Main and Check Meters shall be tested for accuracy, with a portable standard
C
meter, by the MSEDCL Testing Division. The agency/Testing Division shall carry out the
calibration, periodical testing, sealing and maintenance of meters in the presence of the
authorized representative(s) of XXXXXXXXX and the representative(s) of MAHAGENCO
shall sign on the result thereof.
eb

[b] The frequency of meter testing shall be annual.

All the meters will be tested only at the Metering Point. A copy of the test reports will be
provided to XXXXXXXXX
W

[c] If during testing, both the Main and Check Meter are found within the permissible limit of
error i.e. 0.5%, the energy computation will be as per the Main Meter. If during test, any
of the Main Meters is found to be within the permissible limits of error but the
corresponding Check Meter is beyond the permissible limit; the energy computation will
be as per the Main Meter. The Check Meter shall be calibrated immediately.

If during the tests, the Main Meter is found to be beyond permissible limits of error, but
the corresponding Check Meter is found to be within the permissible limits of error, then
the energy computation for the month up to date and time of such test check shall be in
accordance with Check Meter. The Main Meter shall be calibrated immediately and the
energy for the period thereafter shall be as per the calibrated Main Meter.

[d] If during any of the monthly meter readings, the variation between the Main meter and
the Check meter is more than 0.5%, all the meters shall be re-tested and calibrated
immediately by XXXXXXXXX after expiry of initial warranty period.

[e] For all times the reading of the Main meter only will be considered except in rarest
conditions where the Check meter reading may be considered

Page 168 of 194 30


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section 12.03 Installation of Meters:

a) The metering system shall be provided at Interconnection Point as per MERC metering
code.

b) XXXXXXXXX shall install the Weather Monitoring Stations in the solar power plant
area to measure major atmospheric parameters solar radiation, temperature, rainfall
etc. XXXXXXXXX shall maintain the weather data on daily basis so that it can be used
to cross check the actual generation vs solar radiation.

Section 12.04 Charges and Penalties:

XXXXXXXXX shall pay all the costs and charges for the testing mentioned in Section
12.02 above. In the event, any of the meters require retesting/ calibration, additional
charges as applicable will be charged to XXXXXXXXX after expiry of initial warranty
period.

Section 12.05 Joint Meter Reading:

y
[a] The meter readings at the Metering Point shall be undertaken jointly by Mahagenco &
MSEDCL and the authorized representative of the Seller on the 1st day of every month

op
for the preceding month. The meter readings shall be jointly taken on 1st day of every
month. In case Mahagenco’ s or MSEDCL’s representative does not participate within 1st
3 days day of every month, the reading recorded &taken by Seller shall be final and
binding upon for accepting the invoice & making payment accordingly. Such Invoice will
not be treated as “Disputed Invoice” at all.
C
[b] The Joint Meter Reading shall, this recorded shall be the basis &furnished to the Office
of the MAHAGENCO for further processing. The total units received for sale of Solar
Energy to MAHAGENCO will be ascertained by MAHAGENCO office on the basis of the
eb

Joint Meter Readings.


W

Page 169 of 194 31


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE –13

BILLING AND ENERGY ACCOUNTING

Section 13.01 Monthly Energy Bills:

a) XXXXXXXXX shall raise a monthly energy bill based on the Joint Meter Readings
within the 7 (Seven days) from the date of joint meter reading to MAHAGENCO office.
XXXXXXXXX will send hard copies of these bills to the MAHAGENCO office by hand
delivery /courier/Post/email, the monthly energy bill showing all billing parameters,
rates and factors, and any other data reasonable pertinent to the calculation of monthly
payments to XXXXXXXXX in the format provided by MAHAGENCO. However, the
date of receipt of bill shall be the date of receipt of hard copy/email of bill to the
MAHAGENCO office.

Section 13.02 Payments:

The due date of payment shall be 60 (Sixty) days from the date of receipt of bill and will
be paid by account payee’s cheque or by RTGS/ Net Banking/ Bank Transfer in the

y
name of XXXXXXXXX or authorized representative, in whose name power of attorney
is given by XXXXXXXXX.

op
In case of delay in payment beyond the due date, MAHAGENCO shall be liable to pay
interest on such delayed payment at the rate of 1.25% per month

The MAHAGENCO, however, shall be entitled to make adjustments in XXXXXXXXX ’s


C
Invoices for any charges/costs incurred on behalf of XXXXXXXXX (with prior notice &
mutually agreed)and payable by XXXXXXXXX under this Agreement. This shall be
shown in the audited statement issued by the MAHAGENCO.
eb

Section 13.03Payment Security Mechanism between XXXXXXXXX & MAHAGENCO:

Mahagenco will provide the payment security as per MNRE guideline & Gazette
published on 3rd August 2017 which is either
W

 Letter of Credit
 Payment Security Fund
 State Govt. Guarantee

A. Letter of Credit

MAHAGENCO shall establish an Irrevocable Revolving Letter of Credit (IRLC) in favour


of XXXXXXXXX for an amount equivalent to one point zero five (1.05) times of average
monthly billing computed as follows, towards the payment security.
The Letter of Credit shall be opened with any scheduled commercial bank (agreeable to
XXXXXXXXX within one month of COD.

IRLC Value =1.05 x {(Capacity of the plant x 8760 x1000 x CUF) x Applicable Tariff} /
12.
Where CUF means capacity utilisation factor.

The amount of IRLC shall be reviewed each year on 1st April for determination of
average monthly billing and its amount shall be enhanced / reduced accordingly.

