Structure summary Date:12-09-2


Concrete Granular Aggregate Bituminious Cement Treated Binder Course Binder Course Binder Course Wearing Course
Sr.# Area/Location
Pavement Subbase Base Base Base 75mm 60mm 40mm 50mm
Unit CM. CM. CM. CM. CM. SM. SM. SM. SM.
00 SITE PREPARATION
01 RUNWAYS
01A-Main Runway 8,280 1,28,186 1,19,308 20,146 3,630 2,01,452 17,863 46,705 2,01,456
01B- Emergency Runway - 0,00,000 Err:509 0 - Err:509 0 Err:509 Err:509
02 TAXIWAYS
02A-Parallel Taxiway
Parall Taxiway East & West - 63,950 74,127 10,001 - 1,00,006 - 87,727 1,00,006
02B-Link and Rapid Taxiway
Link Taxi Way # 01 - 5,813 6,815 879 - 8,786 - 8,035 8,786
Link Taxi Way # 02 - 21,833 25,270 3,109 - 31,087 - 25,915 31,087
Link Taxi Way # 03 - 18,268 22,246 2,888 - 28,884 - 29,887 28,884
Link Taxi Way # 04 - 10,826 12,897 1,728 - 17,277 - 15,878 17,277
Link Taxi Way # 05 - 10,826 12,897 1,728 - 17,277 - 15,878 17,277
Link Taxi Way # 06 - 7,016 16,642 1,093 - 10,934 - 11,020 10,934
Link Taxi Way # 07 - 11,932 15,069 1,852 - 18,524 - 21,663 18,524
Link Taxi Way # 07A - 6,634 8,518 1,029 - 10,295 - 13,504 10,295
Link Taxi Way # 08 - 6,213 7,609 986 - 9,862 - 10,259 9,862
Rapid Taxiway #01 - 8,206 9,426 400 - 3,999 - 11,041 3,999
Rapid Taxiway #02 - 11,700 12,502 1,159 - 11,594 - 11,610 11,594
Rapid Taxiway #03 - 8,206 9,426 400 - 3,999 - 11,041 3,999
03 APRONS
03B-Cargo Apron 8,820 19,054 13,280 1,953 4,410 19,538 2,455 9,959 19,531
03C-State Lounge Apron 1,980 22,530 13,511 2,640 6,188 26,395 2,750 10,564 26,395
03D-Aircraft Maintenance Apron 5,936 14,840 11,130 - 11,130 - - - -
03A-South East Apron 20,780 49,434 38,478 6,033 10,425 60,330 9,373 12,403 60,330
03A-North West Apron 27,769 56,565 42,817 6,755 12,993 67,546 10,146 13,091 67,546
05 SERVICE ROADS
05A-Cargo Service Road - 8,536 7,829 - - - 26,346 - -
05B-Aircraft Maintenance Apron Service Road - 13,709 12,781 - - - 42,495 - -
Concrete Granular Aggregate Bituminious Cement Treated Binder Course Binder Course Binder Course Wearing Course
Sr.# Area/Location
Pavement Subbase Base Base Base 75mm 60mm 40mm 50mm
05C-State Lounge Apron Service Road - 5,127 4,060 - - - 15,850 -
06 X-Point
- 10,458 5,381 1,686 - 16,859 - 9,708 16,859

G.TOTAL 73,565 5,19,861 Err:509 66,464 48,775 Err:509 1,27,279 Err:509 Err:509

QS SEC 92,885 640,000 608,000 89,616 62,000 887,800 91,544 429,250 887,800

Difference -19,320 -120,139 Err:509 -23,152 -13,225 Err:509 35,735 Err:509 Err:509
nstruction Ltd.Technical Associate
struction Services (Joint Venture)

ction Of NBBIA Package-1

Date:12-09-2012
Wearing Course
40mm
SM.

65,604
0

86,783

7,946
25,703
29,794
15,785
15,785
11,020
21,663
13,504
10,166
11,003
11,610
11,003

12,402
10,564
-
21,768
23,230

32,583
52,664
Wearing Course
40mm
15,850

9,553

5,15,983

520,799

-4,816
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet
Page 01
Title:- 01A- Runways- Main Runway Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
ItemCode:- 01A-2C Description:- Cement Treated Base Course
Granular Sub-Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
BITUMINIOUS CONCRETE PAVEMENT
RG-02 RD 1+190.00 to 1+271.82 1190
Lane 1 1 81.82 45.00 0.600 2209.14 Avg W
RG-02 RD 1+271.82 to 1+289.72 1271.82
Lane 1 1 17.90 46.15 0.600 495.65 Avg W
RG-02 RD 1+289.72 to 1+765.61 1289.72
Lane 1 1 475.89 47.30 0.600 13505.76 Avg W
RG-02 RD 1+765.61 to 1+952.12 1765.61
Lane 1 1 186.51 46.15 0.600 5164.46 Avg W
RG-02 RD 1+952.12 to 2+136.88 1952.12
Lane 1 1 184.76 45.00 0.600 4988.52 Avg W
RG-02 RD 2+136.88 to 2+193.57 2136.88
Lane 1 1 56.69 46.15 0.600 1569.75 Avg W
RG-02 RD 2+193.57 to 2+608.50 2193.57
Lane 1 1 414.93 47.30 0.600 11775.71 Avg W
RG-02 RD 2+608.50 to 2+752.07 2608.5
Lane 1 1 143.57 46.15 0.600 3975.45 Avg W
RG-02 RD 2+752.07 to 2+937.49 2752.07
Lane 1 1 185.42 45.00 0.600 5006.34 Avg W
RG-02 RD 2+937.49 to 2+994.06 2937.49
Lane 1 1 56.57 46.15 0.600 1566.42 Avg W
RG-02 RD 2+994.06 to 3+551.15 2994.06
Lane 1 1 557.09 47.30 0.600 15810.21 Avg W
RG-02 RD 3+551.15 to 3+709.86 3551.15
Lane 1 1 158.71 46.15 0.600 4394.68 Avg W
RG-02 RD 3+709.86 to 3+887.03 3709.86
Lane 1 1 177.17 45.00 0.600 4783.59 Avg W
RG-02 RD 3+887.03 to 3+951.77 3887.03
Lane 1 1 64.74 46.15 0.600 1792.65 Avg W
RG-02 RD 3+951.77 to 4+184.05 3951.77
Lane 1 1 232.28 47.30 0.600 6592.11 Avg W
RG-02 RD 4+184.05 to 4+243.19 4184.05
Lane 1 1 59.14 46.15 0.600 1637.59 Avg W
RG-02 RD 4+243.19 to 4+355.71 4243.19
Lane 1 1 112.52 45.00 0.600 3038.09 4355.712
RG-02 RD 4+355.71 to 4+426.21 4355.712
Lane 1 1 70.50 46.15 0.600 1952.15 Avg W

Carried over to next page 90258.27


Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet

Title:- 01A- Runways- Main Runway Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
ItemCode:- 01A-2C Description:- Cement Treated Base Course
Granular Sub-Base Course
Page 02
No of Detail
No in of Measurements
Description Units Each L B D/H Quantity Remarks
90258.27
RG-02 RD 4+426.21 to 4+608.08 4426.212
Lane 1 1 181.87 47.30 0.600 5161.47 Avg W
RG-02 RD 4+608.08 to 4+678.66 4608.082
Lane 1 1 70.58 46.15 0.600 1954.36 Avg W
RG-02 RD 4+678.66 to 4+847.42 4678.662
Lane 1 1 168.76 45.00 0.600 4556.52 Avg W

Total 101930.62
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet
Page 01
Title:- 01A- Runways- Main Runway Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
ItemCode:- 01A-3C Description:- Crush Aggregate BaseCement
CourseTreated Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
BLAST PAD
RG-01 RD 1+070.00 to 1+172.50 1070.00
Lane 1 1 102.50 45.00 0.200 922.50 Avg W
Shoulder B/side 2 1 102.50 8.42 0.200 345.22 Avg W
RG-01 RD 1+070.00 to 1+190.00 1172.5
Lane 1 1 17.50 45.00 0.200 157.50 Avg W
BITUMINIOUS CONCRETE PAVEMENT
RG-02 RD 1+190.00 to 1+271.82 1190
Lane 1 1 81.82 45.00 0.550 2025.05 Avg W
RG-02 RD 1+271.82 to 1+289.72 1271.82
Lane 1 1 17.90 45.43 0.550 447.21 Avg W
Shoulder R/side 1 1 17.90 7.94 0.200 28.43 Avg W
RG-02 RD 1+289.72 to 1+765.61 1289.72
Lane 1 1 475.89 45.85 0.550 12000.76 Avg W
Shoulder B/side 2 1 475.89 8.38 0.200 1595.18 Avg W
RG-02 RD 1+765.61 to 1+952.12 1765.61
Lane 1 1 186.51 45.43 0.550 4659.72 Avg W
Shoulder L/side 1 1 186.51 7.94 0.200 296.18 Avg W
RG-02 RD 1+952.12 to 2+136.88 1952.12
Lane 1 1 184.76 45.00 0.550 4572.81 Avg W
RG-02 RD 2+136.88 to 2+193.57 2136.88
Lane 1 1 56.69 45.43 0.550 1416.33 Avg W
Shoulder R/side 1 1 56.69 7.94 0.200 90.02 Avg W
RG-02 RD 2+193.57 to 2+608.50 2193.57
Lane 1 1 414.93 45.85 0.550 10463.50 Avg W
Shoulder B/side 2 1 414.93 8.38 0.200 1390.85 Avg W
RG-02 RD 2+608.50 to 2+752.07 2608.5
Lane 1 1 143.57 45.43 0.550 3586.92 Avg W
Shoulder L/side 1 1 143.57 7.94 0.200 227.99 Avg W
RG-02 RD 2+752.07 to 2+937.49 2752.07
Lane 1 1 185.42 45.00 0.550 4589.15 Avg W
RG-02 RD 2+937.49 to 2+994.06 2937.49
Lane 1 1 56.57 45.43 0.550 1413.33 Avg W
Shoulder R/side 1 1 56.57 7.94 0.200 89.83 Avg W
RG-02 RD 2+994.06 to 3+551.15 2994.06
Lane 1 1 557.09 45.85 0.550 14048.42 Avg W
Shoulder B/side 2 1 557.09 8.38 0.200 1867.37 Avg W

Carried over to next page 66234.24


Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet
Page 02
Title:- 01A- Runways- Main Runway Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
ItemCode:- 01A-3C Description:- Crush Aggregate BaseCement
CourseTreated Base Course
66234.24
RG-02 RD 3+551.15 to 3+709.86 3551.15
Lane 1 1 158.71 45.43 0.550 3965.17 Avg W
Shoulder L/side 1 1 158.71 7.94 0.200 252.03 Avg W
RG-02 RD 3+709.86 to 3+887.03 3709.86
Lane 1 1 177.17 45.00 0.550 4384.96 Avg W
RG-02 RD 3+887.03 to 3+951.77 3887.03
Lane 1 1 64.74 45.43 0.550 1617.45 Avg W
Shoulder R/side 1 1 64.74 7.94 0.200 102.81 Avg W
RG-02 RD 3+951.77 to 4+184.05 3951.77
Lane 1 1 232.28 45.85 0.550 5857.52 Avg W
Shoulder B/side 2 1 232.28 8.38 0.200 778.60 Avg W
RG-02 RD 4+184.05 to 4+243.19 4184.05
Lane 1 1 59.14 45.43 0.550 1477.54 Avg W
Shoulder R/side 1 1 59.14 7.94 0.200 93.91 Avg W
RG-02 RD 4+243.19 to 4+355.71 4243.19
Lane 1 1 112.52 45.00 0.550 2784.92 4355.712
RG-02 RD 4+355.71 to 4+426.21 4355.712
Lane 1 1 70.50 45.43 0.550 1761.35 Avg W
Shoulder R/side 1 1 70.50 7.94 0.200 111.95 Avg W
RG-02 RD 4+426.21 to 4+608.08 4426.212
Lane 1 1 181.87 45.85 0.550 4586.31 Avg W
Shoulder B/side 2 1 181.87 8.38 0.200 609.63 Avg W
RG-02 RD 4+608.08 to 4+678.66 4608.082
Lane 1 1 70.58 45.43 0.550 1763.35 Avg W
Shoulder R/side 1 1 70.58 7.94 0.200 112.08 Avg W
RG-02 RD 4+678.66 to 4+847.42 4678.662
Lane 1 1 168.76 45.00 0.550 4176.81 Avg W
BLAST PAD
RG-01 RD 4+847.42 to 4+864.92 4847.422
Lane 1 1 17.50 45.00 0.200 157.50 Avg W
RG-01 RD 4+864.92 to 4+967.41 4864.922
Lane 1 1 102.49 45.00 0.200 922.41 Avg W
Shoulder B/side 2 1 102.49 8.42 0.200 345.19 Avg W

Total 102095.73
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet Page 01
Title:- 01A- Runways- Main Runway Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
ItemCode:- 01A-4C Description:- Cement Treated Base Course
Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
BITUMINIOUS CONCRETE PAVEMENT
RG-02 RD 1+190.00 to 1+271.82 1190
Lane 1 1 81.82 45.00 0.100 368.19 Avg W
RG-02 RD 1+271.82 to 1+289.72 1271.82
Lane 1 1 17.90 45.00 0.100 80.55 Avg W
RG-02 RD 1+289.72 to 1+765.61 1289.72
Lane 1 1 475.89 45.00 0.100 2141.51 Avg W
RG-02 RD 1+765.61 to 1+952.12 1765.61
Lane 1 1 186.51 45.00 0.100 839.30 Avg W
RG-02 RD 1+952.12 to 2+136.88 1952.12
Lane 1 1 184.76 45.00 0.100 831.42 Avg W
RG-02 RD 2+136.88 to 2+193.57 2136.88
Lane 1 1 56.69 45.00 0.100 255.11 Avg W
RG-02 RD 2+193.57 to 2+608.50 2193.57
Lane 1 1 414.93 45.00 0.100 1867.19 Avg W
RG-02 RD 2+608.50 to 2+752.07 2608.5
Lane 1 1 143.57 45.00 0.100 646.07 Avg W
RG-02 RD 2+752.07 to 2+937.49 2752.07
Lane 1 1 185.42 45.00 0.100 834.39 Avg W
RG-02 RD 2+937.49 to 2+994.06 2937.49
Lane 1 1 56.57 45.00 0.100 254.57 Avg W
RG-02 RD 2+994.06 to 3+551.15 2994.06
Lane 1 1 557.09 45.00 0.100 2506.91 Avg W
RG-02 RD 3+551.15 to 3+709.86 3551.15
Lane 1 1 158.71 45.00 0.100 714.20 Avg W
RG-02 RD 3+709.86 to 3+887.03 3709.86
Lane 1 1 177.17 45.00 0.100 797.27 Avg W
RG-02 RD 3+887.03 to 3+951.77 3887.03
Lane 1 1 64.74 45.00 0.100 291.33 Avg W
RG-02 RD 3+951.77 to 4+184.05 3951.77
Lane 1 1 232.28 45.00 0.100 1045.26 Avg W
RG-02 RD 4+184.05 to 4+243.19 4184.05
Lane 1 1 59.14 45.00 0.100 266.13 Avg W
RG-02 RD 4+243.19 to 4+355.71 4243.19
Lane 1 1 112.52 45.00 0.100 506.35 4355.712
RG-02 RD 4+355.71 to 4+426.21 4355.712
Lane 1 1 70.50 45.00 0.100 317.25 Avg W
RG-02 RD 4+426.21 to 4+608.08 45
Lane 1 1 181.87 45.00 0.100 818.42 Avg W
Carried over to next page 15381.37
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet Page 02
Title:- 01A- Runways- Main Runway Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
ItemCode:- 01A-4C Description:- Cement Treated Base Course
Bituminous Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
15381.37
RG-02 RD 4+608.08 to 4+678.66 226.87
Lane 1 1 70.58 45.00 0.100 317.61 Avg W
RG-02 RD 4+678.66 to 4+847.42 297.45
Lane 1 1 168.76 45.00 0.100 759.42 Avg W

Total 16458.40
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet
Page 01
Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses
ItemCode:- 01A-6C Description:- Bituminous Binder Course
a) 75 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
BITUMINIOUS CONCRETE PAVEMENT
RG-02 RD 1+190.00 to 1+271.82 1190
Lane 1 1 81.82 45.00 - 3681.90 Avg W
RG-02 RD 1+271.82 to 1+289.72 1271.82
Lane 1 1 17.90 45.00 - 805.50 Avg W
RG-02 RD 1+289.72 to 1+765.61 1289.72
Lane 1 1 475.89 45.00 - 21415.05 Avg W
RG-02 RD 1+765.61 to 1+952.12 1765.61
Lane 1 1 186.51 45.00 - 8392.95 Avg W
RG-02 RD 1+952.12 to 2+136.88 1952.12
Lane 1 1 184.76 45.00 - 8314.20 Avg W
RG-02 RD 2+136.88 to 2+193.57 2136.88
Lane 1 1 56.69 45.00 - 2551.05 Avg W
RG-02 RD 2+193.57 to 2+608.50 2193.57
Lane 1 1 414.93 45.00 - 18671.85 Avg W
RG-02 RD 2+608.50 to 2+752.07 2608.5
Lane 1 1 143.57 45.00 - 6460.65 Avg W
RG-02 RD 2+752.07 to 2+937.49 2752.07
Lane 1 1 185.42 45.00 - 8343.90 Avg W
RG-02 RD 2+937.49 to 2+994.06 2937.49
Lane 1 1 56.57 45.00 - 2545.65 Avg W
RG-02 RD 2+994.06 to 3+551.15 2994.06
Lane 1 1 557.09 45.00 - 25069.05 Avg W
RG-02 RD 3+551.15 to 3+709.86 3551.15
Lane 1 1 158.71 45.00 - 7141.95 Avg W
RG-02 RD 3+709.86 to 3+887.03 3709.86
Lane 1 1 177.17 45.00 - 7972.65 Avg W
RG-02 RD 3+887.03 to 3+951.77 3887.03
Lane 1 1 64.74 45.00 - 2913.30 Avg W
RG-02 RD 3+951.77 to 4+184.05 3951.77
Lane 1 1 232.28 45.00 - 10452.60 Avg W
RG-02 RD 4+184.05 to 4+243.19 4184.05
Lane 1 1 59.14 45.00 - 2661.30 Avg W
RG-02 RD 4+243.19 to 4+355.71 4243.19
Lane 1 1 112.52 45.00 - 5063.49 4355.712
RG-02 RD 4+355.71 to 4+426.21 4355.712
Lane 1 1 70.50 45.00 - 3172.50 Avg W

Carried over to next page 145629.54


Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet
Page 02
Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses
ItemCode:- 01A-6C Description:- Bituminous Binder Course
a) 75 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
145629.54
RG-02 RD 4+426.21 to 4+608.08 4426.212
Lane 1 1 181.87 45.00 - 8184.15 Avg W
RG-02 RD 4+608.08 to 4+678.66 4608.082
Lane 1 1 70.58 45.00 - 3176.10 Avg W
RG-02 RD 4+678.66 to 4+847.42 4678.662
Lane 1 1 168.76 45.00 - 7594.20 Avg W

Total 164583.99
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses
ItemCode:- 01A-6C Description:- Bituminous Binder Course
a) 60 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
BLAST PAD
RG-01 RD 1+070.00 to 1+172.50 1070.00
Lane 1 1 102.50 45.00 - 4612.50 Avg W
Shoulder B/side 2 1 102.50 7.92 - 1623.60 Avg W
RG-01 RD 1+070.00 to 1+190.00 1172.5
Lane 1 1 17.50 45.00 - 787.50 Avg W
BLAST PAD
RG-01 RD 4+847.42 to 4+864.92 4847.422
Lane 1 1 17.50 45.00 - 787.50 Avg W
RG-01 RD 4+864.92 to 4+967.41 4864.922
Lane 1 1 102.49 45.00 - 4612.05 Avg W
Shoulder B/side 2 1 102.49 7.92 - 1623.44 Avg W

Total 14046.59
Lagan Construction Ltd.Technical Associate
Habib Construction
Construction OfServices
NBBIA(Joint Venture)
Package-1
Measurements Sheet
Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses
ItemCode:- 01A-6C Description:- Bituminous Binder Course
a) 40 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
BITUMINIOUS CONCRETE PAVEMENT
RG-02 RD 1+271.82 to 1+289.72 1271.82
Shoulder R/side 1 1 17.90 7.69 - 137.65 Avg W
RG-02 RD 1+289.72 to 1+765.61 1289.72
Shoulder B/side 2 1 475.89 7.88 - 7500.03 Avg W
RG-02 RD 1+765.61 to 1+952.12 1765.61
Shoulder L/side 1 1 186.51 7.69 - 1434.26 Avg W
RG-02 RD 2+136.88 to 2+193.57 2136.88
Shoulder R/side 1 1 56.69 7.69 - 435.95 Avg W
RG-02 RD 2+193.57 to 2+608.50 2193.57
Shoulder B/side 2 1 414.93 7.88 - 6539.30 Avg W
RG-02 RD 2+608.50 to 2+752.07 2608.5
Shoulder L/side 1 1 143.57 7.69 - 1104.05 Avg W
RG-02 RD 2+937.49 to 2+994.06 2937.49
Shoulder R/side 1 1 56.57 7.69 - 435.02 Avg W
RG-02 RD 2+994.06 to 3+551.15 2994.06
Shoulder B/side 2 1 557.09 7.88 - 8779.74 Avg W
RG-02 RD 3+551.15 to 3+709.86 3551.15
Shoulder L/side 1 1 158.71 7.69 - 1220.48 Avg W
RG-02 RD 3+887.03 to 3+951.77 388.03
Shoulder R/side 1 1 64.74 7.69 - 497.85 Avg W
RG-02 RD 3+951.77 to 4+184.05 452.77
Shoulder B/side 2 1 232.28 7.88 - 3660.73 Avg W
RG-02 RD 4+184.05 to 4+243.19 685.05
Shoulder R/side 1 1 59.14 7.69 - 454.79 Avg W
RG-02 RD 4+355.71 to 4+426.21 4355.712
Shoulder R/side 1 1 70.50 7.69 - 542.15 Avg W
RG-02 RD 4+426.21 to 4+608.08 4426.212
Shoulder B/side 2 1 181.87 7.88 - 2866.27 Avg W
RG-02 RD 4+608.08 to 4+678.66 4608.082
Shoulder R/side 1 1 70.58 7.69 - 542.76 Avg W

TOTAL 36151.02
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet
Page 01
Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses
ItemCode:- 01A-7C Description:- Bituminous Wearing Course
a) 50 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
BITUMINIOUS CONCRETE PAVEMENT
RG-02 RD 1+190.00 to 1+271.82 1190
Lane 1 1 81.82 45.00 - 3681.90 Avg W
RG-02 RD 1+271.82 to 1+289.72 1271.82
Lane 1 1 17.90 45.00 - 805.50 Avg W
RG-02 RD 1+289.72 to 1+765.61 1289.72
Lane 1 1 475.89 45.00 - 21415.05 Avg W
RG-02 RD 1+765.61 to 1+952.12 1765.61
Lane 1 1 186.51 45.00 - 8392.95 Avg W
RG-02 RD 1+952.12 to 2+136.88 1952.12
Lane 1 1 184.76 45.00 - 8314.20 Avg W
RG-02 RD 2+136.88 to 2+193.57 2136.88
Lane 1 1 56.69 45.00 - 2551.05 Avg W
RG-02 RD 2+193.57 to 2+608.50 2193.57
Lane 1 1 414.93 45.00 - 18671.85 Avg W
RG-02 RD 2+608.50 to 2+752.07 2608.5
Lane 1 1 143.57 45.00 - 6460.65 Avg W
RG-02 RD 2+752.07 to 2+937.49 2752.07
Lane 1 1 185.42 45.00 - 8343.90 Avg W
RG-02 RD 2+937.49 to 2+994.06 2937.49
Lane 1 1 56.57 45.00 - 2545.65 Avg W
RG-02 RD 2+994.06 to 3+551.15 2994.06
Lane 1 1 557.09 45.00 - 25069.05 Avg W
RG-02 RD 3+551.15 to 3+709.86 3551.15
Lane 1 1 158.71 45.00 - 7141.95 Avg W
RG-02 RD 3+709.86 to 3+887.03 3709.86
Lane 1 1 177.17 45.00 - 7972.65 Avg W
RG-02 RD 3+887.03 to 3+951.77 3887.03
Lane 1 1 64.74 45.00 - 2913.30 Avg W
RG-02 RD 3+951.77 to 4+184.05 3951.77
Lane 1 1 232.28 45.00 - 10452.60 Avg W
RG-02 RD 4+184.05 to 4+243.19 4184.05
Lane 1 1 59.14 45.00 - 2661.30 Avg W
RG-02 RD 4+243.19 to 4+355.71 4243.19
Lane 1 1 112.52 45.00 - 5063.49 4355.712
RG-02 RD 4+355.71 to 4+426.21 4355.712
Lane 1 1 70.50 45.00 - 3172.50 Avg W

Carried over to next page 145629.54


Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet
Page 02
Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses
ItemCode:- 01A-7C Description:- Bituminous Wearing Course
a) 50 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
145629.54
RG-02 RD 4+426.21 to 4+608.08 4426.212
Lane 1 1 181.87 45.00 - 8184.15 Avg W
RG-02 RD 4+608.08 to 4+678.66 4608.082
Lane 1 1 70.58 45.00 - 3176.10 Avg W
RG-02 RD 4+678.66 to 4+847.42 4678.662
Lane 1 1 168.76 45.00 - 7594.20 Avg W

