Sie sind auf Seite 1von 15

ASSIGNMENT SUBMISSION FORM

This sheet must be submitted with your assignment. Failure to complete, sign and submit this
form will result in a mark of ‘0’ for the assignment.

Student Name Sonya Weekes

Student ID P1074857

Assessor Name Mr Ken Ahana

Qualification Pearson BTEC Level 5 HND Diploma Business (Management)

Unit Number & Unit Title Unit 6 Managing a successful Business Project

Assignment Title The impact of digital Technology on business activity.

Date of Submission

Plagiarism is presenting somebody else’s work as your own. It includes: copying information directly
from the Web or books without referencing the material; submitting joint coursework as an individual
effort; copying another student’s coursework; stealing coursework from another student and
submitting it as your own work. Suspected plagiarism will be investigated and if found to have
occurred will be dealt with according to the procedures set down by the College. Please see your
student handbook for further details of what is / isn’t plagiarism.

By submitting this form and signing below, I declare that:


 I am the author of this assignment and that any assistance I received in its preparation is fully
disclosed and acknowledged in this assignment
 I also certify that this assignment was prepared by me specifically for this course
 I certify that I have taken all reasonable precautions to make sure that my work has not been
copied by other students
 I confirm that I have understood the College’s regulations on plagiarism
 I confirm that research resources are fully acknowledged

Signature: Sonya Weekes Date: 15th January 2019


Contents
An Investigation into the positive economic, cultural, and ethical impact of globalisation on
different business functions. ............................................................................................................... 3
Task 1 ................................................................................................................................................. 3
Introduction ................................................................................................................................... 3
An Investigation into the positive economic, cultural, and ethical impact of globalisation on
different business functions.

Task 1

Introduction
A project is characterised as a onetime set of exercises that is done with a characterised start and
completion. As indicated by (ERDF,2014) it is a lot of exercises done with the point of accomplishing
venture destinations and convey result inside a time period. A project might be to execute new PC
framework in a business or emerge products or services. For projects to be fruitful, it is imperative that
it is very much arranged with finish precision to guarantee successful execution and control.
Economic, cultural, and ethical issues of globalisation
Globalisation is the procedure empowering money related and venture markets to work universal, to a
great extent because of deregulation and enhance correspondences, as indicated by Erickson et al.,
(2009). Economic globalisation is the mix of various national economies set up together to shape a
solitary economy through organised commerce and free capital development, which implies, this can
prompt more noteworthy relationship between nations. In this way, goods, services, capital, labour,
knowledge and data will have the capacity to move quick and openly around the globe. Despite the
huge focal points, worldwide associations confront vital issues, for example social just as moral issues
contrasted with national association.
The worldwide business condition is described by an assortment of various societies and morals
starting with one nation then onto the next, which makes it try for any business to structure worldwide
business procedure. For instance: Singapore promote personal and social discipline as opposed to
political opportunity and freedom. Nations like these demonstrates that their social qualities are to
essential to be considered and any proposal that will in general change them, will be viewed as
innovative.
Regarding the financial, the decent variety of remote monetary standards influences productivity if
worldwide organisations, although supporting methodologies can moderate a portion of the money
showcase. Morally, while individuals are moving to created nations looking for occupations,
organisations are for the most re-appropriating their generation economically to specialist in
underdeveloped nations, letting proficient well enough alone for position in created nations.