Page 170 of 194 32


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

The Letter of Credit established by MAHGENCO shall:

a. On the date it is issued, have a term equal to 1 (one) year but revolving for
the full term of this Agreement.
b. Be transferable or assignable to any lender of XXXXXXXXX.
c. Be payable as a payment security mechanism upon the execution and
presentation by the designated officer of XXXXXXXXX after the Due Date of
Payment provided it is supported by a copy of the Bill for which payment is
sought and a certificate by the designated officer of XXXXXXXXX that the Bill
remains unpaid.
d. Be reinstated to its original level after every valid draw by XXXXXXXXX
within 8 (eight) days.
e. The charges for opening, maintaining and operation of Letter of Credits shall
be borne by MAHAGENCO.

B. Payment Security Fund which shall be suitable to support payment for at least 3
(three) months’ billing of all the Projects tied up with such fund; Mahagenco is to
ascertain this to SPD

C. State Government Guarantee


In addition to A) & B) above, the Procurer may also choose to provide State

y
Government Guarantee, in a legally enforceable form, ensuring that there is
adequate security to the Solar Power Generator, both in terms of payment of energy

Section 13.04 Billing and Payment Records:


op
charges and termination compensation if any.

The Billing and Payment records shall be maintained by XXXXXXXXX for the reconciliation by
the Corporate Office of MAHAGENCO on quarterly basis.
C
Section 13.05 Disputed Bill:
eb

13.05.1 If the MAHAGENCO does not dispute a Monthly Bill raised by the other Party within
Thirty (30) days of receiving, such Bill shall be taken as conclusive.
W

13.05.2 If the MAHAGENCO disputes the amount payable under a Monthly Bill it shall
pay the undisputed amount and it shall within thirty (30) days of receiving such
Bill, issue a notice (the "Bill Dispute Notice") to the invoicing Party against
disputed amount setting out:

i) the details of the disputed amount;


ii) its estimate of what the correct amount should be; and
iii) all written material in support of its claim.

13.05.3 If the XXXXXXXXX agrees to the claim raised in the Bill Dispute Notice issued
pursuant to Article 13.05.2, then XXXXXXXXX shall make appropriate adjustment
in the next Monthly Bill.

In such a case excess amount shall be refunded along with interest at the same
rate as Late Payment Surcharge, which shall be applied from the date on which
such excess payment was made by the MAHAGENCO and up to and including the
date on which such payment has been received as refund.

Page 171 of 194 33


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

13.05.4 If the XXXXXXXXX does not agree to the claim raised in the Bill Dispute Notice
issued pursuant to Article 13.05.2, it shall, within thirty (30) days of receiving the
Bill Dispute Notice, furnish a notice ("Bill Disagreement Notice") to the disputing
Party providing:

i) reasons for its disagreement;


ii) its estimate of what the correct amount should be; and
iii) all written material in support of its counter-claim.

13.05.5 Upon receipt of the Bill Disagreement Notice by the MAHAGENCO under Article
13.05.4, authorized representative(s) or a director of the board of directors/
member of board of the MAHAGENCO and XXXXXXXXX shall meet and make
best endeavors to amicably resolve such dispute within thirty (30) days of receipt
of the Bill Disagreement Notice.

13.05.6 If the Parties do not amicably resolve the Dispute within thirty (30) days of receipt
of Bill Disagreement Notice pursuant to Article 13.05.4, the matter shall be
referred to Dispute resolution in accordance with Article18.

y
13.05.7 For the avoidance of doubt, it is clarified that despite a Dispute regarding an

op
Invoice, the MAHAGENCO shall, without prejudice to its right to Dispute, be
under an obligation to make payment, of 50% of the Disputed Amount in the
Monthly Bill.
C
Section 13.06 Reconciliation of bills & payments between Mahagenco &XXXXXXXXX:

Mahagenco &XXXXXXXXX will reconcile the bills & payment on quarterly basis as per the
eb

following way

Mahagenco will make payment to XXXXXXXXX as per Joint Meter Reading taken at the
metering point inside solar power plant as per unit tariff Rs 3.18/kWh
W

Page 172 of 194 34


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 14

EVENTS OF DEFAULTS AND REMEDIES

Section 14.01XXXXXXXXX Events of Default :

The occurrence of any one of the following shall constitute an event of default by the
XXXXXXXXX ("SELLER"):

(i) (A)The Financial Closing Date shall fail to occur within 12 months from date of signing of
Agreement or by the COD, whichever is later; (B) the Construction Commencement Date
shall fail to occur within 18 (Eighteen) months following the handing over of site land as
per the RFP ; or (C) the Commercial Operation Date of the Unit shall fail to occur within
stipulated period or such extended time as mutually agreed by XXXXXXXXX and
MAHAGENCO; or

(ii) XXXXXXXXX fails to comply with any material provision of this Agreement and such failure
shall continue uncured for 90 (ninety) days after notice thereof by MAHAGENCO, provided
that MAHAGENCO may exercise discretion to extend the period for compliances, on

y
satisfaction of reasonable grounds; or

(iii)

op
XXXXXXXXX (A) makes a general assignment or an arrangement or composition with or for
the benefit of its creditors, other than creation of charges on the Project as required by
Financing Arrangements, (B) or takes any action for the purpose of effecting the foregoing
or (C) files a voluntary winding-up petition under any bankruptcy or similar Law; or
C
(iv) a proceeding or case shall be commenced against XXXXXXXXX, without the application or
consent of XXXXXXXXX, in any court of competent jurisdiction, seeking (A) its liquidation,
reorganization of its debts, dissolution or winding-up, or the composition or readjustment of
its debts other than in the course of amalgamation or reconstruction of XXXXXXXXX duly
eb

approved by MAHAGENCO and the Financing Parties, (B) the appointment of a receiver,
custodian, liquidator or the like of XXXXXXXXX or of all or any substantial part of its assets
or (C) similar relief in respect of XXXXXXXXX under any Law relating to bankruptcy,
insolvency, reorganization of its debts, winding-up, composition or adjustment of debts, and
such proceeding or case shall continue undismissed, or an order, judgement or decree
W

approving or ordering any of the foregoing shall be entered and continue unstayed and in
effect, for a period of 180 days; or