Total 164583.99
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 01
Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses
ItemCode:- 01A-7C Description:- Bituminous Wearing Course
a) 40 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
BLAST PAD
RG-01 RD 1+070.00 to 1+172.50 1070.00
Lane 1 1 102.50 45.00 - 4612.50 Avg W
Shoulder B/side 2 1 102.50 7.50 - 1537.50 Avg W
RG-01 RD 1+070.00 to 1+190.00 1172.5
Lane 1 1 17.50 45.00 - 787.50 Avg W
BITUMINIOUS CONCRETE PAVEMENT
RG-02 RD 1+271.82 to 1+289.72 1271.82
Shoulder R/side 1 1 17.90 7.50 - 134.25 Avg W
RG-02 RD 1+289.72 to 1+765.61 1289.72
Shoulder B/side 2 1 475.89 7.50 - 7138.35 Avg W
RG-02 RD 1+765.61 to 1+952.12 1765.61
Shoulder L/side 1 1 186.51 7.50 - 1398.83 Avg W
RG-02 RD 2+136.88 to 2+193.57 2136.88
Shoulder R/side 1 1 56.69 7.50 - 425.18 Avg W
RG-02 RD 2+193.57 to 2+608.50 2193.57
Shoulder B/side 2 1 414.93 7.50 - 6223.95 Avg W
RG-02 RD 2+608.50 to 2+752.07 2608.5
Shoulder L/side 1 1 143.57 7.50 - 1076.78 Avg W
RG-02 RD 2+937.49 to 2+994.06 2937.49
Shoulder R/side 1 1 56.57 7.50 - 424.28 Avg W
RG-02 RD 2+994.06 to 3+551.15 2994.06
Shoulder B/side 2 1 557.09 7.50 - 8356.35 Avg W
RG-02 RD 3+551.15 to 3+709.86 3551.15
Shoulder L/side 1 1 158.71 7.50 - 1190.33 Avg W
RG-02 RD 3+887.03 to 3+951.77 388.03
Shoulder R/side 1 1 64.74 7.50 - 485.55 Avg W
RG-02 RD 3+951.77 to 4+184.05 452.77
Shoulder B/side 2 1 232.28 7.50 - 3484.20 Avg W
RG-02 RD 4+184.05 to 4+243.19 685.05
Shoulder R/side 1 1 59.14 7.50 - 443.55 Avg W
RG-02 RD 4+355.71 to 4+426.21 4355.712
Shoulder R/side 1 1 70.50 7.50 - 528.75 Avg W
RG-02 RD 4+426.21 to 4+608.08 4426.212
Shoulder B/side 2 1 181.87 7.50 - 2728.05 Avg W

Carried over to next page 40975.88


Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 02
Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses
ItemCode:- 01A-7C Description:- Bituminous Wearing Course
a) 40 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
40975.88
RG-02 RD 4+608.08 to 4+678.66 4608.082
Shoulder R/side 1 1 70.58 7.50 - 529.35 Avg W
BLAST PAD
RG-01 RD 4+847.42 to 4+864.92 4847.422
Lane 1 1 17.50 45.00 - 787.50 Avg W
RG-01 RD 4+864.92 to 4+967.41 4864.922
Lane 1 1 102.49 45.00 - 4612.05 Avg W
Shoulder B/side 2 1 102.49 7.50 - 1537.35 Avg W

Total 48442.13
BITUMINIOUS CONCRETE PAVEMENT
RG-02 RD 1+190.00 to 1+271.82 1190
Lane 1 1 81.82 0.00 - 0.00 Avg W
RG-02 RD 1+271.82 to 1+289.72 1271.82
Lane 1 1 17.90 0.00 - 0.00 Avg W
Shoulder R/side 1 1 17.90 0.00 - 0.00 Avg W
RG-02 RD 1+289.72 to 1+765.61 1289.72
Lane 1 1 475.89 0.00 - 0.00 Avg W
Shoulder B/side 2 1 475.89 0.00 - 0.00 Avg W
RG-02 RD 1+765.61 to 1+952.12 1765.61
Lane 1 1 186.51 0.00 - 0.00 Avg W
Shoulder L/side 1 1 186.51 0.00 - 0.00 Avg W
RG-02 RD 1+952.12 to 2+136.88 1952.12
Lane 1 1 184.76 0.00 - 0.00 Avg W
RG-02 RD 2+136.88 to 2+193.57 2136.88
Lane 1 1 56.69 0.00 - 0.00 Avg W
Shoulder R/side 1 1 56.69 0.00 - 0.00 Avg W
RG-02 RD 2+193.57 to 2+608.50 2193.57
Lane 1 1 414.93 0.00 - 0.00 Avg W
Shoulder B/side 2 1 414.93 0.00 - 0.00 Avg W
RG-02 RD 2+608.50 to 2+752.07 2608.5
Lane 1 1 143.57 0.00 - 0.00 Avg W
Shoulder L/side 1 1 143.57 0.00 - 0.00 Avg W
RG-02 RD 2+752.07 to 2+937.49 2752.07
Lane 1 1 185.42 0.00 - 0.00 Avg W
RG-02 RD 2+937.49 to 2+994.06 2937.49
Lane 1 1 56.57 0.00 - 0.00 Avg W
Shoulder R/side 1 1 56.57 0.00 - 0.00 Avg W
RG-02 RD 2+994.06 to 3+551.15 2994.06
Lane 1 1 557.09 0.00 - 0.00 Avg W
Shoulder B/side 2 1 557.09 0.00 - 0.00 Avg W
RG-02 RD 3+551.15 to 3+709.86 3551.15
Lane 1 1 158.71 0.00 - 0.00 Avg W
Shoulder L/side 1 1 158.71 0.00 - 0.00 Avg W
RG-02 RD 3+709.86 to 3+887.03 3709.86
Lane 1 1 177.17 0.00 - 0.00 Avg W
RG-02 RD 3+887.03 to 3+951.77 3887.03
Lane 1 1 64.74 0.00 - 0.00 Avg W
Shoulder R/side 1 1 64.74 0.00 - 0.00 Avg W
RG-02 RD 3+951.77 to 4+184.05 3951.77
Lane 1 1 232.28 0.00 - 0.00 Avg W
Shoulder B/side 2 1 232.28 0.00 - 0.00 Avg W
RG-02 RD 4+184.05 to 4+243.19 4184.05
Lane 1 1 59.14 0.00 - 0.00 Avg W
Shoulder R/side 1 1 59.14 0.00 - 0.00 Avg W
RG-02 RD 4+243.19 to 4+355.71 4243.19
Lane 1 1 112.52 0.00 - 0.00 4355.712
RG-02 RD 4+355.71 to 4+426.21 4355.712
Lane 1 1 70.50 0.00 - 0.00 Avg W
Shoulder R/side 1 1 70.50 0.00 - 0.00 Avg W
RG-02 RD 4+426.21 to 4+608.08 4426.212
Lane 1 1 181.87 0.00 - 0.00 Avg W
Shoulder B/side 2 1 181.87 0.00 - 0.00 Avg W
RG-02 RD 4+608.08 to 4+678.66 4608.082
Lane 1 1 70.58 0.00 - 0.00 Avg W
Shoulder R/side 1 1 70.58 0.00 - 0.00 Avg W
RG-02 RD 4+678.66 to 4+847.42 4678.662
Lane 1 1 168.76 0.00 - 0.00 Avg W
BLAST PAD
RG-01 RD 1+070.00 to 1+172.50 1070.00
Lane 1 1 102.50 0.00 - 0.00 Avg W
Shoulder B/side 2 1 102.50 0.00 - 0.00 Avg W
RG-01 RD 1+070.00 to 1+190.00 1172.5
Lane 1 1 17.50 0.00 - 0.00 Avg W
BLAST PAD
RG-01 RD 4+847.42 to 4+864.92 4847.422
Lane 1 1 17.50 0.00 - 0.00 Avg W
RG-01 RD 4+864.92 to 4+967.41 4864.922
Lane 1 1 102.49 0.00 - 0.00 Avg W
Shoulder B/side 2 1 102.49 0.00 - 0.00 Avg W
1271.82 81.82
45 45 45
1289.72 17.9
46.15 46.15 46.15
1765.61 475.89
47.3 47.3 47.3
1952.12 186.51
46.15 46.15 46.15
2136.88 184.76
45 45 45
2193.57 56.69
46.15 46.15 46.15
2608.5 414.93
47.3 47.3 47.3
2752.07 143.57
46.15 46.15 46.15
2937.49 185.42
45 45 45
2994.06 56.57
46.15 46.15 46.15
3551.15 557.09
47.3 47.3 47.3
3709.86 158.71
46.15 46.15 46.15
3887.03 177.17
45 45 45
3951.77 64.74
46.15 46.15 46.15
4184.05 232.28
47.3 47.3 47.3
4243.19 59.14
46.15 46.15 46.15
4355.712 112.522
45 45 45
4426.212 70.5
46.15 46.15 46.15
4608.082 181.87
47.3 47.3 47.3
4678.662 70.58
46.15 46.15 46.15
4847.422 168.76
45 45 45
1172.5 102.5
45 45 45
8.42 8.42 8.42
1190 17.5
45 45 45

1271.82 81.82
45 45 45
1289.72 17.9
45.425 45.425 45.425
7.94 7.94 7.94
1765.61 475.89
45.85 45.85 45.85
8.38 8.38 8.38
1952.12 186.51
45.425 45.425 45.425
7.94 7.94 7.94
2136.88 184.76
45 45 45
2193.57 56.69
45.425 45.425 45.425
7.94 7.94 7.94
2608.5 414.93
45.85 45.85 45.85
8.38 8.38 8.38
2752.07 143.57
45.425 45.425 45.425
7.94 7.94 7.94
2937.49 185.42
45 45 45
2994.06 56.57
45.425 45.425 45.425
7.94 7.94 7.94
3551.15 557.09
45.85 45.85 45.85
8.38 8.38 8.38
3709.86 158.71
45.425 45.425 45.425
7.94 7.94 7.94
3887.03 177.17
45 45 45
3951.77 64.74
45.425 45.425 45.425
7.94 7.94 7.94
4184.05 232.28
45.85 45.85 45.85
8.38 8.38 8.38
4243.19 59.14
45.425 45.425 45.425
7.94 7.94 7.94
4355.712 112.522
45 45 45
4426.212 70.5
45.425 45.425 45.425
7.94 7.94 7.94
4608.082 181.87
45.85 45.85 45.85
8.38 8.38 8.38
4678.662 70.58
45.425 45.425 45.425
7.94 7.94 7.94
4847.422 168.76
45 45 45

4864.922 17.5
45 45 45
4967.412 102.49
45 45 45
8.42 8.42 8.42
1271.82 81.82
45 45 45
1289.72 17.9
45 45 45
1765.61 475.89
45 45 45
1952.12 186.51
45 45 45
2136.88 184.76
45 45 45
2193.57 56.69
45 45 45
2608.5 414.93
45 45 45
2752.07 143.57
45 45 45
2937.49 185.42
45 45 45
2994.06 56.57
45 45 45
3551.15 557.09
45 45 45
3709.86 158.71
45 45 45
3887.03 177.17
45 45 45
3951.77 64.74
45 45 45
4184.05 232.28
45 45 45
4243.19 59.14
45 45 45
4355.712 112.522
45 45 45
4426.212 70.5
45 45 45
226.87 181.87
45 45 45
297.45 70.58
45 45 45
466.21 168.76
45 45 45
1271.82 81.82
45 45 45
1289.72 17.9
45 45 45
1765.61 475.89
45 45 45
1952.12 186.51
45 45 45
2136.88 184.76
45 45 45
2193.57 56.69
45 45 45
2608.5 414.93
45 45 45
2752.07 143.57
45 45 45
2937.49 185.42
45 45 45
2994.06 56.57
45 45 45
3551.15 557.09
45 45 45
3709.86 158.71
45 45 45
3887.03 177.17
45 45 45
3951.77 64.74
45 45 45
4184.05 232.28
45 45 45
4243.19 59.14
45 45 45
4355.712 112.522
45 45 45
4426.212 70.5
45 45 45
4608.082 181.87
45 45 45
4678.662 70.58
45 45 45
4847.422 168.76
45 45 45
1172.5 102.5
45 45 45
7.92 7.92 7.92
1190 17.5
45 45 45

4864.922 17.5
45 45 45
4967.412 102.49
45 45 45
7.92 7.92 7.92
1289.72 17.9
7.69 7.69 7.69
1765.61 475.89
7.88 7.88 7.88
1952.12 186.51
7.69 7.69 7.69
2193.57 56.69
7.69 7.69 7.69
2608.5 414.93
7.88 7.88 7.88
2752.07 143.57
7.69 7.69 7.69
2994.06 56.57
7.69 7.69 7.69
3551.15 557.09
7.88 7.88 7.88
3709.86 158.71
7.69 7.69 7.69
452.77 64.74
7.69 7.69 7.69
685.05 232.28
7.88 7.88 7.88
744.19 59.14
7.69 7.69 7.69
4426.212 70.5
7.69 7.69 7.69
4608.082 181.87
7.88 7.88 7.88
4678.662 70.58
7.69 7.69 7.69
1271.82 81.82
45 45 45
1289.72 17.9
45 45 45
1765.61 475.89
45 45 45
1952.12 186.51
45 45 45
2136.88 184.76
45 45 45
2193.57 56.69
45 45 45
2608.5 414.93
45 45 45
2752.07 143.57
45 45 45
2937.49 185.42
45 45 45
2994.06 56.57
45 45 45
3551.15 557.09
45 45 45
3709.86 158.71
45 45 45
3887.03 177.17
45 45 45
3951.77 64.74
45 45 45
4184.05 232.28
45 45 45
4243.19 59.14
45 45 45
4355.712 112.522
45 45 45
4426.212 70.5
45 45 45
4608.082 181.87
45 45 45
4678.662 70.58
45 45 45
4847.422 168.76
45 45 45
1172.5 102.5
45 45 45
7.5 7.5 7.5
1190 17.5
45 45 45

1289.72 17.9
7.5 7.5 7.5
1765.61 475.89
7.5 7.5 7.5
1952.12 186.51
7.5 7.5 7.5
2193.57 56.69
7.5 7.5 7.5
2608.5 414.93
7.5 7.5 7.5
2752.07 143.57
7.5 7.5 7.5
2994.06 56.57
7.5 7.5 7.5
3551.15 557.09
7.5 7.5 7.5
3709.86 158.71
7.5 7.5 7.5
452.77 64.74
7.5 7.5 7.5
685.05 232.28
7.5 7.5 7.5
744.19 59.14
7.5 7.5 7.5
4426.212 70.5
7.5 7.5 7.5
4608.082 181.87
7.5 7.5 7.5
4678.662 70.58
7.5 7.5 7.5

4864.922 17.5
45 45 45
4967.412 102.49
45 45 45
7.5 7.5 7.5
1271.82 81.82
0 0 0
1289.72 17.9
0 0 0
0 0 0
1765.61 475.89
0 0 0
0 0 0
1952.12 186.51
0 0 0
0 0 0
2136.88 184.76
0 0 0
2193.57 56.69
0 0 0
0 0 0
2608.5 414.93
0 0 0
0 0 0
2752.07 143.57
0 0 0
0 0 0
2937.49 185.42
0 0 0
2994.06 56.57
0 0 0
0 0 0
3551.15 557.09
0 0 0
0 0 0
3709.86 158.71
0 0 0
0 0 0
3887.03 177.17
0 0 0
3951.77 64.74
0 0 0
0 0 0
4184.05 232.28
0 0 0
0 0 0
4243.19 59.14
0 0 0
0 0 0
4355.712 112.522
0 0 0
4426.212 70.5
0 0 0
0 0 0
4608.082 181.87
0 0 0
0 0 0
4678.662 70.58
0 0 0
0 0 0
4847.422 168.76
0 0 0

1172.5 102.5
0 0 0
0 0 0
1190 17.5
0 0 0

4864.922 17.5
0 0 0
4967.412 102.49
0 0 0
0 0 0
Binder
75mm
L
B

Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 205.00 -
Lane With 1/S Shoulder 60+7.5 - -
Lane Without Shoulder - 35.00 -

BCP
Lane With B/S Shoulder 60+7.50+7.50 1862.06 60.00
Lane With 1/S Shoulder 60+7.5 884.91 60.00
Lane Without Shoulder 60 910.45 60.00
3897.42
Binder
75mm
Total

-
-
-

111723.60
53094.60
54627.00
219445.20
Binde
60mm
L
B

Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 205.00 75.42
Lane With 1/S Shoulder 60+7.5 - 67.71
Lane Without Shoulder - 35.00 -

BCP
Lane With B/S Shoulder 60+7.50+7.50 1862.06 -
Lane With 1/S Shoulder 60+7.5 884.91 -
Lane Without Shoulder - 910.45 -
3897.42
Binder
60mm
Total

15461.10
67.71

-
-

-
15528.81
Wearing
50mm
L
B

Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 205.00 -
Lane With 1/S Shoulder 60+7.5 - -
Lane Without Shoulder - 35.00 -

BCP
Lane With B/S Shoulder 60+7.50+7.50 1862.06 60.00
Lane With 1/S Shoulder 60+7.5 884.91 60.00
Lane Without Shoulder 60 910.45 60.00
3897.42
Wearing
50mm
Total

-
-

111723.60
53094.60

54627.00
219445.20
Binder
40mm
L
B

Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 205.00 -
Lane With 1/S Shoulder 60+7.5 - -
Lane Without Shoulder - 35.00 -

BCP
Lane With B/S Shoulder 60+7.50+7.50 1862.06 15.38
Lane With 1/S Shoulder 60+7.5 884.91 7.69
Lane Without Shoulder 60 910.45 -
3897.42
Binder
40mm
Total

-
-

28638.48
6804.96

-
35443.44
Wearing
40mm
L
B

Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 205.00 75.00
Lane With 1/S Shoulder 60+7.5 - 67.50
Lane Without Shoulder - 35.00 -

BCP
Lane With B/S Shoulder 60+7.50+7.50 1862.06 15.00
Lane With 1/S Shoulder 60+7.5 884.91 7.50
Lane Without Shoulder 60 910.45 -
3897.42
Wearing
40mm
Total

15375
-

27930.9
6636.825
-
49942.73
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Main Run Way
Title:- 01A- Runways- Main Runway Sub-Title:- Plain & Reinforced Concrete
ItemCode:- 01A-1C Description:- Plain Concrete Pavement

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-02 RD 1+190.00 to 1+290.00 1190.00

Lane 1 1 100.00 60.00 0.460 2760.00 Avg W

RG-04 RD 4+647.60 to 4+847.60 4647.60

Lane 1 1 200.00 60.00 0.460 5520.00 Avg W

Total 8280.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 01
Title:- Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
01A- Runways- Main Runway
Cement Treated Base Course
ItemCode:- 01A-2C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-02 RD 1+190.00 to 1+270.30 1190.00

Lane 1 1 80.30 61.15 0.200 982.07 Avg W

RG-02 RD 1+270.30 to 1+290.00 1270.3

Lane 1 1 19.69 62.30 0.200 245.34 Avg W

BITUMINIOUS CONCRETE PAVEMENT

RG-03 RD 1+290.00 to 1+413.43 1290.00

Lane 1 1 123.43 62.30 0.600 4613.81 Avg W

RG-03 RD 1+413.43 to 1+512.57 1413.43

Lane 1 1 99.14 61.15 0.600 3637.45 Avg W

RG-03 RD 1+512.57 to 2+158.88 1512.57

Lane 1 1 646.31 62.30 0.600 24159.07 Avg W

RG-03 RD 2+158.88 to 2+453.39 2158.88

Lane 1 1 294.51 61.15 0.600 10805.57 Avg W

RG-03 RD 2+453.39 to 2+808.03 2453.39

Lane 1 1 354.64 62.30 0.600 13256.44 Avg W


RG-03 RD 2+808.03 to 2+923.59 2808.03
Lane 1 1 115.56 60.00 0.600 4160.16 Avg W

RG-03 RD 2+923.59 to 3+523.48 1512.57

Lane 1 1 599.89 61.15 0.600 22009.96 Avg W

RG-03 RD 3+523.48 to 3+774.93 2112.46

Lane 1 1 251.45 62.30 0.600 9399.20 Avg W

RG-03 RD 3+774.93 to 3+886.81 2363.91

Lane 1 1 111.88 61.15 0.600 4104.88 Avg W

RG-03 RD 3+886.81 to 4+243.63 2475.79

Lane 1 1 356.82 62.30 0.600 13337.93 Avg W


RG-03 RD 4+243.63 to 4+355.51 2832.61
Lane 1 1 111.88 61.15 0.600 4104.88 Avg W
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 02
Title:- Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
01A- Runways- Main Runway
Cement Treated Base Course
ItemCode:- 01A-2C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-03 RD 4+355.51 to 4+647.6 2944.49
Lane 1 1 292.03 62.30 0.600 10916.08 Avg W
CEMENT CONCRETE PAVEMENT
RG-04 RD 4+647.60 to 4+680.06 4647.6
Lane 1 1 32.46 62.30 0.200 404.45 Avg W
RG-04 RD 4+680.06 to 4+847.6 4680.06
Lane 1 1 167.53 61.15 0.200 2048.89 Avg W

Total 128186.19
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 01
Title:- 01A- Runways- Main Runway Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
Cement Treated Base Course
ItemCode:- 01A-3C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
BLAST PAD

RG-01 RD 1+070.00 to 1+172.50 1070.00

Lane 1 1 102.50 60.92 0.200 1248.86 Avg W

Shoulder B/side 2 1 102.50 8.42 0.200 345.22 Avg W

RG-01 RD 1+070.00 to 1+190.00 1172.5

Lane 1 1 17.50 60.46 0.200 211.61 Avg W

Shoulder R/side 1 1 17.50 7.96 0.200 27.86 Avg W


CEMENT CONCRETE PAVEMENT

RG-02 RD 1+190.00 to 1+270.30 1190

Shoulder R/side 1 1 80.30 7.94 0.200 127.52 Avg W

RG-02 RD 1+270.30 to 1+290.00 1270.3

Shoulder B/side 2 1 19.69 8.38 0.200 66.00 Avg W

BITUMINIOUS CONCRETE PAVEMENT

RG-03 RD 1+290.00 to 1+413.43 1290.00

Lane 1 1 123.43 60.85 0.550 4130.89 Avg W

Shoulder B/side 2 1 123.43 8.08 0.200 398.93 Avg W

RG-03 RD 1+413.43 to 1+512.57 1413.43

Lane 1 1 99.14 60.43 0.550 3294.79 Avg W

Shoulder L/side 1 1 99.14 7.79 0.200 154.46 Avg W

RG-03 RD 1+512.57 to 2+158.88 1512.57

Lane 1 1 646.31 60.85 0.500 19663.98 Avg W

Shoulder B/side 2 1 646.31 8.08 0.200 2088.87 Avg W

RG-03 RD 2+158.88 to 2+453.39 2158.88

Lane 1 1 294.51 60.43 0.500 8897.88 Avg W

Shoulder R/side 1 1 294.51 7.79 0.200 458.85 Avg W

RG-03 RD 2+453.39 to 2+808.03 2453.39

Lane 1 1 354.64 60.85 0.500 10789.92 Avg W


Shoulder B/side 2 1 354.64 8.08 0.200 1146.20 Avg W
RG-03 RD 2+808.03 to 2+923.59 2808.03
Lane 1 1 115.56 60.00 0.500 3466.80 Avg W
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 02
Title:- 01A- Runways- Main Runway Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
Cement Treated Base Course
ItemCode:- 01A-3C Description:- Crush Aggregate Base Course
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-03 RD 2+923.59 to 3+523.48 2923.59

Lane 1 1 599.89 60.43 0.550 19936.59 Avg W

Shoulder R/side 1 1 599.89 7.79 0.200 934.63 Avg W

RG-03 RD 3+523.48 to 3+774.93 3523.48

Lane 1 1 251.45 60.85 0.500 7650.37 Avg W

Shoulder B/side 2 1 251.45 8.08 0.200 812.69 Avg W

RG-03 RD 3+774.93 to 3+886.81 3774.93

Lane 1 1 111.88 60.43 0.500 3380.17 Avg W

Shoulder R/side 1 1 111.88 7.79 0.200 174.31 Avg W

RG-03 RD 3+886.81 to 4+243.63 3886.81

Lane 1 1 356.82 60.85 0.550 11941.87 Avg W

Shoulder B/side 2 1 356.82 8.08 0.200 1153.24 Avg W


RG-03 RD 4+243.63 to 4+355.51 4243.63
Lane 1 1 111.88 60.43 0.550 3718.19 Avg W
Shoulder R/side 1 1 111.88 7.79 0.200 174.31 Avg W
RG-03 RD 4+355.51 to 4+647.6 4355.51
Lane 1 1 292.03 60.85 0.550 9773.51 Avg W
Shoulder B/side 2 1 292.03 8.08 0.200 943.84 Avg W
CEMENT CONCRETE PAVEMENT
RG-04 RD 4+647.60 to 4+680.06 4647.6
Shoulder B/side 2 1 32.46 8.38 0.200 108.81 Avg W
RG-04 RD 4+680.06 to 4+847.6 4680.06
Shoulder R/side 1 1 167.53 7.94 0.200 266.04 Avg W
BLAST PAD
RG-05 RD 4+847.6 to 4+871.68 4847.6
Lane 1 1 24.08 60.46 0.200 291.18 Avg W
Shoulder R/side 1 1 24.08 7.96 0.200 38.34 Avg W
RG-05 RD 4+871.68 to 4+967.6 4871.68
Lane 1 1 95.91 60.92 0.200 1168.57 Avg W
Shoulder B/side 2 1 95.91 8.42 0.200 323.02 Avg W