Tesco
Tesco is a worldwide basic need and general promoting retailer working in excess of 4,00 stores
overall today. In UK alone, Tesco has such a large business with more than 2,200 stores with
different configurations i.e., Tesco Express, Tesco Metro, Tesco Superstores, Tesco Extra and Tesco
Homeplus. Plus, Tesco likewise works in whatever is left of the world as far back as they look for new
open doors amid the mid-90s. They operate 2,026 stores in 13 markets which are in Europe, Asia,
North America and they had effectively entered the Indian market a year ago. With adaptable and
multi-designs approaches, just as a built up and reliable remarkable procedure for development,
Tesco is producing all out income of £56,910 million in the year 2009/10. Tesco general store fused in
1947 with home office in Welwyn Garden City, Hertfordshire, Britain, UK. The company is the third
biggest retailer on the planet by income. (Tesco,2019)

Project Aim and Objectives


Project aim and objectives is frequently helpful to consider your research questions. The aim of
the work is the general reason for the examination which ought to be plainly and succinctly
characterised, with a wide explanation of wanted results, or the general expectations of the
exploration, which illustrate your exploration venture. Undertaking point accentuate what is to be
practised (not how it is to be cultivated) and address the long-haul venture results, for example it
ought to mirror the yearnings and desires for the examination subject. When points have been set
up, the following undertaking is to figure the destinations. For the most part, a venture ought to
have close to a few points explanations, while it might incorporate a few destinations reliable with
them. Along these lines, if the venture ought to be effective, the destinations must utilise the
(SMART) instrument which implies the examination ought to be specific, measurable, actionable,
realistic and timely. (ERM,2019)

The Aims Project


The aim of the project is to examine the positive cultural, ethical and economic effect of
globalisation on Tesco business capacities such as operations, marketing, accounting and HR.

Objectives of the Project


Investigate the positive effect of economic, cultural, and ethical of globalisation on various
business capacities.
Examine the effect of globalisation on Tesco business operations.
Deciding on the cost ramifications of executing this task.
Deciding on the time period that will be required to finish the project.
Deciding the assets that will be required to finish the venture.
Deciding the assets that will be required for the fruitful finish of the venture.
Structuring questionnaires that will be utilised to gather research information for the venture.
Speaking with the respondents that are recognised as member for the task.
Exhibiting the information produced for the exploration for investigation.
Examining the information presented for the research iso as to draw discoveries, end and
proposal.
Recording the activities of the project with proof and their result.

Project Management
Project management is the utilisation of procedures, strategies, learning, aptitudes and experience to
accomplish the venture destinations. It is an exceptional, transient undertaking, attempted to
accomplish arranged targets, which could be characterised regarding yields, results or advantages. A
project is typically regarded to be a triumph on the off chance that it accomplishes the destinations as
per their acknowledgement criteria, inside a concurred timescale and spending plan. The means are
taken in project management includes planning, this contain numerous parts of a project and itemised
out the project scope and the system that will be utilised to address venture extension and targets.
Organising, this includes the allotment of the assets to guarantee achievement of the project.
Measuring, this decides whether the point of the project has been accomplished and controlling, this
includes the execution of the analyst does not digress for the gauges. (APM.org)
Advantages of using Project Management
Project management is a powerful business tool that can convey numerous focal points to
organisations everything being equal. It gives Tesco repeatable procedures, rules and methods to
assist them with managing the general population and the work engaged with tasks. It can expand the
organisation odds of achievement just as conveying their undertakings reliably, effectively, on time
and spending plan.
The main advantage of project management is that oversees extends adequately, empowering the
organisation to determine issues more rapidly. It requires investment and cash to deal with an
undertaking, anyway, following great practices can help Tesco to:
Enhance their odds of accomplishing the ideal outcome.
Gain a new imminent on the undertaking, and how it fits with your business methodology.
Organise the business’ assets and guarantee their effective use.
Set the extension, calendar and spending plan precisely from the begin.
Remain on timetable and keep expenses and assets to spending plan.
Enhance profitability and nature of work.
Energise steady correspondence among staff, providers and customers.
Fulfil the different needs of the task’s partners.
Relieve dangers of a task coming up short.
Increment consumer quality.
Increase upper hand and lift the organisation main concern.
On the off chance that Tesco lost time to irregularity, not having a procedure to deal with their
activities, this can result in lost time, squandered cash and poor execution.