(v) XXXXXXXXX shall permanently abandon the construction or operation of the Facility (other
than due to a Force Majeure Event) and within 30 days after receipt of notice from
MAHAGENCO asserting it intends to terminate this Agreement due to such abandonment,
XXXXXXXXX fails to start (and thereafter continue) good faith efforts to construct or operate
the Facility;

(vi) If XXXXXXXXX fails to supply Solar Energy for a continuous period of 3 (three) months for
due to the fault which are attributable to XXXXXXXXX and not due to Force Majeure event
or any other reason not attributable to XXXXXXXXX.

Page 173 of 194 35


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Section 14.02 Remedies for XXXXXXXXX Default:

MAHAGENCO may terminate this Agreement by giving written notice of 60 (sixty) days in
advance to XXXXXXXXX of such breach after cooling period and MAHAGENCO's intention to
terminate this Agreement, as per termination procedure stipulated in section 5.05.

Section 14.03 MAHAGENCO’s Events of Default:


i) MAHAGENCO fails to pay any portion of a undisputed Monthly Bill or Supplementary Bill
for a period of 60 days after the Due Date.

ii) MAHAGENCO fails to comply with any material provision of this Agreement (other than
with respect to the payment of money), and such failure shall continue uncured for 90
days after notice thereof by the MAHAGENCO, provided that XXXXXXXXX may exercise
discretion to extend the period for compliances, on satisfaction of reasonable grounds; or

iii) MAHAGENCO files a voluntary winding-up petition under any bankruptcy or similar Law;
or a proceeding or case shall be commenced against the MAHAGENCO, without the
application or consent of the MAHAGENCO, in any court of competent jurisdiction,
seeking (A) its liquidation, reorganization of its debts, dissolution or winding-up, or the
composition or readjustment of its debts other than in the course of amalgamation or

y
reconstruction of the MAHAGENCO duly approved by the Seller and the Financing
Parties, (B) the appointment of a receiver, custodian, liquidator or the like of the

op
MAHAGENCO or of all or any substantial part of its assets or (C) similar relief in respect
of the MAHAGENCO under any Law relating to bankruptcy, insolvency, reorganization of
its debts, winding-up, composition or adjustment of debts, and such proceeding or case
shall continue undismissed, or an order, judgement or decree approving or ordering any
of the foregoing shall be entered and continue un stayed and in effect, for a period of 180
C
days.

Section 14.04 Remedies for MAHAGENCO Default


eb

(i) MAHAGENCO event of Default if any occurs and is continuing, XXXXXXXXX shall be
entitled to sell the Solar Energy other than MAHAGENCO, subject to compliance with the
Open Access Regulations as may be applicable from time to time. The STU and
Licensees shall facilitate such third party sale and enter into an Energy
Transmission/Wheeling Agreement with XXXXXXXXX to enable such third party sale. In
W

such case the Site will continue to be leased out for the period of 25 (twenty five) years
from the date of COD

(ii) In the case of sale of Solar Energy to third party consumers under circumstances at (i)
above, subject to the relevant Open Access Regulations, the transmission charges and
wheeling charges and transmission loss and wheeling loss as may be determined by the
Commission separately from time to time, shall be applicable.

(iii) In the case of sale of Solar Energy to third party consumers or any entity other than
MAHAGENCO, MAHAGENCO will not be liable for any payments towards purchase of
Solar Energy or any other payments and MAHAGENCO will be absolved against payment
liabilities in respect of the sale of Solar Energy to third party consumers or any entity other
than MSEDCL.

(iv) MSEDCL will continue to ensure evacuation of Solar Energy beyond Interconnection Point.

(v) XXXXXXXXX may terminate this Agreement by giving written notice to MAHAGENCO of
such breach and MAHAGENCO's intention to terminate this Agreement, as per termination
procedure stipulated in section 5.05.

Page 174 of 194 36


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

(vi) In case of breach of the material provisions of this Agreement by MAHAGENCO, due to
which the Agreement stands terminated and in spite of the efforts to supply the Solar
Power to third party XXXXXXXXX is unable to do so, then MAHAGENCO shall be liable to
pay such amount calculated based on the estimated generation calculated on the basis of
average of last 3 months billing and pay to XXXXXXXXX the revenue equivalent to 25
years billing.

y
op
C
eb
W

Page 175 of 194 37


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 15

LIMITATION OF LIABILITY AND DAMAGES

Section 15.01 Limitation of Liability:

[a] Each Party shall be responsible for the acts of its employees and will indemnify, defend
and hold the other Party harmless from any and all claim, damage or expense arising
out of or relating to:

(i) An act of the indemnifying party's employees; and

(ii) Injury to or death of any of the indemnifying party's employees (except if caused by
the gross negligence of the other party) which such employee is on the premises of
the other Party pursuant to this Agreement.