Total 119308.32
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 01A- Runways- Main Runway Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and
Cement Treated Base Course
ItemCode:- 01A-4C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-03 RD 1+290.00 to 4+647.60 1290.00

Lane 1 1 3357.60 60.00 0.100 20145.60 Avg W

Total 20145.60
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- Sub-Title:- Granular Sub-Base Course,Crush Aggregate Bas Course and


01A- Runways- Main Runway
Cement Treated Base Course
ItemCode:- 01A-5C Description:- Cement Treated Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-02 RD 1+190.00 to 1+270.30 1190

Lane 1 1 80.30 60.50 0.200 971.63 Avg W

RG-02 RD 1+270.30 to 1+290.00 1270.3

Lane 1 1 19.69 60.50 0.200 238.25 Avg W


RG-04 RD 4+647.60 to 4+680.06 4647.6

Lane 1 1 32.46 60.50 0.200 392.77 Avg W


RG-04 RD 4+680.06 to 4+847.6 4680.06

Lane 1 1 167.53 60.50 0.200 2027.11 Avg W

Total 3629.76
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses


ItemCode:- 01A-6C Description:- Bituminous Binder Course
a) 75 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-03 RD 1+290.00 to 4+647.60 1290.00

Lane 1 1 3357.54 60.00 - 201452.40 Avg W

Total 201452.40
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses


ItemCode:- 01A-6C Description:- Bituminous Binder Course
a) 60 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 1+070.00 to 1+190.00 1070.00

Lane 1 1 120.00 60.00 - 7200.00 Avg W

Shoulder B/side 2 1 102.50 7.92 - 1623.60 Avg W

Shoulder R/side 1 1 17.50 7.71 - 134.93 Avg W

RG-05 RD 4+847.60 to 4+967.60 4847.6

Lane 1 1 120.00 60.00 - 7200.00 Avg W

Shoulder R/side 1 1 24.08 7.71 - 185.66 Avg W

Shoulder B/side 2 1 95.91 7.92 - 1519.21 Avg W

Total 17863.40
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet Page 01
Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses
ItemCode:- 01A-6C Description:- Bituminous Binder Course
a) 40 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-02 RD 1+190.00 to 1+270.30 1190

Shoulder R/side 1 1 80.30 7.69 - 617.51 Avg W

RG-02 RD 1+270.30 to 1+290.00 1270.3

Shoulder B/side 2 1 19.69 7.88 - 310.31 Avg W


RG-03 RD 1+290.00 to 1+413.43 1290
Shoulder B/side 2 1 123.43 7.88 - 1945.26 Avg W
RG-03 RD 1+413.43 to 1+512.57 1413.43

Shoulder R/side 1 1 99.14 7.69 - 762.39 Avg W

RG-03 RD 1+290.00 to 1+413.43 1290.00

Shoulder B/side 2 1 123.43 7.88 - 1945.26 Avg W

RG-03 RD 1+413.43 to 1+512.57 1413.43

Shoulder L/side 1 1 99.14 7.69 - 762.39 Avg W

RG-03 RD 1+512.57 to 2+158.88 1512.57

Shoulder B/side 2 1 646.31 7.88 - 10185.85 Avg W

RG-03 RD 2+158.88 to 2+453.39 2158.88

Shoulder R/side 1 1 294.51 7.69 - 2264.78 Avg W

RG-03 RD 2+453.39 to 2+808.03 2453.39


Shoulder B/side 2 1 354.64 7.88 - 5589.13 Avg W

RG-03 RD 2+923.59 to 3+523.48 2923.59

Shoulder R/side 1 1 599.89 7.69 - 4613.15 Avg W

RG-03 RD 3+523.48 to 3+774.93 3523.48

Shoulder B/side 2 1 251.45 7.88 - 3962.85 Avg W

RG-03 RD 3+774.93 to 3+886.81 3774.93

Shoulder R/side 1 1 111.88 7.69 - 860.36 Avg W

RG-03 RD 3+886.81 to 4+243.63 3886.81

Shoulder B/side 2 1 356.82 7.88 - 5623.48 Avg W


RG-03 RD 4+243.63 to 4+355.51 4243.63
Shoulder R/side 1 1 111.88 7.69 - 860.36 Avg W

Carried over to next page 40303.07


Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet Page 02
Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses
ItemCode:- 01A-6C Description:- Bituminous Binder Course
a) 40 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-03 RD 4+355.51 to 4+647.6 40303.07 4355.51
Shoulder B/side 2 1 292.03 7.88 - 4602.39 Avg W
RG-04 RD 4+647.60 to 4+680.06 4647.6
Shoulder B/side 2 1 32.46 7.88 - 511.57 Avg W
RG-04 RD 4+680.06 to 4+847.6 4680.06
Shoulder R/side 1 1 167.53 7.69 - 1288.31 Avg W

Total 46705.33
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses


ItemCode:- 01A-7C Description:- Bituminous Wearing Course
a) 50 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-03 RD 1+290.00 to 4+647.60 1290.00

Lane 1 1 3357.60 60.00 - 201456.00 Avg W

Total 201456.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 01
Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses
ItemCode:- 01A-7C Description:- Bituminous Wearing Course
a) 40 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 1+070.00 to 1+172.50 1070.00

Lane 1 1 102.50 60.00 - 6150.00

Shoulder B/side 2 1 102.50 7.50 - 1537.50 Avg W

RG-01 RD 1+070.00 to 1+190.00 1172.5

Lane 1 1 17.50 60.00 - 1050.00


Shoulder R/side 1 1 17.50 7.50 - 131.25 Avg W
RG-02 RD 1+190.00 to 1+270.30 1190
Shoulder R/side 1 1 80.30 7.50 - 602.25 Avg W
RG-02 RD 1+270.30 to 1+290.00 1270.3
Shoulder B/side 2 1 19.69 7.50 - 295.35 Avg W
RG-03 RD 1+290.00 to 1+413.43 1290
Shoulder B/side 2 1 123.43 7.50 - 1851.45 Avg W
RG-03 RD 1+413.43 to 1+512.57 1413.43
Shoulder R/side 1 1 99.14 7.50 - 743.55 Avg W
RG-03 RD 1+290.00 to 1+413.43 1290.00
Shoulder B/side 2 1 123.43 7.50 - 1851.45 Avg W
RG-03 RD 1+413.43 to 1+512.57 1413.43
Shoulder L/side 1 1 99.14 7.50 - 743.55 Avg W
RG-03 RD 1+512.57 to 2+158.88 1512.57
Shoulder B/side 2 1 646.31 7.50 - 9694.65 Avg W
RG-03 RD 2+158.88 to 2+453.39 2158.88
Shoulder R/side 1 1 294.51 7.50 - 2208.83 Avg W
RG-03 RD 2+453.39 to 2+808.03 2453.39
Shoulder B/side 2 1 354.64 7.50 - 5319.60 Avg W
RG-03 RD 2+923.59 to 3+523.48 2923.59
Shoulder R/side 1 1 599.89 7.50 - 4499.18 Avg W
RG-03 RD 3+523.48 to 3+774.93 3523.48
Shoulder B/side 2 1 251.45 7.50 - 3771.75 Avg W
RG-03 RD 3+774.93 to 3+886.81 3774.93
Shoulder R/side 1 1 111.88 7.50 - 839.10 Avg W
RG-03 RD 3+886.81 to 4+243.63 3886.81
Shoulder B/side 2 1 356.82 7.50 - 5352.30 Avg W
RG-03 RD 4+243.63 to 4+355.51 4243.63
Shoulder R/side 1 1 111.88 7.50 - 839.10 Avg W
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet Page 02
Title:- 01A- Runways- Main Runway Sub-Title:- Bituminous Surface Courses
ItemCode:- 01A-7C Description:- Bituminous Wearing Course
a) 40 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-03 RD 4+355.51 to 4+647.6 4355.51
Shoulder B/side 2 1 292.03 7.50 - 4380.45 Avg W
RG-04 RD 4+647.60 to 4+680.06 4647.6

Lane 1 1 32.46 60.00 - 1947.60


Shoulder B/side 2 1 32.46 7.50 - 486.90 Avg W
RG-04 RD 4+680.06 to 4+847.6 4680.06

Lane 1 1 167.53 60.00 - 10051.80


Shoulder R/side 1 1 167.53 7.50 - 1256.48 Avg W

Total 65604.08
Blast Pad Binder 40
Lane With B/S Shoulder = 2275 2275
Lane With 1/S Shoulder = 1507 1507
Lane Without Shoulder = 116 116
PQC
Lane With B/S Shoulder = 2275
Lane With 1/S Shoulder = 1507
Lane Without Shoulder = 116
Bituminos Pavement
Lane With B/S Shoulder = 2275
Lane With 1/S Shoulder = 1507
Lane Without Shoulder = 116

3,898 3,898
1290.00 100
60 60 60

4847.60 200
60 60 60
1270.3 80.3

61.15 61.15 61.15

1289.99 19.69
62.3 62.3 62.3

1413.43 123.43

62.3 62.3 62.3

1512.57 99.14
61.15 61.15 61.15

2158.88 646.31
62.3 62.3 62.3

2453.39 294.51
61.15 61.15 61.15

2808.03 354.64

62.3 62.3 62.3


2923.59 115.56
60 60 60

2112.46 599.89

61.15 61.15 61.15

2363.91 251.45
62.3 62.3 62.3

2475.79 111.88
61.15 61.15 61.15

2832.61 356.82
62.3 62.3 62.3
2944.49 111.88
61.15 61.15 61.15
3236.52 292.03
62.3 62.3 62.3

4680.06 32.46
62.3 62.3 62.3
4847.59 167.53
61.15 61.15 61.15
1172.5 102.5
60.92 60.92 60.92

8.42 8.42 8.42

1190 17.5
60.46 60.46 60.46

7.96 7.96 7.96

1270.3 80.3

7.94 7.94 7.94

1289.99 19.69
8.38 8.38 8.38

1413.43 123.43

60.85 60.85 60.85

8.08 8.08 8.08

1512.57 99.14

60.425 60.425 60.425

7.79 7.79 7.79

2158.88 646.31
60.85 60.85 60.85

8.08 8.08 8.08

2453.39 294.51
60.425 60.425 60.425

7.79 7.79 7.79

2808.03 354.64
60.85 60.85 60.85
8.08 8.08 8.08
2923.59 115.56
60 60 60
3523.48 599.89

60.425 60.425 60.425

7.79 7.79 7.79

3774.93 251.45

60.85 60.85 60.85

8.08 8.08 8.08

3886.81 111.88
60.425 60.425 60.425

7.79 7.79 7.79

4243.63 356.82
60.85 60.85 60.85

8.08 8.08 8.08


4355.51 111.88
60.425 60.425 60.425
7.79 7.79 7.79
4647.54 292.03
60.85 60.85 60.85
8.08 8.08 8.08

4680.06 32.46
8.38 8.38 8.38
4847.59 167.53
7.94 7.94 7.94

4871.68 24.08
60.46 60.46 60.46
7.96 7.96 7.96
4967.59 95.91
60.92 60.92 60.92
8.42 8.42 8.42
4647.60 3357.6

60 60 60
1270.3 80.3

60.5 60.5 60.5

1289.99 19.69
60.5 60.5 60.5
4680.06 32.46

60.5 60.5 60.5


4847.59 167.53
60.5 60.5 60.5
4647.60 3357.54
60 60 60
1190.00 120
60 60 60

7.92 7.92 7.92

7.71 7.71 7.71

4967.6 120

60 60 60

7.71 7.71 7.71

7.92 7.92 7.92


1270.3 80.3

7.69 7.69 7.69

1289.99 19.69
7.88 7.88 7.88
1413.43 123.43
7.88 7.88 7.88
1512.57 99.14

7.69 7.69 7.69

1413.43 123.43

7.88 7.88 7.88

1512.57 99.14
7.69 7.69 7.69

2158.88 646.31
7.88 7.88 7.88

2453.39 294.51
7.69 7.69 7.69

2808.03 354.64
7.88 7.88 7.88

3523.48 599.89
7.69 7.69 7.69

3774.93 251.45
7.88 7.88 7.88

3886.81 111.88

7.69 7.69 7.69

4243.63 356.82

7.88 7.88 7.88


4355.51 111.88
7.69 7.69 7.69
4647.54 292.03
7.88 7.88 7.88
4680.06 32.46
7.88 7.88 7.88
4847.59 167.53
7.69 7.69 7.69
4647.60 3357.6
60 60 60
1172.5 102.5

7.5 7.5 7.5

1190 17.5

7.5 7.5 7.5


1270.3 80.3
7.5 7.5 7.5
1289.99 19.69
7.5 7.5 7.5
1413.43 123.43
7.5 7.5 7.5
1512.57 99.14
7.5 7.5 7.5
1413.43 123.43
7.5 7.5 7.5
1512.57 99.14
7.5 7.5 7.5
2158.88 646.31
7.5 7.5 7.5
2453.39 294.51
7.5 7.5 7.5
2808.03 354.64
7.5 7.5 7.5
3523.48 599.89
7.5 7.5 7.5
3774.93 251.45
7.5 7.5 7.5
3886.81 111.88
7.5 7.5 7.5
4243.63 356.82
7.5 7.5 7.5
4355.51 111.88
7.5 7.5 7.5
4647.54 292.03
7.5 7.5 7.5
4680.06 32.46

7.5 7.5 7.5


4847.59 167.53

7.5 7.5 7.5


3897.6
Binder
75mm
L
B

Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 198.41 -
Lane With 1/S Shoulder 60+7.5 41.58 -
Lane Without Shoulder - - -

CCP
Lane With B/S Shoulder 60+7.50+7.50 52.15 -
Lane With 1/S Shoulder 60+7.5 247.83 -
Lane Without Shoulder - - -

BCP
Lane With B/S Shoulder 60+7.50+7.50 2024.68 60.00
Lane With 1/S Shoulder 60+7.5 1217.30 60.00
Lane Without Shoulder 60 115.56 60.00
3897.51
Binder
75mm
Total

-
-
-

-
-
-

121480.80
73038.00

6933.60
201452.40
Binde
60mm
L
B

Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 198.41 75.42
Lane With 1/S Shoulder 60+7.5 41.58 67.71
Lane Without Shoulder - - -

CCP
Lane With B/S Shoulder 60+7.50+7.50 52.15 -
Lane With 1/S Shoulder 60+7.5 247.83 -
Lane Without Shoulder - - -

BCP
Lane With B/S Shoulder 60+7.50+7.50 2024.68 -
Lane With 1/S Shoulder 60+7.5 1217.30 -
Lane Without Shoulder 60 115.56 -
3897.51
Binder
60mm
Total

14964.08
2815.38

-
-

-
-

-
17779.46
Binder
40mm
L
B

Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 198.41 -
Lane With 1/S Shoulder 60+7.5 41.58 -
Lane Without Shoulder - - -

CCP
Lane With B/S Shoulder 60+7.50+7.50 52.15 15.38
Lane With 1/S Shoulder 60+7.5 247.83 7.69
Lane Without Shoulder - - -

BCP
Lane With B/S Shoulder 60+7.50+7.50 2024.68 15.38
Lane With 1/S Shoulder 60+7.5 1217.30 7.69
Lane Without Shoulder 60 115.56 -
3897.51
Binder
40mm
Total

-
-

802.07
1905.81

31139.58
9361.04

-
43208.50
Wearing
50mm
L
B

Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 198.41 -
Lane With 1/S Shoulder 60+7.5 41.58 -
Lane Without Shoulder - - -

CCP
Lane With B/S Shoulder 60+7.50+7.50 52.15 -
Lane With 1/S Shoulder 60+7.5 247.83 -
Lane Without Shoulder - - -

BCP
Lane With B/S Shoulder 60+7.50+7.50 2024.68 60.00
Lane With 1/S Shoulder 60+7.5 1217.30 60.00
Lane Without Shoulder 60 115.56 60.00
3897.51
Wearing
50mm
Total

-
-

-
-

121480.80
73038.00

6933.60
201452.40
Wearing
40mm
L
B

Blast Pad
Lane With B/S Shoulder 60+7.50+7.50 198.41 75.00
Lane With 1/S Shoulder 60+7.5 41.58 67.50
Lane Without Shoulder - - -

CCP
Lane With B/S Shoulder 60+7.50+7.50 52.15 15.00
Lane With 1/S Shoulder 60+7.5 247.83 7.50
Lane Without Shoulder - - -

BCP
Lane With B/S Shoulder 60+7.50+7.50 2024.68 15.00
Lane With 1/S Shoulder 60+7.5 1217.30 7.50
Lane Without Shoulder 60 115.56 -
3897.51
Wearing
40mm
Total

14880.75
2806.65

782.25
1858.725

30370.2
9129.75
-
59828.33
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Paralell Taxiway E.W
Title:- 02A-Taxiways-Parallel Taxiways Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02A-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+757.27 to 0+898.88

Lane 1 1 141.61 31.09 0.600 2641.59


RG-02 RD 0+898.88 to 0+1232.38
Lane 1 1 333.50 33.85 0.600 6773.39

RG-03 RD 0+1232.38 to 0+1620.5


Lane 1 1 388.21 51.92 0.600 12093.88

RG-04 RD 0+1620.50 to 0+1814.67


Lane 1 1 194.17 39.91 0.600 4649.59

RG-05 RD 0+1814.67 to 0+2280.50


Lane 1 1 465.91 37.90 0.600 10594.79
RG-06 RD 0+2280.50 to 0+2501.40

Lane 1 1 220.90 27.30 0.600 3618.34


RG-07 RD 0+2501.40 to 0+2970.17

Lane 1 1 468.77 35.79 0.600 10066.00


RG-08 RD 0+2970.17 to 0+3019.68
Lane 1 1 49.58 64.80 0.600 1927.67

RG-09 RD 0+3019.68 to 0+3219.95


Lane 1 1 200.35 42.47 0.600 5105.84

RG-10 RD 0+3219.95 to 0+3579.16


Lane 1 1 359.87 27.30 0.600 5894.67
RG-11 RD 0+3579.16 to 0+3615.91

Lane 1 1 36.75 26.48 0.600 583.89

Total 63949.65
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 01
Title:- 02A-Taxiways-Parallel Taxiways Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02A-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+757.27 to 0+898.88
Lane 1 1 141.61 29.64 0.550 2308.53
RG-02 RD 0+898.88 to 0+1232.38
Lane 1 1 333.50 32.40 0.550 5942.97
RG-03 RD 0+1232.38 to 0+1620.5
Lane 1 1 388.21 50.47 0.550 10776.46
RG-04 RD 0+1620.50 to 0+1814.67
Lane 1 1 194.17 38.46 0.550 4107.28
RG-05 RD 0+1814.67 to 0+2280.50
Lane 1 1 465.91 36.45 0.550 9340.33
RG-06 RD 0+2280.50 to 0+2501.40
Lane 1 1 220.90 25.85 0.550 3140.65
RG-07 RD 0+2501.40 to 0+2970.17
Lane 1 1 468.77 34.34 0.550 8853.32
RG-08 RD 0+2970.17 to 0+3019.68
Lane 1 1 49.58 63.35 0.550 1727.49
RG-09 RD 0+3019.68 to 0+3219.95
Lane 1 1 200.35 41.02 0.550 4520.57
RG-10 RD 0+3219.95 to 0+3579.16
Lane 1 1 359.87 25.85 0.550 5116.45
RG-11 RD 0+3579.16 to 0+3615.91
Lane 1 1 36.75 25.03 0.550 505.92
RG-01 RD 0+000.00 to 0+3616

L/side shoulder portion-1 1 1 30.68 17.69 0.200 108.56

portion-2 1 1 44.04 17.94 0.200 158.02

portion-3 1 1 620.93 17.94 0.200 2227.90

portion-4 1 1 547.11 17.94 0.200 1963.03

portion-5 1 1 704.95 17.94 0.200 2529.36


Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 02
Title:- 02A-Taxiways-Parallel Taxiways Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02A-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

portion-6 1 1 215.87 17.94 0.200 774.54

portion-7 1 1 182.68 17.94 0.200 655.46


R/side shoulder portion-1 1 1 79.50 17.50 0.200 278.25

portion-2 1 1 850.94 17.94 0.200 3053.17

portion-3 1 1 114.36 17.44 0.200 398.89

portion-4 1 1 144.22 17.03 0.200 491.21

portion-5 1 1 218.42 17.32 0.200 756.61

portion-6 1 1 413.00 17.90 0.200 1478.54

portion-7 1 1 296.12 17.94 0.200 1062.48

portion-8 1 1 46.85 17.94 0.200 168.10

portion-9 1 1 438.36 17.94 0.200 1572.84

portion-10 1 1 73.00 7.55 0.200 110.23

Total 74127.14
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02A-Taxiways-Parallel Taxiways Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02A-3C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+757.27 to 0+898.88

Lane 1 1 141.61 28.79 0.100 407.70


RG-02 RD 0+898.88 to 0+1232.38
Lane 1 1 333.50 31.55 0.100 1052.19

RG-03 RD 0+1232.38 to 0+1620.5


Lane 1 1 388.21 49.62 0.100 1926.36

RG-04 RD 0+1620.50 to 0+1814.67


Lane 1 1 194.17 37.61 0.100 730.27

RG-05 RD 0+1814.67 to 0+2280.50


Lane 1 1 465.91 35.60 0.100 1658.66
RG-06 RD 0+2280.50 to 0+2501.40

Lane 1 1 220.90 25.00 0.100 552.25


RG-07 RD 0+2501.40 to 0+2970.17

Lane 1 1 468.77 33.49 0.100 1569.85


RG-08 RD 0+2970.17 to 0+3019.68
Lane 1 1 49.58 62.50 0.100 309.88

RG-09 RD 0+3019.68 to 0+3219.95


Lane 1 1 200.35 40.17 0.100 804.89

RG-10 RD 0+3219.95 to 0+3579.16


Lane 1 1 359.87 25.00 0.100 899.68
RG-11 RD 0+3579.16 to 0+3615.91

Lane 1 1 36.75 24.18 0.100 88.86

Total 10000.58
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02A-Taxiways-Parallel Taxiways Sub-Title:- Bituminous Surface Course


ItemCode:- 02A-4C Description:- Bituminous Binder Course
a) 75mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+757.27 to 0+898.88


Lane 1 1 141.61 28.79 - 4076.95

RG-02 RD 0+898.88 to 0+1232.38


Lane 1 1 333.50 31.55 - 10521.93
RG-03 RD 0+1232.38 to 0+1620.5

Lane 1 1 388.21 49.62 - 19263.58


RG-04 RD 0+1620.50 to 0+1814.67

Lane 1 1 194.17 37.61 - 7302.73


RG-05 RD 0+1814.67 to 0+2280.50
Lane 1 1 465.91 35.60 - 16586.61

RG-06 RD 0+2280.50 to 0+2501.40


Lane 1 1 220.90 25.00 - 5522.50

RG-07 RD 0+2501.40 to 0+2970.17


Lane 1 1 468.77 33.49 - 15698.49
RG-08 RD 0+2970.17 to 0+3019.68

Lane 1 1 49.58 62.50 - 3098.75


RG-09 RD 0+3019.68 to 0+3219.95

Lane 1 1 200.35 40.17 - 8048.92


RG-10 RD 0+3219.95 to 0+3579.16
Lane 1 1 359.87 25.00 - 8996.75

RG-11 RD 0+3579.16 to 0+3615.91


Lane 1 1 36.75 24.18 - 888.62

Total 100005.83
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02A-Taxiways-Parallel Taxiways Sub-Title:- Bituminous Surface Course


ItemCode:- 02A-4C Description:- Bituminous Binder Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+3616


L/side shoulder portion-1 1 1 30.68 17.44 - 535.14

portion-2 1 1 44.04 17.69 - 779.07

portion-3 1 1 620.93 17.69 - 10984.25

portion-4 1 1 547.11 17.69 - 9678.38

portion-5 1 1 704.95 17.69 - 12470.57

portion-6 1 1 215.87 17.69 - 3818.74

portion-7 1 1 182.68 17.69 - 3231.61


R/side shoulder portion-1 1 1 79.50 17.69 - 1406.36

portion-2 1 1 850.94 17.69 - 15053.13

portion-3 1 1 114.36 17.19 - 1965.85

portion-4 1 1 144.22 16.78 - 2420.01

portion-5 1 1 218.42 17.07 - 3728.43

portion-6 1 1 413.00 17.65 - 7289.45

portion-7 1 1 296.12 17.69 - 5238.36

portion-8 1 1 47.51 17.69 - 840.48

portion-9 1 1 438.36 17.69 - 7754.59

portion-10 1 1 73.00 7.30 - 532.90

Total 87727.30
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02A-Taxiways-Parallel Taxiways Sub-Title:- Bituminous Surface Course


ItemCode:- 02A-5C Description:- Bituminous Wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+757.27 to 0+898.88


Lane 1 1 141.61 28.79 - 4076.95

RG-02 RD 0+898.88 to 0+1232.38


Lane 1 1 333.50 31.55 - 10521.93
RG-03 RD 0+1232.38 to 0+1620.5

Lane 1 1 388.21 49.62 - 19263.58


RG-04 RD 0+1620.50 to 0+1814.67

Lane 1 1 194.17 37.61 - 7302.73


RG-05 RD 0+1814.67 to 0+2280.50
Lane 1 1 465.91 35.60 - 16586.61

RG-06 RD 0+2280.50 to 0+2501.40


Lane 1 1 220.90 25.00 - 5522.50

RG-07 RD 0+2501.40 to 0+2970.17


Lane 1 1 468.77 33.49 - 15698.49
RG-08 RD 0+2970.17 to 0+3019.68

Lane 1 1 49.58 62.50 - 3098.75


RG-09 RD 0+3019.68 to 0+3219.95

Lane 1 1 200.35 40.17 - 8048.92


RG-10 RD 0+3219.95 to 0+3579.16
Lane 1 1 359.87 25.00 - 8996.75

RG-11 RD 0+3579.16 to 0+3615.91


Lane 1 1 36.75 24.18 - 888.62

Total 100005.83
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02A-Taxiways-Parallel Taxiways Sub-Title:- Bituminous Surface Course