The diagram below shows what project management involves with an explanation of each:

https://www.apm.org.uk/resources/what-is-project-management/

Project management plan covers the following aspects: -


Cost Management
Cost management is the way towards arranging and controlling financial plan of a business. Cost
management is a form of management accounting that enables a business to anticipate executing
uses to help diminish the opportunity of going over spending plan. There is a cost for me to undertake
this project which includes the following:
Travel: - This cost is regarding the how much it will be to travel to get the information which equals to
roughly around £25.
Books/Journals: - This cost is regarding purchasing books or journals that will have the information
about globalisation and the impact of it which equals to roughly £35.
Printing: - This cost is regarding materials that will be required to undertake the research, such as
questionnaires to hand out to the individuals, which equals roughly to £15.
Telephone: - This cost is regarding all the calls made to Tesco to follow up on discussions previously.

Scope
The scope of a research is set of expectations of an exploration venture. The project will take a
gander at the effect globalisation on Tesco task. Tesco workers will be drawn nearer to request for
their perspectives on the point zone. It will concentrate on how globalisation influence its HR,
activities, operations, marketing as well as accounting.
The accompanying research ought to be considered:
Problem definition
Research plan
Population sample
Information gathering
Examination of the information gathered
Conclusion, findings and recommendation. (Le.ac.uk, 2019)

Time Management
Time management is basically the capacity to compose and design the time spent on exercises in
multi day. The aftereffect of good time the management and includes abilities, for example, arranging,
defining objectives and organising for a superior execution. The way to good time management isn’t
to work more, yet to work more effectively. This implies I will structure my time so I can accomplish
more in less time (without worry obviously). The normal time for fruition is between six to eleven
weeks, which I will consequently diagram a time allotment that is practical to finish each phase of the
venture. Each stage will have exercises that will require finish which Work breakdown Structure will
likewise be utilising to give in detail every moment in each stage including fulfilment date, which will
enable the venture to be moved toward undertaking by assignment, which permits more illumination
and powerful management. (Inloox, 2019)
Quality Management
Quality management incorporates the procedure and activities that are utilised to make sense of and
accomplish the quality of the expectations of a project. Quality is basically what the client or partner
needs from the task expectations. Quality management can have a smaller centre, which implies it’s
bound to accomplish its objectives. There are a ton of components that can influence the quality and
result if a venture, anyway, to convey a quality task, the exploration will expect to keep away from any
elements that may influence the nature of the examination, which implies that the exploration will be
exact, succinct, has lucidity and evident. At the end of the day, the inquiry that will be appropriated as
survey will be clear and explicit to maintain a strategic distance from the nature of information
gathered. (ProjectManager, 2019)
Communication
Communication is the key in project management. For a fruitful task execution, successful
correspondence to all partners is basic. Numerous tasks fizzle considering an absence of
correspondence or an in effectual one. Correspondence is best characterised as the trading of data
and the outflow of thoughts, musings and emotions by utilising words and different techniques. In
project management this implies the trading of learning, abilities and experience. For this exploration
correspondence will be done both oral and composed with various assets, for example, individuals,
web, (PC) and books. Oral correspondence will occur among myself and the interviewees to finish the
review and composed correspondence will be utilised to do my last report when I complete the
project. (Inloox, 2019)

Documentation
Documentation is a fundamental piece of documentation to ensure that venture necessities are
satisfied and to build up discernibility about what has been done, who has done it and when it has
been finished. Documentation must establish the framework for quality, detectability, and history for
both individual report and for the whole venture documentation. It is additionally critical that the
documentation is very much organised, simple to pursue, and satisfactory. Distinctive type of
documentation can be embraced for an exploration, from example, diary, logbook, recorder just as
formal report. Inside this venture a logbook will be utilised to record any exercises and task learning.
A formal report will likewise be utilised to convey the last research venture on fulfilment. The report
will be composed and submitted on the web. (Simplilearn, 2019)