[b] Neither Party shall be liable for any failure or delay on its part in performing any of its
obligations under this Agreement or for any loss, damages, costs, charges or expenses
incurred or suffered by the other Party by reason of such failure or delay, if and so far as
such failure or delay shall be the result of or arising out of Force Majeure.

y
Section 15.02 Limitations on Damages:

op
The Parties hereby confirm that the express remedies and measures of damages provided in this
Agreement satisfy the essential purposes hereof. For breach of any provision for which an
express remedy or measure of damages is provided, such express remedy or measure of
C
damages shall be the sole and exclusive remedy and the obligor's liability shall be limited as
provided in such provision. If no remedy or measure of damages is expressly herein provided,
the obligor's liability shall be limited to direct actual damages only. Neither Party shall be liable to
the other Party for consequential, incidental, punitive, exemplary or indirect damages, lost profits
eb

or other business interruption damages by statute, in tort or contract (except to the extent
expressly provided herein).
W

Page 176 of 194 38


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 16

REPRESENTATIONS, WARRANTIES AND COVENANTS

Section 16.01XXXXXXXXX 's Representations, Warranties and Covenants:

XXXXXXXXX hereby represents and warrants as follows:


[a] XXXXXXXXX is a company duly organized, validly existing and in good standing
under Indian laws. XXXXXXXXX has all requisite power and authority to conduct its
business, to own its properties, and to execute, deliver and perform its obligations
under this Agreement.
[b] The execution, delivery and performance of its obligations under this Agreement by
XXXXXXXXX have been duly authorized by all necessary corporate action, and do
not and will not:

(i) Require any consent or approval by any governing body of XXXXXXXXX,


other than that which has been obtained and is in full force and effect
(evidence of which shall be delivered to MAHAGENCO upon its request);

y
(ii) Violate any provision of law, rule, regulation, order, writ, judgment, injunction,
decree, determination or award currently in effect having applicability to

(iii)
op
XXXXXXXXX or violate any provision in any formation documents of
XXXXXXXXX, the violation of which could have a material adverse effect on
the ability of XXXXXXXXX to perform its obligations under this Agreement;

Result in a breach or constitute a default under XXXXXXXXX 's formation


C
documents or bylaws, or under any agreement relating to the management or
affairs of XXXXXXXXX or any indenture or loan or credit agreement, or any
other agreement, lease or instrument to which XXXXXXXXX is a party or by
which XXXXXXXXX or its properties or assets may be bound or affected, the
eb

breach or default of which could reasonably be expected to have a material


adverse effect on the ability of XXXXXXXXX to perform its obligations under
this Agreement; or

(iv) Result in, or require the creation or imposition of any mortgage, deed of trust,
W

pledge, lien, security interest or other charge or encumbrance of any nature


upon or with respect to any of the assets or properties of XXXXXXXXX now
owned or hereafter acquired, the creation or imposition of which could
reasonably be expected to have a material adverse effect on the ability of
XXXXXXXXX to perform its obligations under this Agreement.

[c] This Agreement is a valid and binding obligation of XXXXXXXXX.

[d] The execution and performance of this Agreement will not conflict with or constitute
a breach or default under any contract or agreement of any kind to which
XXXXXXXXX is a party or any judgment, order, statute, or regulation that is
applicable to XXXXXXXXX or the Facility.

[e] To the best knowledge of XXXXXXXXX, and except for those permits, consents,
approvals, licenses and authorizations mentioned in this Agreement, which
XXXXXXXXX anticipates will be obtained by XXXXXXXXX in the ordinary course of
business, all permits, consents, approvals, licenses, authorizations or other action
required by any Governmental Authority to authorize XXXXXXXXX 's execution,

Page 177 of 194 39


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

delivery and performance of this Agreement have been duly obtained and are in full
force and effect.

[f] XXXXXXXXX shall comply with all applicable local, state and central laws,
regulations and ordinances, and all applicable central, state, and local environmental
laws and regulations presently in effect or which may be enacted during the Term of
this Agreement.

y
op
C
eb
W

Page 178 of 194 40


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 17

FORCE MAJEURE

Except for obligations to pay money and other accrued rights and obligations, the performance
of any obligation required hereunder shall be excused during the continuation of any Force
Majeure event suffered by the Party and the time for performance of any obligation that has
been delayed due to the occurrence of a Force Majeure event shall be extended by the number
of days of the Force Majeure event, provided, however, that the Party experiencing the delay
shall notify the other Party of the occurrence of such Force Majeure Event and the anticipated
period of delay within ten (10) days after the commencement of the Force Majeure Event,
provided, further that in no event, will any delay or failure of performance caused by any
conditions or events of Force Majeure extend this Agreement beyond its Term.

Each Party suffering a Force Majeure Event shall take, or cause to be taken, such action as
may be necessary to void, nullify, overcome or otherwise to mitigate in all material respects the
effects of any Force Majeure Event suffered by either of them and the Parties agree to meet to
seek and coordinate appropriate mitigation measures.

y
op
C
eb
W

Page 179 of 194 41


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 18

GOVERNING LAW, DISPUTE RESOLUTION AND CONSENT TO JURISDICTION

Section 18.01: Governing Law:

This Agreement and the rights and duties of the Parties hereunder shall be governed by and
construed, enforced and performed in accordance with the Laws of India. Any legal
proceedings in respect of any matters, claims or disputes under this Agreement shall be under
the jurisdiction of appropriate courts in Mumbai, India only.

Section 18.02 Dispute Resolution:

Any disputes arising out of, in connection with or with respect to this Agreement, the subject
matter hereof, the performance or non-performance of any obligation hereunder, that cannot be
resolved by negotiation among the Parties within sixty (60) days.

In case the Parties are unable to resolve the disputes through mutual negotiation, the same

y
shall be referred to arbitration conducted as per the provisions of Arbitration & Conciliation Act,
1996, or any subsequent enactment or amendment thereto, adjudicated by a sole arbitrator,
appointed by mutual agreement of the Parties.

op
The cost of arbitration shall be shared equally by the Parties.