ItemCode:- 02A-4C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+3616


L/side shoulder portion-1 1 1 30.68 17.25 - 529.31

portion-2 1 1 44.04 17.50 - 770.70

portion-3 1 1 620.93 17.50 - 10866.28

portion-4 1 1 547.11 17.50 - 9574.43

portion-5 1 1 704.95 17.50 - 12336.63

portion-6 1 1 215.87 17.50 - 3777.73

portion-7 1 1 182.68 17.50 - 3196.90


R/side shoulder portion-1 1 1 79.50 17.50 - 1391.25

portion-2 1 1 850.94 17.50 - 14891.45

portion-3 1 1 114.36 17.00 - 1944.17

portion-4 1 1 144.22 16.59 - 2392.00

portion-5 1 1 218.42 16.88 - 3686.00

portion-6 1 1 413.00 17.46 - 7213.00

portion-7 1 1 296.12 17.50 - 5182.10

portion-8 1 1 48.03 17.50 - 840.48

portion-9 1 1 438.36 17.50 - 7671.30

portion-10 1 1 73.00 7.11 - 519.00

Total 86782.71
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Link no 01
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02B-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+040.00 to 0+068.21 0040.00

Lane 1 1 28.21 48.97 0.600 828.86 Area

RG-02 RD 0+068.21 to 0+114.99 0068.21

Lane 1 1 46.78 34.18 0.600 959.22 Avg W

RG-03 RD 0+114.99 to 0+161.8 0114.99

Lane 1 1 46.81 34.18 0.600 959.84 Avg W

RG-04 RD 0+161.80 to 0+0197.48 0161.80

Lane 1 1 35.68 51.84 0.600 1109.74 Area

RG-01 RD 0+226.00 to 0+254.50 0226.00

Lane 1 1 28.50 66.12 0.600 1130.72 Area

RG-02 RD 0+0254.5 to 0+293.5 00254.5

Lane 1 1 39.00 35.26 0.600 824.97 Avg W

Total 5813.35
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+040.00 to 0+068.21 0040.00

Lane 1 1 28.21 47.07 0.550 730.27 Area

RG-02 RD 0+068.21 to 0+114.99 0068.21

Lane 1 1 46.78 33.88 0.550 871.57 Avg W

RG-03 RD 0+114.99 to 0+161.8 0114.99

Lane 1 1 46.81 33.88 0.550 872.13 Avg W

RG-01 RD 0+040.00 to 0+068.21 0040.00

Lane 1 1 157.48 11.23 0.550 972.38 Area

L/side shoulder 1 1 157.50 17.75 0.200 559.13 Area

R/side shoulder 1 1 190.19 15.31 0.200 582.30 Area

RG-01 RD 0+226.00 to 0+254.50 0226.00

Lane 1 1 28.50 63.66 0.550 997.94 Area

RG-02 RD 0+0254.5 to 0+293.5 00254.5

Lane 1 1 39.00 34.96 0.550 749.78 Avg W

L/side shoulder 1 1 67.43 17.75 0.200 239.38


R/side shoulder 1 1 99.85 12.04 0.200 240.39 Area

226

39

28.5

Total 6815.27
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+040.00 to 0+068.21 0040.00

Lane 1 1 28.21 45.94 0.100 129.59 Area

RG-02 RD 0+068.21 to 0+114.99 0068.21

Lane 1 1 46.78 33.03 0.100 154.49 Avg W

RG-03 RD 0+114.99 to 0+161.8 0114.99

Lane 1 1 46.81 33.03 0.100 154.59 Avg W

RG-04 RD 0+161.80 to 0+0197.48 0161.80

Lane 1 1 35.68 36.32 0.100 129.59 Area

RG-01 RD 0+226.00 to 0+254.50 0226.00

Lane 1 1 28.50 62.20 0.100 177.28 Area

RG-02 RD 0+0254.5 to 0+293.5 00254.5

Lane 1 1 39.00 34.11 0.100 133.01 Avg W

Total 878.55
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 75mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+040.00 to 0+068.21 0040.00

Lane 1 1 28.21 45.94 - 1295.91 Area

RG-02 RD 0+068.21 to 0+114.99 0068.21

Lane 1 1 46.78 33.03 - 1544.91 Avg W

RG-03 RD 0+114.99 to 0+161.8 0114.99

Lane 1 1 46.81 33.03 - 1545.90 Avg W

RG-04 RD 0+161.80 to 0+0197.48 0161.80

Lane 1 1 35.68 36.32 - 1295.91 Area

RG-01 RD 0+226.00 to 0+254.50 0226.00

Lane 1 1 28.50 62.20 - 1772.80 Area

RG-02 RD 0+0254.5 to 0+293.5 00254.5

Lane 1 1 39.00 34.11 - 1330.10 Avg W

Total 8785.52
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+040.00 to 0+0197.50 0040.00

L/side shoulder 1 1 157.50 17.65 - 2779.88 Area

R/side shoulder 1 1 190.19 15.15 - 2881.94 Area

RG-01 RD 0+226.00 to 0+293.5 0226.00

L/side shoulder 1 1 67.50 17.65 - 1191.38 Area

R/side shoulder 1 1 99.85 11.83 - 1181.45 Area

Total 8034.64
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-5C Description:- Bituminous Wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks Rang

RG-01 RD 0+040.00 to 0+068.21 0040.00

Lane 1 1 28.21 45.94 - 1295.91 Area

RG-02 RD 0+068.21 to 0+114.99 0068.21

Lane 1 1 46.78 33.03 - 1544.91 Avg W

RG-03 RD 0+114.99 to 0+161.8 0114.99

Lane 1 1 46.81 33.03 - 1545.90 Avg W

RG-04 RD 0+161.80 to 0+0197.48 0161.80

Lane 1 1 35.68 36.32 - 1295.91 Area

RG-01 RD 0+226.00 to 0+254.50 0226.00

Lane 1 1 28.50 62.20 - 1772.80 Area

RG-02 RD 0+0254.5 to 0+293.5 00254.5

Lane 1 1 39.00 34.11 - 1330.10 Avg W

Total 8785.52
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+040.00 to 0+0197.50 0040.00

L/side shoulder 1 1 157.50 17.50 - 2756.25 Area

R/side shoulder 1 1 190.19 15.02 - 2856.64 Area

RG-01 RD 0+226.00 to 0+293.5 0226.00

L/side shoulder 1 1 67.50 17.50 - 1181.25 Area

R/side shoulder 1 1 99.85 11.54 - 1152.02 Area

Total 7946.16
0068.21 28.21

1381.43 48.97

0114.99 46.78

38.95 29.4 34.175

161.8 46.81
38.95 29.4 34.175

197.48 35.68
1849.57 51.84

254.5 28.5
1884.54 66.12

293.5 39

38.15 32.36 35.255


0068.21 28.21

1327.764 47.07

0114.99 46.78

38.65 29.1 33.875

161.8 46.81
38.65 29.1 33.875

197.48 157.48
1767.96 11.23

1295.91 8.23

2911.52 15.31

254.5 28.5

1814.43 63.66

293.5 39

37.85 32.06 34.955

1201.97 12.04

8.845

0.15
0068.21 28.21

1295.91 45.94

0114.99 46.78

37.8 28.25 33.025

161.8 46.81
37.8 28.25 33.025

197.48 35.68
1295.91 36.32

254.5 28.5
1772.8 62.20

293.5 39

37 31.21 34.105
0068.21 28.21
1295.91 45.94

0114.99 46.78
37.8 28.25 33.025

161.8 46.81

37.8 28.25 33.025

197.48 35.68

1295.91 36.32

254.5 28.5
1772.8 62.20

293.5 39
37 31.21 34.105
0197.50 157.5
1295.91 8.23

2881.94 15.15

293.5 67.5
1295.91 19.20

1181.45 11.83
Range Rd L Avg W

0068.21 28.21
1295.91 45.94

0114.99 46.78
37.8 28.25 33.025

161.8 46.81

37.8 28.25 33.025

197.48 35.68

1295.91 36.32

254.5 28.5
1772.8 62.20

293.5 39
37 31.21 34.105
0197.50 157.5
1295.91 8.23

2856.64 15.02

293.5 67.5
1295.91 19.20

1152.02 11.54

28.5 8.75
39
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Link No 02
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02B-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+021.00
Lane 1 1 21.00 165.89 0.550 1915.98
RG-02 RD 0+021.00 to 0+099.41
Lane 1 1 54.35 40.12 0.550 1199.29
RG-03 RD 0+099.41 to 0+154.76
Lane 1 1 55.35 27.30 0.550 831.08
RG-04 RD 0+154.76 to 0+233.19
Lane 1 1 78.43 33.65 0.550 1451.54
RG-05 RD 0+233.19 to 0+263.33
Lane 1 1 30.14 114.76 0.550 1902.30
RG-01 RD 0+026.00 to 0+051.21
Lane 1 1 25.21 67.69 0.600 1023.80
RG-02 RD 0+051.21 to 0+108.51
Lane 1 1 57.30 41.92 0.600 1441.35
RG-03 RD 0+108.51 to 0+167.51
Lane 1 1 59.00 42.20 0.600 1493.88
RG-04 RD 0+167.51 to 0+201
Lane 1 1 33.50 112.11 0.600 2253.49
RG-01 RD 0+0.000 to 0+014.77
Lane 1 1 14.77 60.36 0.600 534.94
RG-02 RD 0+0.14.77 to 0+073.82
Lane 1 1 59.05 43.37 0.600 1536.60
RG-03 RD 0+073.82 to 0+132.92
Lane 1 1 59.10 38.63 0.600 1369.64
RG-04 RD 0+0.132.92 to 0+154.30
Lane 1 1 21.37 50.64 0.600 649.31
RG-01 RD 0+204.00 to 0+224.73
Lane 1 1 20.73 49.78 0.600 619.19
RG-02 RD 0+0.224.73 to 0+283.78
Lane 1 1 59.05 38.63 0.600 1368.48
RG-03 RD 0+283.78 to 0+338.13
Lane 1 1 54.35 43.41 0.600 1415.60
RG-04 RD 0+0.338.13 to 0+358.77
Lane 1 1 20.64 66.71 0.600 826.09

Total 21832.54
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 01
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+021.00

Lane 1 1 21.00 165.89 0.550 1915.98


RG-02 RD 0+021.00 to 0+099.41
Lane 1 1 54.35 38.67 0.550 1155.94

RG-03 RD 0+099.41 to 0+154.76


Lane 1 1 55.35 25.85 0.550 786.94

RG-04 RD 0+154.76 to 0+233.19


Lane 1 1 78.43 32.20 0.550 1389.00
RG-05 RD 0+233.19 to 0+263.33
Lane 1 1 30.14 114.76 0.550 1902.30
RG-01 RD 0+037.50to 0+201
L/side shoulder portion-1 1 1 30.51 12.94 0.200 78.97
portion-2 1 1 232.83 17.50 0.200 814.91
R/side shoulder
portion-1 1 1 30.99 12.94 0.200 80.20
portion-2 1 1 211.43 17.50 0.200 739.99
portion-3 1 1 31.03 12.94 0.200 80.31
RG-01 RD 0+026.00 to 0+051.21
Lane 1 1 25.21 65.62 0.550 909.85
RG-02 RD 0+051.21 to 0+108.51
Lane 1 1 57.30 41.62 0.550 1311.78
RG-03 RD 0+108.51 to 0+167.51
Lane 1 1 59.00 41.90 0.550 1359.66
RG-04 RD 0+167.51 to 0+201
Lane 1 1 33.50 106.57 0.550 1963.53
RG-01 RD 0+026.00 to 0+201

L/side shoulder 1 1 312.34 16.58 0.200 1035.92


R/side shoulder 1 1 306.73 16.76 0.200 1028.31
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 02
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+0.000 to 0+014.77

Lane 1 1 14.77 58.72 0.550 477.01


RG-02 RD 0+0.14.77 to 0+073.82
Lane 1 1 59.05 41.92 0.550 1361.46

RG-03 RD 0+073.82 to 0+132.92


Lane 1 1 59.10 37.18 0.550 1208.37

RG-04 RD 0+0.132.92 to 0+154.30


Lane 1 1 21.37 48.59 0.550 571.12

L/side shoulder portion-1 1 1 9.55 10.79 0.200 20.61


portion-2 1 1 117.43 10.79 0.200 253.41
portion-3 1 1 28.84 10.79 0.200 62.24

R/side shoulder 1 1 148.24 10.79 0.200 319.90


RG-01 RD 0+204.00 to 0+224.73

Lane 1 1 20.73 48.04 0.550 547.76


RG-02 RD 0+0.224.73 to 0+283.78
Lane 1 1 59.05 37.18 0.550 1207.35

RG-03 RD 0+283.78 to 0+338.13


Lane 1 1 54.35 41.96 0.550 1254.29

RG-04 RD 0+0.338.13 to 0+358.77


Lane 1 1 20.64 64.34 0.550 730.41
L/side shoulder 1 1 163.75 10.94 0.200 358.29

R/side shoulder 1 1 157.44 10.94 0.200 344.48

Total 25270.27
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+021.00
Lane 1 1 21.00 62.77 0.100 131.81
RG-02 RD 0+021.00 to 0+099.41
Lane 1 1 54.35 37.82 0.100 205.55
RG-03 RD 0+099.41 to 0+154.76
Lane 1 1 55.35 25.00 0.100 138.38
RG-04 RD 0+154.76 to 0+233.19
Lane 1 1 78.43 31.35 0.100 245.88
RG-05 RD 0+233.19 to 0+263.33
Lane 1 1 30.14 30.49 0.100 91.89
RG-01 RD 0+026.00 to 0+051.21
Lane 1 1 25.21 64.54 0.100 162.71
RG-02 RD 0+051.21 to 0+108.51
Lane 1 1 57.30 40.77 0.100 233.64
RG-03 RD 0+108.51 to 0+167.51
Lane 1 1 59.00 41.05 0.100 242.20
RG-04 RD 0+167.51 to 0+201
Lane 1 1 33.50 103.77 0.100 347.62
RG-01 RD 0+0.000 to 0+014.77
Lane 1 1 14.77 57.76 0.100 85.31
RG-02 RD 0+0.14.77 to 0+073.82
Lane 1 1 59.05 41.07 0.100 242.52
RG-03 RD 0+073.82 to 0+132.92
Lane 1 1 59.10 36.33 0.100 214.68
RG-04 RD 0+0.132.92 to 0+154.30
Lane 1 1 21.37 47.45 0.100 101.39
RG-01 RD 0+204.00 to 0+224.73
Lane 1 1 20.73 46.96 0.100 97.35
RG-02 RD 0+0.224.73 to 0+283.78
Lane 1 1 59.05 36.33 0.100 214.50
RG-03 RD 0+283.78 to 0+338.13
Lane 1 1 54.35 41.11 0.100 223.43
RG-04 RD 0+0.338.13 to 0+358.77
Lane 1 1 20.64 62.92 0.100 129.87

Total 3108.71
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 75mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+021.00
Lane 1 1 21.00 62.77 - 1318.11
RG-02 RD 0+021.00 to 0+099.41
Lane 1 1 54.35 37.82 - 2055.52
RG-03 RD 0+099.41 to 0+154.76
Lane 1 1 55.35 25.00 - 1383.75
RG-04 RD 0+154.76 to 0+233.19
Lane 1 1 78.43 31.35 - 2458.78
RG-05 RD 0+233.19 to 0+263.33
Lane 1 1 30.14 30.49 - 918.86
RG-01 RD 0+026.00 to 0+051.21
Lane 1 1 25.21 64.54 - 1627.14
RG-02 RD 0+051.21 to 0+108.51
Lane 1 1 57.30 40.77 - 2336.35
RG-03 RD 0+108.51 to 0+167.51
Lane 1 1 59.00 41.05 - 2421.95
RG-04 RD 0+167.51 to 0+201
Lane 1 1 33.50 103.77 - 3476.16
RG-01 RD 0+0.000 to 0+014.77
Lane 1 1 14.77 57.76 - 853.09
RG-02 RD 0+0.14.77 to 0+073.82
Lane 1 1 59.05 41.07 - 2425.18
RG-03 RD 0+073.82 to 0+132.92
Lane 1 1 59.10 36.33 - 2146.81
RG-03 RD 0+0.132.92 to 0+154.30
Lane 1 1 21.37 47.45 - 1013.90
RG-01 RD 0+204.00 to 0+224.73
Lane 1 1 20.73 46.96 - 973.52
RG-02 RD 0+0.224.73 to 0+283.78
Lane 1 1 59.05 36.33 - 2144.99
RG-03 RD 0+283.78 to 0+338.13
Lane 1 1 54.35 41.11 - 2234.33
RG-04 RD 0+0.338.13 to 0+358.77
Lane 1 1 20.64 62.92 - 1298.69
Total 31087.13
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201

L/side shoulder portion-1 1 1 31.16 12.67 - 394.85


portion-2 1 1 232.83 17.50 - 4074.54
R/side shoulder

portion-1 1 1 31.65 12.67 - 401.02


portion-2 1 1 211.43 17.50 - 3699.96

portion-3 1 1 31.69 12.67 - 401.56


RG-01 RD 0+026.00 to 0+201
L/side shoulder 1 1 312.34 16.48 - 5148.34

R/side shoulder 1 1 306.73 16.66 - 5110.88


RG-01 RD 0+000 to 0+154.30

L/side shoulder portion-1 1 1 9.55 10.69 - 102.09


portion-2 1 1 117.43 10.69 - 1255.33
portion-3 1 1 28.84 10.69 - 308.30

R/side shoulder 1 1 148.24 10.69 - 1584.69

RG-01 RD 0+204.00 to 0+358.77


L/side shoulder 1 1 163.75 10.69 - 1750.49
R/side shoulder 1 1 157.44 10.69 - 1683.03

Total 25915.06
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-5C Description:- Bituminous Wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+021.00
Lane 1 1 21.00 62.77 - 1318.11
RG-02 RD 0+021.00 to 0+099.41
Lane 1 1 54.35 37.82 - 2055.52
RG-03 RD 0+099.41 to 0+154.76
Lane 1 1 55.35 25.00 - 1383.75
RG-04 RD 0+154.76 to 0+233.19
Lane 1 1 78.43 31.35 - 2458.78
RG-05 RD 0+233.19 to 0+263.33
Lane 1 1 30.14 30.49 - 918.86
RG-01 RD 0+026.00 to 0+051.21
Lane 1 1 25.21 64.54 - 1627.14
RG-02 RD 0+051.21 to 0+108.51
Lane 1 1 57.30 40.77 - 2336.35
RG-03 RD 0+108.51 to 0+167.51
Lane 1 1 59.00 41.05 - 2421.95
RG-04 RD 0+167.51 to 0+201
Lane 1 1 33.50 103.77 - 3476.16
RG-01 RD 0+0.000 to 0+014.77
Lane 1 1 14.77 57.76 - 853.09
RG-02 RD 0+0.14.77 to 0+073.82
Lane 1 1 59.05 41.07 - 2425.18
RG-03 RD 0+073.82 to 0+132.92
Lane 1 1 59.10 36.33 - 2146.81
RG-03 RD 0+0.132.92 to 0+154.30
Lane 1 1 21.37 47.45 - 1013.90
RG-01 RD 0+204.00 to 0+224.73
Lane 1 1 20.73 46.96 - 973.52
RG-02 RD 0+0.224.73 to 0+283.78
Lane 1 1 59.05 36.33 - 2144.99
RG-03 RD 0+283.78 to 0+338.13
Lane 1 1 54.35 41.11 - 2234.33
RG-04 RD 0+0.338.13 to 0+358.77
Lane 1 1 20.64 62.92 - 1298.69

Total 31087.13
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 31.59 12.50 - 394.85

portion-2 1 1 232.83 17.50 - 4074.54


R/side shoulder
portion-1 1 1 32.08 12.50 - 401.02

portion-2 1 1 211.43 17.50 - 3699.96


portion-3 1 1 32.12 12.50 - 401.56

RG-01 RD 0+026.00 to 0+201


L/side shoulder 1 1 312.34 16.33 - 5101.49
R/side shoulder 1 1 306.73 16.51 - 5064.87

RG-01 RD 0+000 to 0+154.30


L/side shoulder portion-1 1 1 9.55 10.50 - 100.25

portion-2 1 1 117.43 10.50 - 1233.02


portion-3 1 1 28.84 10.50 - 302.83
R/side shoulder 1 1 148.24 10.50 - 1556.52

RG-01 RD 0+204.00 to 0+358.77


L/side shoulder 1 1 163.75 10.50 - 1719.38

R/side shoulder 1 1 157.44 10.50 - 1653.12

Total 25703.39
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Link No 03
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base
Course And Cement Treated Base Course
ItemCode:- 02B-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+033.47 0000.00

Lane 1 1 33.47 111.74 0.600 2243.97 Area

RG-02 RD 0+033.47 to 0+167.14 0033.47

Lane 1 1 54.35 40.12 0.600 1308.15 Avg W

RG-03 RD 0+167.14 to 0+236.18 0167.14

Lane 1 1 69.04 40.10 0.600 1661.10 Avg W

RG-04 RD 0+236.18 to 0+269.95 0236.18

Lane 1 1 33.77 109.99 0.600 2228.56 Area

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 67.69 0.600 1023.80 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 41.92 0.600 1441.35 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 42.20 0.600 1493.88 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 112.11 0.600 2253.49 Area

RG-01 RD 0+037.50 to 0+058.14 0037.50

Lane 1 1 20.64 66.61 0.600 824.86 Area

RG-02 RD 0+058.14 to 0+112.49 0058.14

Lane 1 1 54.35 42.11 0.600 1373.21 Avg W

RG-03 RD 0+112.49 to 0+173.98 0112.49

Lane 1 1 61.49 42.45 0.600 1566.28 Avg W

RG-04 RD 0+173.98 to 0+194.98 0173.98

Lane 1 1 21.00 67.40 0.600 849.22 Area

Total 18267.85
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base
Course And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity
RG-01 RD 0+000.00 to 0+033.47 0000.00
Lane 1 1 33.47 106.93 0.550 1968.51 Area
RG-02 RD 0+033.47 to 0+167.14 0033.47
Lane 1 1 54.35 38.67 0.550 1155.79 Avg W
RG-03 RD 0+167.14 to 0+236.18 0167.14
Lane 1 1 69.04 38.65 0.550 1467.62 Avg W
RG-04 RD 0+236.18 to 0+269.95 0236.18
Lane 1 1 33.77 105.24 0.550 1954.66 Area
RG-01 RD 0+037.50to 0+201
L/side shoulder portion-1 1 1 135.37 12.94 0.200 350.33 area
portion-2 1 1 212.22 17.50 0.200 742.76
portion-3 1 1 118.96 12.94 0.200 307.88 area
R/side shoulder
portion-1 1 1 135.37 12.94 0.200 350.33 area
portion-2 1 1 212.22 17.50 0.200 742.76
portion-3 1 1 118.96 12.94 0.200 307.88 area
RG-01 RD 0+026.00 to 0+051.21 0026.00
Lane 1 1 25.21 65.62 0.550 909.85 Area
RG-02 RD 0+051.21 to 0+108.51 0051.21
Lane 1 1 57.30 41.62 0.550 1311.78 Avg W
RG-03 RD 0+108.51 to 0+167.51 0108.51
Lane 1 1 59.00 41.90 0.550 1359.66 Avg W
RG-04 RD 0+167.51 to 0+201 0167.51
Lane 1 1 33.50 106.57 0.550 1963.53 Area
RG-01 RD 0+026.00 to 0+201 0026.00
L/side shoulder 1 1 312.34 16.58 0.200 1035.92 Area
R/side shoulder 1 1 306.73 16.76 0.200 1028.31 Area
RG-01 RD 0+037.50 to 0+058.14 0037.50
Lane 1 1 20.64 64.32 0.550 730.14 Area
RG-02 RD 0+058.14 to 0+112.49 0058.14
Lane 1 1 54.35 41.96 0.550 1254.29 Avg W
RG-03 RD 0+112.49 to 0+173.98 0112.49
Lane 1 1 61.49 42.30 0.550 1430.68 Avg W
RG-04 RD 0+173.98 to 0+194.98 0173.98
Lane 1 1 21.00 64.88 0.550 749.36 Area
L/side shoulder portion-1 1 1 27.01 12.94 0.200 69.89 area
portion-2 1 1 120.40 17.50 0.200 421.40
portion-3 1 1 27.26 12.94 0.200 70.54 area
R/side shoulder portion-1 1 1 27.01 12.94 0.200 69.89 area
portion-2 1 1 120.40 17.50 0.200 421.40
portion-3 1 1 27.26 12.94 0.200 70.54 area

Total 22245.67
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base


Course And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+033.47 0000.00

Lane 1 1 33.47 104.08 0.100 348.36 Area

RG-02 RD 0+033.47 to 0+167.14 0033.47

Lane 1 1 54.35 37.82 0.100 205.52 Avg W

RG-03 RD 0+167.14 to 0+236.18 0167.14

Lane 1 1 69.04 37.80 0.100 260.97 Avg W

RG-04 RD 0+236.18 to 0+269.95 0236.18

Lane 1 1 33.77 102.42 0.100 345.87 Area

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 64.54 0.100 162.71 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 40.77 0.100 233.64 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 41.05 0.100 242.20 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 103.77 0.100 347.62 Area