Risk
Risk is a procedure that permits singular hazard occasions and in general hazard to be comprehend
and oversaw proactively, enhancing accomplishment by limiting dangers and boosting openings. The
dangers that can be confront while doing this venture is the failure to get to the people who will total
the polls that will be utilised to gather the information. To keep this from happening is for me to visit
Tesco and becoming acquainted with the workers just as making loads of telephone calls and
messages to build their ability to take part in the exploration. I additionally have different assignments
to finish, family life and different components, which can take up a great deal of my time which can be
another hazard to finish my project. To keep this from occurring, I will ensure that I set reachable
achievement outing into thought my different duties guaranteeing that I teach myself to finish this
project. (APM, 2019)

Resources
The resources of an organisation comprise of individuals, materials, gear, information and time.
Organisations ordinarily have constrained assets, along these lines, exchange offs on and what
venture assets are exhausted, and hen are made regularly inside organisations. A resource
assignment plan is am imperative device in viable management of rare resources. The planning of the
need of those resources can be and ought to be resolved inside project plans. A resource plan, which
portrays the sort of asset required and the planning of that require, is basic to viable resource
management. As the task plan changes, the resource plan should likewise be sufficiently adaptable to
alter as these progressions happen. To do this examination there are a wide range of resources that
will be required to guarantee its fruitful finish and the accomplishment of venture objective. This
incorporates material, individuals, cash, talk with, overview, web as well as books.
(ProjectInsight,2019)

1.3 Work Breakdown and Gantt Chart


Work Breakdown Structure
A work breakdown structure (WBS) is a key project deliverable that organises the team’s work into
manageable sections. The project management body of knowledge defines the work breakdown
structure as a “deliverable oriented hierarchical decomposition of the work to be executed by the
project team.” The work breakdown structure visually defines the scope into manageable chunks that
a project team can understand, as each level of the work breakdown structure provides further
information definition and detail. It also helps to identify any risk of the project in order to mitigate
them accordingly.

Gantt Chart
A Gantt chart is a project management tool assisting in the planning and scheduling of project of all
sizes, although they are particularly useful for simplifying complex projects. This will help me to keep
up to date with the schedule of the project at every stage.

Milestone
A project milestone is a management tool that is used to delineate a point in a project schedule.
These points can note the start and finish of a project and mark the completion of a major phase of
work. Milestones can be used to symbolise anything that has started or finished, though it’s primarily
used as a scheduling tool. This will help to keep track of the schedule task in terms of the progress of
the report.
Project Plan

Activity Start Date End Date


Data Collection 8th February 2019 19th February 2019
Finding and Analysis 19th February 2019 26th February 2019
Presentation 22nd February 2019 23rd February 2019
Recommendation 24th February 2019 24th February 2019
Conclusion 26th February 2019 28th February 2019
Budget 1st February 2019 4th February 2019
Scope 1st February 2019 4th February 2019
Quality 5th February 2019 6th April 2019
Communication 7th February 2019 16th February 2019
Documentation 8th February 2019 6th April 2019
Risk 7th February 2019 26th February 2019
Resources 1st April 2019 4th April 2019

Project Planner

Task 2: - Project Execution Phase, Field Work and Project Log Book
Project Execution Phase
Types of Research Methods
Research methods alluded to the arrangement or procedure that is embraced to accumulate
information. It relates to every one of the systems and techniques that are conveyed to attempt and
accomplish the target of a research project (OSSA, 2015). The following are distinctive parts of an
examination technique.
Quantitative Method: - the idea of quantitative research is that it is typically communicated in factors.
It places accentuation on statically numerical and scientific computation of information, which is then
summed up over a gathering. It expects to respond to the inquiry how regularly, and what number of
(Bryman, 2015). The information for quantitative strategy is generally gathered through surveys,
studies just as the control of existing information utilising numerical systems.
Qualitative Method: in contrast to quantitative, these are explorative in nature and is concerned about
increasing comprehension or knowledge into a hidden (Polonsky,2011). The qualitative research
method is fundamentally applicable when directing examination venture that can't be communicated
in measurably, for example, articulation of human inclination and feelings. It gives achieve information
about circumstance and conduct inside a more extensive setting. In any case, subjective is frequently
censured for absence of generalisability and its dependent on abstract translation (Vaus,2002).