The decision of the Arbitrator(s) shall be final and binding upon the Parties.
C
The venue of the arbitration shall be Mumbai.

The arbitration proceedings shall be in English language.


eb

This clause shall survive termination or expiry of this Agreement.


W

Page 180 of 194 42


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 19

CLEAN DEVELOPMENT MECHANISM (CDM) AND SUBSIDY.

Section 19.01 CDM:

All risks, costs and efforts associated with the availing of carbon credits shall be borne by the
generating company XXXXXXXXX. Further, the entire proceeds of carbon credit from approved
CDM project, if any, shall be retained by the generating company.

y
op
C
eb
W

Page 181 of 194 43


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 20

NOTICES

Section 20.01 Notices in Writing:.

All notices, requests, consent or other communication shall be addressed to the other Party at
the addresses noted below or such other address as shall be notified by a Party in writing to the
other Party. All such notices, requests, consent or other communication, unless otherwise
specified herein, shall be in writing and may be delivered by hand delivery, post, courier service
or by facsimile, or by electronic mail and at all times the Party serving the notice shall need to
retain the proof of delivery:

XXXXXXXXX.

3rd Floor, Asset 301-304, & 307,


Worldmark, 3 Aerocity New Delhi,
Pin - 110037
MAHAGENCO:

y
The Chief Engineer (SPGD),
Maharashtra State Power Generation Company Limited,
Prakashgad, Bandra (East),
Mumbai 400 051.

op
C
All notices or communications if given by facsimile shall be followed by sending a copy of the
said notice via post office in an envelope addressed to the appropriate Party for delivery by
speed post or registered mail. All notices shall be deemed validly delivered upon receipt
evidenced by an acknowledgment of the recipient, unless the Party delivering the notice can
prove in case of delivery through the registered post that the recipient refused to acknowledge
eb

the receipt of the notice despite efforts of the postal authorities.

Any Party may by notice of at least 15(fifteen) days to the other Party change the address
and/or addresses to which such notices and communication to it are to be delivered or mailed.
W

Page 182 of 194 44


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

ARTICLE 21

MISCELLANEOUS

Section 21.01 Amendments and Exhibits:

This Agreement may not be changed or amended unless such change or amendment shall be
in writing and signed by authorized representatives of the Parties.

Section 21..02 Disclaimer:

No review, approval, consent, advice, recommendation, authorization, notice, inspection, test or


other act by a Party regarding the construction, ownership, operation, use or maintenance of
the Facility or the delivery of Solar Energy under this Agreement shall constitute or be
interpreted as or be relied upon by any other person or entity not a party to this Agreement as a

y
warranty, representation or endorsement by such Party.

Section 21.03 Entire Agreement:

op
This Agreement constitutes the entire agreement between the Parties relating to the subject
matter of this Agreement and shall supersede all other prior and contemporaneous
C
understandings or agreements, both written and verbal, between the Parties relating to the
subject matter of this Agreement.

Section 21.04 Waiver:


eb

Failure to enforce any right or obligation by any Party with respect to any matter arising in
connection with this Agreement shall not constitute a waiver as to that matter or any other
matter. Any waiver by any Party of its rights with respect to a default under this Agreement or
W

with respect to any other matters arising in connection with this Agreement must be in writing
and shall not be effective unless the same is approved in writing by the other Party.

Section 21.05 Captions; Construction:

All indexes, titles, subject headings, section titles and similar items are provided for the purpose
of reference and convenience and are not intended to affect the meaning of the content or
scope of this Agreement.

Section 21.06 Assignment:

XXXXXXXXX /MAHAGENCO shall not assign, transfer or otherwise dispose of any of its rights
or obligations under this Agreement, in whole or in part, without the prior written consent of the
other party.

Page 183 of 194 45


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Provided that, the Purchaser shall permit assignment of any of the Seller’s rights and
obligations under this Agreement in favour of the lenders to the Seller, if required under the
Financing Agreements.

Section 21.07 No Agency:

This Agreement is not intended, and shall not be construed, to create any association, joint
venture, agency relationship or partnership between the Parties or to impose any such
obligation or liability upon either Party. Neither Party shall have any right, power, or authority to
enter into any agreement or undertaking for, or act as or be an agent or representative of, or
otherwise bind, the other Party.

Section 21.08 Cooperation:

The Parties acknowledge that they are entering into a long-term arrangement in which the
cooperation of both of them will be required. If, during the Term hereof, changes in the
operations, facilities or methods of either Party will materially benefit a Party without detriment
to the other Party, the Parties commit to each other to make reasonable efforts to cooperate

y
and assist each other in making such change.

Section 21.09 Further Assurances:

op
Upon the receipt of a written request from the other Party, each Party shall execute such
additional documents, instruments and assurances and take such additional actions as are
reasonably necessary and desirable to carry out the terms and intent hereof. Neither Party shall
C
unreasonably withhold condition or delay its compliance with any reasonable request made
pursuant to this Section 21.09.

Section 21.10 Counterparts:


eb

This Agreement may be executed in several counterparts, each of which shall be an original
and all of which together shall constitute but one and the same instrument.

Section 21.11 Severability:


W

If any of the terms of this Agreement is finally held or determined to be invalid, illegal or void, all
other terms of the Agreement shall remain in effect; provided, however, that the Parties shall
enter into negotiations concerning the terms affected by such decision for the purpose of
achieving conformity with requirements of any applicable law and the intent of the Parties.

Section 21.12 Change in Law:

In the event a Change in Law results in any adverse financial loss/ gain to the Solar Power
Generator then, in order to ensure that the Solar Power Generator is placed in the same
financial position as it would have been had it not been for the occurrence of the Change in
Law, the Solar Power Generator/ Procurer shall be entitled to compensation by the other party,
as the case may be, subject to the condition that the quantum and mechanism of compensation
payment shall be determined and shall be effective from such date as may be decided by the
Appropriate Commission.