RG-01 RD 0+037.50 to 0+058.14 0037.50

Lane 1 1 20.64 62.92 0.100 129.86 Area

RG-02 RD 0+058.14 to 0+112.49 0058.14

Lane 1 1 54.35 41.11 0.100 223.43 Avg W

RG-03 RD 0+112.49 to 0+173.98 0112.49

Lane 1 1 61.49 41.45 0.100 254.90 Avg W

RG-04 RD 0+173.98 to 0+194.98 0173.98

Lane 1 1 21.00 63.51 0.100 133.36 Area

Total 2888.44
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 75mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity

RG-01 RD 0+000.00 to 0+033.47 0000.00

Lane 1 1 33.47 104.08 - 3483.59 Area

RG-02 RD 0+033.47 to 0+167.14 0033.47

Lane 1 1 54.35 37.82 - 2055.25 Avg W

RG-03 RD 0+167.14 to 0+236.18 0167.14

Lane 1 1 69.04 37.80 - 2609.71 Avg W

RG-04 RD 0+236.18 to 0+269.95 0236.18

Lane 1 1 33.77 102.42 - 3458.72 Area

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 64.54 - 1627.14 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 40.77 - 2336.35 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 41.05 - 2421.95 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 103.77 - 3476.16 Area

RG-01 RD 0+037.50 to 0+058.14 0037.50

Lane 1 1 20.64 62.92 - 1298.63 Area

RG-02 RD 0+058.14 to 0+112.49 0058.14

Lane 1 1 54.35 41.11 - 2234.33 Avg W

RG-03 RD 0+112.49 to 0+173.98 0112.49

Lane 1 1 61.49 41.45 - 2548.96 Avg W

RG-04 RD 0+173.98 to 0+194.98 0173.98

Lane 1 1 21.00 63.51 - 1333.64 Area

Total 28884.43
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity

RG-01 RD 0+037.50to 0+201

L/side shoulder portion-1 1 1 138.25 12.67 - 1751.63 area

portion-2 1 1 212.22 17.50 - 3713.80

portion-3 1 1 121.50 12.67 - 1539.39 area

R/side shoulder

portion-1 1 1 138.25 12.67 - 1751.63 area

portion-2 1 1 212.22 17.50 - 3713.80

portion-3 1 1 121.50 12.67 - 1539.39 area

RG-01 RD 0+026.00 to 0+201 0026.00

L/side shoulder 1 1 312.34 16.48 - 5148.34 Area

R/side shoulder 1 1 306.73 16.66 - 5110.88 Area

RG-01 RD 0+037.50to 0+201

L/side shoulder portion-1 1 1 27.58 12.67 - 349.46 area

portion-2 1 1 120.40 17.50 - 2107.00

portion-3 1 1 27.84 12.67 - 352.69 area

R/side shoulder portion-1 1 1 27.58 12.67 - 349.46 area

portion-2 1 1 120.40 17.50 - 2107.00

portion-3 1 1 27.84 12.67 - 352.69 area

Total 29887.16
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-5C Description:- Bituminous Wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+033.47 0000.00

Lane 1 1 33.47 104.08 - 3483.59 Area

RG-02 RD 0+033.47 to 0+167.14 0033.47

Lane 1 1 54.35 37.82 - 2055.25 Avg W

RG-03 RD 0+167.14 to 0+236.18 0167.14

Lane 1 1 69.04 37.80 - 2609.71 Avg W

RG-04 RD 0+236.18 to 0+269.95 0236.18

Lane 1 1 33.77 102.42 - 3458.72 Area

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 64.54 - 1627.14 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 40.77 - 2336.35 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 41.05 - 2421.95 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 103.77 - 3476.16 Area

RG-01 RD 0+037.50 to 0+058.14 0037.50

Lane 1 1 20.64 62.92 - 1298.63 Area

RG-02 RD 0+058.14 to 0+112.49 0058.14

Lane 1 1 54.35 41.11 - 2234.33 Avg W

RG-03 RD 0+112.49 to 0+173.98 0112.49

Lane 1 1 61.49 41.45 - 2548.96 Avg W

RG-04 RD 0+173.98 to 0+194.98 0173.98

Lane 1 1 21.00 63.51 - 1333.64 Area

Total 28884.43
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity

RG-01 RD 0+037.50to 0+201

L/side shoulder portion-1 1 1 140.13 12.50 - 1751.63 area

portion-2 1 1 212.22 17.50 - 3713.80

portion-3 1 1 123.15 12.50 - 1539.39 area

R/side shoulder

portion-1 1 1 140.13 12.50 - 1751.63 area

portion-2 1 1 212.22 17.50 - 3713.80

portion-3 1 1 123.15 12.50 - 1539.39 area

RG-01 RD 0+026.00 to 0+201 0026.00

L/side shoulder 1 1 312.34 16.33 - 5101.49 Area

R/side shoulder 1 1 306.73 16.51 - 5064.87 Area

RG-01 RD 0+037.50to 0+201

L/side shoulder portion-1 1 1 27.96 12.50 - 349.46 area

portion-2 1 1 120.40 17.50 - 2107.00

portion-3 1 1 28.22 12.50 - 352.69 area

R/side shoulder portion-1 1 1 27.96 12.50 - 349.46 area

portion-2 1 1 120.40 17.50 - 2107.00

portion-3 1 1 28.22 12.50 - 352.69 area

Total 29794.30
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Link no 04
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50 to 0+058.14 0037.50

Lane 1 1 20.64 66.61 0.600 824.86 Area

RG-02 RD 0+058.14 to 0+112.49 0058.14

Lane 1 1 54.35 42.11 0.600 1373.21 Avg W

RG-03 RD 0+112.49 to 0+173.98 0112.49

Lane 1 1 61.49 42.45 0.600 1566.28 Avg W

RG-04 RD 0+173.98 to 0+194.98 0173.98

Lane 1 1 21.00 67.40 0.600 849.22 Area

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 67.69 0.600 1023.80 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 41.92 0.600 1441.35 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 42.20 0.600 1493.88 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 112.11 0.600 2253.49 Area

###

Total 10826.07
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50 to 0+058.14 0037.50

Lane 1 1 20.64 64.32 0.550 730.14 Area

RG-02 RD 0+058.14 to 0+112.49 0058.14

Lane 1 1 54.35 41.96 0.550 1254.29 Avg W

RG-03 RD 0+112.49 to 0+173.98 0112.49

Lane 1 1 61.49 42.30 0.550 1430.68 Avg W

RG-04 RD 0+173.98 to 0+194.98 0173.98

Lane 1 1 21.00 64.88 0.550 749.36 Area

L/side shoulder portion-1 1 1 27.01 12.94 0.200 69.89 area

portion-2 1 1 120.40 17.50 0.200 421.40


portion-1 1 1 27.26 12.94 0.200 70.54 area

R/side shoulder portion-1 1 1 27.01 12.94 0.200 69.89 area

portion-2 1 1 120.40 17.50 0.200 421.40

portion-1 1 1 27.26 12.94 0.200 70.54 area

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 65.62 0.550 909.85 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 41.62 0.550 1311.78 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 41.90 0.550 1359.66 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 106.57 0.550 1963.53 Area

RG-01 RD 0+026.00 to 0+201 0026.00

L/side shoulder 1 1 312.34 16.58 0.200 1035.92 Area

R/side shoulder 1 1 306.73 16.76 0.200 1028.31 Area

Total 12897.17
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50 to 0+058.14 0037.50

Lane 1 1 20.64 62.92 0.100 129.86 Area

RG-02 RD 0+058.14 to 0+112.49 0058.14

Lane 1 1 54.35 41.11 0.100 223.43 Avg W

RG-03 RD 0+112.49 to 0+173.98 0112.49

Lane 1 1 61.49 41.45 0.100 254.90 Avg W

RG-04 RD 0+173.98 to 0+194.98 0173.98

Lane 1 1 21.00 63.51 0.100 133.36 Area

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 64.54 0.100 162.71 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 40.77 0.100 233.64 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 41.05 0.100 242.20 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 103.77 0.100 347.62 Area

Total 1727.72
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 75mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50 to 0+058.14 0037.50

Lane 1 1 20.64 62.92 - 1298.63 Area

RG-02 RD 0+058.14 to 0+112.49 0058.14

Lane 1 1 54.35 41.11 - 2234.33 Avg W

RG-03 RD 0+112.49 to 0+173.98 0112.49

Lane 1 1 61.49 41.45 - 2548.96 Avg W

RG-04 RD 0+173.98 to 0+194.98 0173.98

Lane 1 1 21.00 63.51 - 1333.64 Area

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 64.54 - 1627.14 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 40.77 - 2336.35 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 41.05 - 2421.95 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 103.77 - 3476.16 Area

Total 17277.16
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 27.58 12.67 - 349.46 area

portion-2 1 1 120.40 17.50 - 2107.00


portion-1 1 1 27.84 12.67 - 352.69 area

R/side shoulder portion-1 1 1 27.58 12.67 - 349.46 area

portion-2 1 1 120.40 17.50 - 2107.00


portion-1 1 1 27.84 12.67 - 352.69 area

RG-01 RD 0+026.00 to 0+201 0026.00

L/side shoulder 1 1 312.34 16.48 - 5148.34 Area

R/side shoulder 1 1 306.73 16.66 - 5110.88 Area

Total 15877.52
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-5C Description:- Bituminous Wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50 to 0+058.14 0037.50

Lane 1 1 20.64 62.92 - 1298.63 Area

RG-02 RD 0+058.14 to 0+112.49 0058.14

Lane 1 1 54.35 41.11 - 2234.33 Avg W

RG-03 RD 0+112.49 to 0+173.98 0112.49

Lane 1 1 61.49 41.45 - 2548.96 Avg W

RG-04 RD 0+173.98 to 0+194.98 0173.98

Lane 1 1 21.00 63.51 - 1333.64 Area

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 64.54 - 1627.14 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 40.77 - 2336.35 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 41.05 - 2421.95 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 103.77 - 3476.16 Area

Total 17277.16
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 27.96 12.50 - 349.46 area

portion-2 1 1 120.40 17.50 - 2107.00


portion-1 1 1 28.22 12.50 - 352.69 area

R/side shoulder portion-1 1 1 27.96 12.50 - 349.46 area

portion-2 1 1 120.40 17.50 - 2107.00


portion-1 1 1 28.22 12.50 - 352.69 area

RG-01 RD 0+026.00 to 0+201 0026.00

L/side shoulder 1 1 312.34 16.33 - 5101.49 Area

R/side shoulder 1 1 306.73 16.51 - 5064.87 Area

Total 15784.66
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Link No 05
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50 to 0+058.14 0037.50

Lane 1 1 20.64 66.61 0.600 824.86 Area

RG-02 RD 0+058.14 to 0+112.49 0058.14

Lane 1 1 54.35 42.11 0.600 1373.21 Avg W

RG-03 RD 0+112.49 to 0+173.98 0112.49

Lane 1 1 61.49 42.45 0.600 1566.28 Avg W

RG-04 RD 0+173.98 to 0+194.98 0173.98

Lane 1 1 21.00 67.40 0.600 849.22 Area

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 67.69 0.600 1023.80 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 41.92 0.600 1441.35 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 42.20 0.600 1493.88 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 112.11 0.600 2253.49 Area

###

Total 10826.07
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50 to 0+058.14 0037.50

Lane 1 1 20.64 64.32 0.550 730.14 Area

RG-02 RD 0+058.14 to 0+112.49 0058.14

Lane 1 1 54.35 41.96 0.550 1254.29 Avg W

RG-03 RD 0+112.49 to 0+173.98 0112.49

Lane 1 1 61.49 42.30 0.550 1430.68 Avg W

RG-03 RD 0+173.98 to 0+194.98 0173.98

Lane 1 1 21.00 64.88 0.550 749.36 Area

L/side shoulder portion-1 1 1 27.01 12.94 0.200 69.89 area

portion-2 1 1 120.40 17.50 0.200 421.40


portion-3 1 1 27.26 12.94 0.200 70.54 area

R/side shoulder portion-1 1 1 27.01 12.94 0.200 69.89 area

portion-2 1 1 120.40 17.50 0.200 421.40

portion-3 1 1 27.26 12.94 0.200 70.54 area

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 65.62 0.550 909.85 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 41.62 0.550 1311.78 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 41.90 0.550 1359.66 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 106.57 0.550 1963.53 Area

RG-01 RD 0+026.00 to 0+201 0026.00

L/side shoulder 1 1 312.34 16.58 0.200 1035.92 Area

R/side shoulder 1 1 306.73 16.76 0.200 1028.31 Area

Total 12897.17
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50 to 0+058.14 0037.50

Lane 1 1 20.64 62.92 0.100 129.86 Area

RG-02 RD 0+058.14 to 0+112.49 0058.14

Lane 1 1 54.35 41.11 0.100 223.43 Avg W

RG-03 RD 0+112.49 to 0+173.98 0112.49

Lane 1 1 61.49 41.45 0.100 254.90 Avg W

RG-04 RD 0+173.98 to 0+194.98 0173.98

Lane 1 1 21.00 63.51 0.100 133.36 Area

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 64.54 0.100 162.71 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 40.77 0.100 233.64 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 41.05 0.100 242.20 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 103.77 0.100 347.62 Area

Total 1727.72
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 75mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50 to 0+058.14 0037.50

Lane 1 1 20.64 62.92 - 1298.63 Area

RG-02 RD 0+058.14 to 0+112.49 0058.14

Lane 1 1 54.35 41.11 - 2234.33 Avg W

RG-03 RD 0+112.49 to 0+173.98 0112.49

Lane 1 1 61.49 41.45 - 2548.96 Avg W

RG-04 RD 0+173.98 to 0+194.98 0173.98

Lane 1 1 21.00 63.51 - 1333.64 Area

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 64.54 - 1627.14 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 40.77 - 2336.35 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 41.05 - 2421.95 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 103.77 - 3476.16 Area

Total 17277.16
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 27.58 12.67 - 349.46 area

portion-2 1 1 120.40 17.50 - 2107.00


portion-1 1 1 27.84 12.67 - 352.69 area

R/side shoulder portion-1 1 1 27.58 12.67 - 349.46 area

portion-2 1 1 120.40 17.50 - 2107.00


portion-1 1 1 27.84 12.67 - 352.69 area

RG-01 RD 0+026.00 to 0+201 0026.00

L/side shoulder 1 1 312.34 16.48 - 5148.34 Area

R/side shoulder 1 1 306.73 16.66 - 5110.88 Area

Total 15877.52
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-5C Description:- Bituminous Wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50 to 0+058.14 0037.50

Lane 1 1 20.64 62.92 - 1298.63 Area

RG-02 RD 0+058.14 to 0+112.49 0058.14

Lane 1 1 54.35 41.11 - 2234.33 Avg W

RG-03 RD 0+112.49 to 0+173.98 0112.49

Lane 1 1 61.49 41.45 - 2548.96 Avg W

RG-04 RD 0+173.98 to 0+194.98 0173.98

Lane 1 1 21.00 63.51 - 1333.64 Area

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 64.54 - 1627.14 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 40.77 - 2336.35 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 41.05 - 2421.95 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 103.77 - 3476.16 Area

Total 17277.16
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 27.96 12.50 - 349.46 area

portion-2 1 1 120.40 17.50 - 2107.00


portion-3 1 1 28.22 12.50 - 352.69 area

R/side shoulder portion-1 1 1 27.96 12.50 - 349.46 area

portion-2 1 1 120.40 17.50 - 2107.00


portion-3 1 1 28.22 12.50 - 352.69 area

RG-01 RD 0+026.00 to 0+201 0026.00

L/side shoulder 1 1 312.34 16.33 - 5101.49 Area

R/side shoulder 1 1 306.73 16.51 - 5064.87 Area

Total 15784.66
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Link No 06
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate
Base Course And Cement Treated Base Course
ItemCode:- 02B-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+021.00

Lane 1 1 21.00 46.91 0.600 591.07

RG-02 RD 0+021.00 to 0+074.99

Lane 1 1 54.35 35.34 0.600 1152.27

RG-03 RD 0+074.99 to 0+130.34

Lane 1 1 55.35 35.34 0.600 1173.48

RG-04 RD 0+130.34 to 151.34

Lane 1 1 21.00 46.91 0.600 591.00

RG-01 RD 0+000.00 to 0+021.00

Lane 1 1 21.00 46.91 0.600 591.07

RG-02 RD 0+021.00 to 0+074.99

Lane 1 1 54.35 35.34 0.600 1152.27

RG-03 RD 0+074.99 to 0+130.34

Lane 1 1 55.35 35.34 0.600 1173.48

RG-04 RD 0+130.34 to 151.34

Lane 1 1 21.00 46.91 0.600 591.00

Total 7015.65
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 01
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate
Base Course And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+021.00

Lane 1 1 21.00 45.01 0.550 519.88

RG-02 RD 0+021.00 to 0+074.99

Lane 1 1 54.35 33.89 0.550 1012.91

RG-03 RD 0+074.99 to 0+130.34

Lane 1 1 55.35 33.89 0.550 1031.54

RG-04 RD 0+130.34 to 151.34

Lane 1 1 21.00 45.01 0.550 519.82

RG-01 RD 0+037.50to 0+201

L/side shoulder portion-1 1 1 30.93 12.94 0.200 80.06

portion-2 1 1 111.95 17.50 0.200 391.84

L/side shoulder portion-1 1 1 30.99 12.94 0.200 80.20

R/side shoulder

portion-1 1 1 142.50 17.50 0.200 498.75

RG-01 RD 0+000.00 to 0+021.00

Lane 1 1 21.00 45.01 0.550 519.88

RG-02 RD 0+021.00 to 0+074.99

Lane 1 1 54.35 33.89 0.550 1012.91

RG-03 RD 0+074.99 to 0+130.34

Lane 1 1 55.35 33.89 0.550 1031.54

RG-04 RD 0+130.34 to 151.34

Lane 1 1 21.00 45.01 0.550 519.82

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 30.93 12.94 0.200 80.06

portion-2 1 1 111.95 17.50 0.200 391.84

L/side shoulder portion-1 1 1 30.99 12.94 0.200 80.20

R/side shoulder
portion-1 1 1 142.50 17.50 0.200 498.75
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 02
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate
Base Course And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+021.00

Lane 1 1 21.00 45.01 0.550 519.88

RG-02 RD 0+021.00 to 0+074.99

Lane 1 1 54.35 33.89 0.550 1012.91

RG-03 RD 0+074.99 to 0+130.34

Lane 1 1 55.35 33.89 0.550 1031.54

RG-04 RD 0+130.34 to 151.34

Lane 1 1 21.00 45.01 0.550 519.82

RG-01 RD 0+037.50to 0+201

L/side shoulder portion-1 1 1 30.93 12.94 0.200 80.06

portion-2 1 1 111.95 17.50 0.200 391.84


L/side shoulder portion-1 1 1 30.99 12.94 0.200 80.20
R/side shoulder
portion-1 1 1 142.50 17.50 0.200 498.75
RG-01 RD 0+000.00 to 0+021.00
Lane 1 1 21.00 45.01 0.550 519.88
RG-02 RD 0+021.00 to 0+074.99
Lane 1 1 54.35 33.89 0.550 1012.91
RG-03 RD 0+074.99 to 0+130.34
Lane 1 1 55.35 33.89 0.550 1031.54
RG-04 RD 0+130.34 to 151.34
Lane 1 1 21.00 45.01 0.550 519.82
RG-01 RD 0+037.50to 0+201
L/side shoulder portion-1 1 1 30.93 12.94 0.200 80.06
portion-2 1 1 111.95 17.50 0.200 391.84
L/side shoulder portion-1 1 1 30.99 12.94 0.200 80.20
R/side shoulder
portion-1 1 1 142.50 17.50 0.200 498.75
portion-2 1 1 39.52 12.94 0.200 102.27

Total 16642.27
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate


Base Course And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+021.00

Lane 1 1 21.00 43.88 0.100 92.16

RG-02 RD 0+021.00 to 0+074.99

Lane 1 1 54.35 33.04 0.100 179.55

RG-03 RD 0+074.99 to 0+130.34

Lane 1 1 55.35 33.04 0.100 182.85

RG-04 RD 0+130.34 to 151.34

Lane 1 1 21.00 43.87 0.100 92.13

RG-01 RD 0+000.00 to 0+021.00

Lane 1 1 21.00 43.88 0.100 92.16

RG-02 RD 0+021.00 to 0+074.99

Lane 1 1 54.35 33.04 0.100 179.55

RG-03 RD 0+074.99 to 0+130.34

Lane 1 1 55.35 33.04 0.100 182.85

RG-04 RD 0+130.34 to 151.34

Lane 1 1 21.00 43.87 0.100 92.13

Total 1093.37
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 75mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+021.00

Lane 1 1 21.00 43.88 - 921.58

RG-02 RD 0+021.00 to 0+074.99

Lane 1 1 54.35 33.04 - 1795.45

RG-03 RD 0+074.99 to 0+130.34

Lane 1 1 55.35 33.04 - 1828.49

RG-04 RD 0+130.34 to 151.34

Lane 1 1 21.00 43.87 - 921.34

RG-01 RD 0+000.00 to 0+021.00

Lane 1 1 21.00 43.88 - 921.58

RG-02 RD 0+021.00 to 0+074.99

Lane 1 1 54.35 33.04 - 1795.45

RG-03 RD 0+074.99 to 0+130.34

Lane 1 1 55.35 33.04 - 1828.49

RG-04 RD 0+130.34 to 151.34

Lane 1 1 21.00 43.87 - 921.34

Total 10933.72
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201

L/side shoulder portion-1 1 1 31.59 12.67 - 400.29

portion-2 1 1 111.95 17.50 - 1959.20

L/side shoulder portion-1 1 1 31.65 12.67 - 401.02

R/side shoulder

portion-1 1 1 142.50 17.50 - 2493.75

RG-01 RD 0+037.50to 0+201

L/side shoulder portion-1 1 1 31.59 12.67 - 400.29

portion-2 1 1 111.95 17.50 - 1959.20

L/side shoulder portion-1 1 1 31.65 12.67 - 401.02

R/side shoulder

portion-1 1 1 142.50 17.50 - 2493.75

portion-2 1 1 40.36 12.67 - 511.36

Total 11019.87
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-5C Description:- Bituminous Wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+021.00

Lane 1 1 21.00 43.88 - 921.58

RG-02 RD 0+021.00 to 0+074.99

Lane 1 1 54.35 33.04 - 1795.45

RG-03 RD 0+074.99 to 0+130.34

Lane 1 1 55.35 33.04 - 1828.49

RG-04 RD 0+130.34 to 151.34

Lane 1 1 21.00 43.87 - 921.34

RG-01 RD 0+000.00 to 0+021.00

Lane 1 1 21.00 43.88 - 921.58

RG-02 RD 0+021.00 to 0+074.99

Lane 1 1 54.35 33.04 - 1795.45

RG-03 RD 0+074.99 to 0+130.34

Lane 1 1 55.35 33.04 - 1828.49

RG-04 RD 0+130.34 to 151.34

Lane 1 1 21.00 43.87 - 921.34

Total 10933.72
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201

L/side shoulder portion-1 1 1 32.02 12.50 - 400.29

portion-2 1 1 111.95 17.50 - 1959.20

L/side shoulder portion-1 1 1 32.08 12.50 - 401.02

R/side shoulder

portion-1 1 1 142.50 17.50 - 2493.75

RG-01 RD 0+037.50to 0+201

L/side shoulder portion-1 1 1 32.02 12.50 - 400.29

portion-2 1 1 111.95 17.50 - 1959.20

L/side shoulder portion-1 1 1 32.08 12.50 - 401.02

R/side shoulder

portion-1 1 1 142.50 17.50 - 2493.75

portion-2 1 1 40.91 12.50 - 511.36

Total 11019.87
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Link No 07
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02B-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+020.83 0000.00

Lane 1 1 20.83 65.94 0.600 824.06 Area

RG-02 RD 0+020.83 to 0+099.90 0020.83

Lane 1 1 54.35 40.11 0.600 1307.99 Avg W

RG-03 RD 0+099.90 to 0+151.12 0099.90

Lane 1 1 51.22 31.32 0.600 962.37 Avg W

RG-04 RD 0+151.12 to 0+212.74 0151.12

Lane 1 1 61.62 30.76 0.600 1137.07 Avg W

RG-05 RD 0+212.74 to 253.94 0212.74

Lane 1 1 41.20 40.78 0.600 1008.10 Area

RG-01 RD 0+000.00 to 0+021.39 0000.00

Lane 1 1 21.39 67.37 0.600 864.69 Area

RG-02 RD 0+021.39 to 100.65 0021.39

Lane 1 1 54.35 40.16 0.600 1309.45 Avg W

RG-03 RD 0+100.65 to 281.18 0100.65

Lane 1 1 180.53 27.30 0.600 2957.08 Avg W

RG-04 RD 0+281.18 to 358.7 0281.18

Lane 1 1 77.52 33.57 0.600 1561.41 Avg W


Total 11932.22

Lagan Construction Ltd.Technical Associate


Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+020.83 0000.00

Lane 1 1 20.83 63.76 0.550 730.48 Area

RG-02 RD 0+020.83 to 0+099.90 0020.83

Lane 1 1 54.35 38.11 0.550 1139.20 Avg W

RG-03 RD 0+099.90 to 0+151.12 0099.90

Lane 1 1 51.22 29.32 0.550 825.83 Avg W

RG-04 RD 0+151.12 to 0+212.74 0151.12

Lane 1 1 61.62 28.76 0.550 974.54 Avg W

RG-05 RD 0+212.74 to 253.94 0212.74

Lane 1 1 41.20 39.05 0.550 884.82 Area

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 210.42 17.50 0.200 736.48
portion-2 1 1 22.81 17.67 0.200 80.60 area

portion-3 1 1 22.69 17.67 0.200 80.20 area

R/side shoulder portion-1 1 1 20.11 17.67 0.200 71.07 area

portion-2 1 1 153.75 17.50 0.200 538.14


portion-3 1 1 66.24 17.67 0.200 234.08 area

RG-01 RD 0+000.00 to 0+021.39 0000.00

Lane 1 1 21.39 65.21 0.550 767.20 Area

RG-02 RD 0+021.39 to 100.65 0021.39

Lane 1 1 54.35 38.71 0.550 1156.99 Avg W

RG-03 RD 0+100.65 to 281.18 0100.65

Lane 1 1 180.53 25.85 0.550 2566.69 Avg W

RG-04 RD 0+281.18 to 358.7 0281.18

Lane 1 1 77.52 32.12 0.550 1369.47 Avg W

RG-05 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 336.72 17.50 0.200 1178.53
portion-2 1 1 22.69 17.67 0.200 80.20 area