Descriptive Research: - This can be clarified as an announcement of undertakings as they are at


present with the scientist having no power over factor. In addition, "engaging examinations might be
portrayed as basically the endeavour to decide, depict or distinguish what is. This examination is gone
for throwing light on current issues or issues through a procedure of information accumulation that
empowers them to depict the circumstance more totally than was conceivable without utilizing this
strategy. It identifies with the way that while spellbinding exploration can utilize a few factors, just a
single variable is required to lead an engaging report.

Exploratory research: - this strategy is utilized to investigate an examination question in detail, with no
endeavour in offering last or convincing answer for the current issue under research. Such research
issue is regularly conveyed to that has not been obviously characterized. It helps in characterize and
give better comprehension of an issue, without an endeavour to offer any definitive proof. (Saunders
et al.,2012).
Casual Research: - this research strategy researches into an issue or theme that is centred around
the impact of one variable on another. Usually utilized in a business situation to evaluate the impact of
a change on present business activities.

Data Collection
Research data is characterized as recorded truthful material regularly held by and acknowledged in
established researchers as important to approve inquire about discoveries, albeit a large portion of
such information is made in computerized arrangement, all exploration information is incorporated
independent of the configuration in which it is made. (Leicester,2016). An exploration information not
at all like different sorts of data, is gathered or made for the reasons for examination to create unique
research results. The idea of gathering information in an exploration pertinent to all handle
contemplate including sociology, mankind just as business. Be that as it may, the information can
either be primary or secondary.
Primary data are direct data that were gathered straightforwardly structure the source utilizing unique
and important information accumulation instrument, for example, talk with polls, reviews just as
through perception. Such information is regularly viewed as dependable, as the wellspring of the
information can be checked and affirmed. In contrast primary data, optional are existing information
that were initially gathered through essential methods and accessible to other specialist as an
auxiliary wellspring of information. So also, the information might be viewed as problematic, as the
wellspring of the information may not be affirmed or checked (Vaus, 2002).
Technique Definition/Explanation Advantage Disadvantage
Interviews An interview is a Exact screening. Nature of information
discussion for social by questioner.
affair data which can
be directed up close Catch verbal and non-
and personal. verbal ques. Cost.

Questionnaires A questionnaire is a The respondent the They need detail.


research instrument respondent gives data Since the reactions
comprising of a which can be are fixed, there’s less
progression of effectively changed degree for
inquiries to gather data over into quantitative respondents to supply
from respondents. information. (e.g., tally answers which mirror
the quantity of yes or their actual emotions
no answers), on a theme.
permitting measurable
examination of the
reactions.
Observation This is a method for Can be solid on Is excessively
gathering information legitimacy and inside emotional.
through watching. and out
Perception information comprehension.
gathering strategy is Tedious.
named a participatory
report, because the Access to
analyst must inundate circumstances and
herself in setting individuals where polls
where her and meetings are
respondents are, while inconceivable or are
taking notes as well as wrong to utilize.
chronicle.

Focus Group This a common They can spare time Can be precarious to
qualitative research and cash contrasted break down.
system utilized by with individual
organizations for meetings.
advertising purposes. Can be hard to
It is subjective empower a scope of
research since it They can give a more individuals to take
approaches members extensive scope of part.
for open-finished data.
reactions passing on
musings or
sentiments.
Sampling approaches and techniques

Probability Sampling: - Probability sampling is an inspecting strategy, in which the subjects of the
populace inspire an equivalent chance to be chosen as an agent test.

Non-Probability Sampling: - Nonprobability sampling is a strategy for examining wherein, it isn't


realized what individual from the populace will be chosen as an example.