Page 184 of 194 46


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

In these Guidelines, the term Change in Law shall refer to the occurrence of any of the
following events after the last date of the bid submission, including (i) the enactment of any new
law; or (ii) an amendment, modification or repeal of an existing law; or (iii) the requirement to
obtain a new consent, permit or license; or (iv) any modification to the prevailing conditions
prescribed for obtaining an consent, permit or license, not owing to any default of the Solar
Power Generator; or (v) any change in the rates of any Taxes, duties, cess, Surcharge and
levies which have a direct effect on the Project. However, Change in Law shall not include any
change in taxes on corporate income or any change in any withholding tax on income or
dividends.

Section 21.13 Relief for Change in Law:

If there is any Change in Law affecting the Project cost of the Seller, than the Seller shall notify
the Purchaser in writing describing in reasonable detail the events constituting a Change in
Law and the impact it has or would have on the Seller’s Project cost. Following such
notification, such an increase in amount as would sufficiently compensate the Seller for the
adverse effects on Project cost caused by the Change in Law, in order to ensure that the
Seller is placed in the same financial position as it would have been had it not been for the

y
occurrence of the Change in Law will be made by the Purchaser. The Purchaser may request
the Seller to provide such additional information or document as it deems necessary to verify
the effect of Change in Law on the Project cost

Section21.14 Third Party Beneficiaries: op


C
This Agreement is solely for the benefit of the Parties and their respective successors and
permitted assigns and shall not be construed as creating any duty, standard of care or any
liability to, any person not a party to this Agreement.
eb

Section21.15 Confidentiality:

The Parties undertake to hold in confidence this Agreement and not to disclose the terms and
conditions of this transaction contemplated hereby to third parties, except:
W

(a) To their professional advisors;


(b) To their officers, contractors, employees, agents or representative, financers. Lenders,
who need to have access to such information for the proper performance of their
activities; or
(c) Disclosures required under Law without the prior written consent of the other Party;

Section21.16 Language:

All agreements, correspondences and communication between the Parties relating to this
Agreement and all other documentation to be prepared and supplied under the Agreement shall
be written and in English, and the Agreement shall be construed and interpreted in accordance
with English language.

Section 21.17 Approval of MERC :

Page 185 of 194 47


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

The terms and conditions approved by MERC in their order as well as the terms and conditions,
if any, laid by MEDA in their approval regarding IC registration shall be incorporated in PPA &
PSA.

<EXECUTION PAGE FOLLOWS>

IN WITNESS WHEREOF THE PARTIES HERETO HAVE SET AND SUBSCRIBED THEIR
RESPECTIVE HAND TO THESE PRESENTS ON THE DAY, MONTH AND YEAR WRITTEN
HEREINBELOW

XXXXXXXXX: MAHAGENCO:

[■] [■]

y
By: _________________________ By: _________________________
Name:
Title:
Date:
op Name:
Title:
Date:
C
Witness: Witness:

1. 1.
eb

2. 2.
W

Page 186 of 194 48


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

EXHIBIT A

FACILITY DESCRIPTION

(To be prepared as per MNRE Guidelines for the purpose of obtaining approval by
Mahagenco)

To be filled by XXXXXXXXX

Sr.No. Item Description


1. Make Later
2. Model No. Later
3. Rating in kW 50,000kW (Cumulative)
4. Technology used solar PV/thermal Solar-PV
5. Key accessories As per Technical Specification of RFP-
61485
6. Module mounting structure Later
7. Junction boxes Later
8. Power Conditioning Unit Later
9. Cables As per IEC/IS standards

y
10. AC/DC/AC System (Yes/No) DC to AC system
11. Rated voltage (V) As per Design
12.

13.
14.
Auxiliary Consumption (kWh)
Reactive Energy requirement
op
Units to be generated per annum (kWh) at 1.66 million units per year per MW.
projected CUF
As Applicable
NIL
C
15. Capacity Utilization Factor (CUF) % 19%

Similar tables to be made by Mahagenco/MSEDCL for their scope separately & to be provided
toXXXXXXXXX in order to prepare a consolidated list, if required
eb

Project site locations


XXXXXX Region: Cumulative capacity = 50MWac

Distance
W

from the Proposed


Sr. Evacuation Sub
Name of the Project Site sub -station Capacity in
No Station
(Km) MW

Page 187 of 194 49


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Note:

Above site locations are tentative proposed locations and Mahagenco have sole rights to add,
delete or cancel any or all locations without assigning any reasons.

Minimum project size will be 2MW however, Mahagenco has sole rights to increase or
decrease the capacity of one or more above projects.

Seal of Company Name of XXXXXXXXX


Date: Signature:

y
op
C
eb
W

Page 188 of 194 50


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure A

7. Change in law:

a. "Change in Law" shall refer to the occurrence of any of the following events after the
last date of the bid submission, including (i) the enactment of any new law; or (ii) an
amendment, modification or repeal of an existing law; or (iii) the requirement to obtain
a new consent, permit or license; or (iv) any modification to the prevailing conditions
prescribed for obtaining an consent, permit or license, not owing to any default of the
Solar Power Generator; or (v) any change in the rates of any Taxes, Duties and Cess
which have a direct effect on the Project. However, Change in Law shall not include
any change in taxes on corporate income or any change in any withholding tax on
income or dividends.

y
b. Relief for Change in Law

op
In the event a Change in Law results in any adverse financial loss/ gain to the Power
Producer then, in order to ensure that the Power Producer is placed in the same financial
position as it would have been had it not been for the occurrence of the Change in Law,
C
the Power Producer/ Procurer shall be entitled to compensation by the other party, as the
case may be, subject to the condition that the quantum and mechanism of compensation
payment shall be determined and shall be effective from such date as may be decided by
the MERC.
eb

(i) If a Change in Law results in the Power Producer’s costs directly attributable
to the Project being decreased or increased by one percent (1%), of the
estimated revenue from the Electricity for the Contract Year for which such
adjustment becomes applicable or more, during Operation Period, the Tariff
Payment to the Power Producer shall be appropriately increased or decreased
W

with due approval of MERC.


