Sie sind auf Seite 1von 1

MADHYA PRADESH PUBLIC WORKS DEPARTMENT - NH WING

Rehabilitation & Up-gradation of Intermediate lane flexible pavement to 2 lanes with paved shoulders of flexible Pavement (27.558 Km) and Rigid Pavement (22.572 Km) on
Maksudangarh–Sironj Section from Km 42.510 to Km 92.640 and White topping (Inside Sironj city for length of 6.16 km) of newly declared NH-752B in the State of Madhya Pradesh on
EPC Mode

RFI SUMMARY
Client : M.P. PWD - NH Wing - Govt. of Madhya Pradesh, Bhopal.
Authority's Engineer : Dhruv JV Krishna Associate & Global Infra Solutions
EPC Contractor : Bansal Construction Works Private Limited, Bhopal.

Date of Chainage Length Inspection


S.No RFI No. Side Works Description Remarks
submission From To (meter) Date Time
B) Highway

1 BCWPL/NH-752B/HWY/1808 4/May/19 74+300 74+800 500 LHS Fdd & Level Checking of GSB Top Layer 5/May/19 3:00 PM

2 BCWPL/NH-752B/HWY/1809 4/May/19 74+000 74+300 300 LHS Fdd & Level Checking of DLC Layer 5/May/19 4:15 PM

3 BCWPL/NH-752B/HWY/1810 4/May/19 69+960 69+600 -360 LHS PQC laying and level checking 5/May/19 4:40 PM

4 BCWPL/NH-752B/HWY/1811 4/May/19 74+800 75+000 200 BHS Fdd & level Checking of EMB. Top Layer 5/May/19 5:30 PM

B) Structure

Shuttering, Reinforcement Checking & M -30 Concrete Pouring for


1 BCWPL/NH-752B/STR/1355 4/May/19 62+600 MNB LHS 5/May/19 4:00 PM
retaining wall final lift A1 side LHS

Shuttering, Reinforcement Checking & M -35 Concrete Pouring for


2 BCWPL/NH-752B/STR/1356 4/May/19 71+080 MNB BHS 5/May/19 2:00 PM
middle wall 2nd lift M1 BHS

Shuttering, Reinforcement Checking & M -30 Concrete Pouring for


3 BCWPL/NH-752B/STR/1357 4/May/19 75+190 MNB LHS 5/May/19 3:l5 PM
retaining wall 1st lift A1 side LHS

EPC Contractor's Representative Authority's Engineer Representative

Das könnte Ihnen auch gefallen