Technique Definition/Explanation Advantage Disadvantage


Random In this method, every Random sampling is Random sampling
part has an equivalent the simplicity of technique is its need
possibility of being amassing the of a total rundown of
chosen as a subject. example. It is likewise the considerable
considered as a number of individuals
reasonable method for from the populace.
choosing an example
structure a given part
since each part is
given equivalent
chances of being
chosen...
Stratified This is a probability Free from analyst Can't mirror all
examining procedure inclination. distinctions.
wherein the scientist
partitions the whole
populace into various Past the impact of the Complete portrayal is
subgroups or strata, at analyst. beyond the realm of
that point arbitrarily imagination.
chooses the last
subjects relatively from
the diverse strata.
Cluster This is the place the This technique is This is also probability
analyst isolates the cheap, quick and sampling technique
populace into easy. Rather than with plausibility of high
independent inspecting a whole examining blunder.
gatherings, called nation when utilizing This is brought by the
groups. straightforward restricted bunches
arbitrary examining, incorporated into the
the scientist can example leaving off a
dispense his huge extent of the
constrained assets to
populace unsampled.
the few haphazardly
chosen bunches or
territories when
utilizing group tests.
Systematic This is a probability Its amazingly No equivalent shot of
examining technique straightforward and being chosen.
where the components helpful for the analysts
are looked over an
objective populace by
choosing an arbitrary to make, direct, Members might not
beginning stage and dissect tests. have any desire to
choosing different partake, so framework
individuals after a fixed is separated.
testing interim.

Convenience This is a non- Simplicity of Probability of being


probability examining accessibility. one-sided.
procedure where
Saves time.
subjects are chosen
on account of their Results can't be
advantageous summed up.
openness and
nearness to the
specialist.

Field Work
Type of Research
The explanation behind this examination is to explore the positive economic, cultural, and ethical
impact of globalisation on Tesco business capacities such as operations, marketing, accounting and
HR.
I completed the exploration on Tesco as this is one of the biggest global basic supplies and promoting
store in the UK with different branches crosswise over and outside the nation. Tesco mission is to
wind up the main grocery store, giving great quality items at a lower cost. There is a great deal of
Tesco general stores in the UK, be that as it may, I have done the Tesco that is in Bow, because of its
availability. This store offers a similar item and services that can be gotten in other Tesco stores the
nation over. Questionnaires will be utilized to gather the information, and this will be completed by
choosing irregular representatives dependent on their openness.
Sources of Data
Surveys will be circulated to the representatives that work for the organization to get their
perspectives on globalization on positive economic, cultural and ethical exercises which will embrace
the primary information gathering. Information will likewise be gathered from the organization site,
publications, journals, magazines and papers to work out the consequences for globalization for the
organization. Secondary information will likewise be gathered to provide guidance for the
questionnaires that will be appropriated as this will help with guaranteeing the inquiries are important
and fit for reason.
Instrument for Data collection
The instrument of information gathered, would be through the conveyance of surveys. There are 10
close-finished inquiries which will permit the members select just a single response to each question
and remarking where important. This will guarantee the unwavering quality and importance of the
information gathered.
Sampling
I will utilize the convenient inspecting procedure. I will utilize this procedure in light of the fact that the
representatives of Tesco are incredibly occupied and the main way I can do this exploration is by
discovering the beginning and completing movements and break times for the representatives of
Tesco and work around these occasions so I am ready to give workers the surveys that are on break
and representatives that are going to begin and complete their days of work.
Data Analysis
When the surveys are gathered, the information will be displayed and assembled together. The
information will be exhibited in tables for better examination of the discoveries.

Reliability and validity


This information will embrace the essential research since surveys will be conveyed to the workers of
Tesco, since it will be gathered specifically from the respondents. Along these lines, this guarantee
the information gathered is exact and substantial. Other information will be gathered from the
organization corporate site.
Ethical Consideration
Before this examination was completed an assent, structure was given to the manager of Tesco,
which educate about the reason, points and targets of the exploration and how it will profit the
organization. It is imperative this was done as a result of the significance of ethical thought since
individuals will be included. A verbal correspondence additionally occurred with the manager
exhorting that workers can decline their participation in this examination and didn't need to clarify why
they have would not partake.