(ii) The Power Procurer / Mahagenco or the Power Producer, as the case may be,
shall provide the other Party with a certificate stating that the adjustment in
the Tariff Payment is directly as a result of the Change in Law and shall
provide supporting documents to substantiate the same and such certificate
shall correctly reflect the increase or decrease in costs.
(iii) The revised tariff shall be effective from the date of such Change in Law as
approved by MERC, the Parties hereto have caused this Agreement to be
executed by their fully authorized officers, and copies delivered to each Party,
as of the day and year first above stated.

Page 189 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Annexure-21
750 MW Cumulative Capacity with additional capacity of 250 MW under Green Shoe option (Tender Code-71217)
Sr.No District Block No Capacity Total Capacity
A Kokan Region
1 Thane
2 Palghar K1 50 MW
3 Raigad 100 MW
4 Ratnagiri
K2 50 MW
5 Sindudurg
Western Maharashtra
B Region

1 Pune W-1 50 MW
2 Ahmednagar
3 Solpur W-2 50 MW
200 MW
4 Sangali W-3 50 MW
5 Satara
W-4 50 MW
6 Kolhapur

y
C Marathwada

op
1 Aurangabad
2 Jalna M-1 50
3 Beed
4 Latur
M-2 50 150 MW
5 Osmanabad
C
6 Hingoli
7 Parbhani M-3 50
8 Nanded
eb

D Vidarbha Region
1 Nagpur
2 Wardha V-1 50 MW

3 Bhandara
W

4 Gondia
5 Chandrapur V-2 50 MW
6 Gadchiroli 200 MW

7 Washim
8 Buldhana V-3 50 MW

9 Yavatmal
10 Akola
V-4 50 MW
11 Amravati
E Northern Maharashtra
1 Jalgaon
N-1 50 MW
2 Nashik
100 MW
3 Dhule
N-2 50 MW
4 Nandurbar

Page 190 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM
Rev: 00, Date: 01/01/2009 

Maharashtra State Power Generation Co Ltd 
e_tendering Cell 
This Section is applicable to all Power Stations Thermal, Hydro & Gas 
SAFETY TERMS & CONDITIONS 
1. Compensation: Safety of your workers and staff is your sole responsibility & you will arrange to pay full compensation 
to your workers/staff.  In case of accident to any of them and in any circumstances MSPGCL will not be responsible for 
and liable to pay any compensation as per WORKMENS COMPENSATION ACT. 
2. Competency / Excellence: Contractor should deploy competent workers  for  the particular  job  and he should utilize 
authorized  his workers  for carrying the electrical works such as welding, grinding   and  other works carried out by 
electrical   equipments. Contractor should submit the list of his workers deployed for the job and list of workers who 
are   authorized for carrying electrical works to the concerned section head for verification of competency of their 
workers, before starting the work as per the rules 1951. 
3. Electrical Safety:  
3.1. Every portable electrical tool should be used with three pin plugs and three wire systems to avoid electric shock 
while at work proper earthing should be checked both at supply end and at tool end before commencement of 
work. 
3.2. Three wire sockets and properly insulated portable electrical boards with fuses & with earth leakage circuit 
breaker are to be used by contractor. On/Off switch should be connected in the live wire and no it in neutral wire. 
3.3. Colour coding of three wire system should be below.  Red: Live, Grey / Black: Neutral, Green: Earth. 

y
3.4. Only 24 volt hand lamps to be used at confined spaces lying at turbine, boiler, coal mills, grills, structures, coal 
handling plant, Conveyor belts etc 
4. Fire Safety:  
4.1.

4.2.
op
The contractor should keep ready two buckets of water while carrying out welding work. One bucket is to be used 
for quenching fire if occurs. Last bit of electrode should be dropped in the second bucket with water to ensure 
that red‐hot electrode does not cause any fire. 
Contractor should ensure provision of Cover/curtain in the hazardous area, so that hot petals of metal (molten 
C
metal) do not cause any fire. This is particularly necessary while carrying out welding /gas cutting at high elevation 
on grills, in coal handling plants etc. 
4.3. Single piece cable (without joints) should be used during welding work to avoid the fire through cable joint. 
5. Medical:  
eb

5.1. In case of injury of person, arrangement for shifting of the injured person for medical treatment is to be made 
immediately by the contractor.  
5.2. The contractor should keep "First aid box" ready at site. 
6. Penalty: If any of our officer, supervisor finds that, you & your employees are not following the safety rules and 
regulation including use of personnel protective equipments at site; he is authorized to stop your work immediately. In 
W

case of violation of safety rules, you shall be liable to pay penalty up to Rs.  1000.00 for first violation and up to Rs. 
3000.00 for second violations. For the third violation of rules the order may be terminated or you may be declared 
debarred for the further contract up to period of one year.  For violation of fire safety the contract will be terminated 
immediately and the contractor will not be considered for further contract. 
7. Safety Appliances / Equipments : Contractor shall provides required safety appliances / equipments to their workers 
like safety shoes, helmet, goggles, welding screen, safety belts, hand‐gloves etc. depending upon the working condition 
and nature of the work in hand. You shall arrange the appliances / equipments at your own cost. 
8. Scrap Removal: All type of scraps to be removed immediately from the work spot for maintaining cleanliness. 
9. Supervisors: Adequate Nos. of supervisors to be appointed by the contractor to ensure all safety provisions and use of 
personnel protective equipments by contractor workers. 
10. Testing of T & P / Equipment: Contractor should maintain history register of their lifting tools and tackles, such as   
chain pulleys blocks, slings, tirfor etc. and these are to be tested by competent persons   authorized by Director of 
Industrial Safety & Health Mumbai, as per Maharashtra Factory Rule (96). Copy of the test certificate should be 
submitted to Safety Officer. 
 