R/side shoulder portion-1 1 1 19.59 17.67 0.200 69.24 area

portion-2 1 1 338.27 17.50 0.200 1183.95


Total 15068.69

Lagan Construction Ltd.Technical Associate


Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+020.83 0000.00

Lane 1 1 20.83 62.46 0.100 130.10 Area

RG-02 RD 0+020.83 to 0+099.90 0020.83

Lane 1 1 54.35 37.81 0.100 205.50 Avg W

RG-03 RD 0+099.90 to 0+151.12 0099.90

Lane 1 1 51.22 29.02 0.100 148.61 Avg W

RG-03 RD 0+151.12 to 0+212.74 0151.12

Lane 1 1 61.62 28.46 0.100 175.34 Avg W

RG-04 RD 0+212.74 to 253.94 0212.74

Lane 1 1 41.20 38.02 0.100 156.64 Area

RG-01 RD 0+000.00 to 0+021.39 0000.00

Lane 1 1 21.39 63.93 0.100 136.74 Area

RG-02 RD 0+021.39 to 100.65 0021.39

Lane 1 1 54.35 37.86 0.100 205.74 Avg W

RG-03 RD 0+100.65 to 281.18 0100.65

Lane 1 1 180.53 25.00 0.100 451.33 Avg W

RG-04 RD 0+281.18 to 358.7 0281.18

Lane 1 1 77.52 31.27 0.100 242.41 Avg W


Total 1852.40

Lagan Construction Ltd.Technical Associate


Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 75mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+020.83 0000.00

Lane 1 1 20.83 62.46 - 1300.97 Area

RG-02 RD 0+020.83 to 0+099.90 0020.83

Lane 1 1 54.35 37.81 - 2054.97 Avg W

RG-03 RD 0+099.90 to 0+151.12 0099.90

Lane 1 1 51.22 29.02 - 1486.15 Avg W

RG-03 RD 0+151.12 to 0+212.74 0151.12

Lane 1 1 61.62 28.46 - 1753.40 Avg W

RG-04 RD 0+212.74 to 253.94 0212.74

Lane 1 1 41.20 38.02 - 1566.42 Area

RG-01 RD 0+000.00 to 0+021.39 0000.00

Lane 1 1 21.39 63.93 - 1367.39 Area

RG-02 RD 0+021.39 to 100.65 0021.39

Lane 1 1 54.35 37.86 - 2057.42 Avg W

RG-03 RD 0+100.65 to 281.18 0100.65

Lane 1 1 180.53 25.00 - 4513.25 Avg W

RG-04 RD 0+281.18 to 358.7 0281.18

Lane 1 1 77.52 31.27 - 2424.05 Avg W


Total 18524.01

Lagan Construction Ltd.Technical Associate


Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201

L/side shoulder portion-1 1 1 210.42 17.50 - 3682.42


portion-2 1 1 22.81 17.67 - 403.01 area

portion-3 1 1 22.69 17.67 - 401.02 area

R/side shoulder portion-1 1 1 20.11 17.67 - 355.34 area

portion-2 1 1 153.75 17.50 - 2690.70

portion-3 1 1 66.24 17.67 - 1170.39 area

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 336.72 17.50 - 5892.64

portion-2 1 1 22.69 17.67 - 400.99 area

R/side shoulder portion-1 1 1 19.59 17.67 - 346.18 area

portion-2 1 1 338.27 17.50 - 5919.74


Total 21663.39

Lagan Construction Ltd.Technical Associate


Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-5C Description:- Bituminous Wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+020.83 0000.00

Lane 1 1 20.83 62.46 - 1300.97 Area

RG-02 RD 0+020.83 to 0+099.90 0020.83

Lane 1 1 54.35 37.81 - 2054.97 Avg W

RG-03 RD 0+099.90 to 0+151.12 0099.90

Lane 1 1 51.22 29.02 - 1486.15 Avg W

RG-03 RD 0+151.12 to 0+212.74 0151.12

Lane 1 1 61.62 28.46 - 1753.40 Avg W

RG-04 RD 0+212.74 to 253.94 0212.74

Lane 1 1 41.20 38.02 - 1566.42 Area

RG-01 RD 0+000.00 to 0+021.39 0000.00

Lane 1 1 21.39 63.93 - 1367.39 Area

RG-02 RD 0+021.39 to 100.65 0021.39

Lane 1 1 54.35 37.86 - 2057.42 Avg W

RG-03 RD 0+100.65 to 281.18 0100.65


Lane 1 1 180.53 25.00 - 4513.25 Avg W

RG-04 RD 0+281.18 to 358.7 0281.18

Lane 1 1 77.52 31.27 - 2424.05 Avg W

Total 18524.01

Lagan Construction Ltd.Technical Associate


Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201

L/side shoulder portion-1 1 1 210.42 17.50 - 3682.42


portion-2 1 1 23.03 17.50 - 403.01 area

portion-3 1 1 22.92 17.50 - 401.02 area

R/side shoulder portion-1 1 1 20.30 17.50 - 355.34 area

portion-2 1 1 153.75 17.50 - 2690.70

portion-3 1 1 66.88 17.50 - 1170.39 area

RG-01 RD 0+037.50to 0+201

L/side shoulder portion-1 1 1 336.72 17.50 - 5892.64


portion-2 1 1 22.91 17.50 - 400.99 area

R/side shoulder portion-1 1 1 19.78 17.50 - 346.18 area

portion-2 1 1 338.27 17.50 - 5919.74


Total 21663.39
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Taxiway Link No 7A
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+020.67 0000.00

Lane 1 1 20.67 46.65 0.600 578.57 Area

RG-02 RD 0+020.67 to 0+100.78 0020.67

Lane 1 1 54.35 33.80 0.600 1102.05 Avg W

RG-03 RD 0+100.78 to 195.43 0100.78

Lane 1 1 94.65 27.30 0.600 1550.37 Avg W

RG-04 RD 0+195.43 to 274.47 0195.43

Lane 1 1 79.04 40.11 0.600 1901.94 Avg W

RG-05 RD 0+274.47 to 0+302.61 0274.47

Lane 1 1 28.14 88.93 0.600 1501.50 Area


###

###

Total 6634.43
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+020.67 0000.00

Lane 1 1 20.67 44.85 0.550 509.91 Area

RG-02 RD 0+020.67 to 0+100.78 0020.67

Lane 1 1 54.35 32.35 0.550 966.87 Avg W

RG-03 RD 0+100.78 to 195.43 0100.78

Lane 1 1 94.65 25.85 0.550 1345.69 Avg W

RG-04 RD 0+195.43 to 274.47 0195.43

Lane 1 1 79.04 38.66 0.550 1680.41 Avg W

RG-05 RD 0+274.47 to 0+302.61 0274.47

Lane 1 1 28.14 84.94 0.550 1314.57 Area

L/side shoulder portion-1 1 1 250.31 17.50 0.200 876.09

portion-2 1 1 77.17 17.97 0.200 277.34 area

portion-3 1 1 97.77 17.97 0.200 351.37 area

R/side shoulder portion-1 1 1 21.15 17.97 0.200 76.00 area

portion-2 1 1 253.12 17.50 0.200 885.92


portion-3 1 1 65.13 17.97 0.200 234.08 area

Total 8518.25
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+020.67 0000.00

Lane 1 1 20.67 43.82 0.100 90.57 Area

RG-02 RD 0+020.67 to 0+100.78 0020.67

Lane 1 1 54.35 31.50 0.100 171.18 Avg W

RG-03 RD 0+100.78 to 0+195.43 0100.78

Lane 1 1 94.65 25.00 0.100 236.63 Avg W

RG-04 RD 0+195.43 to 0+274.47 0195.43

Lane 1 1 79.04 37.81 0.100 298.81 Avg W

RG-05 RD 0+274.47 to 0+302.61 0274.47

Lane 1 1 28.14 82.55 0.100 232.30 Area

###

Total 1029.48
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 75mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+020.67 0000.00

Lane 1 1 20.67 43.82 - 905.67 Area

RG-02 RD 0+020.67 to 0+100.78 0020.67

Lane 1 1 54.35 31.50 - 1711.75 Avg W

RG-03 RD 0+100.78 to 0+195.43 0100.78

Lane 1 1 94.65 25.00 - 2366.25 Avg W

RG-04 RD 0+195.43 to 0+274.47 0195.43

Lane 1 1 79.04 37.81 - 2988.11 Avg W

RG-05 RD 0+274.47 to 0+302.61 0274.47

Lane 1 1 28.14 82.55 - 2322.98 Area

###

Total 10294.76
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 250.31 17.50 - 4380.44

portion-2 1 1 78.34 17.70 - 1386.68 area

portion-3 1 1 99.26 17.70 - 1756.86 area

R/side shoulder portion-1 1 1 21.47 17.70 - 379.99 area

portion-2 1 1 253.12 17.50 - 4429.60


portion-3 1 1 66.12 17.70 - 1170.39 area

Total 13503.96
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-5C Description:- Bituminous Wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+020.67 0000.00

Lane 1 1 20.67 43.82 - 905.67 Area

RG-02 RD 0+020.67 to 0+100.78 0020.67

Lane 1 1 54.35 31.50 - 1711.75 Avg W

RG-03 RD 0+100.78 to 0+195.43 0100.78

Lane 1 1 94.65 25.00 - 2366.25 Avg W

RG-04 RD 0+195.43 to 0+274.47 0195.43

Lane 1 1 79.04 37.81 - 2988.11 Avg W

RG-05 RD 0+274.47 to 0+302.61 0274.47

Lane 1 1 28.14 82.55 - 2322.98 Area

###

Total 10294.76
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 250.31 17.50 - 4380.44

portion-2 1 1 79.24 17.50 - 1386.68 area

1 1 100.39 17.50 - 1756.86 area

R/side shoulder portion-1 1 1 21.71 17.50 - 379.99 area

portion-2 1 1 253.12 17.50 - 4429.60


portion-1 1 1 66.88 17.50 - 1170.39 area

Total 13503.96
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Taxyway Link No 08
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 67.69 0.600 1023.80 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 41.92 0.600 1441.35 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 42.20 0.600 1493.88 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 112.11 0.600 2253.49 Area

Total 6212.52
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 65.62 0.550 909.85 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 41.62 0.550 1311.78 Avg W

RG-03 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 41.90 0.550 1359.66 Avg W

RG-04 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 106.57 0.550 1963.53 Area

RG-01 RD 0+026.00 to 0+201 0026.00

L/side shoulder 1 1 312.34 16.58 0.200 1035.92 Area

R/side shoulder 1 1 306.73 16.76 0.200 1028.31 Area

###

Total 7609.04
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 64.54 0.100 162.71 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 40.77 0.100 233.64 Avg W

RG-02 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 41.05 0.100 242.20 Avg W

RG-02 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 103.77 0.100 347.62 Area

Total 986.16
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 75mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 64.54 - 1627.14 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 40.77 - 2336.35 Avg W

RG-02 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 41.05 - 2421.95 Avg W

RG-02 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 103.77 - 3476.16 Area

Total 9861.60
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+026.00 to 0+201 0026.00

L/side shoulder 1 1 312.34 16.48 - 5148.34 Area

R/side shoulder 1 1 306.73 16.66 - 5110.88 Area

Total 10259.22
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-5C Description:- Bituminous Wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+026.00 to 0+051.21 0026.00

Lane 1 1 25.21 64.54 - 1627.14 Area

RG-02 RD 0+051.21 to 0+108.51 0051.21

Lane 1 1 57.30 40.77 - 2336.35 Avg W

RG-02 RD 0+108.51 to 0+167.51 0108.51

Lane 1 1 59.00 41.05 - 2421.95 Avg W

RG-02 RD 0+167.51 to 0+201 0167.51

Lane 1 1 33.50 103.77 - 3476.16 Area

Total 9861.60
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+026.00 to 0+201 0026.00

L/side shoulder 1 1 312.34 16.33 - 5101.49 Area

R/side shoulder 1 1 306.73 16.51 - 5064.87 Area

###
###

Total 10166.36
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Rapid No 01
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+092.16 0000.00

Lane 1 1 92.16 44.27 0.600 2448.10 Area

RG-02 RD 0+092.16 to 0+121.30 ###

Lane 1 1 54.35 20.00 0.600 652.16 Avg W

RG-03 RD 0+121.30 to 0+185.12 ###

Lane 1 1 63.82 32.91 0.600 1260.04 Avg W

RG-04 RD 0+185.12 to 0+297.32 ###

Lane 1 1 112.20 57.13 0.600 3845.83 Area

###

Total 8206.14
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+092.16 0000.00

Lane 1 1 92.16 42.34 0.550 2146.00 Area

RG-02 RD 0+092.16 to 0+121.30 ###

Lane 1 1 54.35 18.22 0.550 544.57 Avg W

RG-03 RD 0+121.30 to 0+185.12 ###

Lane 1 1 63.82 31.52 0.550 1106.35 Avg W

RG-04 RD 0+185.12 to 0+297.32 ###

Lane 1 1 112.20 55.52 0.550 3426.09 Area

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 50.32 12.94 0.200 130.24 area

portion-2 1 1 91.85 17.54 0.200 322.28

portion-1 1 1 169.74 12.94 0.200 439.28 area

R/side shoulder portion-1 1 1 253.61 12.94 0.200 656.33 area

portion-2 1 1 131.02 17.54 0.200 459.62


portion-1 1 1 75.26 12.94 0.200 194.78 area

Total 9425.54
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+092.16 0000.00

Lane 1 1 92.16 5.91 0.100 54.51 Area

RG-02 RD 0+092.16 to 0+121.30 ###

Lane 1 1 54.35 17.19 0.100 93.41 Area

RG-03 RD 0+121.30 to 0+185.12 ###

Lane 1 1 63.82 30.71 0.100 195.97 Area

RG-04 RD 0+185.12 to 0+297.32 ###

Lane 1 1 112.20 4.99 0.100 56.02 Area

Total 399.89
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 75mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+092.16 0000.00

Lane 1 1 92.16 5.91 - 545.07 Area

RG-02 RD 0+092.16 to 0+121.30 ###

Lane 1 1 54.35 17.19 - 934.06 Area

RG-03 RD 0+121.30 to 0+185.12 ###

Lane 1 1 63.82 30.71 - 1959.65 Area

RG-04 RD 0+185.12 to 0+297.32 ###

Lane 1 1 112.20 4.99 - 560.15 Area

Total 3998.93
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 51.40 12.67 - 651.19 area

portion-2 1 1 91.85 17.67 - 1622.99


portion-1 1 1 173.36 12.67 - 2196.41 area

R/side shoulder portion-1 1 1 259.01 12.67 - 3281.65 area

portion-2 1 1 131.02 17.67 - 2315.12


portion-1 1 1 76.87 12.67 - 973.88 area

Total 11041.25
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-5C Description:- Bituminous Wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+092.16 0000.00

Lane 1 1 92.16 5.91 - 545.07 Area

RG-02 RD 0+092.16 to 0+121.30 ###

Lane 1 1 54.35 17.19 - 934.06 Area

RG-03 RD 0+121.30 to 0+185.12 ###

Lane 1 1 63.82 30.71 - 1959.65 Area

RG-04 RD 0+185.12 to 0+297.32 ###

Lane 1 1 112.20 4.99 - 560.15 Area

Total 3998.93
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 52.10 12.50 - 651.19 area

portion-2 1 1 91.85 17.50 - 1607.38


portion-1 1 1 175.71 12.50 - 2196.41 area

R/side shoulder portion-1 1 1 262.53 12.50 - 3281.65 area

portion-2 1 1 131.02 17.50 - 2292.85


portion-1 1 1 77.91 12.50 - 973.88 area

Total 11003.36
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Rapid No 02
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+086.69 ###

Lane 1 1 86.69 52.71 0.600 2741.61 ###

RG-02 RD 0+000.00 to 0+029.14 ###

Lane 1 1 54.35 132.13 0.600 4308.61 ###

RG-03 RD 0+029.14 to 0+179.00 ###

Lane 1 1 149.86 51.71 0.600 4649.30 ###

Total 11699.52
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+086.69 0000.00

Lane 1 1 86.69 50.74 0.550 2419.32 Area

RG-02 RD 0+000.00 to 0+029.14 ###

Lane 1 1 54.35 125.38 0.550 3747.89 Area

RG-03 RD 0+029.14 to 0+179.00 ###

Lane 1 1 149.86 48.68 0.550 4012.67 Area

L/side shoulder portion-1 1 1 41.72 12.94 0.200 107.98 area

portion-2 1 1 42.99 17.50 0.200 150.47

portion-3 1 1 54.14 12.94 0.200 140.11 area

portion-4 1 1 29.09 17.50 0.200 101.82


portion-5 1 1 218.62 12.94 0.200 565.80 area

R/side shoulder portion-1 1 1 269.11 12.94 0.200 696.45 area

portion-2 1 1 97.29 17.50 0.200 340.52


portion-3 1 1 84.54 12.94 0.200 218.79 area

Total 12501.81
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+086.69 0000.00

Lane 1 1 86.69 49.57 0.100 429.73 Area

RG-02 RD 0+000.00 to 0+029.14 ###

Lane 1 1 54.35 3.08 0.100 16.71 Area

RG-03 RD 0+029.14 to 0+179.00 ###

Lane 1 1 149.86 47.57 0.100 712.93 Area

Total 1159.37
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 75mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+086.69 0000.00

Lane 1 1 86.69 49.57 - 4297.28 Area

RG-02 RD 0+000.00 to 0+029.14 ###

Lane 1 1 54.35 3.08 - 167.14 Area

RG-03 RD 0+029.14 to 0+179.00 ###

Lane 1 1 149.86 47.57 - 7129.30 Area

Total 11593.72
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 42.61 12.67 - 539.92 area

portion-2 1 1 42.99 17.50 - 752.33


portion-3 1 1 55.29 12.67 - 700.54 area

portion-4 1 1 29.09 17.50 - 509.08

portion-5 1 1 223.28 12.67 - 2828.98 area

R/side shoulder portion-1 1 1 274.84 12.67 - 3482.27 area

portion-2 1 1 97.29 17.50 - 1702.58


portion-3 1 1 86.34 12.67 - 1093.95 area

Total 11609.64
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-5C Description:- Bituminous Wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+086.69 0000.00

Lane 1 1 86.69 49.57 - 4297.28 Area

RG-02 RD 0+000.00 to 0+029.14 ###

Lane 1 1 54.35 3.08 - 167.14 Area

RG-03 RD 0+029.14 to 0+179.00 ###

Lane 1 1 149.86 47.57 - 7129.30 Area

Total 11593.72
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 43.19 12.50 - 539.92 area

portion-2 1 1 42.99 17.50 - 752.33


portion-3 1 1 56.04 12.50 - 700.54 area

portion-4 1 1 29.09 17.50 - 509.08

portion-5 1 1 226.32 12.50 - 2828.98 area

R/side shoulder portion-1 1 1 278.58 12.50 - 3482.27 area

portion-2 1 1 97.29 17.50 - 1702.58


portion-3 1 1 87.52 12.50 - 1093.95 area

Total 11609.64
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Rapid No 03
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+092.16 0000.00

Lane 1 1 92.16 44.27 0.600 2448.10 Area

RG-02 RD 0+092.16 to 0+121.30 ###

Lane 1 1 54.35 20.00 0.600 652.16 Avg W

RG-03 RD 0+121.30 to 0+185.12 ###

Lane 1 1 63.82 32.91 0.600 1260.04 Avg W

RG-04 RD 0+185.12 to 0+297.32 ###

Lane 1 1 112.20 57.13 0.600 3845.83 Area

###

Total 8206.14
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+092.16 0000.00

Lane 1 1 92.16 42.34 0.550 2146.00 Area

RG-02 RD 0+092.16 to 0+121.30 ###

Lane 1 1 54.35 18.22 0.550 544.57 Avg W

RG-03 RD 0+121.30 to 0+185.12 ###

Lane 1 1 63.82 31.52 0.550 1106.35 Avg W

RG-04 RD 0+185.12 to 0+297.32 ###

Lane 1 1 112.20 55.52 0.550 3426.09 Area

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 50.32 12.94 0.200 130.24 area

portion-2 1 1 91.85 17.54 0.200 322.28

portion-1 1 1 169.74 12.94 0.200 439.28 area

R/side shoulder portion-1 1 1 253.61 12.94 0.200 656.33 area

portion-2 1 1 131.02 17.54 0.200 459.62


portion-1 1 1 75.26 12.94 0.200 194.78 area

Total 9425.54
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+092.16 0000.00

Lane 1 1 92.16 5.91 0.100 54.51 Area

RG-02 RD 0+092.16 to 0+121.30 ###

Lane 1 1 54.35 17.19 0.100 93.41 Area

RG-03 RD 0+121.30 to 0+185.12 ###

Lane 1 1 63.82 30.71 0.100 195.97 Area

RG-04 RD 0+185.12 to 0+297.32 ###

Lane 1 1 112.20 4.99 0.100 56.02 Area

Total 399.89
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 75mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+092.16 0000.00

Lane 1 1 92.16 5.91 - 545.07 Area

RG-02 RD 0+092.16 to 0+121.30 ###

Lane 1 1 54.35 17.19 - 934.06 Area

RG-03 RD 0+121.30 to 0+185.12 ###

Lane 1 1 63.82 30.71 - 1959.65 Area

RG-04 RD 0+185.12 to 0+297.32 ###

Lane 1 1 112.20 4.99 - 560.15 Area

Total 3998.93
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 51.40 12.67 - 651.19 area

portion-2 1 1 91.85 17.67 - 1622.99


portion-1 1 1 173.36 12.67 - 2196.41 area

R/side shoulder portion-1 1 1 259.01 12.67 - 3281.65 area

portion-2 1 1 131.02 17.67 - 2315.12


portion-1 1 1 76.87 12.67 - 973.88 area

Total 11041.25
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-5C Description:- Bituminous Wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+092.16 0000.00

Lane 1 1 92.16 5.91 - 545.07 Area

RG-02 RD 0+092.16 to 0+121.30 ###

Lane 1 1 54.35 17.19 - 934.06 Area

RG-03 RD 0+121.30 to 0+185.12 ###

Lane 1 1 63.82 30.71 - 1959.65 Area

RG-04 RD 0+185.12 to 0+297.32 ###

Lane 1 1 112.20 4.99 - 560.15 Area

Total 3998.93
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+037.50to 0+201


L/side shoulder portion-1 1 1 52.10 12.50 - 651.19 area

portion-2 1 1 91.85 17.50 - 1607.38


portion-1 1 1 175.71 12.50 - 2196.41 area

R/side shoulder portion-1 1 1 262.53 12.50 - 3281.65 area

portion-2 1 1 131.02 17.50 - 2292.85


portion-1 1 1 77.91 12.50 - 973.88 area

Total 11003.36
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Cargo Apron
Title:- 3B:Cargo Apron Sub-Title:- Plain & Reinforcement Concrete
ItemCode:- 03B-2C Description:- Plane Cement Concrete Pavement Panel

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000 to 0+245.00
Lane 1 1 245.00 90.00 0.400 8820.00

Total 8820.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- 3B:Cargo Apron Sub-Title:- Granular Sub-Base Course, Crush Aggregate Base Course
And Cement Treared Base Course
ItemCode:- 03B-4C Description:- Granular Sub Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000 to 0+245.00
Lane 1 1 353.84 13.35 0.600 2834.26
Lane 1 1 245.00 90.00 0.200 4410.00
Shoulder L/Side 1 1 245.00 10.00 0.600 1470.00
Shoulder R/Side 1 1 361.34 17.64 0.200 1274.81
RG-01 RD 0+000.00 to 0+515.00
Lane 1 1 51.00 296.24 0.600 9064.91

Total 19053.98
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- 3B:Cargo Apron Sub-Title:- Granular Sub-Base Course, Crush Aggregate Base Course
And Cement Treared Base Course
ItemCode:- 01A-5C Description:- Crushed Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000 to 0+245.00
Lane 1 1 353.84 12.78 0.550 2486.17
Shoulder L/Side 1 1 245.00 10.00 0.200 490.00
Shoulder R/Side 1 1 361.34 17.54 0.200 1268.53
RG-01 RD 0+000.00 to 0+515.00
Lane 1 1 51.00 296.24 0.550 8309.50