References
ERDF, (2014) 2014 – 2020 European growth programme. Available [online] at
https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/71
9940/ESIF-GN-1-002_ERDF_Output_Indicators_Definition_guidance_v6.pdf (Accessed 14/01/2019)
Erickson, M., Harriet, B , William, S. & Stephenson, C. (2009). Business in Society: People, Work and
Organisations Paperback, Boston Polity. (Accessed 14/01/2019).
UK Essays.com (2019) Available [online] at https://www.ukessays.com/essays/marketing/company-
and-market-overview-of-tesco-marketing-essay.php (Accessed 16/01/2019)

ERM.ECS (2019) Available [online] at


http://www.erm.ecs.soton.ac.uk/theme4/aims_and_objectives.html (Accessed 16/01/2019)
APM.org (2019), Available [online] at https://www.apm.org.uk/resources/what-is-project-management/
(Accessed 20/01/2019)
What is tech target (2019), Available [online] at https://whatis.techtarget.com/definition/cost-
management (Accessed 20/01/2019)
Nibusiness (2019), Available [online] at https://www.nibusinessinfo.co.uk/content/advantages-
project-management (Accessed 20/01/2019)
Liecester (2019) , Available [online] at https://www2.le.ac.uk/services/research-data/rdm/what-is-rdm
(Accessed 20/01/2019)
Inloox (2019), Available [online] at https://www.inloox.com/company/blog/articles/the-importance-of-
time-management-aspects-of-project-management-part-1/ (Accessed 20/01/2019)
Projectmanager (2019), Available [online] at https://www.projectmanager.com/blog/project-quality-
management-quick-guide (Accessed 20/01/2019)
Inloox (2019), Available [online] at https://www.inloox.com/project-management-
glossary/communication/ (Accessed 20/01/2019)
Simplilearn (2019), Available [online] at https://www.simplilearn.com/project-documentation-article
(Accessed 21/01/2019)
APM (2019), Available [online] at https://www.apm.org.uk/body-of-knowledge/delivery/risk-
management/ (Accessed 21/01/2019)
ProjectInsight (2019), Available [online] at https://www.projectinsight.net/project-management-
basics/basic-resource-management (Accessed 21/0/2019)

https://www.workbreakdownstructure.com/

https://www.apm.org.uk/resources/find-a-resource/gantt-chart/

https://www.projectmanager.com/blog/milestones-project-management

https://research-methodology.net/descriptive-research/

https://www2.le.ac.uk/services/research-data/rdm/what-is-rdm/research-data

http://sectorsource.ca/sites/default/files/resources/files/tipsheet6_interviewing_for_research_en_0.pdf

https://www.snapsurveys.com/blog/advantages-disadvantages-facetoface-data-collection/

https://www.simplypsychology.org/questionnaires.html

https://research-methodology.net/research-methods/qualitative-research/observation/

http://compass.port.ac.uk/UoP/file/664e8001-f121-4e5d-aa06-
6c95c797e8af/1/Observations_IMSLRN.zip/page_04.htm

https://smallbusiness.chron.com/focus-group-research-method-17464.html

http://www.evalued.bcu.ac.uk/tutorial/4b.htm

https://explorable.com/simple-random-sampling

https://explorable.com/stratified-sampling

https://getrevising.co.uk/grids/stratified-sampling

https://stattrek.com/statistics/dictionary.aspx?definition=cluster_sampling

https://explorable.com/cluster-sampling

https://www.questionpro.com/blog/systematic-sampling/

https://getrevising.co.uk/grids/systematic_sampling

https://explorable.com/convenience-sampling

https://businesszeal.com/advantages-disadvantages-of-convenience-sampling

Das könnte Ihnen auch gefallen