Page 191 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

TECHNO-COMMERCIAL BID

BID DOCUMENTS
S No. Document Name Document Details
1 DOC1 * Annexure 1:Eligibility of offer
2 BANK DETAILS * Annexure.XVII -List of Bankers
3 DOC10 * Annexure.XV- Contract Performance security
4 DOC9 * Annex. XVI- Undertaking for Financial requirement
5 DOC8 * Annex. XIV- Checklist
6 DOC7 * Annex. XIII- Certificate of relationship
7 DOC6 * Annex. XII- Disclosure
Annexure I - Bank Guarantee Against Bid Security
8 Annex.XI- Bid security
(EMD) *
9 DOC5 * Annex. X- format for B.R.
Annex. IX- undertaking of financialiy evaluated
10 DOC4 * entity
Annexure VIII(B) - Undertaking By Authorised
11 Annex.VIII- Format for undertaking
Indian Representative *

y
12 QR1 * Annex.VII- Q.r. As per Clause 11
13

14
Annexure VIII(A) - Authorisation of Indian
Representative *
DOC3 *
op Annex.VI. -Authorization
Annex.V- Bidders composition & Ownership
Structure
15 DOC2 * Annex.IV- Consent from consortium
C
16 Annexure XIII - Consortium Agreement * ANNEX.III- Consortium Agreement
Annexure II-A & II-B - Power of Attorney (For
17 Annex-II: Power of Attorny
Authorized signatory) and (For Consortium) *
18 QR2 * Annexure.XVIII- Format for financial Proposal
eb

* - Indicates Mandatory Document to Fill (to participate in tender)

ITEM DETAILS
Specification

Item Code Item Name Category Documents


Comments
W
Qty. Req.

Drawing
Version

Req. from
S. No.

Unit

Vendors

SERVICES<>SOLAR<>SOLAR POWER
PROJECT<>SOLAR POWER PROJECT
ON PPP/EPC/BOOT
BASIS<>SELECTION OF SOLAR
033-35-002- POWER DEVELOPER FOR DESIGN, No Documents
1 WORKS 01.00 KWH 0 No No N.A.
006-0001 * ENGINEERING, MANUFACTURE, Selected
SUPPLY, ERECTION, TESTING AND
COMMISSIONING OF CUMULATIVE
CAPACITY GRID INTERACTIVE SOLAR
PV POWER PLANT IN MAHARASHTRA
* - Indicates Mandatory Item to Quote (or to participate in tender)

Page 192 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

PRICE BID

BID DOCUMENTS
NOT REQUIRED

FORMULA DETAILS
Category Name Formula
RATEPERUNIT+TOTALGSTINRUPEESONRATEPERUNIT+TRANSPOTATIONCHARGE
SINRUPEES+TOTALGSTINRUPEESONTRANSPOTATIONCHARGES+CONSULTANCY
WORKS CHARGESINRUPEES+TOTALGSTINRUPEESONCONSULTANCYCHARGES+TOANDF
ROCHARGESINRUPEES+TOTALGSTINRUPEESONTOANDFROCHARGES+TRANSITI
NSURANCEINRUPEES+TOTALGSTINRUPEESONTRANSITINSURANCE

y
op
C
eb
W

Page 193 of 194


TENDER-71217/AMENDMENT-4/08-Aug-2018 12:50:23 PM

Price Schedule : WORKS


GST ON TOTAL GST ON TOTAL GST ON TOTAL
GST ON TRANSP GST ON CONSUL CONSUL GST ON TO AND TO AND GST ON TRANSIT GST ON TOTAL
TOTAL TRANSP
RATE TRANSIT GST ON
Quantity Rate Per GST ON OTATION
OTATION TRANSP TANCY TANCY CONSUL FRO FRO TO AND
Item PER INSURAN INSURAN TRANSIT Total
S No. (in Unit (in RATEPE CHARGE
CHARGE OTATION CHARGE CHARGE TANCY CHARGE CHARGE FRO
Code UNIT (in CHARGE CE (in CE (in INSURAN
Number) Rupees) RUNIT (in S (in
S (in CHARGE S (in S (in CHARGE S (in S (in
Percentag Rupees) Percentag CE (in
Rupees) Rupees)
Percentag S (in Rupees) Percentag S (in Rupees) Percentag S (in
e) e) Rupees)
e) Rupees) e) Rupees) e) Rupees)
[SERVICES<>SOLAR<>SOLAR POWER PROJECT<>SOLAR POWER PROJECT ON PPP/EPC/BOOT BASIS<>SELECTION OF SOLAR POWER DEVELOPER FOR DESIGN, ENGINEERING,
1 MANUFACTURE, SUPPLY, ERECTION, TESTING AND COMMISSIONING OF CUMULATIVE CAPACITY GRID INTERACTIVE SOLAR PV POWER PLANT IN MAHARASHTRA]
033-35-
002-006-
0001 *
* - Indicate Price required for this item.