L/side shoulder 1 1 159.01 12.94 0.200 411.53


R/side shoulder 1 1 121.37 12.94 0.200 314.10

Total 13279.84
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- 3B:Cargo Apron Sub-Title:- Granular Sub-Base Course, Crush Aggregate Base Course
And Cement Treared Base Course
ItemCode:- 03B-6C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000 to 0+245.00
Lane 1 1 353.84 12.50 0.100 442.30
RG-01 RD 0+000.00 to 0+515.00
Lane 1 1 51.00 296.24 0.100 1510.82

Total 1953.12
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- 3B:Cargo Apron Sub-Title:- Granular Sub-Base Course, Crush Aggregate Base Course
And Cement Treared Base Course
ItemCode:- 03B-7C Description:- Cemente Treated Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000 to 0+245.00
Lane 1 1 245.00 90.00 0.200 4410.00

Total 4410.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 3B:Cargo Apron Sub-Title:- Bituminous Surface Courses

ItemCode:- 03B-9C Description:- Bituminous Binder Course


a) 75 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

Lane 1 1 353.84 12.52 - 4430.08


RG-01 RD 0+000.00 to 0+515.00
Lane 1 1 51.00 296.24 - 15108.19

Total 19538.27
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 3B:Cargo Apron Sub-Title:- Bituminous Surface Courses

ItemCode:- 03B-8C Description:- Bituminous Binder Course


a) 60 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000 to 0+245.00


Shoulder L/Side 1 1 245.00 10.02 - 2454.90

Total 2454.90
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 3B:Cargo Apron Sub-Title:- Bituminous Surface Courses

ItemCode:- 03B-8C Description:- Bituminous Binder Course


b) 40 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000 to 0+245.00


Shoulder R/Side 1 1 361.34 17.52 - 6330.68
L/side shoulder 1 1 164.35 12.52 - 2057.65

R/side shoulder 1 1 125.44 12.52 - 1570.52

Total 9958.85
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- 3B:Cargo Apron Sub-Title:- Bituminous Surface Courses

ItemCode:- 03B-9C Description:- Bituminous Wearing Course


a) 50 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

Lane 1 1 353.84 12.50 - 4423.00


RG-01 RD 0+000.00 to 0+515.00
Lane 1 1 51.00 296.24 - 15108.19

Total 19531.19
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 3B:Cargo Apron Sub-Title:- Bituminous Surface Courses

ItemCode:- 03B-9C Description:- Bituminous Wearing Course


b) 40 mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000 to 0+245.00


Shoulder L/Side 1 1 245.00 10.00 - 2450.00
Shoulder R/Side 1 1 361.34 17.50 - 6323.45
L/side shoulder 1 1 164.61 12.50 - 2057.65

R/side shoulder 1 1 125.64 12.50 - 1570.52

Total 12401.62
0000.00 51 51
Area 15108.19 296.24
0000.00 51 51
Area 15108.19 296.24

area 2057.65 Avg.W 7.94 17.94 12.94

area 1570.522 Avg.W 7.94 17.94 12.94


0000.00 51 51
Area 15108.19 296.24
0000.00 51 51
Area 15108.19 296.24
area 2057.65 Avg.W 7.52 17.52 12.52

area 1570.522 Avg.W 7.52 17.52 12.52


0000.00 51 51
Area 15108.19 296.24
area 2057.65 Avg.W 7.5 17.5 12.50

area 1570.522 Avg.W 7.5 17.5 12.50


Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
State Lounge Apron
Title:- 3C-Aprons-State Lounge Sub-Title:- Plain Reinforcement Concrete
ItemCode:- 03C-2C Description:- Plain Concrete Pavements

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+075.00 to 0+165.00

Lane 1 1 275.00 90.00 0.080 1980.00

Total 1980.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 3C-Aprons-State Lounge Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 03C-4C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+015.00


Lane 1 1 333.58 15.00 0.600 3002.22

RG-02 RD 0+015.18 to 0+075


Lane 1 1 287.04 60.00 0.600 10333.44
RG-03 RD 0+075.00 to 0+165.00
Lane 1 1 275.23 90.00 0.230 5697.26

L/side shoulder 1 1 275.00 10.00 0.300 825.00


Lane 1 1 333.55 13.35 0.600 2671.74

Total 22529.66
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 3C-Aprons-State Lounge Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 03C-5C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+015.00


Lane 1 1 333.58 15.00 0.550 2752.04

RG-02 RD 0+015.18 to 0+075


Lane 1 1 287.04 60.00 0.150 2583.36
RG-03 RD 0+075.00 to 0+165.00
Lane 1 1 275.00 90.00 0.150 3712.50

L/side shoulder 1 1 275.00 10.00 0.200 550.00

R/side shoulder portion-1 1 1 237.12 17.64 0.200 836.56


Lane 1 1 333.55 12.78 0.550 2343.61
L/side shoulder 1 1 139.78 12.94 0.200 361.74

R/side shoulder 1 1 143.39 12.94 0.200 371.09

Total 13510.89
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 3C-Aprons-State Lounge Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 03C-6C Description:- Bituminious Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+015.00


Lane 1 1 333.58 15.00 0.100 500.37

RG-02 RD 0+015.00 to 0+075


Lane 1 1 287.04 60.00 0.100 1722.24
Lane 1 1 333.55 12.50 0.100 416.94

Total 2639.55
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 3C-Aprons-State Lounge Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 03C-7C Description:- Cement Treated Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+075.00 to 0+165.00


Lane 1 1 275.00 90.00 0.250 6187.50

Total 6187.50
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 3C-Aprons-State Lounge Sub-Title:- Bituminous Surface Course


ItemCode:- 03C-8C Description:- Bituminous Binder Course
a) 75mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+015.00


Lane 1 1 333.58 15.00 - 5003.70
RG-01 RD 0+015.00 to 0+075
Lane 1 1 287.04 60.00 - 17222.40

Lane 1 1 333.55 12.50 - 4169.38

Total 26395.48
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- 3C-Aprons-State Lounge Sub-Title:- Bituminous Surface Course
ItemCode:- 03C-8C Description:- Bituminous Binder Course
a) 60mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

L/side shoulder 1 1 275.00 10.00 - 2750.00

Total 2750.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- 3C-Aprons-State Lounge Sub-Title:- Bituminous Surface Course
ItemCode:- 03C-8C Description:- Bituminous Binder Course
b) 40mm

No of No in Detail of Measurements

Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+060.00

R/side shoulder portion-1 1 1 237.12 17.50 - 4149.60


L/side shoulder 1 1 275.00 10.00 - 2750.00
L/side shoulder 1 1 144.46 12.52 - 1808.69
R/side shoulder 1 1 148.20 12.52 - 1855.44

Total 10563.73
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 3C-Aprons-State Lounge Sub-Title:- Bituminous Surface Course


ItemCode:- 03C-9C Description:- Bituminous wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+015.00

Lane 1 1 333.58 15.00 - 5003.70


RG-01 RD 0+015.00 to 0+075

Lane 1 1 287.04 60.00 - 17222.40


Lane 1 1 333.55 12.50 - 4169.38

Total 26395.48
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- 3C-Aprons-State Lounge Sub-Title:- Bituminous Surface Course
ItemCode:- 02B-4C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

R/side shoulder portion-1 1 1 237.12 17.50 - 4149.60


L/side shoulder portion-1 1 1 275.00 10.00 - 2750.00
L/side shoulder 1 1 144.70 12.50 - 1808.69

R/side shoulder 1 1 148.44 12.50 - 1855.44

Total 10563.73
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Aircraft Maintenance Apron
Title:- 3D-Aprons-Aircraft Maintenance Sub-Title:- Plain & Reinforcement Cement Concrete
ItemCode:- 03D-2C Description:- Plain Concrete Pavement

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks Rd L

RG-01 RD 0+010.00 to 0+275 ###

Lane 1 1 265.00 280.00 0.080 5936.00 ###

Total 5936.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 3D-Aprons-Aircraft Maintenance Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 03D-4C Description:- Granular Sub-Base Course ###
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+010.00 to 0+275 ###

Lane 1 1 265.00 280.00 0.200 14840.00 ###

Total 14840.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 3D-Aprons-Aircraft Maintenance Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 03D-5C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+010.00 to 0+275 ###

Lane 1 1 265.00 280.00 0.150 11130.00 ###

Total 11130.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 3D-Aprons-Aircraft Maintenance Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 03D-5C Description:- Cement Treated Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+010.00 to 0+275 ###

Lane 1 1 265.00 280.00 0.150 11130.00 ###

###

Total 11130.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Apron South East
Title:- Aprons-South East & North West Sub-Title:- Plain & Reinforcement Concrete
ItemCode:- 03A-2c Description:- Plain Concrete Pavement

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+515.00

Apron 1 1 50.00 361.87 0.460 8323.12


RG-01 RD 0+000.00 to 0+515.00

Apron 1 1 30.00 463.21 0.230 3196.17


RG-01 RD 0+000.00 to 0+515.00
Apron 1 1 45.50 442.48 0.460 9261.16

Total 20780.44
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- Aprons-South East & North West Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 03A-4C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 485.64 13.65 0.600 3977.38
RG-01 RD 0+000.00 to 0+950
Lane 1 1 414.78 50.50 0.600 12567.98
RG-01 RD 0+000.00 to 0+950
Lane 1 1 447.67 8.00 0.600 2148.81
RG-01 RD 0+000.00 to 0+515.00

Apron 1 1 45.50 442.48 0.200 4026.59


RG-01 RD 0+000.00 to 0+515.00
Apron 1 1 50.00 361.87 0.200 3618.75

RG-01 RD 0+000.00 to 0+515.00


Apron 1 1 30.00 463.21 0.200 2779.28

RG-01 RD 0+000.00 to 0+515.00


Road 1 1 20.00 468.65 0.300 2811.92
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 378.57 13.65 0.600 3100.50
RG-01 RD 0+000.00 to 0+950
Lane 1 1 407.10 50.50 0.600 12335.26
RG-01 RD 0+000.00 to 0+950
Lane 1 1 430.84 8.00 0.600 2068.02

Total 49434.48
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- Aprons-South East & North West Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 03A-5C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 512.88 12.93 0.550 3645.93
RG-01 RD 0+000.00 to 0+950
Lane 1 1 414.78 50.50 0.550 11520.65
RG-01 RD 0+000.00 to 0+950
Lane 1 1 447.67 8.00 0.550 1969.74
RG-01 RD 0+0.00 to 0+950.00

R/shoulder 1 1 336.36 17.54 0.200 1179.96


RG-01 RD 0+000.00 to 0+515.00
Road 1 1 20.00 468.65 0.300 2811.92

RG-01 RD 0+0.00 to 0+950.00


R/shoulder 1 1 371.93 17.54 0.200 1304.73
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 399.65 12.93 0.550 2842.13
RG-01 RD 0+000.00 to 0+950
Lane 1 1 407.10 50.50 0.550 11307.32
RG-01 RD 0+000.00 to 0+950
Lane 1 1 430.84 8.00 0.550 1895.69

Total 38478.06
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- Aprons-South East & North West Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 3A-6C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 530.32 12.50 0.100 662.90
RG-01 RD 0+000.00 to 0+950
Lane 1 1 414.78 50.50 0.100 2094.66
RG-01 RD 0+000.00 to 0+950
Lane 1 1 447.67 8.00 0.100 358.14
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 413.40 12.50 0.100 516.75
RG-01 RD 0+000.00 to 0+950
Lane 1 1 407.10 50.50 0.100 2055.88
RG-01 RD 0+000.00 to 0+950
Lane 1 1 430.84 8.00 0.100 344.67

Total 6032.99
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- Aprons-South East & North West Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 03A-5C Description:- Cement Treated Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+515.00


Apron 1 1 50.00 361.87 0.200 3618.75
RG-01 RD 0+000.00 to 0+515.00

Apron 1 1 30.00 463.21 0.200 2779.28


RG-01 RD 0+000.00 to 0+515.00

Apron 1 1 45.50 442.48 0.200 4026.59

Total 10424.61
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- Aprons-South East & North West Sub-Title:- Bituminous Surface Course
ItemCode:- 3A-8C Description:- Bituminous Binder Course
a) 75mm
No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 530.32 12.50 - 6628.97
RG-01 RD 0+000.00 to 0+950
Lane 1 1 414.78 50.50 - 20946.63
RG-01 RD 0+000.00 to 0+950
Lane 1 1 447.67 8.00 - 3581.35
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 413.40 12.50 - 5167.50
RG-01 RD 0+000.00 to 0+950
Lane 1 1 407.10 50.50 - 20558.77
RG-01 RD 0+000.00 to 0+950
Lane 1 1 430.84 8.00 - 3446.70

Total 60329.92
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- Aprons-South East & North West Sub-Title:- Bituminous Surface Course
ItemCode:- 3A-8C Description:- Bituminous Binder Course
a) 60mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+515.00


Road 1 1 20.00 468.65 - 9373.06

Total 9373.06
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- Aprons-South East & North West Sub-Title:- Bituminous Surface Course
ItemCode:- 3A-8C Description:- Bituminous Binder Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+950
R/side shoulder 1 1 335.98 17.52 - 5886.33

RG-01 RD 0+0.00 to 0+950.00


R/shoulder 1 1 371.93 17.52 - 6516.22

Total 12402.55
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- Aprons-South East & North West Sub-Title:- Bituminous Surface Course
ItemCode:- 3A-9C Description:- Bituminous wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 530.32 12.50 - 6628.97
RG-01 RD 0+000.00 to 0+950
Lane 1 1 414.78 50.50 - 20946.63
RG-01 RD 0+000.00 to 0+950
Lane 1 1 447.67 8.00 - 3581.35
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 413.40 12.50 - 5167.50
RG-01 RD 0+000.00 to 0+950
Lane 1 1 407.10 50.50 - 20558.77
RG-01 RD 0+000.00 to 0+950
Lane 1 1 430.84 8.00 - 3446.70

Total 60329.92
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- Aprons-South East & North West Sub-Title:- Bituminous Surface Course
ItemCode:- 3A-9C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+950
R/side shoulder 1 1 336.36 17.50 - 5886.33

RG-01 RD 0+000.00 to 0+515.00


Road 1 1 20.00 468.65 - 9373.06

RG-01 RD 0+0.00 to 0+950.00


R/shoulder 1 1 371.93 17.50 - 6508.78

Total 21768.17
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Apron South East
Title:- Aprons-South East & North West Sub-Title:- Plain & Reinforcement Concrete

ItemCode:- 03A-2c Description:- Plain Concrete Pavement

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks Range

RG-01 RD 0+000.00 to 0+515.00


Apron 1 1 50.00 492.48 0.460 11326.98 Area

RG-01 RD 0+000.00 to 0+515.00

Apron 1 1 30.00 503.62 0.320 4834.75 Area

RG-01 RD 0+000.00 to 0+515.00

Apron 1 1 59.80 421.95 0.460 11606.97 Area

Total 27768.69
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- Aprons-South East & North West Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 03A-4C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+950


Taxilane 1 1 630.50 13.65 0.600 5163.82 Area

RG-01 RD 0+000.00 to 0+950

Lane 1 1 503.52 50.50 0.600 15256.51 Area

RG-01 RD 0+000.00 to 0+950

Lane 1 1 498.44 8.00 0.600 2392.51 Area

RG-01 RD 0+000.00 to 0+515.00


Apron 1 1 59.80 421.95 0.200 5046.51 Area

RG-01 RD 0+000.00 to 0+515.00


Apron 1 1 50.00 492.48 0.200 4924.77 Area

RG-01 RD 0+000.00 to 0+515.00


Apron 1 1 30.00 503.62 0.200 3021.72 Area

RG-01 RD 0+000.00 to 0+515.00


Road 1 1 20.00 507.29 0.300 3043.72 Area
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 475.14 13.65 0.600 3891.36 Area
RG-01 RD 0+000.00 to 0+950
Lane 1 1 391.20 50.50 0.600 11853.43 Area

RG-01 RD 0+000.00 to 0+950


Lane 1 1 410.46 8.00 0.600 1970.22 Area

Total 56564.57
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- Aprons-South East & North West Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 03A-5C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+950


Taxilane 1 1 665.87 12.93 0.550 4733.50 Area

RG-01 RD 0+000.00 to 0+950

Lane 1 1 503.52 50.50 0.550 13985.14 Area

RG-01 RD 0+000.00 to 0+950

Lane 1 1 498.44 8.00 0.550 2193.14 Area

RG-01 RD 0+0.00 to 0+950.00


L/shoulder 1 1 393.54 17.54 0.200 1380.52 Area

RG-01 RD 0+000.00 to 0+515.00


Road 1 1 20.00 507.29 0.300 3043.72 Area

RG-01 RD 0+0.00 to 0+950.00


R/shoulder 1 1 354.12 17.54 0.200 1242.27 Area

RG-01 RD 0+000.00 to 0+950

Taxilane 1 1 501.59 12.93 0.550 3567.08 Area

RG-01 RD 0+000.00 to 0+950


Lane 1 1 391.20 50.50 0.550 10865.65 Area

RG-01 RD 0+000.00 to 0+950


Lane 1 1 410.46 8.00 0.550 1806.03 Area

6485.599

Total 42817.04
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- Aprons-South East & North West Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 3A-6C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+950


Taxilane 1 1 688.51 12.50 0.100 860.64 Area

RG-01 RD 0+000.00 to 0+950

Lane 1 1 503.52 50.50 0.100 2542.75 Area

RG-01 RD 0+000.00 to 0+950

Lane 1 1 498.44 8.00 0.100 398.75 Area

RG-01 RD 0+000.00 to 0+950


Taxilane 1 1 518.85 12.50 0.100 648.56 Area

RG-01 RD 0+000.00 to 0+950


Lane 1 1 391.20 50.50 0.100 1975.57 Area

RG-01 RD 0+000.00 to 0+950


Lane 1 1 410.46 8.00 0.100 328.37 Area

Total 6754.64
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- Aprons-South East & North West Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 03A-5C Description:- Cement Treated Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+515.00

Apron 1 1 50.00 492.48 0.200 4924.77 Area

RG-01 RD 0+000.00 to 0+515.00


Apron 1 1 30.00 503.62 0.200 3021.72 Area

RG-01 RD 0+000.00 to 0+515.00


Apron 1 1 59.80 421.95 0.200 5046.51 Area

37.5

Total 12993.00
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- Aprons-South East & North West Sub-Title:- Bituminous Surface Course
ItemCode:- 3A-8C Description:- Bituminous Binder Course

a) 75mm

No of No in Detail of Measurements

Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+950


Taxilane 1 1 688.51 12.50 - 8606.38 Area
RG-01 RD 0+000.00 to 0+950
Lane 1 1 503.52 50.50 - 25427.52 Area
RG-01 RD 0+000.00 to 0+950
Lane 1 1 498.44 8.00 - 3987.52 Area
RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 518.85 12.50 - 6485.60 Area
RG-01 RD 0+000.00 to 0+950
Lane 1 1 391.20 50.50 - 19755.72 Area
RG-01 RD 0+000.00 to 0+950
Lane 1 1 410.46 8.00 - 3283.70 Area

3987.52

Total 67546.43
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- Aprons-South East & North West Sub-Title:- Bituminous Surface Course
ItemCode:- 3A-8C Description:- Bituminous Binder Course

a) 60mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+515.00

Road 1 1 20.00 507.29 - 10145.72 Area

area

Total 10145.72
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- Aprons-South East & North West Sub-Title:- Bituminous Surface Course
ItemCode:- 3A-8C Description:- Bituminous Binder Course

a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+950


L/side shoulder 1 1 393.09 17.52 - 6886.88 Area

RG-01 RD 0+0.00 to 0+950.00

R/shoulder 1 1 354.12 17.52 - 6204.26 Area


area

Total 13091.14
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- Aprons-South East & North West Sub-Title:- Bituminous Surface Course
ItemCode:- 3A-9C Description:- Bituminous wearing Course

a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+950

Taxilane 1 1 688.51 12.50 - 8606.38 Area

RG-01 RD 0+000.00 to 0+950

Lane 1 1 503.52 50.50 - 25427.52 Area


RG-01 RD 0+000.00 to 0+950

Lane 1 1 498.44 8.00 - 3987.52 Area


RG-01 RD 0+000.00 to 0+950
Taxilane 1 1 518.85 12.50 - 6485.60 Area
RG-01 RD 0+000.00 to 0+950
Lane 1 1 391.20 50.50 - 19755.72 Area
RG-01 RD 0+000.00 to 0+950
Lane 1 1 410.46 8.00 - 3283.70 Area

Total 67546.43
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- Aprons-South East & North West Sub-Title:- Bituminous Surface Course
ItemCode:- 3A-9C Description:- Bituminous wearing Course

a) 40mm

No of No in Detail of Measurements

Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+950


L/side shoulder 1 1 393.54 17.50 - 6886.88 Area

RG-01 RD 0+000.00 to 0+515.00


Road 1 1 20.00 507.29 - 10145.72 Area
RG-01 RD 0+0.00 to 0+950.00

R/shoulder 1 1 354.12 17.50 - 6197.18 Area

Total 23229.78
Range Rd L Avg W

24623.86 492.48

15108.581 503.62

25232.54 421.95
29.45675 29.45675

24623.872
8606.37 630.50

25427.52 503.52 25427.52

3987.52 498.44

25232.54 421.95

24623.86 492.48

15108.581 503.62

10145.72 507.29

6485.599 475.14

19755.72 391.20

3283.697 410.46

3987.52

6197.18

25232.536
8606.37 665.87

25427.52 503.52

3987.52 498.44

6886.88 393.54

10145.72 507.29

6197.18 354.12

6485.599 501.59

19755.72 391.20

3283.697 410.46
8606.37 688.51

25427.52 503.52

3987.52 498.44

6485.599 518.85

19755.72 391.20

3283.697 410.46

0.15

0.04

0.15

0.1
15108.581

24623.86 492.48

15108.581 503.62

25232.54 421.95

157.5 -120 195


8606.376 688.51

25427.52 503.52

3987.52 498.44

6485.599 518.85

19755.72 391.20

3283.697 410.46

0.15

0.04

0.15

0.1
10145.72 507.29

401.556 Avg.W 507.286 0 253.64


6886.88 393.09

6197.18 354.12

401.556 Avg.W 0 0 0.00

24623.86
8606.376 688.51

25427.52 503.52

3987.52 498.44

6485.599 518.85

19755.72 391.20

3283.697 410.46

0.29
6886.88 393.54

10145.72 507.29

6197.18 354.12

10145.795
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Cargo Service Road
Title:- 05-Service Roads Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 05-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+649.541


Lane 1 1 649.54 10.80 0.300 2104.51
RG-02 RD 0+649.541 to 0+878.911

Lane 1 1 229.37 10.80 0.300 743.16


RG-03 RD 0+878.911 to 0+904.911

Lane 1 1 26.00 10.80 0.300 84.24


RG-04 RD 0+904.911 to 1+044.004
Lane 1 1 139.09 10.80 0.300 450.66

RG-05 RD 1+044.004 to 1+102.300


Lane 1 1 58.30 10.80 0.300 188.88

RG-06 RD 1+102.300 to 1+271.81


Lane 1 1 169.51 10.80 0.300 549.21

RG-07 RD 1+271.81 to 1+302.092


Lane 1 1 30.28 10.80 0.300 98.11
RG-08 RD 1+302.092 to 1+655.592

Lane 1 1 353.50 10.80 0.300 1145.34


RG-09 RD 1+655.592 to 1+684.862
Lane 1 1 29.27 10.91 0.300 95.78

RG-10 RD 1+684.862 to 1+867.062


Lane 1 1 182.20 10.80 0.300 590.33
RG-11 RD 1+867.062 to 1+890.622
Lane 1 1 23.56 10.80 0.300 76.34
RG-12 RD 1+890.622 to 2+169.122
Lane 1 1 278.50 10.80 0.300 902.34

RG-13 RD 2+169.122 to 2+634.315


Lane 1 1 465.19 10.80 0.300 1507.23

Total 8536.13
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 01
Title:- 05-Service Roads Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 05-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+649.541


Lane 1 1 649.54 10.25 0.250 1664.45
RG-02 RD 0+649.541 to 0+878.911

Lane 1 1 229.37 10.25 0.250 587.76


RG-03 RD 0+878.911 to 0+904.911

Lane 1 1 26.00 10.25 0.250 66.63


RG-04 RD 0+904.911 to 1+044.004
Lane 1 1 139.09 10.25 0.250 356.43

RG-05 RD 1+044.004 to 1+102.300


Lane 1 1 58.30 10.25 0.250 149.38

RG-06 RD 1+102.300 to 1+271.81


Lane 1 1 169.51 10.25 0.250 434.37

RG-07 RD 1+271.81 to 1+302.092


Lane 1 1 30.28 10.25 0.250 77.60
RG-08 RD 1+302.092 to 1+655.592

Lane 1 1 353.50 10.25 0.250 905.84


RG-09 RD 1+655.592 to 1+684.862
Lane 1 1 29.27 10.35 0.250 75.75

RG-10 RD 1+684.862 to 1+867.062


Lane 1 1 182.20 10.25 0.250 466.89
RG-11 RD 1+867.062 to 1+890.622
Lane 1 1 23.56 10.25 0.250 60.38
RG-12 RD 1+890.622 to 2+169.122
Lane 1 1 278.50 10.25 0.250 713.66

RG-13 RD 2+169.122 to 2+634.315


Lane 1 1 465.19 10.25 0.250 1192.06
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 02
Title:- 05-Service Roads Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 05-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+649.541


Shoulder 2 1 649.54 1.58 0.150 307.88
RG-02 RD 0+649.541 to 0+878.911

Shoulder 2 1 229.37 1.58 0.150 108.72


RG-03 RD 0+878.911 to 0+904.911

Shoulder L/Side 1 1 26.00 1.58 0.150 6.16


RG-04 RD 0+904.911 to 1+044.004
Shoulder 2 1 139.09 1.58 0.150 65.93

RG-05 RD 1+044.004 to 1+102.300


Shoulder L/Side 1 1 58.30 1.58 0.150 13.82

RG-06 RD 1+102.300 to 1+271.81


Shoulder L/Side 1 1 169.51 1.58 0.150 40.17

RG-07 RD 1+271.81 to 1+302.092


Shoulder 2 1 30.28 1.58 0.150 14.35
RG-08 RD 1+302.092 to 1+655.592

Shoulder 2 1 353.50 1.58 0.150 167.56


RG-09 RD 1+655.592 to 1+684.862
Shoulder 2 1 29.27 1.58 0.150 13.87

RG-10 RD 1+684.862 to 1+867.062


Shoulder 2 1 182.20 1.58 0.150 86.36
RG-11 RD 1+867.062 to 1+890.622
Shoulder 2 1 23.56 1.58 0.150 11.17
RG-12 RD 1+890.622 to 2+169.122
Shoulder 2 1 278.50 1.58 0.150 132.01

RG-13 RD 2+169.122 to 2+634.315


Shoulder 1 1 465.19 1.58 0.150 110.25

Total 7829.45
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- 02-Service Roads Sub-Title:- Bituminous Surface Course
ItemCode:- 05-3C Description:- Bituminous Binder Course
a) 60mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+649.541

Lane 1 1 649.54 10.00 - 6495.41


RG-02 RD 0+649.541 to 0+878.911

Lane 1 1 229.37 10.00 - 2293.70


RG-03 RD 0+878.911 to 0+904.911
Lane 1 1 26.00 10.00 - 260.00
RG-04 RD 0+904.911 to 1+044.004
Lane 1 1 139.09 10.00 - 1390.93

RG-05 RD 1+044.004 to 1+102.300


Lane 1 1 58.30 10.00 - 582.96
RG-06 RD 1+102.300 to 1+271.81

Lane 1 1 169.51 10.00 - 1695.10


RG-07 RD 1+271.81 to 1+302.092

Lane 1 1 30.28 10.00 - 302.82


RG-08 RD 1+302.092 to 1+655.592

Lane 1 1 353.50 10.00 - 3535.00


RG-09 RD 1+655.592 to 1+684.862
Lane 1 1 29.27 10.10 - 295.61
RG-10 RD 1+684.862 to 1+867.062

Lane 1 1 182.20 10.00 - 1822.00


RG-11 RD 1+867.062 to 1+890.622
Lane 1 1 23.56 10.00 - 235.61

RG-12 RD 1+890.622 to 2+169.122


Lane 1 1 278.50 10.00 - 2785.00

RG-13 RD 2+169.122 to 2+634.315


Lane 1 1 465.19 10.00 - 4651.93

Total 26346.07
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 01
Title:- 05-Service Roads Sub-Title:- Bituminous Surface Course
ItemCode:- 05-4C Description:- Bituminous Wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+649.541


Lane 1 1 649.54 10.00 - 6495.41

RG-02 RD 0+649.541 to 0+878.911


Lane 1 1 229.37 10.00 - 2293.70
RG-03 RD 0+878.911 to 0+904.911

Lane 1 1 26.00 10.00 - 260.00


RG-04 RD 0+904.911 to 1+044.004

Lane 1 1 139.09 10.00 - 1390.93


RG-05 RD 1+044.004 to 1+102.300
Lane 1 1 58.30 10.00 - 582.96

RG-06 RD 1+102.300 to 1+271.81


Lane 1 1 169.51 10.00 - 1695.10

RG-07 RD 1+271.81 to 1+302.092


Lane 1 1 30.28 10.00 - 302.82
RG-08 RD 1+302.092 to 1+655.592

Lane 1 1 353.50 10.00 - 3535.00


RG-09 RD 1+655.592 to 1+684.862
Lane 1 1 29.27 10.10 - 295.61

RG-10 RD 1+684.862 to 1+867.062


Lane 1 1 182.20 10.00 - 1822.00
RG-11 RD 1+867.062 to 1+890.622
Lane 1 1 23.56 10.00 - 235.61
RG-12 RD 1+890.622 to 2+169.122
Lane 1 1 278.50 10.00 - 2785.00

RG-13 RD 2+169.122 to 2+634.315


Lane 1 1 465.19 10.00 - 4651.93
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 02
Title:- 05-Service Roads Sub-Title:- Bituminous Surface Course
ItemCode:- 05-4C Description:- Bituminous Wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+649.541


Shoulder 2 1 649.54 1.50 - 1948.62

RG-02 RD 0+649.541 to 0+878.911


Shoulder 2 1 229.37 1.50 - 688.11
RG-03 RD 0+878.911 to 0+904.911

Shoulder L/Side 1 1 26.00 1.50 - 39.00


RG-04 RD 0+904.911 to 1+044.004

Shoulder 2 1 139.09 1.50 - 417.28


RG-05 RD 1+044.004 to 1+102.300
Shoulder L/Side 1 1 58.30 1.50 - 87.44

RG-06 RD 1+102.300 to 1+271.81


Shoulder L/Side 1 1 169.51 1.50 - 254.27

RG-07 RD 1+271.81 to 1+302.092


Shoulder 2 1 30.28 1.50 - 90.85
RG-08 RD 1+302.092 to 1+655.592

Shoulder 2 1 353.50 1.50 - 1060.50


RG-09 RD 1+655.592 to 1+684.862
Shoulder 2 1 29.27 1.50 - 87.81

RG-10 RD 1+684.862 to 1+867.062


Shoulder 2 1 182.20 1.50 - 546.60
RG-11 RD 1+867.062 to 1+890.622
Shoulder 2 1 23.56 1.50 - 70.68
RG-12 RD 1+890.622 to 2+169.122
Shoulder 2 1 278.50 1.50 - 835.50

RG-13 RD 2+169.122 to 2+634.315


Shoulder 1 1 465.19 1.50 - 110.25

Total 32582.98
0.4
10.8

Range Rd L Avg W

0000.00 649.541 649.541


Avg W 10.8 10.8 10.8

649.541 878.911 229.37


Avg W 10.8 10.8 10.8

878.911 904.911 26

Avg W 10.8 10.8 10.8

904.911 1044.004 139.093

Avg W 10.8 10.8 10.8

1044.004 1102.3 58.296


Avg W 10.8 10.8 10.8

1102.3 1271.81 169.51


Avg W 10.8 10.8 10.8

1271.81 1302.092 30.282


Avg W 10.8 10.8 10.8

1302.092 1655.592 353.5

Avg W 10.8 10.8 10.8

1655.592 1684.862 29.27


Area 319.26 10.91

1684.862 1867.062 182.2


Avg W 10.8 10.8 10.8

1867.062 1890.622 23.56


Area 254.46 10.80

1890.622 2169.122 278.5


Avg W 10.8 10.8 10.8

2169.122 2634.315 465.193


Avg W 10.8 10.8 10.8
0.125
10.25

Range Rd L Avg W

0000.00 649.541 649.541


Avg W 10.25 10.25 10.25

649.541 878.911 229.37


Avg W 10.25 10.25 10.25

878.911 904.911 26

Avg W 10.25 10.25 10.25

904.911 1044.004 139.093

Avg W 10.25 10.25 10.25

1044.004 1102.3 58.296


Avg W 10.25 10.25 10.25

1102.3 1271.81 169.51


Avg W 10.25 10.25 10.25

1271.81 1302.092 30.282


Avg W 10.25 10.25 10.25

1302.092 1655.592 353.5

Avg W 10.25 10.25 10.25

1655.592 1684.862 29.27


Area 303 10.35

1684.862 1867.062 182.2


Avg W 10.25 10.25 10.25

1867.062 1890.622 23.56


Area 241.51 10.25

1890.622 2169.122 278.5


Avg W 10.25 10.25 10.25

2169.122 2634.315 465.193


Avg W 10.25 10.25 10.25
10

arks

0000.00 649.541 649.541


Avg W 10 10 10

649.541 878.911 229.37

Avg W 10 10 10

878.911 904.911 26

Avg W 10 10 10

904.911 1044.004 139.093


Avg W 10 10 10

1044.004 1102.3 58.296


Avg W 10 10 10

1102.3 1271.81 169.51


Avg W 10 10 10

1271.81 1302.092 30.282

Avg W 10 10 10

1302.092 1655.592 353.5

Avg W 10 10 10

1655.592 1684.862 29.27


Area 295.61 10.10

1684.862 1867.062 182.2

Avg W 10 10 10

1867.062 1890.622 23.56


Area 235.61 10.00

1890.622 2169.122 278.5


Avg W 10 10 10

2169.122 2634.315 465.193


Avg W 10 10 10
10

0000.00 649.541 649.541


Avg W 10 10 10

649.541 878.911 229.37


Avg W 10 10 10

878.911 904.911 26

Avg W 10 10 10

904.911 1044.004 139.093

Avg W 10 10 10

1044.004 1102.3 58.296


Avg W 10 10 10

1102.3 1271.81 169.51


Avg W 10 10 10

1271.81 1302.092 30.282


Avg W 10 10 10

1302.092 1655.592 353.5

Avg W 10 10 10

1655.592 1684.862 29.27


Area 295.61 10.10

1684.862 1867.062 182.2


Avg W 10 10 10

1867.062 1890.622 23.56


Area 235.61 10.00

1890.622 2169.122 278.5


Avg W 10 10 10

2169.122 2634.315 465.193


Avg W 10 10 10
Range
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Aircraft Maintenance Apron Service Road
Title:- 05-Service Roads Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 05-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 2+589.669


Lane 1 1 2589.67 10.80 0.300 8390.53
RG-02 RD 2+589.669 to 2+618.919

Lane 1 1 29.26 10.80 0.300 94.80


RG-03 RD 2+618.919 to 2+775.41

Lane 1 1 156.50 10.80 0.300 507.06


RG-04 RD 2+775.41 to 2+795.41
Lane 1 1 20.00 10.80 0.300 64.80

RG-05 RD 2+795.41 to 3+108.52


Lane 1 1 313.11 10.80 0.300 1014.48

RG-01 RD 0+000.00 to 0+010.00


Lane 1 1 10.00 13.80 0.300 41.39

RG-02 RD 0+010.00 to 0+260.00


Lane 1 1 250.00 10.80 0.300 810.00
RG-03 RD 0+260.00 to 0+291.416

Lane 1 1 31.42 11.20 0.300 105.52


RG-04 RD 0+291.416 to 0+541.41

Lane 1 1 250.00 10.80 0.300 810.00


RG-05 RD 0+541.41 to 0+581.41
Lane 1 1 40.00 17.36 0.300 208.36

RG-06 RD 0+541.41 to 0+791.41


Lane 1 1 250.00 10.80 0.300 810.00

RG-07 RD 0+791.41 to 0+801.41


Lane 1 1 10.00 13.46 0.300 40.37
RG-07 RD 0+791.41 to 0+801.41

Lane 1 1 10.00 270.63 0.300 811.88

Total 13709.17
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 01
Title:- 05-Service Roads Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 05-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 2+589.669


Lane 1 1 2589.67 10.55 0.250 6830.25
RG-02 RD 2+589.669 to 2+618.919

Lane 1 1 29.26 10.55 0.250 77.17


RG-03 RD 2+618.919 to 2+775.41

Lane 1 1 156.50 10.55 0.250 412.77


RG-04 RD 2+775.41 to 2+795.41
Lane 1 1 20.00 10.55 0.250 52.75

RG-05 RD 2+795.41 to 3+108.52


Lane 1 1 313.11 10.55 0.250 825.83

RG-01 RD 0+000.00 to 0+010.00


Lane 1 1 10.00 13.62 0.250 34.04

RG-02 RD 0+010.00 to 0+260.00


Lane 1 1 250.00 10.55 0.250 659.38
RG-03 RD 0+260.00 to 0+291.416

Lane 1 1 31.42 11.11 0.250 87.26


RG-04 RD 0+291.416 to 0+541.41

Lane 1 1 250.00 10.55 0.250 659.38


RG-05 RD 0+541.41 to 0+581.41
Lane 1 1 40.00 17.15 0.250 171.55

RG-06 RD 0+541.41 to 0+791.41


Lane 1 1 250.00 10.55 0.250 659.38

RG-07 RD 0+791.41 to 0+801.41


Lane 1 1 10.00 13.27 0.250 33.17
RG-07 RD 0+791.41 to 0+801.41

Lane 1 1 10.00 270.63 0.250 676.56


Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 02
Title:- 05-Service Roads Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 05-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 2+589.669


Shoulder 2 1 2589.67 1.58 0.150 1223.62
RG-02 RD 2+589.669 to 2+618.919

Shoulder 2 1 29.26 1.58 0.150 13.82


RG-03 RD 2+618.919 to 2+775.41

Shoulder 2 1 156.50 1.58 0.150 73.95


RG-04 RD 2+775.41 to 2+795.41
Shoulder L/Side 1 1 20.00 1.58 0.150 4.73

RG-05 RD 2+795.41 to 3+108.52


Shoulder L/Side 1 1 313.11 1.58 0.150 73.97

RG-01 RD 0+000.00 to 0+010.00


Shoulder L/Side 1 1 14.53 1.58 0.150 3.43

RG-02 RD 0+010.00 to 0+260.00


Shoulder L/Side 1 1 250.00 1.58 0.150 59.06
RG-03 RD 0+260.00 to 0+291.416

Shoulder L/Side 1 1 40.45 1.58 0.150 9.56


RG-04 RD 0+291.416 to 0+541.41

Shoulder L/Side 1 1 250.00 1.58 0.150 59.06


RG-05 RD 0+541.41 to 0+581.41
Shoulder L/Side 1 1 75.38 1.58 0.150 17.81

RG-06 RD 0+541.41 to 0+791.41


Shoulder L/Side 1 1 250.00 1.58 0.150 59.06

RG-07 RD 0+791.41 to 0+801.41


Shoulder L/Side 1 1 14.53 1.58 0.150 3.43

Total 12780.98
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 05-Service Roads Sub-Title:- Bituminous Surface Course


ItemCode:- 05-3C Description:- Bituminous Binder Course
a) 60mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 2+589.669


Lane 1 1 2589.67 10.00 - 25896.69

RG-02 RD 2+589.669 to 2+618.919


Lane 1 1 29.26 10.00 - 292.59
RG-03 RD 2+618.919 to 2+775.41

Lane 1 1 156.50 10.00 - 1565.00


RG-04 RD 2+775.41 to 2+795.41

Lane 1 1 20.00 10.00 - 200.00


RG-05 RD 2+795.41 to 3+108.52
Lane 1 1 313.11 10.00 - 3131.10

RG-01 RD 0+000.00 to 0+010.00


Lane 1 1 10.00 12.15 - 121.47

RG-02 RD 0+010.00 to 0+260.00


Lane 1 1 250.00 10.00 - 2500.00
RG-03 RD 0+260.00 to 0+291.416

Lane 1 1 31.42 10.00 - 314.15


RG-04 RD 0+291.416 to 0+541.41

Lane 1 1 250.00 10.00 - 2500.00


RG-05 RD 0+541.41 to 0+581.41
Lane 1 1 40.00 16.16 - 646.57

RG-06 RD 0+541.41 to 0+791.41


Lane 1 1 250.00 10.00 - 2500.00

RG-07 RD 0+791.41 to 0+801.41


Lane 1 1 10.00 12.15 - 121.46
RG-07 RD 0+791.41 to 0+801.41

Lane 1 1 10.00 270.63 - 2706.25

Total 42495.28
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 01
Title:- 05-Service Roads Sub-Title:- Bituminous Surface Course
ItemCode:- 05-4C Description:- Bituminous Wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 2+589.669


Lane 1 1 2589.67 10.00 - 25896.69

RG-02 RD 2+589.669 to 2+618.919


Lane 1 1 29.26 10.00 - 292.59
RG-03 RD 2+618.919 to 2+775.41

Lane 1 1 156.50 10.00 - 1565.00


RG-04 RD 2+775.41 to 2+795.41

Lane 1 1 20.00 10.00 - 200.00


RG-05 RD 2+795.41 to 3+108.52
Lane 1 1 313.11 10.00 - 3131.10

RG-01 RD 0+000.00 to 0+010.00


Lane 1 1 10.00 12.15 - 121.47

RG-02 RD 0+010.00 to 0+260.00


Lane 1 1 250.00 10.00 - 2500.00
RG-03 RD 0+260.00 to 0+291.416

Lane 1 1 31.42 10.00 - 314.15


RG-04 RD 0+291.416 to 0+541.41

Lane 1 1 250.00 10.00 - 2500.00


RG-05 RD 0+541.41 to 0+581.41
Lane 1 1 40.00 16.16 - 646.57

RG-06 RD 0+541.41 to 0+791.41


Lane 1 1 250.00 10.00 - 2500.00

RG-07 RD 0+791.41 to 0+801.41


Lane 1 1 10.00 12.15 - 121.46
RG-07 RD 0+791.41 to 0+801.41

Lane 1 1 10.00 270.63 - 2706.25


Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Page 02
Title:- 05-Service Roads Sub-Title:- Bituminous Surface Course
ItemCode:- 05-4C Description:- Bituminous Wearing Course
a) 40mm
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 2+589.669


Shoulder 2 1 2589.67 1.50 - 7769.01

RG-02 RD 2+589.669 to 2+618.919


Shoulder 2 1 29.26 1.50 - 87.78
RG-03 RD 2+618.919 to 2+775.41

Shoulder 2 1 156.50 1.50 - 469.50


RG-04 RD 2+775.41 to 2+795.41

Shoulder L/Side 1 1 20.00 1.50 - 30.00


RG-05 RD 2+795.41 to 3+108.52
Shoulder L/Side 1 1 313.11 1.50 - 469.67

RG-01 RD 0+000.00 to 0+010.00


Shoulder L/Side 1 1 14.53 1.50 - 21.80

RG-02 RD 0+010.00 to 0+260.00


Shoulder L/Side 1 1 250.00 1.50 - 375.00
RG-03 RD 0+260.00 to 0+291.416

Shoulder L/Side 1 1 40.45 1.50 - 60.67


RG-04 RD 0+291.416 to 0+541.41

Shoulder L/Side 1 1 250.00 1.50 - 375.00


RG-05 RD 0+541.41 to 0+581.41
Shoulder L/Side 1 1 75.38 1.50 - 113.07

RG-06 RD 0+541.41 to 0+791.41


Shoulder L/Side 1 1 250.00 1.50 - 375.00

RG-07 RD 0+791.41 to 0+801.41


Shoulder L/Side 1 1 14.53 1.50 - 21.80

Total 52663.56
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
State Lounge Service Road
Title:- 05-Service Roads Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 05-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+060.00
Lane 1 1 60.00 11.35 0.300 204.38
RG-02 RD 0+060.00 to 0+470.639

Lane 1 1 410.64 10.80 0.300 1330.47


RG-03 RD 0+470.639 to 0+520.639
Lane 1 1 50.00 12.45 0.300 186.74

RG-04 RD 0+520.639 to 0+978.669


Lane 1 1 458.03 10.80 0.300 1484.02
RG-01 RD 0+000.00 to 0+472.471

Lane 1 1 472.47 10.80 0.300 1530.81


RG-02 RD 0+472.471 TO 0+593.124

Lane 1 1 120.65 10.80 0.300 390.92

Total 5127.33
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 05-Service Roads Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course And
Cement Treated Base Course
ItemCode:- 05-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+060.00
Lane 1 1 60.00 10.96 0.250 164.36
RG-02 RD 0+060.00 to 0+470.639

Lane 1 1 410.64 10.25 0.250 1052.26


RG-03 RD 0+470.639 to 0+520.639
Lane 1 1 50.00 11.95 0.250 149.32

RG-04 RD 0+520.639 to 0+978.669


Lane 1 1 458.03 10.25 0.250 1173.70
RG-01 RD 0+000.00 to 0+472.471

Lane 1 1 472.47 10.25 0.250 1210.71


RG-02 RD 0+472.471 TO 0+593.124

Lane 1 1 120.65 10.25 0.250 309.17

Total 4059.52
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
Title:- 02-Service Roads Sub-Title:- Bituminous Surface Course
ItemCode:- 05-3C Description:- Bituminous Binder Course
a) 60mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+060.00
Lane 1 1 60.00 10.78 - 646.57
RG-02 RD 0+060.00 to 0+470.639
Lane 1 1 410.64 10.00 - 4106.39
RG-03 RD 0+470.639 to 0+520.639
Lane 1 1 50.00 11.72 - 585.84
RG-04 RD 0+520.639 to 0+978.669

Lane 1 1 458.03 10.00 - 4580.30


RG-01 RD 0+000.00 to 0+472.471

Lane 1 1 472.47 10.00 - 4724.71


RG-02 RD 0+472.471 TO 0+593.124
Lane 1 1 120.65 10.00 - 1206.53

Total 15850.34
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 05-Service Roads Sub-Title:- Bituminous Surface Course


ItemCode:- 05-4C Description:- Bituminous Wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks
RG-01 RD 0+000.00 to 0+060.00
Lane 1 1 60.00 10.78 - 646.57
RG-02 RD 0+060.00 to 0+470.639

Lane 1 1 410.64 10.00 - 4106.39


RG-03 RD 0+470.639 to 0+520.639
Lane 1 1 50.00 11.72 - 585.84

RG-04 RD 0+520.639 to 0+978.669


Lane 1 1 458.03 10.00 - 4580.30
RG-01 RD 0+000.00 to 0+472.471

Lane 1 1 472.47 10.00 - 4724.71


RG-02 RD 0+472.471 TO 0+593.124

Lane 1 1 120.65 10.00 - 1206.53

Total 15850.34
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet
X-Point
Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-1C Description:- Granular Sub-Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+155.19

Lane 1 1 155.19 53.23 0.600 4956.22


RG-02 RD 0+155.19 to 0+402.19
Lane 1 1 247.00 23.80 0.600 3527.16

RG-03 RD 0+402.19 to 0+457.89


Lane 1 1 55.70 36.83 0.600 1230.69

RG-04 RD 0+457.89 to 0+477.18


Lane 1 1 19.29 64.24 0.600 743.48

Total 10457.56
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-2C Description:- Crush Aggregate Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+155.19

Lane 1 1 155.19 52.01 0.200 1614.32


RG-02 RD 0+155.19 to 0+402.19
Lane 1 1 247.00 23.50 0.200 1160.90

RG-03 RD 0+402.19 to 0+457.89


Lane 1 1 55.70 36.53 0.200 406.89

RG-04 RD 0+457.89 to 0+477.18


Lane 1 1 19.29 62.37 0.200 240.62

RG-01 RD 0+000.00 to 0+477.18


L/R side shoulder Cir. 1 1 155.19 16.99 0.200 527.34
L/ side shoulder 1 1 246.39 10.79 0.200 531.71

1 1 85.10 10.79 0.200 183.65


R/side shoulder 1 1 246.39 10.79 0.200 531.71

1 1 85.10 10.79 0.200 183.65

Total 5380.78
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Granular Sub-Base Course,Crush Aggregate Base Course
And Cement Treated Base Course
ItemCode:- 02B-3C Description:- Bituminous Base Course

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+155.19

Lane 1 1 155.19 51.46 0.100 798.53


RG-02 RD 0+155.19 to 0+402.19
Lane 1 1 247.00 23.00 0.100 568.10

RG-03 RD 0+402.19 to 0+457.89


Lane 1 1 55.70 36.03 0.100 200.66

RG-04 RD 0+457.89 to 0+477.18


Lane 1 1 19.29 61.50 0.100 118.64

Total 1685.93
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 75mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+155.19


Lane 1 1 155.19 51.46 - 7985.32

RG-02 RD 0+155.19 to 0+402.19


Lane 1 1 247.00 23.00 - 5681.00
RG-03 RD 0+402.19 to 0+457.89

Lane 1 1 55.70 36.03 - 2006.59


RG-04 RD 0+457.89 to 0+477.18

Lane 1 1 19.29 61.50 - 1186.42

Total 16859.33
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous Binder Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+477.18


L/R side shoulder Cir. 1 1 155.19 16.89 - 2621.16

L/ side shoulder 1 1 246.39 10.69 - 2633.91


1 1 85.10 10.69 - 909.72
R/side shoulder 1 1 246.39 10.69 - 2633.91

1 1 85.10 10.69 - 909.72

Total 9708.42
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)
Construction Of NBBIA Package-1
Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-5C Description:- Bituminous Wearing Course
a) 50mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+155.19


Lane 1 1 155.19 51.46 - 7985.32

RG-02 RD 0+155.19 to 0+402.19


Lane 1 1 247.00 23.00 - 5681.00
RG-03 RD 0+402.19 to 0+457.89

Lane 1 1 55.70 36.03 - 2006.59


RG-04 RD 0+457.89 to 0+477.18

Lane 1 1 19.29 61.50 - 1186.42

Total 16859.33
Lagan Construction Ltd.Technical Associate
Habib Construction Services (Joint Venture)

Construction Of NBBIA Package-1


Measurements Sheet

Title:- 02B-TaxiWays - Link Sub-Title:- Bituminous Surface Course


ItemCode:- 02B-4C Description:- Bituminous wearing Course
a) 40mm

No of No in Detail of Measurements
Description Units Each L B D/H Quantity Remarks

RG-01 RD 0+000.00 to 0+477.18


L/R side shoulder Cir. 1 1 155.19 16.70 - 2591.67

L/ side shoulder 1 1 246.39 10.50 - 2587.10


1 1 85.10 10.50 - 893.55
R/side shoulder 1 1 246.39 10.50 - 2587.10

1 1 85.10 10.50 - 893.55

Total 9552.96